CN104674612A - Support system for cargo ropeway - Google Patents
Support system for cargo ropeway Download PDFInfo
- Publication number
- CN104674612A CN104674612A CN201410845980.5A CN201410845980A CN104674612A CN 104674612 A CN104674612 A CN 104674612A CN 201410845980 A CN201410845980 A CN 201410845980A CN 104674612 A CN104674612 A CN 104674612A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- support pin
- pipe support
- steel tubular
- triangular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
- E01B25/16—Tracks for aerial rope railways with a stationary rope
- E01B25/18—Ropes; Supports, fastening or straining means for ropes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
A support system for a cargo ropeway mainly comprises left and right two three-legged steel tubular supports identical in structure and a cross beam connected to the upper ends of the three-legged steel tubular supports. Each three-legged steel tubular support comprises three steel tubular support legs connected at the upper ends; included angles of the steel tubular support legs are not greater than 60 degrees; each steel tubular support leg is made by detachably splicing at least two steel tubular segments. The three-legged steel tubular supports are opposite; two steel tubular support legs of each three-legged steel tubular supports are parallel, and the others are symmetrically disposed on a central horizontal line outside; the upper ends of the three-legged steel tubular supports are fixed together through beam connecting plates; the cross beam for mounting a middle carrier saddle is fixedly connected between the beam connecting plates. The support system has the advantages such as simple structure, convenience of use, high structural strength, high bearing capacity and greatly improved safety.
Description
Technical field
What the present invention relates to is a kind of mounting system of freight ropeway, belongs to the supporting freight ropeway technical field for electric transmission line erection.
Background technology
At present, transmission line of electricity more and more to super-pressure, extra-high voltage future development, and these super-pressure, extra-high voltage are erected at no man's land mostly, the particularly complex topographic area such as mountain area, forest land territory, this erection for transmission line of electricity brings very large inconvenience, especially set up these super-pressure, UHV transmission line goods and materials transport make troubles; Need first to add freight ropeway for this reason, the electric transmission line erection goods and materials of a large amount of heavy types are transported to the place of complicated landform, erect power transmission lines for power worker; Current freight ropeway at least comprises two end supports, drag cable, ropeway carrying-rope, freight trolley and tractor, and what have also comprises intermediate support, drives freight trolley that stringing goods and materials are transported to stringing place to support drag cable and ropeway carrying-rope.
Because freight ropeway carries the stringing goods and materials of larger volume and weight, under the condition that erection condition is comparatively severe, consider that more is the safety of cableway, wherein select the ropeway supporting trestle of how structure to become key point, current ropeway supporting trestle more selects pylon structure, the ropeway supporting trestle complex structure of this pylon structure, erection has certain difficulty, consumable quantity is large, and cost is high, handling inconvenience; Although some ropeway supporting trestles select the simple door shaped stent of structure, but because structure is simple, the place that the physical features such as Plain, city are comparatively smooth can only be suitable for, and the goods and materials that transport are mostly light-duty and small volume, use and be obviously restricted, but also the hidden danger of security incident can be there is.
Summary of the invention
The object of the invention is to overcome the deficiency that prior art exists, and provide a kind of and carry out improveing on prior art basis, structure is simple, and easy to use, structural strength is high, and bearing capacity is large, the mounting system of the freight ropeway that security performance improves greatly.
The object of the invention is to have come by following technical solution, a kind of mounting system of freight ropeway, it is formed with the crossbeam being connected to two triangular steel pipe holder upper ends primarily of the left and right two triangular steel pipe holder that structure is identical, described triangular steel pipe holder comprises three steel pipe support pin be connected together in upper end, and the mutual angle of three steel pipe support pin is not more than 60 degree, every root steel pipe support pin is at least detachably connected by two sections of steel pipes.
Two described triangular steel pipe holders are positioned opposite, two opposing parallel layouts of steel pipe support pin wherein in two triangular steel pipe holders, and another root steel pipe support pin is placed on the central horizontal line in outside symmetrically; The upper end of three described steel pipe supports is fixed together by a cross-beam connecting plate, and be fixedly linked the described crossbeam for installing middle carrying saddle between described cross-beam connecting plate.
The middle part of three described steel pipe support pin is connected to tube connector respectively by anchor ear between two, two steel pipe support pin of described opposing parallel layout are in being arranged vertically, and another root is placed in steel pipe support pin diagonal brace on outer side center horizon and is arranged in parallel in two the upper end of steel pipe support pin.
Described steel pipe support pin regulates supporting leg to be formed by fixedly connecting by removable shape formula connector by upper supporting leg, intermediate support leg and bottom; The lateral direction of two triangular steel pipe holders is provided with three road bracing wires, and become central horizontal line and 30-60 degree angular direction, both sides to arrange respectively respectively, per pass bracing wire is that 16mm wire rope+5t chain block+5t ground auger or iron stake are formed by diameter.
It is simple that the present invention has structure, and easy to use, structural strength is high, and bearing capacity is large, and security performance carries high greatly.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 be in Fig. 1 A to triangular steel pipe holder structural representation.
Fig. 3 is support guy structure schematic diagram of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be described in detail: shown in Fig. 1,2, the mounting system of a kind of freight ropeway of the present invention, it is formed with the crossbeam 2 being connected to two triangular steel pipe holder upper ends primarily of the left and right two triangular steel pipe holder 1 that structure is identical, described triangular steel pipe holder 1 comprises three steel pipe support pin 2 be connected together in upper end, and the mutual angle of three steel pipe support pin 2 is not more than 60 degree, every root steel pipe support pin 2 is at least detachably connected by two sections of steel pipes.
Shown in Fig. 1, two triangular steel pipe holders 1 of the present invention are positioned opposite, two opposing parallel layouts of steel pipe support pin 21 wherein in two triangular steel pipe holders 1, namely the bottom line of two steel pipe support pin 21 of a triangular steel pipe holder is parallel with the bottom line of two steel pipe support pin 21 of another triangular steel pipe holder; Another root steel pipe support pin 22 is placed on the central horizontal line in outside symmetrically, and described central horizontal line refers to the bisector of aforesaid two steel pipe support pin 21; The upper end of three described steel pipe supports 1 is fixed together by a cross-beam connecting plate 3, and be fixedly linked the described crossbeam 2 for installing middle carrying saddle 4 between described cross-beam connecting plate 3.
Shown in figure, the middle part of three described steel pipe support pin 2 is connected to tube connector 6 respectively by anchor ear 5 between two, two steel pipe support pin 21 of described opposing parallel layout are in being arranged vertically, and another root is placed in steel pipe support pin 22 diagonal brace on outer side center horizon and is arranged in parallel in two the upper end of steel pipe support pin 21.
Steel pipe support pin 2 of the present invention regulates supporting leg 25 to be formed by fixedly connecting by removable shape formula connector 26 by upper supporting leg 23, intermediate support leg 24 and bottom; The lateral direction of two triangular steel pipe holders 1 is provided with three road bracing wires 7, as shown in Figure 3, become central horizontal line 71 and 30-60 degree angular direction, both sides oblique line 72 to arrange respectively respectively, per pass bracing wire 7 is that 16mm wire rope+5t chain block+5t ground auger or iron stake are formed by diameter.
Claims (4)
1. the mounting system of a freight ropeway, it is formed with the crossbeam being connected to two triangular steel pipe holder upper ends primarily of the left and right two triangular steel pipe holder that structure is identical, it is characterized in that described triangular steel pipe holder comprises three steel pipe support pin be connected together in upper end, and the mutual angle of three steel pipe support pin is not more than 60 degree, every root steel pipe support pin is at least detachably connected by two sections of steel pipes.
2. the mounting system of freight ropeway according to claim 1, it is characterized in that two described triangular steel pipe holders are positioned opposite, two opposing parallel layouts of steel pipe support pin wherein in two triangular steel pipe holders, another root steel pipe support pin is placed on the central horizontal line in outside symmetrically; The upper end of three described steel pipe supports is fixed together by a cross-beam connecting plate, and be fixedly linked the described crossbeam for installing middle carrying saddle between described cross-beam connecting plate.
3. the mounting system of freight ropeway according to claim 1 and 2, it is characterized in that the middle part of three described steel pipe support pin is connected to tube connector respectively by anchor ear between two, two steel pipe support pin of described opposing parallel layout are in being arranged vertically, and another root is placed in steel pipe support pin diagonal brace on outer side center horizon and is arranged in parallel in two the upper end of steel pipe support pin.
4. the mounting system of freight ropeway according to claim 1 and 2, is characterized in that described steel pipe support pin regulates supporting leg to be formed by fixedly connecting by removable shape formula connector by upper supporting leg, intermediate support leg and bottom; The lateral direction of two triangular steel pipe holders is provided with three road bracing wires, and become central horizontal line and 30-60 degree angular direction, both sides to arrange respectively respectively, per pass bracing wire is that 16mm wire rope+5t chain block+5t ground auger or iron stake are formed by diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410845980.5A CN104674612A (en) | 2014-12-31 | 2014-12-31 | Support system for cargo ropeway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410845980.5A CN104674612A (en) | 2014-12-31 | 2014-12-31 | Support system for cargo ropeway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104674612A true CN104674612A (en) | 2015-06-03 |
Family
ID=53310159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410845980.5A Pending CN104674612A (en) | 2014-12-31 | 2014-12-31 | Support system for cargo ropeway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104674612A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106314448A (en) * | 2016-09-20 | 2017-01-11 | 巨力索具股份有限公司 | Ropeway supporting frame and inverted installation method thereof |
CN108082194A (en) * | 2017-12-26 | 2018-05-29 | 浙江省送变电工程有限公司 | A kind of 6 tonnes of heavy cableways and its installation method |
CN114687257A (en) * | 2022-03-15 | 2022-07-01 | 浙江电力建设工程咨询有限公司 | Intelligent light fast-assembling cableway support and monitoring system thereof |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB114548A (en) * | 1917-07-13 | 1918-04-11 | William Lindsay Hamilton | Improvements in or connected with Aerial or Suspended Railways. |
CN201187172Y (en) * | 2008-04-16 | 2009-01-28 | 广西大学 | Bidirectional velocity-adjustable single arm cable railway support |
CN202063137U (en) * | 2011-04-14 | 2011-12-07 | 河南旭德隆电力设备有限公司 | Double-carrying-cable circulation-type freight cableway system |
CN102602398A (en) * | 2012-04-06 | 2012-07-25 | 中国十七冶集团有限公司 | Quick-transporting method and quick-transport device for foldable temporary cableways |
CN202744905U (en) * | 2012-08-03 | 2013-02-20 | 河南旭德隆机械有限公司 | Frame type stable support leg device for cableway transportation system |
CN202755276U (en) * | 2012-08-17 | 2013-02-27 | 中国十七冶集团有限公司 | 'Eight'-shaped tower used for temporary freight transport ropeway |
CN203113868U (en) * | 2013-02-20 | 2013-08-07 | 马鞍山十七冶工程科技有限责任公司 | Gantry tower for construction cableway |
CN203439035U (en) * | 2013-07-10 | 2014-02-19 | 河南旭德隆机械有限公司 | Combined type support for freight cableway |
CN203485917U (en) * | 2013-10-15 | 2014-03-19 | 河南旭德隆机械有限公司 | Combined support for cableway transportation |
-
2014
- 2014-12-31 CN CN201410845980.5A patent/CN104674612A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB114548A (en) * | 1917-07-13 | 1918-04-11 | William Lindsay Hamilton | Improvements in or connected with Aerial or Suspended Railways. |
CN201187172Y (en) * | 2008-04-16 | 2009-01-28 | 广西大学 | Bidirectional velocity-adjustable single arm cable railway support |
CN202063137U (en) * | 2011-04-14 | 2011-12-07 | 河南旭德隆电力设备有限公司 | Double-carrying-cable circulation-type freight cableway system |
CN102602398A (en) * | 2012-04-06 | 2012-07-25 | 中国十七冶集团有限公司 | Quick-transporting method and quick-transport device for foldable temporary cableways |
CN202744905U (en) * | 2012-08-03 | 2013-02-20 | 河南旭德隆机械有限公司 | Frame type stable support leg device for cableway transportation system |
CN202755276U (en) * | 2012-08-17 | 2013-02-27 | 中国十七冶集团有限公司 | 'Eight'-shaped tower used for temporary freight transport ropeway |
CN203113868U (en) * | 2013-02-20 | 2013-08-07 | 马鞍山十七冶工程科技有限责任公司 | Gantry tower for construction cableway |
CN203439035U (en) * | 2013-07-10 | 2014-02-19 | 河南旭德隆机械有限公司 | Combined type support for freight cableway |
CN203485917U (en) * | 2013-10-15 | 2014-03-19 | 河南旭德隆机械有限公司 | Combined support for cableway transportation |
Non-Patent Citations (1)
Title |
---|
国家电网公司基建部组: "《国家电网公司输电线路工程货运架空索道运输标准化手册》", 31 March 2010, article "支架" * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106314448A (en) * | 2016-09-20 | 2017-01-11 | 巨力索具股份有限公司 | Ropeway supporting frame and inverted installation method thereof |
CN108082194A (en) * | 2017-12-26 | 2018-05-29 | 浙江省送变电工程有限公司 | A kind of 6 tonnes of heavy cableways and its installation method |
CN108082194B (en) * | 2017-12-26 | 2024-06-18 | 浙江省送变电工程有限公司 | 6-Ton heavy cableway and installation method thereof |
CN114687257A (en) * | 2022-03-15 | 2022-07-01 | 浙江电力建设工程咨询有限公司 | Intelligent light fast-assembling cableway support and monitoring system thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201367023Y (en) | Bi-cable circulating goods cableway | |
CN103031978B (en) | The auxiliary mounting system vertical for iron tower of power transmission line group and method for assembling thereof | |
CN202063137U (en) | Double-carrying-cable circulation-type freight cableway system | |
CN108082194B (en) | 6-Ton heavy cableway and installation method thereof | |
CN103103925B (en) | Combined H-shaped steel column bracket | |
CN104674612A (en) | Support system for cargo ropeway | |
CN102535939B (en) | Inversely assembling process for standing stay wire V-type tower | |
CN202557390U (en) | Bridge type frame vehicle special for large-size transformer transportation | |
CN202936092U (en) | Lifting tool of wind power tower barrel | |
CN203472896U (en) | Electric rod transportation auxiliary handcart | |
CN203021207U (en) | Large-load multifunctional gantry crane capable of being flexibly spliced | |
CN204055772U (en) | A kind of transmission line construction freight ropeway running trolley | |
CN204573946U (en) | A kind of instruction lamp stand | |
CN203922511U (en) | A kind of branched some cableway movement system | |
CN102490805A (en) | Electric pole trailer | |
CN202755276U (en) | 'Eight'-shaped tower used for temporary freight transport ropeway | |
CN201941770U (en) | Curve transport cableway system | |
CN205224795U (en) | Cableway fast -assembling pylon | |
CN103573176B (en) | Power system Rapid Combination ascending tool | |
CN208021448U (en) | A kind of 6 tonnes of heavy cableways | |
CN202007522U (en) | Safety construction device for pole tower | |
CN205554023U (en) | Concave type bridge type transportation equipment of heavy load | |
CN205657401U (en) | Cable bridge | |
CN204751892U (en) | Rolling mill speed reducer special lifting device | |
CN203439030U (en) | Duplex cross-shaped saddle device for freight cableway transport |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150603 |
|
RJ01 | Rejection of invention patent application after publication |