CN102409811A - Airtight and heat-insulating metal roof and its construction method - Google Patents

Airtight and heat-insulating metal roof and its construction method Download PDF

Info

Publication number
CN102409811A
CN102409811A CN2011102305443A CN201110230544A CN102409811A CN 102409811 A CN102409811 A CN 102409811A CN 2011102305443 A CN2011102305443 A CN 2011102305443A CN 201110230544 A CN201110230544 A CN 201110230544A CN 102409811 A CN102409811 A CN 102409811A
Authority
CN
China
Prior art keywords
metal
fixed
bottom plate
heat
metal bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102305443A
Other languages
Chinese (zh)
Other versions
CN102409811B (en
Inventor
邵启雁
付梓
崔卓立
蔡庆军
王荣涛
郭青松
吴黄忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN 201110230544 priority Critical patent/CN102409811B/en
Publication of CN102409811A publication Critical patent/CN102409811A/en
Application granted granted Critical
Publication of CN102409811B publication Critical patent/CN102409811B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses an airtight heat insulation metal roof and a construction method thereof, wherein the airtight heat insulation metal roof comprises a roof truss and also comprises the following components: the purlin supports are welded on the truss at fixed intervals; the purlins are fixed on the purlin supports through bolts; the adjacent metal bottom plates are buckled with each other and are fixed on the purlines through a plurality of fixing bases; the adjacent metal top plates are mutually buckled and fixed on the metal bottom plate through a heat-insulation metal fixing seat; the glass wool is laid between the metal bottom plate and the metal top plate. By adopting the airtight heat-insulation metal roof and the construction method thereof, the airtight heat-insulation construction of roofs of high-tech industrial factory buildings such as electronics, biopharmaceuticals and the like is realized, and the airtight heat-insulation metal roof has the advantages of high construction efficiency, low construction cost and few construction procedures.

Description

Airtight insulated metal roofing and job practices thereof
Technical field
The present invention relates to a kind of roofing and job practices thereof, refer to a kind of airtight insulated metal roofing and job practices thereof especially.
Background technology
Along with developing rapidly of high-tech industry such as China's electronics, bio-pharmaceuticals become a kind of trend; There is the factory building of airtight heat insulation requirement to increase gradually; But present conventional roofing and job practices thereof are not suitable for the airtight heat insulation constructions of high-tech industry such as electronics, bio-pharmaceuticals, and can not satisfy airtight heat insulation requirement well, and it is slow to have speed of application simultaneously; Problems such as construction cost is high, and working procedure is loaded down with trivial details.
Summary of the invention
The objective of the invention is to overcome the defective of prior art, and a kind of airtight insulated metal roofing and job practices thereof are provided, it has airtight thermal stability height, can satisfy airtight heat insulation requirement, and efficiency of construction is high, and construction cost is low, the advantage that working procedure is few.
The technical scheme that realizes above-mentioned purpose is:
A kind of airtight insulated metal roofing of the present invention, roofing is fixed on the purlin, comprising:
A plurality of purlin holders are welded on the said truss said purlin holder constant spacing;
A plurality of purlins, said purlin pass through bolt in said purlin holder;
A plurality of metal base plates, mutual snapping between the said adjacent metal base plate, and be fixed on the said purlin through the plurality of fixed base;
A plurality of metal top plate, mutual snapping and be fixed on the said metal base plate between the said adjacent metal top board through a heat insulating metal holder;
Glass wool, said glass wool are layed between said metal base plate and the said metal top plate.
Above-mentioned adjacent metal base plate comprises one first metal base plate and one second metal base plate; The end of said first metal base plate forms first buckling parts of one first metal base plate; The end of second metal base plate forms second buckling parts of one second metal base plate; Said first metal base plate and said second metal base plate are anchored on said firm banking through one first clip component: first end chucking of the said first clip component is fixed between the two adjacent said firm bankings; Second end of the said first clip component is fastened on first buckling parts of said first metal base plate, and is fastened under second buckling parts of said second metal base plate.
Paste the EPDM adhesive tape between second end of first buckling parts of above-mentioned first metal base plate, the first clip component and second buckling parts of second metal base plate, the button seam place of second buckling parts of said second metal base plate and first buckling parts of first metal base plate is marked with fluid sealant.
Above-mentioned adjacent metal top board comprises one first metal top plate and one second metal top plate, and the end of said first metal top plate forms first buckling parts of one first metal top plate; The end of said second metal top plate forms second buckling parts of one second metal top plate; Said first metal top plate and said second metal top plate are anchored on said heat insulating metal holder through one second clip component; First end chucking of the said second clip component is fixed in the top of said heat insulating metal holder, and the bottom chucking of heat insulating metal holder is fixed on second buckling parts of said second metal base plate; Second end is fastened on first buckling parts of said first metal top plate, and is fastened under second buckling parts of said second metal top plate.
Above-mentioned heat insulating metal holder is made up of three parts, and top is that stainless steel, centre are divided into galvanized steel plain sheet for white flame-retarded resin, bottom.
A kind of job practices based on airtight insulated metal roofing of the present invention may further comprise the steps:
S1: set up roofing truss, with a plurality of purlin holder constant spacings be welded on the said truss, again with a plurality of purlins through bolt in said purlin holder;
S2: with plurality of fixed base constant spacing be welded on the said purlin;
S3: on said firm banking, lay metal base plate, mutual snapping and being fixed on the said firm banking between the said adjacent metal base plate;
S4: on said metal base plate, lay glass wool;
S5: on said glass wool, lay metal top plate, mutual snapping and be fixed on the said metal base plate between the said adjacent metal top board through a heat insulating metal holder;
S6: carry out airtight receipts limit at gable, ridge, cornice place, will receive side plate and truss is fixed, and accomplish the laying of edge's metal base plate and metal top plate.
Through following steps to carrying out mutual snapping between the above-mentioned adjacent metal base plate and being fixed on the said firm banking:
Form one first buckling parts in the end of one first metal base plate;
End at second metal base plate of adjacent said first metal base plate forms one second buckling parts;
First end of one first clip component chucking is fixed between the two adjacent fixed bases, second end of the said first clip component is fastened on first buckling parts of said first metal base plate;
Second buckling parts of said second metal base plate is fastened on second end of the said first clip component.
Through following steps to carrying out mutual snapping between the said adjacent metal top board and being fixed on the said metal base plate:
Form one first buckling parts in the end of one first metal top plate;
End in second metal top plate of adjacent said first metal top plate forms one second buckling parts;
First end of one second clip component chucking is fixed in the top of said heat insulating metal holder, second end of the said second clip component is fastened on first buckling parts of said first metal top plate;
The bottom chucking of said heat insulating metal holder is fixed on second buckling parts of said second metal base plate,
Second buckling parts of said second metal top plate is fastened on second end of the said second clip component.
Be fastened at second end before first buckling parts of said first metal base plate, on first buckling parts of said first metal base plate, paste the EPDM adhesive tape earlier the above-mentioned first clip component; Be fastened at second buckling parts before second end of the said first clip component, on second end of the said first clip component, paste the EPDM adhesive tape earlier said second metal base plate.
After second buckling parts with above-mentioned second metal base plate is fastened on second end of the said first clip component, also comprise step: inject fluid sealant at second buckling parts of said second metal base plate and the outside button of first buckling parts seam place of said first metal base plate.
The present invention has been owing to adopted above technical scheme, makes it have following beneficial effect to be:
The airtight thermal stability of roofing is high, and is anticorrosion, antirust and fireproof performance is good, and simple in structure being convenient to installed; Realize the airtight heat insulation construction of high-tech industry factory building roofs such as electronics, bio-pharmaceuticals, guaranteed the speed of application of double-deck airtight insulated metal roofing, reduced the operation of construction; It is good to have air-tightness, and heat-proof quality is high, and efficiency of construction is high; Construction cost is low, the advantage that working procedure is few.
Description of drawings
Fig. 1 is the roof structure sketch map of airtight insulated metal roofing of the present invention and job practices thereof;
Fig. 2 decomposes view for the metal base plate buckling parts of airtight insulated metal roofing of the present invention and job practices thereof;
Fig. 3 is the metal base plate buckling parts buckling state structural representation of airtight insulated metal roofing of the present invention and job practices thereof;
Fig. 4 is the metal top plate buckling parts buckling state structural representation of airtight insulated metal roofing of the present invention and job practices thereof;
Fig. 5 fastens the installation steps sketch map for the metal base plate of airtight insulated metal roofing of the present invention and job practices thereof.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is described further.
See also Fig. 1, a kind of airtight insulated metal roofing of the present invention comprises a roofing truss 3, also comprises:
A plurality of metal base plates 7, mutual snapping between the adjacent metal base plate 7, and be fixed on the purlin 2 through plurality of fixed base 5; Purlin 2 is anchored on purlin holder 1 through bolt 4, is welded on the truss 3 purlin holder 1 constant spacing; Glass wool 8 is layed on the metal base plate 7, and this glass wool 8 is that PE (polyvinyl) film glass is cotton, and thickness in monolayer is 80mm, and weight is 16kg/m; A plurality of metal top plate 9 are layed on the glass wool 8, mutual snapping and be fixed on the metal base plate 7 between the adjacent metal top board 9 through a heat insulating metal holder 6, and metal top plate 9 adopts the 0.8mmPVDF steel plates.Heat insulating metal holder 6 is made up of three parts; Top is that stainless steel, centre are divided into galvanized steel plain sheet for white flame-retarded resin, bottom; Its middle and upper part stainless steel contacts with the upper strata flashing board, and preventing to get rusty influences the cleanliness factor of air, and middle part flame-retarded resin material is cut off the heat that top plate brings; Play heat-blocking action, bottom not galvanized steel plain sheet is play anticorrosion and the effect of top plate strength of stability.
See also Fig. 2,3, adjacent metal base plate 7 comprises one first metal base plate 71 and one second metal base plate 72; The end parts of first metal base plate 71 forms first buckling parts 11 of one first metal base plate 71; First buckling parts 11 and second buckling parts 15 of second metal base plate 72 that the end parts of second metal base plate 72 forms second buckling parts, 15, the first metal base plates 71 of one second metal base plate 72 are anchored on firm banking 5 through one first clip component 12; First end, 121 chuckings of the first clip component 12 are fixed between the two adjacent fixed bases 5; Second end 122 of the first clip component 12 is fastened on first buckling parts 11 of first metal base plate 71, and is fastened on second buckling parts 15 times of second metal base plate 72.
Paste EPDM (EPDM) adhesive tape 13 between second buckling parts 15 of first buckling parts 11 of first metal base plate 71, second end of the first clip component 12 and second metal base plate 72; The button seam place of second buckling parts 15 of second metal base plate 72 and first buckling parts 11 of first metal base plate 71 is marked with fluid sealant 14; Fluid sealant 14 is sealing silicone grease glue, guarantees the airtight effect of roofing through adhesive tape 13 and fluid sealant 14.Metal base plate 7 is the 0.8mmGL corrugated steel, and adopts the airtight sheet material of metal.
See also Fig. 4, adjacent metal top board 9 comprises one first metal top plate 91 and one second metal top plate 92, and itself and above-mentioned metal base plate manner are similar, and the end of first metal top plate 91 forms first buckling parts 11 of one first metal top plate 91; The end of second metal top plate 92 forms second buckling parts 15 of one second metal top plate 92; First buckling parts 11 of first metal top plate 91 and second buckling parts 15 of second metal top plate 92 are anchored on heat insulating metal holder 6 through one second clip component 16; The bottom chucking of heat insulating metal holder 6 is fixed on second buckling parts 15 of second metal base plate 72; Top 6, the second ends that first end of the second clip component 16 chucking is fixed in the heat insulating metal holder are fastened on first buckling parts 11 of first metal top plate 91, and are fastened on second buckling parts 15 times of second metal top plate 92.
The job practices of this airtight insulated metal roofing may further comprise the steps:
S1: set up roofing truss 3, with a plurality of purlin holder 1 constant spacings be welded on the truss 3, more a plurality of purlins 2 are fixed in the purlin holder 1 through bolt 4;
Double-deck airtight heat insulating metal heat-insulated roof purlin holder 1 welding procedure is had relatively high expectations to planeness, after truss 3 constructions are accomplished; Need to proofread and correct construction, and the inspection correcting result to steel column and roofing, treat that complete inspection meets the requirements after; And all truss 3 are anticorrosion, antirust and fire prevention is handled; All purlin holder 1 arrangement pitchs are through calculating, and warp design audit, can carry out purlin holder 1 and arrange welding procedure.After purlin holder 1 was welded with truss 3, antiseptic and rustproof processing was carried out in trimming, finish paint brush ring oxygen coating.After purlin holder 1 installation; Carry out same direction, same absolute altitude height measure, if same direction height surpasses 20mm, should give the adjustment of metal shimming; Pad must pass through anticorrosion, antirust processing; Treat that all highly put adjustment and finish, carry out purlin 2 and install that 1 employing of purlin 2 and purlin holder bolt 4 carries out fastening.
S2: with plurality of fixed base 5 constant spacings be welded on the purlin 2;
Before firm banking 5 is installed, should carry out firm banking 5 and measure unwrapping wire, firm banking 5 adopts the fine melt welding with purlin 2 welding, and trimming in time, does anticorrosion, antirust processing.
S3: on firm banking 5, lay metal base plate 7, snapping and being fixed on the firm banking 5 each other between the adjacent metal base plate 7;
See also Fig. 5, through following steps to carrying out mutual snapping between the adjacent metal base plate 7 and being fixed on the firm banking 5:
Form one first buckling parts 11 in the end of one first metal base plate 7;
End at second metal base plate 7 of adjacent this first metal base plate 7 forms one second buckling parts 15;
On first buckling parts 11 of first metal base plate 7, paste EPDM adhesive tape 13;
First end 121 chucking of one first clip component 12 is fixed between the two adjacent fixed bases 5, second end 122 of the first clip component 12 is fastened on first buckling parts 11 of first metal base plate 7;
On second end of the first clip component 12, paste EPDM adhesive tape 13;
Second buckling parts 15 of second metal base plate 7 is fastened on second end of the first clip component 12;
Inject fluid sealant 14 at second buckling parts 15 of second metal base plate 7 and first buckling parts, the 15 outside button seam places of first metal base plate 7.
Metal base plate 7 fastens plural number through manual fastening means and electronic fastening means, when connecting through manual fastening means, whenever fastens once at a distance from a constant spacing.Can whenever once reach temporary fixed through manual fastening means earlier, fasten once through electronic fastening means whole piece again at a distance from three meters fastenings, totally twice, in whole process, to keep the clean and tidy of roofing.
The laying of metal base plate 7 and die casting are carried out simultaneously.
Before laying metal base plate 7, set up the moulding pallet according to scheme earlier, the forming supporter table top is stacked facility materials such as uncoiling machine, cutting off machine, forming machine and coil of strip; About 16 tons of gross weight, forming supporter stage body system is the steel pipe scaffold support system, when steel pipe scaffold is set up; Need can to set up through strict calculating support system, scaffolding height is consistent with the pitched roof minimum point, set up need after the completion qualified by inspection after; Can come into operation, carry out template again and lay uncoiling machine, forming press hoisted in position; Carry out security maintenance simultaneously, thereby realize base plate 7 die casting a slices laying a slice, make the laying of base plate 7 and die casting carry out simultaneously.When carrying out the construction of coil of strip die cast; 40 meters of moulding base plate 7 length (maximum length can to 300 meters), crest height 166mm; At any time check in the press casting procedure whether moulding base plate 7 adheres to specification, like crest height, crest face horizontal dimension, should stop die casting immediately when pinpointing the problems.
S4: on metal base plate 7, lay glass wool 8; Glass wool 8 is laid bilayers and seam crossing staggers, and for the prevention change in weather is laid for the subregion generally speaking, completion laid by the glass wool 8 in a zone after passed examination, and subsequent handling is carried out in this zone at once.
S5: on glass wool 8, lay metal top plate 9, snapping and be fixed on the metal base plate 7 through a heat insulating metal holder 6 and (see also Fig. 3) each other between the adjacent metal top board 9;
Should evenly arrange by design size when heat insulating metal holder 6 is installed, can not arbitrarily install, need after the installation to check and accept.
Through following steps to carrying out mutual snapping between the adjacent metal top board 9 and being fixed on the metal base plate 7:
Form one first buckling parts 11 in the end of one first metal top plate 9;
End in second metal top plate 9 of adjacent this first metal top plate 9 forms one second buckling parts 15;
First end of one second clip component 16 chucking is fixed in the top of heat insulating metal holder 6, second end of the second clip component 16 is fastened on first buckling parts 11 of first metal top plate 9;
With heat insulating metal holder 6 bottom chucking be fixed on second buckling parts 15 of second metal base plate 7,
Second buckling parts 15 of second metal top plate 9 is fastened on second end of the second clip component 16.
S6: carry out airtight receipts limit at gable, ridge, cornice place; Gable is received side plate 17 to be fixed with truss 3 with end receipts side plate 10; And the laying of completion edge metal base plate 7 and metal top plate 9; Realize that eaves limit and partition wall slit place closes up, reach 100 grades in order to ensure tightness, it is the thick galvanized steel plain sheet of 2mm that gable receipts side plate 17 is received side plate 10 with the end.
In addition; Calcium silicate board internal partition wall end face absolute altitude is concordant with metal Roof purlin 2 upper surfaces; Combine with roofing metal base plate 7; Play airtight effect, ridge, gable are not done when waterproof is received the limit and must be taked as corresponding measures such as interim receipts limit or plastic paper covering are installed this one to be carried out interim waterproof, prevent glass wool 8 water inlets.
More than combine accompanying drawing embodiment that the present invention is specified, those skilled in the art can make the many variations example to the present invention according to above-mentioned explanation.Thereby some details among the embodiment should not constitute qualification of the present invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.

Claims (10)

1.一种气密隔热金属屋面,包括一屋面桁架,其特征在于,还包括: 1. An airtight and heat-insulating metal roof, comprising a roof truss, is characterized in that it also includes: 复数个檩托,所述檩托固定间距地焊接于所述桁架上; a plurality of purlin brackets, the purlin brackets are welded to the truss at fixed intervals; 复数个檩条,所述檩条通过螺栓固定于所述檩托上; A plurality of purlins, the purlins are fixed on the purlin supports by bolts; 复数个金属底板,所述相邻的金属底板之间相互扣接,并通过复数个固定底座固定于所述檩条上; A plurality of metal bottom plates, the adjacent metal bottom plates are fastened to each other, and fixed on the purlins through a plurality of fixed bases; 复数个金属顶板,所述相邻的金属顶板之间相互扣接且通过一隔热金属固定座固定于所述金属底板上; A plurality of metal top plates, the adjacent metal top plates are fastened to each other and fixed on the metal bottom plate through a heat-insulating metal fixing seat; 玻璃棉,所述玻璃棉铺设于所述金属底板与所述金属顶板之间。 Glass wool, the glass wool is laid between the metal bottom plate and the metal top plate. 2.根据权利要求1所述的气密隔热金属屋面,其特征在于,所述相邻的金属底板包括一第一金属底板和一第二金属底板;所述第一金属底板的端部形成一第一金属底板的第一扣合部;第二金属底板的端部形成一第二金属底板的第二扣合部;所述第一金属底板和所述第二金属底板通过一第一固定扣合件紧固于所述固定底座: 2. The airtight and heat-insulated metal roof according to claim 1, wherein the adjacent metal bottom plates include a first metal bottom plate and a second metal bottom plate; the end of the first metal bottom plate forms A first fastening portion of a first metal bottom plate; an end portion of a second metal bottom plate forms a second fastening portion of a second metal bottom plate; the first metal bottom plate and the second metal bottom plate are fixed by a first The fastener is fastened to the fixed base: 所述第一固定扣合件的第一端卡紧固定于两相邻所述固定底座之间,所述第一固定扣合件的第二端扣合于所述第一金属底板的第一扣合部上,并被扣合于所述第二金属底板的第二扣合部下。 The first end of the first fixing fastener is clamped and fixed between two adjacent fixed bases, and the second end of the first fixing fastener is fastened to the first metal bottom plate. The fastening part is fastened under the second fastening part of the second metal bottom plate. 3.据权利要求2所述的气密隔热金属屋面,其特征在于,所述第一金属底板的第一扣合部、所述第一固定扣合件的第二端和所述第二金属底板的第二扣合部之间贴覆三元乙丙胶带,所述第二金属底板的第二扣合部与所述第一金属底板的第一扣合部的扣缝处注有密封胶。 3. The airtight and heat-insulated metal roof according to claim 2, characterized in that, the first fastening part of the first metal bottom plate, the second end of the first fixed fastening part and the second The second fastening part of the metal bottom plate is pasted with EPDM tape, and the seam between the second fastening part of the second metal bottom plate and the first fastening part of the first metal bottom plate is injected with a seal glue. 4.根据权利要求2所述的气密隔热金属屋面,其特征在于,所述相邻的金属顶板包括一第一金属顶板和一第二金属顶板,所述第一金属顶板的端部形成一第一金属顶板的第一扣合部;所述第二金属顶板的端部形成一第二金属顶板的第二扣合部;所述第一金属顶板和所述第二金属顶板通过一第二固定扣合件紧固于所述隔热金属固定座; 4. The airtight and thermally insulated metal roof according to claim 2, characterized in that, the adjacent metal roof plates comprise a first metal roof plate and a second metal roof plate, and the ends of the first metal roof plates form A first fastening portion of the first metal top plate; the end of the second metal top plate forms a second fastening portion of the second metal top plate; the first metal top plate and the second metal top plate pass through a first metal top plate Two fixed fasteners are fastened to the heat-insulating metal fixing seat; 所述隔热金属固定座的底端卡紧固定于所述第二金属底板的第二扣合部上; The bottom end of the heat-insulating metal fixing seat is clamped and fixed on the second fastening part of the second metal bottom plate; 所述第二固定扣合件的第一端卡紧固定于所述隔热金属固定座的顶端,第二端扣合于所述第一金属顶板的第一扣合部上,并被扣合于所述第二金属顶板的第二扣合部下。 The first end of the second fixed fastener is clamped and fixed on the top of the heat-insulating metal fixing seat, and the second end is fastened on the first fastening part of the first metal top plate, and is fastened Under the second fastening part of the second metal top plate. 5.根据权利要求1所述的双层气密隔热金属屋面,其特征在于,所述 隔热金属固定座由三部分组成,上部为不锈钢材质、中间为白色阻燃树脂、下部分为镀锌钢板。 5. The double-layer airtight and heat-insulating metal roof according to claim 1, wherein the heat-insulating metal fixing seat is composed of three parts, the upper part is made of stainless steel, the middle is made of white flame-retardant resin, and the lower part is made of plated Zinc steel. 6.一种基于气密隔热金属屋面的施工方法,其特征在于,包括以下步骤: 6. A construction method based on an airtight heat-insulating metal roof, characterized in that it comprises the following steps: S1:架设屋面桁架,将复数个檩托固定间距地焊接于所述桁架上,再将复数个檩条通过螺栓固定于所述檩托上; S1: erecting roof trusses, welding a plurality of purlin brackets to the truss at fixed intervals, and then fixing a plurality of purlins to the purlin brackets by bolts; S2:将复数个固定底座固定间距地焊接在所述檩条上; S2: welding a plurality of fixed bases to the purlins at fixed intervals; S3:于所述固定底座上铺设金属底板,所述相邻的金属底板之间相互扣接且固定于所述固定底座上; S3: laying a metal bottom plate on the fixed base, the adjacent metal bottom plates are interlocked and fixed on the fixed base; S4:于所述金属底板上铺设玻璃棉; S4: laying glass wool on the metal bottom plate; S5:于所述玻璃棉上铺设金属顶板,所述相邻的金属顶板之间相互扣接且通过一隔热金属固定座固定于所述金属底板上; S5: laying a metal top plate on the glass wool, the adjacent metal top plates are fastened to each other and fixed on the metal bottom plate through a heat-insulating metal fixing seat; S6:在山墙、屋脊、檐口处进行气密收边,将收边板与桁架进行固定,并完成边缘处金属底板和金属顶板的铺设。 S6: Carry out airtight edge trimming at the gable, roof ridge, and cornice, fix the edge trimming board and the truss, and complete the laying of the metal bottom plate and metal roof plate at the edge. 7.根据权利要求6所述的双层气密隔热金属屋面施工方法,其特征在于,通过如下步骤对所述相邻的金属底板之间进行相互扣接且将其固定于所述固定底座上: 7. The double-layer airtight and heat-insulated metal roof construction method according to claim 6, characterized in that, the adjacent metal bottom plates are interlocked and fixed to the fixed base through the following steps superior: 在一第一金属底板的端部形成一第一扣合部; forming a first fastening portion at an end portion of a first metal bottom plate; 在一相邻所述第一金属底板的第二金属底板的端部形成一第二扣合部; forming a second fastening portion at an end of a second metal bottom plate adjacent to the first metal bottom plate; 将一第一固定扣合件的第一端卡紧固定于两相邻固定底座之间,将所述第一固定扣合件的第二端扣合于所述第一金属底板的第一扣合部上; Fasten and fix the first end of a first fixed fastener between two adjacent fixed bases, fasten the second end of the first fixed fastener to the first buckle of the first metal bottom plate on the joint; 将所述第二金属底板的第二扣合部扣合于所述第一固定扣合件的第二端上。 Fasten the second fastening part of the second metal bottom plate to the second end of the first fixed fastening part. 8.根据权利要求7所述的双层气密隔热金属屋面施工方法,其特征在于,通过如下步骤对所述相邻的金属顶板之间进行相互扣接且将其固定于所述金属底板上: 8. The double-layer airtight and heat-insulated metal roof construction method according to claim 7, characterized in that, the adjacent metal top plates are fastened to each other and fixed to the metal bottom plate through the following steps superior: 在一第一金属顶板的端部形成一第一扣合部; forming a first fastening portion at an end portion of a first metal top plate; 在一相邻所述第一金属顶板的第二金属顶板的端部形成一第二扣合部; forming a second fastening portion at an end of a second metal top plate adjacent to the first metal top plate; 将一第二固定扣合件的第一端卡紧固定于所述隔热金属固定座的顶端,将所述第二固定扣合件的第二端扣合于所述第一金属顶板的第一扣合部上;  Fasten and fix the first end of a second fastening piece to the top of the heat-insulating metal fixing seat, and fasten the second end of the second fastening piece to the first metal top plate On a fastening part; 将所述隔热金属固定座的底端卡紧固定于所述第二金属底板的第二扣合部上, clamping and fixing the bottom end of the heat-insulating metal fixing seat on the second fastening portion of the second metal bottom plate, 将所述第二金属顶板的第二扣合部扣合于所述第二固定扣合件的第二端上。 Fasten the second fastening part of the second metal top plate to the second end of the second fixed fastening part. 9.根据权利要求7所述的双层气密隔热金属屋面施工方法,其特征在于,在将所述第一固定扣合件的第二端扣合于所述第一金属底板的第一扣合部之前,先在所述第一金属底板的第一扣合部上贴覆三元乙丙胶带; 9. The double-layer airtight and heat-insulated metal roof construction method according to claim 7, characterized in that, after the second end of the first fixing fastener is fastened to the first metal bottom plate, Before the fastening part, first stick EPDM tape on the first fastening part of the first metal bottom plate; 在将所述第二金属底板的第二扣合部扣合于所述第一固定扣合件的第二端之前,先在所述第一固定扣合件的第二端上贴覆三元乙丙胶带。 Before fastening the second fastening part of the second metal bottom plate to the second end of the first fastening fastening part, the second end of the first fastening fastening part is pasted with a three-dimensional Ethylene propylene tape. 10.根据权利要求7所述的双层气密隔热金属屋面施工方法,其特征在于,在将所述第二金属底板的第二扣合部扣合于所述第一固定扣合件的第二端上之后,还包括步骤:在所述第二金属底板的第二扣合部与所述第一金。  10. The double-layer airtight and heat-insulated metal roof construction method according to claim 7, characterized in that, after fastening the second fastening part of the second metal bottom plate to the first fixed fastening part After attaching the second end, it also includes the step of: connecting the second fastening part of the second metal bottom plate with the first metal. the
CN 201110230544 2011-08-12 2011-08-12 Air-tight heat insulation metal roof and construction method thereof Expired - Fee Related CN102409811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110230544 CN102409811B (en) 2011-08-12 2011-08-12 Air-tight heat insulation metal roof and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110230544 CN102409811B (en) 2011-08-12 2011-08-12 Air-tight heat insulation metal roof and construction method thereof

Publications (2)

Publication Number Publication Date
CN102409811A true CN102409811A (en) 2012-04-11
CN102409811B CN102409811B (en) 2013-09-25

Family

ID=45912117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110230544 Expired - Fee Related CN102409811B (en) 2011-08-12 2011-08-12 Air-tight heat insulation metal roof and construction method thereof

Country Status (1)

Country Link
CN (1) CN102409811B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174262A (en) * 2013-03-20 2013-06-26 江苏扬州建工建设集团有限公司 Construction method for super-long steel plate roof
CN104234331A (en) * 2013-06-20 2014-12-24 五冶集团上海有限公司 Eave and frontispiece airtight side-closing installation method for airtight metal roof
CN104652714A (en) * 2015-01-30 2015-05-27 广西壮族自治区冶金建设公司 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels
CN106760262A (en) * 2016-12-13 2017-05-31 上海宝冶集团有限公司 Metal Roof breaks the disconnected thermal means of hot gold utensil base and metal roof tile junction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10169129A (en) * 1996-12-13 1998-06-23 Sekisui House Ltd Roof with solar cells
JP2001279876A (en) * 2000-03-31 2001-10-10 Yodogawa Steel Works Ltd Method and structure for repairing roof and clamp for repairing roof used in the same
CN201635223U (en) * 2010-03-19 2010-11-17 中国江苏国际经济技术合作公司 Metal roof system mounting joint device with layering and grading error adjustment
CN201671250U (en) * 2010-01-09 2010-12-15 深圳南玻幕墙及光伏工程有限公司 A New Photovoltaic Roof System

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10169129A (en) * 1996-12-13 1998-06-23 Sekisui House Ltd Roof with solar cells
JP2001279876A (en) * 2000-03-31 2001-10-10 Yodogawa Steel Works Ltd Method and structure for repairing roof and clamp for repairing roof used in the same
CN201671250U (en) * 2010-01-09 2010-12-15 深圳南玻幕墙及光伏工程有限公司 A New Photovoltaic Roof System
CN201635223U (en) * 2010-03-19 2010-11-17 中国江苏国际经济技术合作公司 Metal roof system mounting joint device with layering and grading error adjustment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崔卓立;邵启雁;蔡庆军;万利民;万伟民: "《波峰166mm 双层气密隔热金属屋面施工技术》", 《城市建设理论研究》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174262A (en) * 2013-03-20 2013-06-26 江苏扬州建工建设集团有限公司 Construction method for super-long steel plate roof
CN104234331A (en) * 2013-06-20 2014-12-24 五冶集团上海有限公司 Eave and frontispiece airtight side-closing installation method for airtight metal roof
CN104234331B (en) * 2013-06-20 2016-08-10 五冶集团上海有限公司 The cornice of airtight metal roofing and gable airtight receipts limit installation method
CN104652714A (en) * 2015-01-30 2015-05-27 广西壮族自治区冶金建设公司 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels
CN106760262A (en) * 2016-12-13 2017-05-31 上海宝冶集团有限公司 Metal Roof breaks the disconnected thermal means of hot gold utensil base and metal roof tile junction
CN106760262B (en) * 2016-12-13 2019-09-10 上海宝冶集团有限公司 Metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction

Also Published As

Publication number Publication date
CN102409811B (en) 2013-09-25

Similar Documents

Publication Publication Date Title
CN109322489B (en) Construction process and device for 360-degree vertical overlock profiled steel sheet
US9322176B2 (en) Sustainable energy efficient roof system
CN107407091B (en) Metal roof material and the roof bedding construction and roof draping methods for having used the metal roof material
CN211114476U (en) Point type roof steel gutter system
US10626616B2 (en) Reverse ballasted roof system
CN102409811B (en) Air-tight heat insulation metal roof and construction method thereof
CN113107142B (en) Construction method of wind-resistant metal roof structure
CN106939671B (en) Metal sandwich roof plate construction method
TWI720069B (en) Metallic roof member and roofing structure and method for roofing using the same
CN110552450A (en) Construction method of large-span short-vertical-edge vertical double-lock-edge titanium-zinc alloy metal roof
US20180041161A1 (en) Direct anchoring solar module system and installation method
CN106939699B (en) Construction method for galvanized steel sheet waterproof layer on inner side of open type ceramic plate curtain wall
CN102182280B (en) Gable side sliding roof panel rigid waterproof system
CN212271426U (en) Roofing eaves mouth structure and roofing system
CN110195489A (en) A kind of double slope metal Sloping roof ridge nodes and its installation method
CN111042420A (en) Roof construction process for light steel villa
CN116771021A (en) Construction method for large hyperboloid special-shaped decorative aluminum veneer
CN206034713U (en) Precast concrete is small -size from waterproof insulation roofing system
JP3196511U (en) Roof panel fixing bracket
CN207727781U (en) A kind of deformation joint of roof connecting structure
CN115822181A (en) A method of installing roof color steel plate
JPH0613305Y2 (en) Roof with snow-throw device
JP3060859U (en) Exterior wall of wooden house
CN215484170U (en) A profiled metal plate roof cornice structure
CN224048523U (en) Factory building roofing metal sheet integration roofing tile subassembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925