CN203922511U - A kind of branched some cableway movement system - Google Patents

A kind of branched some cableway movement system Download PDF

Info

Publication number
CN203922511U
CN203922511U CN201420376063.2U CN201420376063U CN203922511U CN 203922511 U CN203922511 U CN 203922511U CN 201420376063 U CN201420376063 U CN 201420376063U CN 203922511 U CN203922511 U CN 203922511U
Authority
CN
China
Prior art keywords
rope
cableway
rest area
moving trolley
lift ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420376063.2U
Other languages
Chinese (zh)
Inventor
龚祖春
姚卫星
李晓明
高鹏飞
于志斌
马斌
周家锋
雷志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Original Assignee
GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd filed Critical GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Priority to CN201420376063.2U priority Critical patent/CN203922511U/en
Application granted granted Critical
Publication of CN203922511U publication Critical patent/CN203922511U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A kind of branched some cableway movement system, it comprises ropeway carrying-rope, ropeway carrying-rope is set up on support, ropeway carrying-rope is hung oneself and is provided with moving trolley, described moving trolley comprises He Tacai rest area, material rest area, and material rest area is surrounded by the baffle plate at bottom and four sides, and tower material rest area comprises frame type bracing frame, the upper backup pad of frame type bracing frame, upper backup pad below is hung and is provided with 2-6 Ge Ta material bindiny mechanism; Described Ta Cai bindiny mechanism comprises upper lift ring, and upper lift ring upper end and upper backup pad are fixed, lower end and lower lift ring snapping, and lower lift ring bottom and pipe link are fixed, and pipe link lower end is provided with thread segment, and thread segment is provided with nut.While adopting said structure, tower material and other construction material are put into moving trolley, by cableway transportation system, tower material is transported in mountain area, can save greatly manpower, greatly improve the efficiency of transporting of tower material and other construction material.

Description

A kind of branched some cableway movement system
Technical field
The utility model relates to a kind of cableway, is specifically related to a kind of cableway of the equipment that transmits electric power.
Background technology
The newly-built circuit of current power transmission line project has path greatly all to belong to alpine terrain, is wherein no lack of and has tall and big mountain ridge landform.The general mountain shape of these landform rises and falls very large, and in mountain, vegetation is luxuriant, is also primarily that the most important problem that needs solution is transport of materials in mountain construction.And in extra high voltage network construction, main material length of steel tower can reach more than 10 meters, weight also can reach 800kg, and the tower material transport under this kind of topographic condition is very difficult.
In mountain area, carrying tower material or other construction material is generally the mode that adopts a dead lift, a set of complete iron tower component is transported to a place from mountain area and be transported to another place, such as being transported to mountain top from the foot of the hill, the personnel that need to carry come and go many times back and forth, so not only waste greatly manpower, and had the problem that handling efficiency is extremely low.
Summary of the invention
Technical problem to be solved in the utility model is for above-mentioned the deficiencies in the prior art, and branched some cableway movement system of the one providing, it can solve and in mountain area, carry iron tower component waste of manpower and the low problem of handling efficiency.
The object of utility model is achieved in that
A kind of branched some cableway movement system, it comprises ropeway carrying-rope, ropeway carrying-rope is set up on support, ropeway carrying-rope is hung oneself and is provided with moving trolley, described moving trolley comprises He Tacai rest area, material rest area, and material rest area is surrounded by the baffle plate at bottom and four sides, and tower material rest area comprises frame type bracing frame, the upper backup pad of frame type bracing frame, upper backup pad below is hung and is provided with 2-6 Ge Ta material bindiny mechanism; Described Ta Cai bindiny mechanism comprises upper lift ring, and upper lift ring upper end and upper backup pad are fixed, lower end and lower lift ring snapping, and lower lift ring bottom and pipe link are fixed, and pipe link lower end is provided with thread segment, and thread segment is provided with nut.
Below nut and be positioned at pipe link bottom and be provided with locating dowel pin.
The moving trolley lower shoe left and right sides is baffle plate, between two baffle plates, is provided with opening.
Above-mentioned ropeway carrying-rope is cable wire, and ropeway carrying-rope has 4 and sets up between support and support.
Above-mentioned pipe link is steel straight-bar.
The utility model has been obtained following technique effect:
While adopting said structure, tower material and other construction material are put into moving trolley, by cableway transportation system, tower material is transported in mountain area, can save greatly manpower, greatly improve the efficiency of transporting of tower material and other construction material; When use, the material such as sand material, reinforcing bar is inserted in the material rest area on moving trolley, pipe link is inserted in the bolt hole on the flange of tower material steel pipe connecting portion, screw on, plug pin, just can well the flange on tower material steel pipe be connected with moving trolley, by 1-2 transport back and forth of single moving trolley, just can transport a steel tower and assemble required workpiece and material;
Adopt below nut and be positioned at pipe link bottom and be provided with the structure of locating dowel pin, because the weight of tower material is heavier, maximum can reach several tons, and now nut may come off, and locating dowel pin can effectively prevent that nut from coming off, and improves the safety in tower material transportation.
Adopting the moving trolley lower shoe left and right sides is baffle plate, between two baffle plates, be provided with the structure of opening, because the length of tower material is longer, be not easy to place on moving trolley, adopt said structure, the upper end Yu Tacai bindiny mechanism of tower material is connected, and stretch out from the opening of moving trolley base plate lower end, can well realize the placement of longer tower material on moving trolley.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is integral structure schematic diagram of the present utility model;
Fig. 2 is the structural representation of moving trolley in Fig. 1;
Fig. 3 is the partial enlarged drawing at A place in Fig. 2;
Fig. 4 is the schematic diagram that Tu1Zhong Ta material bindiny mechanism is connected with tower material.
Detailed description of the invention
A branched some cableway movement system as shown in Figure 1, it comprises ropeway carrying-rope 1, and ropeway carrying-rope 1 is set up on support 2, and ropeway carrying-rope 1 is hung oneself and is provided with moving trolley 3.
As shown in Figure 2, moving trolley 3 comprises material rest area 3-1 and tower material rest area 3-2, and material rest area is surrounded by the baffle plate at bottom and four sides, and tower material rest area comprises frame type bracing frame 4, the upper backup pad 4-1 of frame type bracing frame 4, upper backup pad 4-1 hangs below and is provided with 2-6 Ge Ta material bindiny mechanism 5;
As described in Figure 3, Ta Cai bindiny mechanism 5 comprises upper lift ring 5-1, and upper lift ring upper end and upper backup pad 4-1 fix, lower end and lower lift ring 5-2 snapping, and lower lift ring bottom and pipe link 5-3 fix, and pipe link 5-3 lower end is provided with thread segment, and thread segment is provided with nut 5-4.
Below nut 5-4 and be positioned at pipe link bottom and be provided with locating dowel pin 5-5.
The moving trolley 3 lower shoe left and right sides are baffle plate 3-3, are provided with opening 3-4 between two baffle plates.
Preferably, ropeway carrying-rope is cable wire, and ropeway carrying-rope has 4 and sets up between support and support.
Preferably, pipe link 5-3 is steel straight-bar.
Adopt said structure, when use, the material such as sand material, reinforcing bar is inserted in the material rest area 3-1 on moving trolley, as shown in Figure 4, pipe link is inserted in the bolt hole on the flange 6 of tower material steel pipe connecting portion, screw on, plug pin, just can well the flange on tower material steel pipe 7 be connected with moving trolley, after operation cableway system, by 1-2 transport back and forth of single moving trolley, just can transport a steel tower and assemble required workpiece and material; Like this by 1-2 transport back and forth of single moving trolley, just a steel tower be can transport and required workpiece and material assembled, well complete tower material and other construction material in the transport in mountain area, saved greatly manpower, greatly improved the efficiency of transporting of tower material and other construction material.

Claims (5)

1. branched some cableway movement system, it comprises ropeway carrying-rope (1), ropeway carrying-rope (1) is set up on support (2), ropeway carrying-rope (1) is hung oneself and is provided with moving trolley (3), it is characterized in that: described moving trolley (3) comprises material rest area (3-1) and tower material rest area (3-2), material rest area is surrounded by the baffle plate at bottom and four sides, tower material rest area comprises frame type bracing frame (4), the upper backup pad (4-1) of frame type bracing frame (4), upper backup pad (4-1) below is hung and is provided with 2-6 Ge Ta material bindiny mechanism (5); Described Ta Cai bindiny mechanism (5) comprises upper lift ring (5-1), upper lift ring upper end and upper backup pad (4-1) are fixing, lower end and lower lift ring (5-2) snapping, lower lift ring bottom and pipe link (5-3) are fixing, and pipe link (5-3) lower end is provided with thread segment, and thread segment is provided with nut (5-4).
2. branched some cableway movement system according to claim 1, is characterized in that: in the below of nut (5-4) and be positioned at pipe link bottom and be provided with locating dowel pin (5-5).
3. branched some cableway movement system according to claim 1, is characterized in that: moving trolley (3) the lower shoe left and right sides is baffle plate (3-3), is provided with opening (3-4) between two baffle plates.
4. branched some cableway movement system according to claim 1, is characterized in that: described ropeway carrying-rope is cable wire, ropeway carrying-rope has 4 and sets up between support and support.
5. branched some cableway movement system according to claim 1, is characterized in that: described pipe link (5-3) is steel straight-bar.
CN201420376063.2U 2014-07-09 2014-07-09 A kind of branched some cableway movement system Active CN203922511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420376063.2U CN203922511U (en) 2014-07-09 2014-07-09 A kind of branched some cableway movement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420376063.2U CN203922511U (en) 2014-07-09 2014-07-09 A kind of branched some cableway movement system

Publications (1)

Publication Number Publication Date
CN203922511U true CN203922511U (en) 2014-11-05

Family

ID=51818367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420376063.2U Active CN203922511U (en) 2014-07-09 2014-07-09 A kind of branched some cableway movement system

Country Status (1)

Country Link
CN (1) CN203922511U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106276627A (en) * 2016-09-27 2017-01-04 湖南省中南桥梁安装工程有限公司 A kind of multi-tower continuous across hoist cable crane
CN106877231A (en) * 2015-12-10 2017-06-20 中国电力科学研究院 A kind of stent car for rushing to repair transmission line of electricity
CN112310884A (en) * 2020-11-27 2021-02-02 国家电网有限公司 Automatic scheduling operation device for power grid maintenance

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106877231A (en) * 2015-12-10 2017-06-20 中国电力科学研究院 A kind of stent car for rushing to repair transmission line of electricity
CN106877231B (en) * 2015-12-10 2020-12-29 中国电力科学研究院 Support vehicle for rush-repair of power transmission line
CN106276627A (en) * 2016-09-27 2017-01-04 湖南省中南桥梁安装工程有限公司 A kind of multi-tower continuous across hoist cable crane
CN112310884A (en) * 2020-11-27 2021-02-02 国家电网有限公司 Automatic scheduling operation device for power grid maintenance

Similar Documents

Publication Publication Date Title
CN204126358U (en) The high electric pole of a kind of safety carries establishes device
CN203922511U (en) A kind of branched some cableway movement system
CN204198225U (en) A kind of suspension bracket of lifting for prefabricated U-shaped aqueduct and device
CN203373022U (en) Self-lifting type cableway transportation device
CN103953061B (en) A kind of offshore wind farm jacket frame foundation structure
CN203781677U (en) Trial mass device of crane
CN203158194U (en) Bundling device for water transportation of transformer
CN201647823U (en) Connecting device between crown block main beam and end beam
CN102277999B (en) Large-section portal steel structure holding pole
CN201458542U (en) Portable hoisting gallows frame
CN202031370U (en) Concrete-steel structure composite wind power tower
CN104674612A (en) Support system for cargo ropeway
CN203485917U (en) Combined support for cableway transportation
CN203439035U (en) Combined type support for freight cableway
CN204437497U (en) Built-in type under ground piping lifting device
CN203715156U (en) Convenient crane
CN203961424U (en) A kind of special tooling of installation and transportation electric pole
CN206955437U (en) A kind of bird assembly jig
CN201882809U (en) Door type cantilever steel frame hoisting equipment used for high hoisting
CN202144673U (en) Integrated base station fixing structure
CN205494769U (en) Novel can dismantle sports fitness thick stick
CN203923910U (en) A kind of instrument for bridge board lifting
CN203439033U (en) Cross-shaped saddle assembly for freight cableway transport
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN217791923U (en) Intelligence lift table bearing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant