CN103245842B - 10 ~ 35kV new clothes electric device total system dry run detection method - Google Patents
10 ~ 35kV new clothes electric device total system dry run detection method Download PDFInfo
- Publication number
- CN103245842B CN103245842B CN201310135270.9A CN201310135270A CN103245842B CN 103245842 B CN103245842 B CN 103245842B CN 201310135270 A CN201310135270 A CN 201310135270A CN 103245842 B CN103245842 B CN 103245842B
- Authority
- CN
- China
- Prior art keywords
- phase
- voltage
- test
- detection method
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 16
- 238000000819 phase cycle Methods 0.000 claims abstract description 15
- 238000000034 method Methods 0.000 claims abstract description 5
- 238000012545 processing Methods 0.000 claims abstract description 5
- 238000012360 testing method Methods 0.000 claims description 29
- 238000007689 inspection Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 6
- 238000002474 experimental method Methods 0.000 claims description 5
- 230000005856 abnormality Effects 0.000 claims description 3
- 238000009413 insulation Methods 0.000 claims description 3
- 238000005204 segregation Methods 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 abstract description 6
- 230000003252 repetitive effect Effects 0.000 abstract description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000001934 delay Effects 0.000 description 1
- 238000010616 electrical installation Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The invention discloses a kind of 10 ~ 35kV new clothes electric device total system dry run detection method, 1) the method utilizes equipment and common instrument on the spot, simple and feasible; 2) this detection method is when carrying out before putting equipment in service, avoids existing problems in transmission process and causes repetitive operation, power failure, processing time; 3) this detection method from Timeliness coverage problem source, can provide reliable basis for dealing with problems, and can judge all second loop return wiring correctness safely, reliably, easily; 4) this detection method energy Timeliness coverage, correcting apparatus self Problems existing and first and second equipment installment quality are as the problem that the human factor such as wiring, phase sequence causes, and guarantee the disposable successful power transmission of electrical equipment.
Description
Technical field
The present invention relates to a kind of voltage detection method, the voltage detection method of particularly a kind of 10 ~ 35kV new clothes electric device total system dry run.
Background technology
In new Electrical equipment installation engineering power transmission in the past; due to workmen in work progress, there is misconnection, miss, virtual connection phenomenon causes equipment electric power feeding time to incur loss through delay; or there is the hidden danger making band direction relay protection positive dirction tripping or malfunction in the other direction because of PT inverted sequence problem; even cause the unsafe factors such as electrical equipment damage; and install in the course of receiving new; inspector is difficult to Timeliness coverage and gets rid of, and delays valuable electric power feeding time, the quality of engineering is had a greatly reduced quality.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, and provide a kind of leaving over 10 ~ 35kV electrical installation project to there is ND potential problem and equipment deficiency, to the self-inspection that the installation quality of electrical equipment is accomplished more comprehensively, more thoroughly, truly, guarantee 10 ~ 35kV new clothes electric device total system dry run detection method of the disposable successful power transmission of electrical equipment.
A kind of 10 ~ 35kV new clothes electric device total system dry run detection method, the steps include:
(1) disconnect main transformer 10kV ~ 35kV side switch, feeder switch all at closing position, by 10kV ~ 35kV bus PT on position.Remove 10kV ~ 35kV station and use low pressure side outlet, by station variation plate placement 1 one 2 grades i.e. ceiling voltage shelves in succession, become as pressure build-up test transformer with 10kV ~ 35kV station, test front megohmmeter and measure 10kV ~ 35kV primary circuit and voltage secondary circuit is alternate and insulation resistance over the ground all meets the requirements, test connection and relevant test job can be carried out:
(2) experiment power supply is taken at external 380V three-phase and four-line AC power, three-phase supply introduces air switch mains side, three-phase voltage pressure regulator end of incoming cables is led to by air switch load-side, Electrical Parameter Meter input end is led to again by three-phase regulator leading-out terminal, 10kV ~ 35kV station low pressure side is led to through Electrical Parameter Meter output terminal, through station with becoming high voltage load switch on 10kV ~ 35kV bus, zero phase and three-phase voltage pressure regulator zero phase of experiment power supply, Electrical Parameter Meter N end connects, the mutually direct ground connection of 10kV ~ 35kV station change zero, and after wiring is correctly checked in work on the spot responsible official inspection, can pressurize, site test personnel should be informed before pressurization, boost operations people is boosted after order under should obtaining work responsible official, can slowly boost, boosting overall process should be exhaled and be sung magnitude of voltage, note observing electrical equipment and instrument simultaneously, whether instrument reading situation of change is normal, should step-down immediately open test power switch if note abnormalities, ascertain the reason and can stepping up from zero be carried out after processing, detected primary system is made to reach positive sequence load voltage value,
(3) opening upper end at PT bis-skies uses multimeter to measure each phase voltage value and should be: primary voltage/PT no-load voltage ratio.The correctness of checking PT no-load voltage ratio, phase-sequence meter is used to measure the correctness of PT secondary voltage phase sequence measurement positive sequence, or use phase meter to measure PT secondary voltage a phase and b phase, b phase and c phase, angle between c phase with a phase, the corresponding advanced b phase 120 degree of measurement result a, the corresponding advanced c phase 120 degree of b, the corresponding advanced a phase 120 degree of c, the correctness of checking secondary connection and phase sequence;
(4) verify that opening upper end at PT bis-skies after PT no-load voltage ratio and phase sequence are correctly measures each phase voltage value U1 and make a record, each phase voltage value U2 is measured at each line segregation metered voltage gauge outfit wiring place, protection or measuring voltage terminal connections place, calculate U1-U2 value, whether the pressure drop of inspection secondary circuit voltage meets standard;
(5) read as requested, record each parameter, voltage should be down to zero by off-test immediately, open test power switch.Recover station low pressure side outlet, all devices is returned to original state, by test instrument, instrument, instrument playback, site clearing.
10 ~ 35kV new clothes electric device total system dry run detection method of the present invention utilizes 10 ~ 35kV station in station to become, three-phase regulator, Electrical Parameter Meter incoming transport 380 volts of power supplys are passed through as experiment power supply input end in its low-pressure side, by adjustment three-phase regulator output voltage, stepping up from zero is become to station and reaches rating operating voltage to bus and bus PT primary system, under dry run state, detect the phase sequence of PT no-load voltage ratio and first and second electrical equipment tie lines, polarity and secondary voltage pressure drop, instrument reading etc. and whether meet technical requirement.
In sum, the present invention's following advantage compared to existing technology:
1) the method utilizes equipment and common instrument on the spot, simple and feasible; 2) this detection method is when carrying out before putting equipment in service, avoids existing problems in transmission process and causes repetitive operation, power failure, processing time; 3) this detection method from Timeliness coverage problem source, can provide reliable basis for dealing with problems, and can judge all second loop return wiring correctness safely, reliably, easily; 4) this detection method energy Timeliness coverage, correcting apparatus self Problems existing and first and second equipment installment quality are as the problem that the human factor such as wiring, phase sequence causes, and guarantee the disposable successful power transmission of electrical equipment.
Accompanying drawing explanation
Fig. 1 is test connection figure of the present invention.
Fig. 2 is voltage secondary circuit wiring diagram of the present invention.
Embodiment
Below in conjunction with embodiment, the present invention is described in more detail.
Embodiment 1
10 ~ 35kV new clothes electric device total system dry run detection method as shown in Figure 1-2, the steps include: to disconnect main transformer 10kV(35kV) side switch and all feeder switches all remain on closing position, by 10kV(35kV) bus PT is on position.Remove 10kV(35kV) stand and use low pressure side outlet, by station variation plate placement ceiling voltage shelves (1 one 2 short circuit) in succession.With 10kV(35kV) stand with becoming as pressure build-up test transformer, test front megohmmeter and measure 10kV(35kV) primary circuit and voltage secondary circuit is alternate and insulation resistance over the ground all meets the requirements, test connection and relevant test job can be carried out:
1) testing crew is tested tie lines figure according to Fig. 1 and is carried out wiring, and through work responsible official check check confirm errorless after, can pressurize, site test (relay protection) personnel should be informed before pressurization, boost operations people is boosted after order under should obtaining work responsible official, can slowly boost, boosting overall process should be exhaled at any time and be sung magnitude of voltage, note observing electrical equipment and instrument simultaneously, whether instrument reading situation of change is normal, should step-down immediately open test power switch if note abnormalities, ascertain the reason and can stepping up from zero be carried out after processing, detected primary system is made to reach positive sequence load voltage value.
2) tester is according to Fig. 2 voltage circuit wiring diagram, opens upper end and uses multimeter to measure each phase voltage value and should be: primary voltage/PT no-load voltage ratio at PT bis-skies.The correctness of checking PT no-load voltage ratio.Use phase-sequence meter to measure the correctness of PT secondary voltage phase sequence measurement positive sequence, or use phase meter to measure PT secondary voltage a phase and b phase, b phase and c phase, angle between c phase with a phase, the corresponding advanced b phase 120 degree of measurement result a, the corresponding advanced c phase 120 degree of b, the corresponding advanced a phase 120 degree of c.The correctness of checking secondary connection and phase sequence.
