CN104652714A - Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels - Google Patents

Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels Download PDF

Info

Publication number
CN104652714A
CN104652714A CN201510050129.8A CN201510050129A CN104652714A CN 104652714 A CN104652714 A CN 104652714A CN 201510050129 A CN201510050129 A CN 201510050129A CN 104652714 A CN104652714 A CN 104652714A
Authority
CN
China
Prior art keywords
interior lining
lining panel
purlin
roofing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510050129.8A
Other languages
Chinese (zh)
Other versions
CN104652714B (en
Inventor
邓迪
韦克雪
黄华高
谢植二
谢茂兵
李淑玲
何勇
韦元基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Industry Group Metallurgical Construction Co., Ltd.
Original Assignee
Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Zhuang Autonomous Region Metallurgical Construction Co filed Critical Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority to CN201510050129.8A priority Critical patent/CN104652714B/en
Publication of CN104652714A publication Critical patent/CN104652714A/en
Application granted granted Critical
Publication of CN104652714B publication Critical patent/CN104652714B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a construction method for pore-forming installation of a self-made mold for steel structure roofing lining panels. The construction method comprises the following steps of surveying and setting out, installing purlines, making the mold, forming holes in the lining panels, hanging the lining panels to an operating platform, installing the roofing lining panels and cleaning. Nail lines of the roofing lining panels of which the construction is finished through the steps are horizontally and vertically straight, and the roofing lining panels have an attractive impression. The construction method disclosed by the invention has the advantages of being light and fast, labor-saving, high in construction speed, shortened in construction period, energy-saving, reduced in consumption and very low in input cost, simple in operation and easy to master, and capable of obtaining a fairly good effect without use of large-scale equipment.

Description

The construction method that a kind of steel structural roof interior lining panel is installed from molding jig pore-forming
Technical field
The present invention relates to the construction method that a kind of steel structural roof interior lining panel uses mould pore-forming to install, for building field.
Background technology
At present in construction work industrial premises, public building long-span roofing, for reducing roofing deadweight, alleviate load, usually adopt interior lining panel roofing, interior lining panel roofing is a kind of novel construction process formed in recent years, due to its easy construction, the superiority such as technique is unique, water resistance is good, attractive appearance, be used widely in recent years, and achieve good economic benefit and social benefit.But the steel structure roofing liner interior lining panel of conventional method construction is uneven, base surface exists nail road not straight, leave over the phenomenons such as nail is too much after finished product, had a strong impact on the sensorial effects of roofing.
Summary of the invention
For overcoming the above problems, the invention provides the construction method that a kind of steel structural roof interior lining panel uses mould pore-forming to install.
Technical scheme of the present invention is: the construction method that a kind of steel structural roof interior lining panel uses mould pore-forming to install, comprise the punching of surveying setting-out, mounting purlines, making mould and interior lining panel, interior lining panel winches to operating platform, roofing interior lining panel is installed and cleanup step, concrete operations condition is as follows:
Described surveying setting-out carries out roofing interior lining panel row plate arrangement diagram in advance according to design drawing and engineering entity size before construction, then carry out on-the-spot unwrapping wire according to row's plate arrangement diagram, by often across or node eject the installation control line of roof purline;
Described mounting purlines is constructed by traditional steel house panel installation techniques; During construction, main purlin and support node plate, secondary purlin and main purlin with bolts, between secondary purlin and secondary purlin, spreading is with bolts by purlin supporting plate, and the connecting bolt of primary and secondary purlin must be tightened by shimming one by one; Strictly must check top, slope and toe absolute altitude when main purlin is installed, bracing wire corrects, fixing; When chance joint is installed not straight, special tool must be adopted to carry out scene and again to get hole, during secondary purlin typesetting, will ensure that gutter position is accurate, first by gutter place fixed flat during installation;
Described making mould and interior lining panel punching are that the first width according to interior lining panel and purlin center distance make a rectangular base, width 2mm wider than interior lining panel, length direction 1m shorter in pre-making interior lining panel length, the interior lining panel be convenient to making hole carries away base, steel nail is utilized to be fixed into a firm base, mark is carried out according to purlin center to center distance again on base length direction, this be labeled as after on surface layer interior lining panel snap the line ready, base is put on one piece of smooth ground well, 5-20 pieces of interior lining panels are put into mould, according to base being marked at the good line of ink marker of bullet on surface layer interior lining panel, then drilling,
It is after on the mould of ground, pore-forming completes that described interior lining panel winches to operating platform, puts neat by length classification, utilizes the position, hole accomplished fluently as suspension centre, slings into punch die on the operational platform with the rope made of hemp; Once can lift by crane 4-5 pieces simultaneously, lift by crane again after installing, avoid load on operating platform excessive and have influence on the security performance of operating platform.For preventing hoisting process interior lining panel to be out of shape, shaped steel should be adopted during lifting to make backing, avoid interior lining panel to deform in hoisting process, material placement location holding capacity situation should be taken simultaneously into consideration and determine once to lift quantity, reduce the transhipment of artificial secondary as far as possible.During vertical transport sheet material, should note guaranteeing that all interior lining panels face up, and all overlap edges (female rib) should towards installing the direction started.
It is be not less than a pitch of waves according to the transverse lap of lower plywood that described roofing interior lining panel is installed, longitudinal lap joint is not less than 120mm, the crest using tap bolt to penetrate lower plywood vertical wave line is fixed on roofing time purlin, and tap bolt must be vertical with secondary purlin supporting surface, fixing firm;
Described cleaning is that constructor's use water, by interior lining panel bottom surface pollution place scrub, scratches place for occurring, the paint-adding pen being applied to mother matrix solid colour mends, and avoids the formation of aberration and affects attractive in appearance when after the interior lining panel in installation operating platform region.
Know-why:
In conventional method, workman faces upward head on the operational platform and to exert oneself nailing, causes position, hole wayward and the shortcoming that trains off, thus makes the interior lining panel nail road of having constructed horizontal vertically uneven, has a strong impact on attractive in appearance.Key technology of the present invention is pore-forming on the mould of ground, improve drilling precision and drilling efficiency, overcome workman to face upward head on the operational platform and to exert oneself nailing, cause position, hole wayward and the shortcoming that trains off, thus ensure that the construction quality of the color steel lining plate of roofing.
Outstanding advantages of the present invention is:
1. economical: adopt mould construction, have light and fast, a rapid shaping about 20 pieces of interior lining panels, save manpower, speed of application is fast, the reduction of erection time, energy-saving and cost-reducing, the cost of input is considerably less, obtains effect fairly good;
2. attractive in appearance: the steel structure roofing interior lining panel nail road adopting the present invention to construct is smooth vertical and horizontal, attractive in appearance;
3. simple to operate: simple to operate, be easy to grasp, do not need main equipment.
Accompanying drawing explanation
Fig. 1 is the process chart of the construction method that steel structural roof interior lining panel of the present invention uses mould pore-forming to install.
Detailed description of the invention
Below by way of drawings and Examples, technical scheme of the present invention is further illustrated.
Embodiment 1
An instantiation of the construction method that steel structural roof interior lining panel of the present invention uses mould pore-forming to install, comprises the steps:
On probation in certain company five meters of car technological transformation project assembly shop civil engineerings and public work roof panel are constructed, carry out roofing interior lining panel row plate arrangement diagram according to engineering entity size before construction, and carry out on-the-spot unwrapping wire by figure; Traditionally construction and installation purlin; A rectangular base is made according to the width of interior lining panel and purlin center distance, width 2mm wider than interior lining panel, length direction 1m slightly shorter in pre-making interior lining panel length, then utilize steel nail on smooth good ground, be fixed into a firm base, mark is carried out according to purlin center to center distance again on base length direction, 15 pieces of interior lining panels being put into mould simultaneously, according to base being marked at the good line of ink marker of bullet on surface layer interior lining panel, then punching; After pore-forming completes, put neat by length classification, utilize the position, hole accomplished fluently as suspension centre, according to a conventional method interior lining panel handling on operating platform, once lift by crane 5 pieces simultaneously; Adopt penetration fixed installation interior lining panel, first by interior lining panel according to the direction orthogonal with gutter, be emitted on mounted purlin, extend in gutter by designing requirement, the bit alignment purlin position, hole first will made time fixing, straight rear tapping screw squeezes into corresponding aperture position; After the interior lining panel in operating platform region installs, with water by interior lining panel bottom surface pollution place scrub, scratch place for occurring, the paint-adding pen for mother matrix solid colour mends.Rear quality of having constructed is very good, obtains the favorable comment of Construction Party.
Embodiment 2
Another instantiation of the construction method that steel structural roof interior lining panel of the present invention uses mould pore-forming to install, comprises the steps:
On probation in certain company's passenger car resettlement first phase technological transformation project drop forging shop civil engineering and public work roof panel are constructed, carry out roofing interior lining panel row plate arrangement diagram according to design drawing before construction, and carry out on-the-spot unwrapping wire by figure; Traditionally construction and installation purlin; A rectangular base is made according to the width of interior lining panel and purlin center distance, width 2mm wider than interior lining panel, length 1m shorter in interior lining panel length, then steel nail is utilized to be fixed into firm base on smooth good ground, base length direction carries out mark according to purlin center to center distance, 20 pieces of interior lining panels being put into mould simultaneously, according to being marked at the good line of ink marker of bullet on surface layer interior lining panel, then punching; After pore-forming completes, put neat by length classification, utilize the position, hole accomplished fluently as suspension centre, according to a conventional method interior lining panel handling on operating platform, once lift by crane 4 pieces simultaneously; Adopt penetration fixed installation interior lining panel, first by interior lining panel according to the direction orthogonal with gutter, be emitted on mounted purlin, the bit alignment purlin position, hole first will made time fixing, straight rear tapping screw squeezes into corresponding aperture position; After the interior lining panel in operating platform region installs, with water by interior lining panel bottom surface pollution place scrub, scratch place for occurring, the paint-adding pen for mother matrix solid colour mends.Rear quality of having constructed is very good, after this project final acceptance of construction, obtains Guangxi high grade project prize.
Embodiment 3
An instantiation of the construction method that steel structural roof interior lining panel of the present invention uses mould pore-forming to install, comprises the steps:
On probation in the engineering roof panel construction of certain passenger car resettlement first phase technological transformation project body workshop, carry out roofing interior lining panel row plate arrangement diagram according to engineering entity size before construction, and carry out on-the-spot unwrapping wire by figure; Traditionally construction and installation purlin; A rectangular base is made according to the width of interior lining panel and purlin center distance, width 2mm wider than interior lining panel, length 1m shorter in interior lining panel length, then steel nail is utilized to be fixed into firm base on smooth good ground, mark is carried out according to purlin center to center distance again on base length direction, 20 pieces of interior lining panels being put into mould simultaneously, according to base being marked at the good line of ink marker of bullet on surface layer interior lining panel, then punching; After pore-forming completes, put neat by length classification, utilize the position, hole accomplished fluently as suspension centre, according to a conventional method interior lining panel handling on operating platform, once lift by crane 5 pieces simultaneously; Adopt penetration fixed installation interior lining panel, first by interior lining panel according to the direction orthogonal with gutter, be emitted on mounted purlin, the bit alignment purlin position, hole first will made time fixing, straight rear tapping screw squeezes into corresponding aperture position; After the interior lining panel in operating platform region installs, with water by interior lining panel bottom surface pollution place scrub, scratch place for occurring, the paint-adding pen for mother matrix solid colour mends.Rear quality of having constructed is very good, after this project final acceptance of construction, obtains the prize of national high grade project.

Claims (1)

1. the construction method of steel structural roof interior lining panel use mould pore-forming installation, it is characterized in that, comprise the punching of surveying setting-out, mounting purlines, making mould and interior lining panel, interior lining panel winches to operating platform, roofing interior lining panel is installed and cleanup step, concrete operations condition is as follows:
Described surveying setting-out carries out roofing interior lining panel row plate arrangement diagram in advance according to design drawing and engineering entity size before construction, then carry out on-the-spot unwrapping wire according to row's plate arrangement diagram, by often across or node eject the installation control line of roof purline;
Described mounting purlines is constructed by traditional steel house panel installation techniques; During construction, main purlin and support node plate, secondary purlin and main purlin with bolts, between secondary purlin and secondary purlin, spreading is with bolts by purlin supporting plate, and the connecting bolt of primary and secondary purlin must be tightened by shimming one by one; Strictly must check top, slope and toe absolute altitude when main purlin is installed, bracing wire corrects, fixing; When chance joint is installed not straight, special tool must be adopted to carry out scene and again to get hole, during secondary purlin typesetting, will ensure that gutter position is accurate, first by gutter place fixed flat during installation;
Described making mould and interior lining panel punching are that the first width according to interior lining panel and purlin center distance make a rectangular base, width 2mm wider than interior lining panel, length direction 1m shorter in pre-making interior lining panel length, steel nail is utilized to be fixed into a firm base, mark is carried out according to purlin center to center distance again on base length direction, this be labeled as after on surface layer interior lining panel snap the line ready, base is put on one piece of smooth ground well, 5-20 pieces of interior lining panels are put into mould, according to base being marked at the good line of ink marker of bullet on surface layer interior lining panel, then drilling;
It is after on the mould of ground, pore-forming completes that described interior lining panel winches to operating platform, puts neat by length classification, utilizes the position, hole accomplished fluently as suspension centre, slings into punch die on the operational platform with the rope made of hemp;
It is be not less than a pitch of waves according to the transverse lap of lower plywood that described roofing interior lining panel is installed, longitudinal lap joint is not less than 120mm, the crest using tap bolt to penetrate lower plywood vertical wave line is fixed on roofing time purlin, and tap bolt must be vertical with secondary purlin supporting surface, fixing firm;
Described cleaning is that constructor's use water, by interior lining panel bottom surface pollution place scrub, scratches place for occurring, the paint-adding pen being applied to mother matrix solid colour mends, and avoids the formation of aberration and affects attractive in appearance when after the interior lining panel in installation operating platform region.
CN201510050129.8A 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels Active CN104652714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510050129.8A CN104652714B (en) 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510050129.8A CN104652714B (en) 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels

Publications (2)

Publication Number Publication Date
CN104652714A true CN104652714A (en) 2015-05-27
CN104652714B CN104652714B (en) 2017-01-18

Family

ID=53244301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510050129.8A Active CN104652714B (en) 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels

Country Status (1)

Country Link
CN (1) CN104652714B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2632196Y (en) * 2003-08-11 2004-08-11 于田 Roof screw hided composite lighting boards
JP2008266888A (en) * 2007-04-16 2008-11-06 Gantan Beauty Ind Co Ltd Fixing structure of roofing material and roofing material construction method
CN201395899Y (en) * 2009-03-12 2010-02-03 厦门新长诚钢构浪板有限公司 Water interruption line structure of lightweight steel factory building roof boards
CN201420340Y (en) * 2009-04-13 2010-03-10 百安力钢结构应用科技有限公司 Metal roofing system
CN201972319U (en) * 2011-02-28 2011-09-14 厦门市国安特机械工程有限公司 Connecting device for profiled steel plate and purline
CN102409811A (en) * 2011-08-12 2012-04-11 中国建筑第八工程局有限公司 Air-tight heat insulation metal roof and construction method thereof
CN202745285U (en) * 2012-08-21 2013-02-20 森特士兴集团股份有限公司 Composite waterproof roofing system
CN202882239U (en) * 2012-08-27 2013-04-17 上海精锐金属建筑系统有限公司 Profiled metal roofing board free end portion wind-resistant connecting piece

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2632196Y (en) * 2003-08-11 2004-08-11 于田 Roof screw hided composite lighting boards
JP2008266888A (en) * 2007-04-16 2008-11-06 Gantan Beauty Ind Co Ltd Fixing structure of roofing material and roofing material construction method
CN201395899Y (en) * 2009-03-12 2010-02-03 厦门新长诚钢构浪板有限公司 Water interruption line structure of lightweight steel factory building roof boards
CN201420340Y (en) * 2009-04-13 2010-03-10 百安力钢结构应用科技有限公司 Metal roofing system
CN201972319U (en) * 2011-02-28 2011-09-14 厦门市国安特机械工程有限公司 Connecting device for profiled steel plate and purline
CN102409811A (en) * 2011-08-12 2012-04-11 中国建筑第八工程局有限公司 Air-tight heat insulation metal roof and construction method thereof
CN202745285U (en) * 2012-08-21 2013-02-20 森特士兴集团股份有限公司 Composite waterproof roofing system
CN202882239U (en) * 2012-08-27 2013-04-17 上海精锐金属建筑系统有限公司 Profiled metal roofing board free end portion wind-resistant connecting piece

Also Published As

Publication number Publication date
CN104652714B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN101691191B (en) Self-climbing tower crane
CN105696789A (en) Vertical aluminum mould building system and construction method thereof
CN101892717A (en) Large autoclaved lightweight aerated concrete slab and installation method thereof
CN202430997U (en) Reinforcing device for template of sump or elevator shaft
CN204040458U (en) A kind of aluminum template system aluminium extruded sections
CN103216050B (en) A kind of building in the style of the ancients eave-rafter construction method of installation
CN101858133B (en) Wall connecting piece of plug-in type low-carbon heat preservation energy-saving board
CN204455779U (en) Combined type channel-section steel formwork leverage
CN104652714A (en) Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels
CN205502067U (en) Prefabricated corridor component and air film ball storehouse shock insulation buffering precast concrete corridor
CN201738538U (en) Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate
CN106522544A (en) Root-rotting-preventing compensating device for formwork
CN202520011U (en) Floor shore device
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN212176324U (en) Ancient building roof board taking wooden rafters and wooden roof boarding as bottom die
CN102767280A (en) Quick-dismounting system and installation method for top plate
CN204418666U (en) A kind of building site is with there being side wall stair template
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN101761253A (en) Construction method of coal chute with lined wear-resistant steel plates
CN207144359U (en) A kind of exquisite log wall decorative cover structure
CN204826634U (en) End or side or top template honeycomb formula girder of board or roof beam
CN205804940U (en) The standardized panel structure in a kind of template screw hole position
CN205025024U (en) Semicircle wood wallboard
CN205025084U (en) Compound template of aluminium frame bamboo offset plate
CN205100546U (en) Movement joint shear wall template structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xie Maobing

Inventor after: Liao Libo

Inventor after: Huang Xiaozhang

Inventor after: Li Liping

Inventor after: Xie Zhier

Inventor after: Deng Di

Inventor after: Huang Huagao

Inventor after: Li Shuling

Inventor after: Wei Kexue

Inventor after: Tang Feng

Inventor after: Zhou Shanxue

Inventor after: He Yong

Inventor after: Ou Zhiyong

Inventor before: Deng Di

Inventor before: Wei Kexue

Inventor before: Huang Huagao

Inventor before: Xie Zhier

Inventor before: Xie Maobing

Inventor before: Li Shuling

Inventor before: He Yong

Inventor before: Wei Yuanji

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Construction Industry Group Metallurgical Construction Co., Ltd.

Address before: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: Guangxi Zhuang Autonomous Region metallurgical construction company

CP01 Change in the name or title of a patent holder