CN104695436A - 膨胀式预应力锚索 - Google Patents
膨胀式预应力锚索 Download PDFInfo
- Publication number
- CN104695436A CN104695436A CN201510168071.7A CN201510168071A CN104695436A CN 104695436 A CN104695436 A CN 104695436A CN 201510168071 A CN201510168071 A CN 201510168071A CN 104695436 A CN104695436 A CN 104695436A
- Authority
- CN
- China
- Prior art keywords
- anchor cable
- anchor
- stress
- head
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
一种膨胀式预应力锚索,包括锚头、锚索、垫板及锚具,其特征在于,锚头与锚索的一端固接,双头膨胀管套在锚索上,双头膨胀管分为柱形段、中段、喇叭口段,柱形段和喇叭口段的侧面上均开有均匀排列的矩形槽,双头膨胀管的柱形段位于锚头端,中空定位胶塞安装在锚索上,垫板、夹片及锚具套在锚索上,垫板上开有注浆孔。本发明的膨胀式预应力锚索,不仅可以做到施工一次性完成,易施工,而且能在锚索安装的同时进行张拉,缩短施工时间,提高工作效率,减少传统锚杆施工过程中应力释放产生的不安全因素,利用深部稳定岩层,尽快对隧道围岩或边坡实施主动预应力,做到主动预应力支护围岩的作用,对安全高效施工有重要意义。
Description
技术领域
本发明涉及隧道围岩、边坡加固处理设备,尤其是一种膨胀式预应力锚索。
背景技术
隧道或边坡加固处理工程中,必须采用锚索,目前使用的锚索几乎都需要锚固剂、砂浆或树脂等材料胶结。采用这种方法,施工中,由于施工工序较多、工序复杂,费时费力,且胶结材料强度提高所需时间影响工程进度,所以经常会出现锚索与岩土无胶结或胶结出现不同程度空腔情况,难以发挥锚索的组合梁和悬吊作用。另外,锚索在隧道和边坡施工中,人们常常会偷工减料,而造成这一现象的主要因素是锚索与围岩胶结复杂、困难。
发明内容
本发明的目的就是提供一种操作方便、施工耗时少、工作效率高、连接牢固的膨胀式预应力锚索。
本发明的膨胀式预应力锚索,包括锚头、锚索、垫板及锚具,其特征在于,锚头与锚索的一端固接,双头膨胀管套在锚索上,双头膨胀管分为柱形段、中段、喇叭口段,柱形段和喇叭口段的侧面上均开有均匀排列的矩形槽,双头膨胀管的柱形段位于锚头端,中空定位胶塞安装在锚索上,垫板、夹片及锚具套在锚索上,垫板上开有注浆孔。
本发明的膨胀式预应力锚索,使用时,将双头膨胀管的柱形段与锚头接触,在双头膨胀管喇叭口段处安装中空定位胶塞,在锚索与中空定位胶塞之间用锚固剂胶结,将锚头、锚索及双头膨胀管通过导管送入围岩的钻孔中,锚头抵达围岩钻孔底部时,取出导管,垫板盖住孔口,通过中空千斤顶对锚索进行张拉,双头膨胀管喇叭口段张开与围岩内部产生摩擦握裹力,达到固定效果,再通过垫板上的注浆孔对张拉好的锚索进行注浆封闭,实现锚固段双向受力,提高锚索的受力效果。
本发明的膨胀式预应力锚索,不仅可以做到施工一次性完成,易施工,而且能在锚索安装的同时进行张拉,缩短施工时间,提高工作效率,减少传统锚杆施工过程中应力释放产生的不安全因素,利用深部稳定岩层,尽快对隧道围岩或边坡实施主动预应力,做到主动预应力支护围岩的作用,对安全高效施工有重要意义。
附图说明
图1是本发明结构示意图;
图2是图1中部件结构示意图;
附图中:1、锚头,2、双头膨胀管,3、中空定位胶塞,4、垫板,5、注浆孔,6、夹片 7、锚具,8、锚索,21、中段,22、柱形段,23、矩形槽,24、喇叭口段。
具体实施方式
在图中,将锚索8与双头膨胀管2组装连接,从锚索8尾端将双头膨胀管2套入,使膨胀管柱形段22与锚头1接触,在双头膨胀管喇叭口段24处通过安装一个中空定位胶塞3,在锚索8与中空定位胶塞3之间用锚固剂胶结,作用为固定双头膨胀管2在非工作状态下保持稳定,锚索8预留张拉长度,完成组装。
工作时,利用工具对围岩成孔,通过导管将锚头1、双头膨胀管2送入成形的孔中,抵达底部位置,将导管拉出,在围岩孔口处,将垫板5、锚具6和夹片10安装,通过中空千斤顶完成对锚索8进行张拉,使双头膨胀管喇叭口段24向后运动嵌入围岩内部,形成一个反力固定住锚头。在不进行注浆的情况下进行拉拔,双头膨胀管柱形段22张开与围岩内部产生摩擦握裹力,达到固定效果,然后再通过注浆孔5对张拉好的锚索进行注浆封闭,更好发挥锚索的组合梁和悬吊作用。
Claims (1)
1.一种膨胀式预应力锚索,包括锚头(1)、锚索(8)、垫板(4)及锚具(7),其特征在于:锚头(1)与锚索(8)的一端固接,双头膨胀管(2)套在锚索(8)上,双头膨胀管(2)分为柱形段(22)、中段(21)、喇叭口段(24),柱形段(22)和喇叭口段(24)的侧面上均开有均匀排列的矩形槽(23),双头膨胀管(2)的柱形段(22)位于锚头端,中空定位胶塞(3)安装在锚索(8)上,垫板(4)、夹片(6)及锚具(7)套在锚索(8)上,垫板(4)上开有注浆孔(5)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510168071.7A CN104695436A (zh) | 2015-04-10 | 2015-04-10 | 膨胀式预应力锚索 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510168071.7A CN104695436A (zh) | 2015-04-10 | 2015-04-10 | 膨胀式预应力锚索 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104695436A true CN104695436A (zh) | 2015-06-10 |
Family
ID=53342952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510168071.7A Pending CN104695436A (zh) | 2015-04-10 | 2015-04-10 | 膨胀式预应力锚索 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104695436A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2431113A1 (de) * | 1974-06-28 | 1976-01-15 | Takechi Komusho Kk | Verfahren und vorrichtung zum einsetzen eines ankers |
CN2198388Y (zh) * | 1994-05-03 | 1995-05-24 | 孙会元 | 膨胀预应力锚索 |
CN1464176A (zh) * | 2002-06-24 | 2003-12-31 | 吴德兴 | 一种锚杆支护方法及其分段式中空注浆锚杆 |
CN202380463U (zh) * | 2011-12-19 | 2012-08-15 | 中铁第四勘察设计院集团有限公司 | 一种注浆囊式可回收锚索 |
EP2647792A2 (en) * | 2012-04-02 | 2013-10-09 | FCI Holdings Delaware, Inc. | Manufacture of cable bolts |
CN204530699U (zh) * | 2015-04-10 | 2015-08-05 | 郑卫华 | 膨胀式预应力锚索 |
-
2015
- 2015-04-10 CN CN201510168071.7A patent/CN104695436A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2431113A1 (de) * | 1974-06-28 | 1976-01-15 | Takechi Komusho Kk | Verfahren und vorrichtung zum einsetzen eines ankers |
CN2198388Y (zh) * | 1994-05-03 | 1995-05-24 | 孙会元 | 膨胀预应力锚索 |
CN1464176A (zh) * | 2002-06-24 | 2003-12-31 | 吴德兴 | 一种锚杆支护方法及其分段式中空注浆锚杆 |
CN202380463U (zh) * | 2011-12-19 | 2012-08-15 | 中铁第四勘察设计院集团有限公司 | 一种注浆囊式可回收锚索 |
EP2647792A2 (en) * | 2012-04-02 | 2013-10-09 | FCI Holdings Delaware, Inc. | Manufacture of cable bolts |
CN204530699U (zh) * | 2015-04-10 | 2015-08-05 | 郑卫华 | 膨胀式预应力锚索 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104500115B (zh) | 一种预应力全长锚固锚杆支护方法 | |
CN205154174U (zh) | 软弱围岩隧道管棚超前支护施工结构 | |
CN204530699U (zh) | 膨胀式预应力锚索 | |
CN105715287A (zh) | 一种组合自进式注浆锚杆 | |
CN104695436A (zh) | 膨胀式预应力锚索 | |
JP5311453B2 (ja) | 地山補強工法 | |
KR102185255B1 (ko) | 확대 구근이 형성된 복합 파일 시공 방법 | |
CN204532399U (zh) | 膨胀式预应力锚杆 | |
CN204475323U (zh) | 一种改进型套筒式内锚头 | |
CN206829129U (zh) | 一种锚杆 | |
CN205188953U (zh) | 一种预应力管桩组合结构 | |
KR20090007218U (ko) | 인장부재 제거형 그라운드 앵커 | |
CN104564115A (zh) | 一种套筒式内锚头 | |
KR100923856B1 (ko) | 앵커 매립식 펄스 방전 선단장치 | |
JP5950724B2 (ja) | アンカー施工方法 | |
CN208472720U (zh) | 一种可注浆锚杆定位支架装置 | |
KR101227596B1 (ko) | 그라운드 앵커 장치 | |
CN207498944U (zh) | 超深喷射注浆导孔的护孔套管 | |
CN206581959U (zh) | 一种巷道深层支护锚固装置 | |
CN206035515U (zh) | 隧道岩层注浆锚固管 | |
CN209163847U (zh) | 一种自钻式锚杆结构 | |
JP2019206868A (ja) | マイクロパイル工法およびマイクロパイル工法で用いるグラウト材充填用挿入部材 | |
JP2006299546A (ja) | ロックボルト | |
JP5875650B1 (ja) | ハイブリッド杭装置 | |
CN105200990B (zh) | 一种胀管式锚索 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150610 |