3) verify that opening upper end at PT bis-skies after PT no-load voltage ratio and phase sequence are correctly measures each phase voltage value U1 and make a record; each phase voltage value U2 is measured at each line segregation metered voltage gauge outfit wiring place, protection or measuring voltage terminal connections place; calculate U1-U2 value, whether the pressure drop of inspection secondary circuit voltage meets standard (voltage drop is no more than 3% of rated voltage).
4) read as requested, record each parameter, voltage should be down to zero by off-test immediately, open test power switch.Recover station low pressure side outlet, all devices is returned to original state, by test instrument, instrument, instrument playback (or entrucking), site clearing.
It is same as the prior art that the present embodiment does not state part.
Claims (1)
1. 10 ~ 35kV new clothes electric device total system dry run detection method, the steps include:
(1) main transformer 10kV ~ 35kV side switch is disconnected, feeder switch is all at closing position, by 10kV ~ 35kV bus PT on position, remove 10kV ~ 35kV station and use low pressure side outlet, by station variation plate placement 1 one 2 grades i.e. ceiling voltage shelves in succession, become as pressure build-up test transformer with 10kV ~ 35kV station, test front megohmmeter and measure 10kV ~ 35kV primary circuit and voltage secondary circuit is alternate and insulation resistance over the ground all meets the requirements, test connection and relevant test job can be carried out:
(2) experiment power supply is taken at external 380V three-phase and four-line AC power, three-phase and four-line AC power introduces air switch mains side, three-phase voltage pressure regulator end of incoming cables is led to by air switch load-side, Electrical Parameter Meter input end is led to again by three-phase voltage pressure regulator leading-out terminal, 10kV ~ 35kV station low pressure side is led to through Electrical Parameter Meter output terminal, through station with becoming high voltage load switch on 10kV ~ 35kV bus, zero phase and three-phase voltage pressure regulator zero phase of experiment power supply, Electrical Parameter Meter N end connects, the mutually direct ground connection of 10kV ~ 35kV station change zero, and after wiring is correctly checked in work on the spot responsible official inspection, can pressurize, site test personnel should be informed before pressurization, boost operations people is boosted after order under should obtaining work responsible official, can slowly boost, boosting overall process should be exhaled and be sung magnitude of voltage, note observing electrical equipment and instrument simultaneously, whether instrument reading situation of change is normal, should step-down immediately open test power switch if note abnormalities, ascertain the reason and can stepping up from zero be carried out after processing, detected primary system is made to reach positive sequence load voltage value,
(3) opening upper end at PT bis-skies uses multimeter to measure each phase voltage value and should be: primary voltage/PT no-load voltage ratio, the correctness of checking PT no-load voltage ratio, phase-sequence meter is used to measure the correctness of PT secondary voltage phase sequence measurement positive sequence, phase meter is used to measure PT secondary voltage a phase and b phase respectively, b phase and c phase, angle between c phase with a phase, the corresponding advanced b phase 120 degree of measurement result a, the corresponding advanced c phase 120 degree of b, the corresponding advanced a phase 120 degree of c, the correctness of checking secondary connection and phase sequence;
(4) verify that opening upper end at PT bis-skies after PT no-load voltage ratio and phase sequence are correctly measures each phase voltage value U1 and make a record, each phase voltage value U2 is measured at each line segregation metered voltage gauge outfit wiring place, protection or measuring voltage terminal connections place, calculate U1-U2 value, whether the pressure drop of inspection secondary circuit voltage meets standard;
(5) read as requested, record each parameter, voltage should be down to zero by off-test immediately, open test power switch, recovers station low pressure side outlet, all devices is returned to original state, by test instrument, instrument, instrument playback, site clearing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310135270.9A CN103245842B (en) | 2013-04-18 | 2013-04-18 | 10 ~ 35kV new clothes electric device total system dry run detection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310135270.9A CN103245842B (en) | 2013-04-18 | 2013-04-18 | 10 ~ 35kV new clothes electric device total system dry run detection method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103245842A CN103245842A (en) | 2013-08-14 |
CN103245842B true CN103245842B (en) | 2015-10-07 |
Family
ID=48925487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310135270.9A Active CN103245842B (en) | 2013-04-18 | 2013-04-18 | 10 ~ 35kV new clothes electric device total system dry run detection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103245842B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105974226A (en) * | 2016-04-29 | 2016-09-28 | 国网河南省电力公司南阳供电公司 | Portable power device test power source device and detection method thereof |
CN108459230B (en) * | 2018-03-09 | 2020-11-24 | 重庆兴汉电力科技股份有限公司 | Fault detection method for electrical high-voltage equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101251569A (en) * | 2008-04-01 | 2008-08-27 | 山东电力研究院 | Method for testing electric secondary AC loop |
CN101872960A (en) * | 2010-06-01 | 2010-10-27 | 佛山市中格威电子有限公司 | Phase sequence detection and adjustment method and circuit |
CN101907670A (en) * | 2010-06-25 | 2010-12-08 | 江苏省电力公司泗洪县供电公司 | Method for verifying correctness of transformer differential protection secondary connection loop |
CN102095958A (en) * | 2009-12-15 | 2011-06-15 | 西安爱邦电气有限公司 | Method for analyzing wiring correctness of double-winding conventional transformer single-switch differential protection CT |
CN102095980A (en) * | 2009-12-15 | 2011-06-15 | 西安爱邦电气有限公司 | Wiring correctness analysis method of conventional transformer |
CN102508189A (en) * | 2011-10-27 | 2012-06-20 | 安徽省电力公司淮南供电公司 | Method for checking secondary current loop of internal sealed type switch cabinet of substation |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2541263A1 (en) * | 2011-07-01 | 2013-01-02 | Siemens Aktiengesellschaft | Fault detection system and method, and power system for subsea pipeline direct electrical heating cables |
-
2013
- 2013-04-18 CN CN201310135270.9A patent/CN103245842B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101251569A (en) * | 2008-04-01 | 2008-08-27 | 山东电力研究院 | Method for testing electric secondary AC loop |
CN102095958A (en) * | 2009-12-15 | 2011-06-15 | 西安爱邦电气有限公司 | Method for analyzing wiring correctness of double-winding conventional transformer single-switch differential protection CT |
CN102095980A (en) * | 2009-12-15 | 2011-06-15 | 西安爱邦电气有限公司 | Wiring correctness analysis method of conventional transformer |
CN101872960A (en) * | 2010-06-01 | 2010-10-27 | 佛山市中格威电子有限公司 | Phase sequence detection and adjustment method and circuit |
CN101907670A (en) * | 2010-06-25 | 2010-12-08 | 江苏省电力公司泗洪县供电公司 | Method for verifying correctness of transformer differential protection secondary connection loop |
CN102508189A (en) * | 2011-10-27 | 2012-06-20 | 安徽省电力公司淮南供电公司 | Method for checking secondary current loop of internal sealed type switch cabinet of substation |
Non-Patent Citations (1)
Title |
---|
电力系统动模综合实验系统的研究与开发;吴涓;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20100415(第4期);C042-159 * |
Also Published As
Publication number | Publication date |
---|---|
CN103245842A (en) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205080251U (en) | Through -flow calibration system of current transformer secondary circuit | |
CN102095950B (en) | Overall test and construction method of differential protection system of large-scale transformer | |
CN102540001B (en) | Method of checking alternating current loop of a 500kV transformer substation through carrying out simulated through-type three-phase short circuit | |
CN202548258U (en) | Device for checking alternating current/voltage loop | |
CN102608485B (en) | Detection method for zero-sequence current loops of transformer substations | |
CN102565618A (en) | Method for detecting zero-sequence voltage circuit of transformer substation | |
CN102944762B (en) | Debugging method of phase sequences of loops at two sides of synchronization point before commissioning of generator set | |
CN105182156B (en) | Based on waveform visualization synchronous loop device for detecting polarity and detection method | |
CN103645415A (en) | Practical method of inspecting electric energy metering device wiring in charged mode | |
CN108169606A (en) | High voltage direct current converter system simulates live detection complexes and its detection method | |
CN103245842B (en) | 10 ~ 35kV new clothes electric device total system dry run detection method | |
CN103076529B (en) | CT secondary circuit intelligent detecting method | |
CN104065034A (en) | Low-voltage failure detector | |
CN102565614B (en) | Alternating voltage loop test method | |
CN107831378B (en) | Device and method for detecting compensation effect of arc suppression coil | |
CN102455395B (en) | Method for testing high-voltage power supply and power distribution system loop | |
CN109283421A (en) | A kind of rail traction substation low-voltage is powered detection test method and device | |
CN104698335A (en) | Method for debugging high-voltage transformer substation in systematization mode by using low tension electricity | |
CN105548821A (en) | Lightning arrester live detection method | |
CN111707981A (en) | CT indirect secondary through-flow method for generator set | |
CN209373017U (en) | A kind of rail traction substation low-voltage energization detection experimental rig | |
CN103743994A (en) | Low-voltage load test method and device | |
CN106771841B (en) | A kind of through-flow system of substation S type and method | |
CN207882364U (en) | High voltage direct current converter system simulates live detection complexes | |
CN113156276A (en) | Method for checking and debugging secondary voltage loop in AC withstand voltage test of switchgear bus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |