CN103245842B - 10 ~ 35kV new clothes electric device total system dry run detection method - Google Patents

10 ~ 35kV new clothes electric device total system dry run detection method Download PDF

Info

Publication number
CN103245842B
CN103245842B CN201310135270.9A CN201310135270A CN103245842B CN 103245842 B CN103245842 B CN 103245842B CN 201310135270 A CN201310135270 A CN 201310135270A CN 103245842 B CN103245842 B CN 103245842B
Authority
CN
China
Prior art keywords
phase
voltage
test
detection method
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310135270.9A
Other languages
Chinese (zh)
Other versions
CN103245842A (en
Inventor
陈永华
董龙角
陆启书
洪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310135270.9A priority Critical patent/CN103245842B/en
Publication of CN103245842A publication Critical patent/CN103245842A/en
Application granted granted Critical
Publication of CN103245842B publication Critical patent/CN103245842B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses a kind of 10 ~ 35kV new clothes electric device total system dry run detection method, 1) the method utilizes equipment and common instrument on the spot, simple and feasible; 2) this detection method is when carrying out before putting equipment in service, avoids existing problems in transmission process and causes repetitive operation, power failure, processing time; 3) this detection method from Timeliness coverage problem source, can provide reliable basis for dealing with problems, and can judge all second loop return wiring correctness safely, reliably, easily; 4) this detection method energy Timeliness coverage, correcting apparatus self Problems existing and first and second equipment installment quality are as the problem that the human factor such as wiring, phase sequence causes, and guarantee the disposable successful power transmission of electrical equipment.

Description

10 ~ 35kV new clothes electric device total system dry run detection method
Technical field
The present invention relates to a kind of voltage detection method, the voltage detection method of particularly a kind of 10 ~ 35kV new clothes electric device total system dry run.
Background technology
In new Electrical equipment installation engineering power transmission in the past; due to workmen in work progress, there is misconnection, miss, virtual connection phenomenon causes equipment electric power feeding time to incur loss through delay; or there is the hidden danger making band direction relay protection positive dirction tripping or malfunction in the other direction because of PT inverted sequence problem; even cause the unsafe factors such as electrical equipment damage; and install in the course of receiving new; inspector is difficult to Timeliness coverage and gets rid of, and delays valuable electric power feeding time, the quality of engineering is had a greatly reduced quality.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, and provide a kind of leaving over 10 ~ 35kV electrical installation project to there is ND potential problem and equipment deficiency, to the self-inspection that the installation quality of electrical equipment is accomplished more comprehensively, more thoroughly, truly, guarantee 10 ~ 35kV new clothes electric device total system dry run detection method of the disposable successful power transmission of electrical equipment.
A kind of 10 ~ 35kV new clothes electric device total system dry run detection method, the steps include:
(1) disconnect main transformer 10kV ~ 35kV side switch, feeder switch all at closing position, by 10kV ~ 35kV bus PT on position.Remove 10kV ~ 35kV station and use low pressure side outlet, by station variation plate placement 1 one 2 grades i.e. ceiling voltage shelves in succession, become as pressure build-up test transformer with 10kV ~ 35kV station, test front megohmmeter and measure 10kV ~ 35kV primary circuit and voltage secondary circuit is alternate and insulation resistance over the ground all meets the requirements, test connection and relevant test job can be carried out:
(2) experiment power supply is taken at external 380V three-phase and four-line AC power, three-phase supply introduces air switch mains side, three-phase voltage pressure regulator end of incoming cables is led to by air switch load-side, Electrical Parameter Meter input end is led to again by three-phase regulator leading-out terminal, 10kV ~ 35kV station low pressure side is led to through Electrical Parameter Meter output terminal, through station with becoming high voltage load switch on 10kV ~ 35kV bus, zero phase and three-phase voltage pressure regulator zero phase of experiment power supply, Electrical Parameter Meter N end connects, the mutually direct ground connection of 10kV ~ 35kV station change zero, and after wiring is correctly checked in work on the spot responsible official inspection, can pressurize, site test personnel should be informed before pressurization, boost operations people is boosted after order under should obtaining work responsible official, can slowly boost, boosting overall process should be exhaled and be sung magnitude of voltage, note observing electrical equipment and instrument simultaneously, whether instrument reading situation of change is normal, should step-down immediately open test power switch if note abnormalities, ascertain the reason and can stepping up from zero be carried out after processing, detected primary system is made to reach positive sequence load voltage value,
(3) opening upper end at PT bis-skies uses multimeter to measure each phase voltage value and should be: primary voltage/PT no-load voltage ratio.The correctness of checking PT no-load voltage ratio, phase-sequence meter is used to measure the correctness of PT secondary voltage phase sequence measurement positive sequence, or use phase meter to measure PT secondary voltage a phase and b phase, b phase and c phase, angle between c phase with a phase, the corresponding advanced b phase 120 degree of measurement result a, the corresponding advanced c phase 120 degree of b, the corresponding advanced a phase 120 degree of c, the correctness of checking secondary connection and phase sequence;
(4) verify that opening upper end at PT bis-skies after PT no-load voltage ratio and phase sequence are correctly measures each phase voltage value U1 and make a record, each phase voltage value U2 is measured at each line segregation metered voltage gauge outfit wiring place, protection or measuring voltage terminal connections place, calculate U1-U2 value, whether the pressure drop of inspection secondary circuit voltage meets standard;
(5) read as requested, record each parameter, voltage should be down to zero by off-test immediately, open test power switch.Recover station low pressure side outlet, all devices is returned to original state, by test instrument, instrument, instrument playback, site clearing.
10 ~ 35kV new clothes electric device total system dry run detection method of the present invention utilizes 10 ~ 35kV station in station to become, three-phase regulator, Electrical Parameter Meter incoming transport 380 volts of power supplys are passed through as experiment power supply input end in its low-pressure side, by adjustment three-phase regulator output voltage, stepping up from zero is become to station and reaches rating operating voltage to bus and bus PT primary system, under dry run state, detect the phase sequence of PT no-load voltage ratio and first and second electrical equipment tie lines, polarity and secondary voltage pressure drop, instrument reading etc. and whether meet technical requirement.
In sum, the present invention's following advantage compared to existing technology:
1) the method utilizes equipment and common instrument on the spot, simple and feasible; 2) this detection method is when carrying out before putting equipment in service, avoids existing problems in transmission process and causes repetitive operation, power failure, processing time; 3) this detection method from Timeliness coverage problem source, can provide reliable basis for dealing with problems, and can judge all second loop return wiring correctness safely, reliably, easily; 4) this detection method energy Timeliness coverage, correcting apparatus self Problems existing and first and second equipment installment quality are as the problem that the human factor such as wiring, phase sequence causes, and guarantee the disposable successful power transmission of electrical equipment.
Accompanying drawing explanation
Fig. 1 is test connection figure of the present invention.
Fig. 2 is voltage secondary circuit wiring diagram of the present invention.
Embodiment
Below in conjunction with embodiment, the present invention is described in more detail.
Embodiment 1
10 ~ 35kV new clothes electric device total system dry run detection method as shown in Figure 1-2, the steps include: to disconnect main transformer 10kV(35kV) side switch and all feeder switches all remain on closing position, by 10kV(35kV) bus PT is on position.Remove 10kV(35kV) stand and use low pressure side outlet, by station variation plate placement ceiling voltage shelves (1 one 2 short circuit) in succession.With 10kV(35kV) stand with becoming as pressure build-up test transformer, test front megohmmeter and measure 10kV(35kV) primary circuit and voltage secondary circuit is alternate and insulation resistance over the ground all meets the requirements, test connection and relevant test job can be carried out:
1) testing crew is tested tie lines figure according to Fig. 1 and is carried out wiring, and through work responsible official check check confirm errorless after, can pressurize, site test (relay protection) personnel should be informed before pressurization, boost operations people is boosted after order under should obtaining work responsible official, can slowly boost, boosting overall process should be exhaled at any time and be sung magnitude of voltage, note observing electrical equipment and instrument simultaneously, whether instrument reading situation of change is normal, should step-down immediately open test power switch if note abnormalities, ascertain the reason and can stepping up from zero be carried out after processing, detected primary system is made to reach positive sequence load voltage value.
2) tester is according to Fig. 2 voltage circuit wiring diagram, opens upper end and uses multimeter to measure each phase voltage value and should be: primary voltage/PT no-load voltage ratio at PT bis-skies.The correctness of checking PT no-load voltage ratio.Use phase-sequence meter to measure the correctness of PT secondary voltage phase sequence measurement positive sequence, or use phase meter to measure PT secondary voltage a phase and b phase, b phase and c phase, angle between c phase with a phase, the corresponding advanced b phase 120 degree of measurement result a, the corresponding advanced c phase 120 degree of b, the corresponding advanced a phase 120 degree of c.The correctness of checking secondary connection and phase sequence.
3) verify that opening upper end at PT bis-skies after PT no-load voltage ratio and phase sequence are correctly measures each phase voltage value U1 and make a record; each phase voltage value U2 is measured at each line segregation metered voltage gauge outfit wiring place, protection or measuring voltage terminal connections place; calculate U1-U2 value, whether the pressure drop of inspection secondary circuit voltage meets standard (voltage drop is no more than 3% of rated voltage).
4) read as requested, record each parameter, voltage should be down to zero by off-test immediately, open test power switch.Recover station low pressure side outlet, all devices is returned to original state, by test instrument, instrument, instrument playback (or entrucking), site clearing.
It is same as the prior art that the present embodiment does not state part.

Claims (1)

1. 10 ~ 35kV new clothes electric device total system dry run detection method, the steps include:
(1) main transformer 10kV ~ 35kV side switch is disconnected, feeder switch is all at closing position, by 10kV ~ 35kV bus PT on position, remove 10kV ~ 35kV station and use low pressure side outlet, by station variation plate placement 1 one 2 grades i.e. ceiling voltage shelves in succession, become as pressure build-up test transformer with 10kV ~ 35kV station, test front megohmmeter and measure 10kV ~ 35kV primary circuit and voltage secondary circuit is alternate and insulation resistance over the ground all meets the requirements, test connection and relevant test job can be carried out:
(2) experiment power supply is taken at external 380V three-phase and four-line AC power, three-phase and four-line AC power introduces air switch mains side, three-phase voltage pressure regulator end of incoming cables is led to by air switch load-side, Electrical Parameter Meter input end is led to again by three-phase voltage pressure regulator leading-out terminal, 10kV ~ 35kV station low pressure side is led to through Electrical Parameter Meter output terminal, through station with becoming high voltage load switch on 10kV ~ 35kV bus, zero phase and three-phase voltage pressure regulator zero phase of experiment power supply, Electrical Parameter Meter N end connects, the mutually direct ground connection of 10kV ~ 35kV station change zero, and after wiring is correctly checked in work on the spot responsible official inspection, can pressurize, site test personnel should be informed before pressurization, boost operations people is boosted after order under should obtaining work responsible official, can slowly boost, boosting overall process should be exhaled and be sung magnitude of voltage, note observing electrical equipment and instrument simultaneously, whether instrument reading situation of change is normal, should step-down immediately open test power switch if note abnormalities, ascertain the reason and can stepping up from zero be carried out after processing, detected primary system is made to reach positive sequence load voltage value,
(3) opening upper end at PT bis-skies uses multimeter to measure each phase voltage value and should be: primary voltage/PT no-load voltage ratio, the correctness of checking PT no-load voltage ratio, phase-sequence meter is used to measure the correctness of PT secondary voltage phase sequence measurement positive sequence, phase meter is used to measure PT secondary voltage a phase and b phase respectively, b phase and c phase, angle between c phase with a phase, the corresponding advanced b phase 120 degree of measurement result a, the corresponding advanced c phase 120 degree of b, the corresponding advanced a phase 120 degree of c, the correctness of checking secondary connection and phase sequence;
(4) verify that opening upper end at PT bis-skies after PT no-load voltage ratio and phase sequence are correctly measures each phase voltage value U1 and make a record, each phase voltage value U2 is measured at each line segregation metered voltage gauge outfit wiring place, protection or measuring voltage terminal connections place, calculate U1-U2 value, whether the pressure drop of inspection secondary circuit voltage meets standard;
(5) read as requested, record each parameter, voltage should be down to zero by off-test immediately, open test power switch, recovers station low pressure side outlet, all devices is returned to original state, by test instrument, instrument, instrument playback, site clearing.
CN201310135270.9A 2013-04-18 2013-04-18 10 ~ 35kV new clothes electric device total system dry run detection method Active CN103245842B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310135270.9A CN103245842B (en) 2013-04-18 2013-04-18 10 ~ 35kV new clothes electric device total system dry run detection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310135270.9A CN103245842B (en) 2013-04-18 2013-04-18 10 ~ 35kV new clothes electric device total system dry run detection method

Publications (2)

Publication Number Publication Date
CN103245842A CN103245842A (en) 2013-08-14
CN103245842B true CN103245842B (en) 2015-10-07

Family

ID=48925487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310135270.9A Active CN103245842B (en) 2013-04-18 2013-04-18 10 ~ 35kV new clothes electric device total system dry run detection method

Country Status (1)

Country Link
CN (1) CN103245842B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105974226A (en) * 2016-04-29 2016-09-28 国网河南省电力公司南阳供电公司 Portable power device test power source device and detection method thereof
CN108459230B (en) * 2018-03-09 2020-11-24 重庆兴汉电力科技股份有限公司 Fault detection method for electrical high-voltage equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101251569A (en) * 2008-04-01 2008-08-27 山东电力研究院 Method for testing electric secondary AC loop
CN101872960A (en) * 2010-06-01 2010-10-27 佛山市中格威电子有限公司 Phase sequence detection and adjustment method and circuit
CN101907670A (en) * 2010-06-25 2010-12-08 江苏省电力公司泗洪县供电公司 Method for verifying correctness of transformer differential protection secondary connection loop
CN102095958A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Method for analyzing wiring correctness of double-winding conventional transformer single-switch differential protection CT
CN102095980A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Wiring correctness analysis method of conventional transformer
CN102508189A (en) * 2011-10-27 2012-06-20 安徽省电力公司淮南供电公司 Method for checking secondary current loop of internal sealed type switch cabinet of substation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2541263A1 (en) * 2011-07-01 2013-01-02 Siemens Aktiengesellschaft Fault detection system and method, and power system for subsea pipeline direct electrical heating cables

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101251569A (en) * 2008-04-01 2008-08-27 山东电力研究院 Method for testing electric secondary AC loop
CN102095958A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Method for analyzing wiring correctness of double-winding conventional transformer single-switch differential protection CT
CN102095980A (en) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 Wiring correctness analysis method of conventional transformer
CN101872960A (en) * 2010-06-01 2010-10-27 佛山市中格威电子有限公司 Phase sequence detection and adjustment method and circuit
CN101907670A (en) * 2010-06-25 2010-12-08 江苏省电力公司泗洪县供电公司 Method for verifying correctness of transformer differential protection secondary connection loop
CN102508189A (en) * 2011-10-27 2012-06-20 安徽省电力公司淮南供电公司 Method for checking secondary current loop of internal sealed type switch cabinet of substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电力系统动模综合实验系统的研究与开发;吴涓;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20100415(第4期);C042-159 *

Also Published As

Publication number Publication date
CN103245842A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN205080251U (en) Through -flow calibration system of current transformer secondary circuit
CN102095950B (en) Overall test and construction method of differential protection system of large-scale transformer
CN102540001B (en) Method of checking alternating current loop of a 500kV transformer substation through carrying out simulated through-type three-phase short circuit
CN202548258U (en) Device for checking alternating current/voltage loop
CN102608485B (en) Detection method for zero-sequence current loops of transformer substations
CN102565618A (en) Method for detecting zero-sequence voltage circuit of transformer substation
CN102944762B (en) Debugging method of phase sequences of loops at two sides of synchronization point before commissioning of generator set
CN105182156B (en) Based on waveform visualization synchronous loop device for detecting polarity and detection method
CN103645415A (en) Practical method of inspecting electric energy metering device wiring in charged mode
CN108169606A (en) High voltage direct current converter system simulates live detection complexes and its detection method
CN103245842B (en) 10 ~ 35kV new clothes electric device total system dry run detection method
CN103076529B (en) CT secondary circuit intelligent detecting method
CN104065034A (en) Low-voltage failure detector
CN102565614B (en) Alternating voltage loop test method
CN107831378B (en) Device and method for detecting compensation effect of arc suppression coil
CN102455395B (en) Method for testing high-voltage power supply and power distribution system loop
CN109283421A (en) A kind of rail traction substation low-voltage is powered detection test method and device
CN104698335A (en) Method for debugging high-voltage transformer substation in systematization mode by using low tension electricity
CN105548821A (en) Lightning arrester live detection method
CN111707981A (en) CT indirect secondary through-flow method for generator set
CN209373017U (en) A kind of rail traction substation low-voltage energization detection experimental rig
CN103743994A (en) Low-voltage load test method and device
CN106771841B (en) A kind of through-flow system of substation S type and method
CN207882364U (en) High voltage direct current converter system simulates live detection complexes
CN113156276A (en) Method for checking and debugging secondary voltage loop in AC withstand voltage test of switchgear bus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant