CN109633352A - The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current - Google Patents

The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current Download PDF

Info

Publication number
CN109633352A
CN109633352A CN201811534034.3A CN201811534034A CN109633352A CN 109633352 A CN109633352 A CN 109633352A CN 201811534034 A CN201811534034 A CN 201811534034A CN 109633352 A CN109633352 A CN 109633352A
Authority
CN
China
Prior art keywords
current
phase
mutual inductor
primary side
phase alternating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811534034.3A
Other languages
Chinese (zh)
Inventor
张冠军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201811534034.3A priority Critical patent/CN109633352A/en
Publication of CN109633352A publication Critical patent/CN109633352A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

A method of three-phase or the secondary wiring of biphase current mutual inductor are checked using single-phase alternating current, threephase current transformer A, B, C primary side is sequentially connected in series along polarity or is sequentially connected in series two-phase current mutual inductor A, C primary side along polarity, adds single-phase alternating current to the current transformer primary side being together in series;There is current transformer if it is three-phase, then measures electric current between the every phase phase current of threephase current transformer secondary side and Y point-earth (N);Have current transformer if it is two-phase, then measure the every phase phase current of biphase current mutual inductor secondary side and Y it is point-earth between (N) electric current.The present invention by phase current and point-earth (N) the amount of current relationship of Y it may determine that secondary wiring of current mutual inductor whether just, the reliable in action of current protection when effectively can guarantee to break down using the present invention, to guarantee equipment and personnel safety.

Description

Three-phase or the secondary wiring of biphase current mutual inductor are checked using single-phase alternating current Method
Technical field:
The invention belongs to high-voltage power supply and distribution system construction fields, in particular to a kind of to check three-phase using single-phase alternating current Or the method for the secondary wiring of biphase current mutual inductor.
Background technique:
High pressure power supply and distribution is widely used in each industrial circle, and current transformer is the electric current inspection in high-voltage power supply and distribution system Original part is surveyed, current protection and current measurement are used for.When electric short circuit failure occurs, current protection can it is reliable, accurate, whether Failure can be quickly cut off, electrical equipment and personal safety are directly related to.So only guaranteed secondary wiring of current mutual inductor It is correct, just can guarantee the reliable in action of current protection when breaking down, to just can guarantee equipment and personnel safety, otherwise shadow Plant produced is rung, heavy economic losses is caused.
Summary of the invention:
The object of the invention is that overcome above-mentioned the deficiencies in the prior art, and provides and a kind of utilize single phase ac The method of galvanoscopy three-phase or the secondary wiring of biphase current mutual inductor, it is electric when effectively can guarantee to break down using this method The reliable in action of protection is flowed, to guarantee equipment and personnel safety.
As above design, the technical scheme is that a kind of check that three-phase or biphase current are mutual using single-phase alternating current The method of the secondary wiring of sensor, it is characterised in that: be sequentially connected in series threephase current transformer A, B, C primary side along polarity or by two Phase current mutual inductor A, C primary side is sequentially connected in series along polarity, adds single-phase alternating current to the current transformer primary side being together in series Stream;There is current transformer if it is three-phase, then measures between the every phase phase current of threephase current transformer secondary side and Y point-earth (N) Electric current, for symmetrical three-phase alternating current vector relations are as follows:Add the identical list of direction vector Phase alternating current flow relation are as follows: IY-N=IA+IB+IC=3IA=3IB=3IC;There is current transformer if it is two-phase, then measures two-phase (N) electric current between the every phase phase current in Current Transformer Secondary side and Y are point-earth, two-phase alternating current vector relations are as follows:Add the identical single-phase alternating current flow relation in direction are as follows: IY-N=IA+IC=2IA=2IC, pass through mutually electricity Stream and point-earth (N) the amount of current relationship of Y it may determine that secondary wiring of current mutual inductor whether just.
The above-mentioned current transformer primary side being together in series adds the current value of single-phase alternating current to be higher than a rated current 30%.
Present invention employs the principle three-phases of three-phase current vector relationship or the secondary wiring of biphase current mutual inductor to be examined It surveys, when electric short circuit failure occurs, can rapidly and accurately cut off failure, be connect to be effectively guaranteed Current Transformer Secondary Line it is correct, ensure that equipment and personnel safety.And the present invention needs equipment few, easy to operate, safe and reliable, accurate.
Detailed description of the invention:
Fig. 1 is the circuit theory schematic diagram of the present invention detection secondary wiring of threephase current transformer;
Fig. 2 is the circuit theory schematic diagram of the present invention detection secondary wiring of two-phase current mutual inductor.
In figure: TY--- automatic coupling voltage regulator;B--- strong current generator.
Specific embodiment:
A method of three-phase or the secondary wiring of biphase current mutual inductor are checked using single-phase alternating current, use three-phase The principle of current vector relationship, needs two people to operate, and a people adds single-phase alternating current, a secondary electricity of people's measurement current transform er Stream.
Detection method is carried out to the secondary wiring of threephase current transformer as shown in Figure 1: are as follows: A, B, C three-phase current mutual inductance Secondary winding uses Y connection, i.e. three-phase and formula wiring, current relationship are as follows: IY-N=IA+IB+IC, way is: A phase current is mutual The P of sensor primary side2End and B phase current mutual inductor primary side P1End, B phase current mutual inductor primary side P2End and the mutual inductance of C phase current Device primary side P1End is connected with high current line, from A phase current mutual inductor primary side P1End and C phase current mutual inductor primary side P2End Add single phase ac, added electric current is that Current Transformer Secondary electric current is 1 ampere, records A phase, B phase, C phase Current Transformer Secondary Side electric current and point-earth (N) electric current of Y.If surveyed electric current IA=IB=IC=1 (ampere), and IY-N=3 (amperes), i.e. IY-N= 3IA=3IB=3IC, then threephase current transformer secondary connection is correct, otherwise, threephase current transformer secondary connection mistake.
It is as shown in Figure 2: detection method to be carried out to the secondary wiring of threephase current transformer are as follows: A, C biphase current mutual inductor Using incomplete Y connection, i.e. two-phase and formula wiring, current relationship are as follows: IY-N=IA+IC, way is: A phase current mutual inductor Primary side P2End and C phase current mutual inductor primary side P1End is connected with high current line, from A phase current mutual inductor primary side P1End and C Phase current mutual inductor primary side P2End plus single phase ac, added electric current is that Current Transformer Secondary electric current is 1 ampere, record A phase, C phase current mutual inductor secondary side current and point-earth (N) electric current of Y.If surveyed electric current IA=IC=1 (ampere), and IY-N=2 (ampere), i.e. IY-N=2IA=2IC, then biphase current mutual inductor secondary connection is correct, and otherwise, biphase current mutual inductor is secondary to be connect Line mistake.

Claims (2)

1. a kind of method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current, it is characterised in that: By threephase current transformer A, B, C primary side be sequentially connected in series along polarity or by two-phase current mutual inductor A, C primary side along polarity according to Secondary series connection adds single-phase alternating current to the current transformer primary side being together in series;There is current transformer if it is three-phase, then Electric current between the every phase phase current of threephase current transformer secondary side and Y point-earth (N) is measured, symmetrical three-phase alternating current is flowed to Magnitude relation are as follows:Add the identical single-phase alternating current flow relation of direction vector are as follows: IY-N=IA+IB+IC =3IA=3IB=3IC;There is current transformer if it is two-phase, then measures the every phase phase current of biphase current mutual inductor secondary side and Y Point-earth (N) electric current, two-phase alternating current vector relations are as follows:Add the identical single phase ac in direction Current relationship are as follows: IY-N=IA+IC=2IA=2IC, by point-earth (N) the amount of current relationship of phase current and Y it may determine that electricity Just whether current transformer secondary connection.
2. a kind of utilization single-phase alternating current according to claim 1 checks three-phase or the secondary wiring of biphase current mutual inductor Method, it is characterised in that: the above-mentioned current transformer primary side being together in series add single-phase alternating current current value be higher than one The 30% of secondary rated current.
CN201811534034.3A 2018-12-14 2018-12-14 The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current Pending CN109633352A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811534034.3A CN109633352A (en) 2018-12-14 2018-12-14 The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811534034.3A CN109633352A (en) 2018-12-14 2018-12-14 The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current

Publications (1)

Publication Number Publication Date
CN109633352A true CN109633352A (en) 2019-04-16

Family

ID=66074102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811534034.3A Pending CN109633352A (en) 2018-12-14 2018-12-14 The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current

Country Status (1)

Country Link
CN (1) CN109633352A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110749834A (en) * 2019-11-26 2020-02-04 广东电网有限责任公司 On-load test analysis method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103809039A (en) * 2013-12-02 2014-05-21 国家电网公司 Method for testing current transformers in substation
CN104597372A (en) * 2014-12-31 2015-05-06 中国二冶集团有限公司 Method for verifying relay protection secondary system
CN104698335A (en) * 2013-12-06 2015-06-10 中冶天工集团有限公司 Method for realizing systematic debugging of high-voltage transformer substation by using low-voltage electricity

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103809039A (en) * 2013-12-02 2014-05-21 国家电网公司 Method for testing current transformers in substation
CN104698335A (en) * 2013-12-06 2015-06-10 中冶天工集团有限公司 Method for realizing systematic debugging of high-voltage transformer substation by using low-voltage electricity
CN104597372A (en) * 2014-12-31 2015-05-06 中国二冶集团有限公司 Method for verifying relay protection secondary system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李元锋 等: "互感器二次回路安装试验及检查方法", 《电力安全技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110749834A (en) * 2019-11-26 2020-02-04 广东电网有限责任公司 On-load test analysis method

Similar Documents

Publication Publication Date Title
CN103840437B (en) The quick diagnosis of power distribution network ferromagnetic resonance and singlephase earth fault and processing method
CN103782509B (en) For detecting system, computer program and the method for the internal winding failure of synchronous generator
CN102608485B (en) Detection method for zero-sequence current loops of transformer substations
CN106771647A (en) A kind of low current neutral grounding electric network capacitance current measurement method
CN103454544B (en) A kind of detection method based on the linear magnetism elimination circuit of electronic jumper
CN103454558B (en) A kind of bipolar direct current transmission system voltage fluctuation fault detection method and device
CN107300684B (en) A kind of check method in transformer differential protection secondary circuit
CN103777077B (en) Wireless pincerlike phase detection device
CN102565618A (en) Method for detecting zero-sequence voltage circuit of transformer substation
CN107121614B (en) A kind of duplex configuration of bus protection transformation current loop polarity measurement method
CN201681138U (en) Lightweight type generator power-frequency alternating-current withstand voltage tester
CN104215867A (en) Online recognition method for single-phase ground faults of low-voltage side of exciting transformer
CN112363090A (en) Metering secondary circuit wiring test method
CN103605041A (en) Non-contact multi-point grounding detection method and system for secondary circuit of current transformer
CN102411120B (en) Earth line selection device for converting station direct current system
CN105403808B (en) A kind of localization method and device of DC line earth fault
CN105467239A (en) Voltage transformer excitation characteristic test system
CN208580172U (en) One kind being grounded situation device for fast detecting for power system device
CN202522634U (en) Device for detecting capacity for withstanding direct-current magnetic biasing of transformer
CN109633352A (en) The method for checking three-phase or the secondary wiring of biphase current mutual inductor using single-phase alternating current
CN103616581B (en) The method of without disconnecting power lead test reactive power compensator
Hong et al. Reliability improvement strategies for HVDC transmission system
CN105548821A (en) Lightning arrester live detection method
CN105738677A (en) Power network ground capacitance current detection method
CN204179639U (en) Intelligent leakage circuit breaker

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190416

WD01 Invention patent application deemed withdrawn after publication