CN106760262B - Metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction - Google Patents
Metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction Download PDFInfo
- Publication number
- CN106760262B CN106760262B CN201611143184.2A CN201611143184A CN106760262B CN 106760262 B CN106760262 B CN 106760262B CN 201611143184 A CN201611143184 A CN 201611143184A CN 106760262 B CN106760262 B CN 106760262B
- Authority
- CN
- China
- Prior art keywords
- hot
- breaks
- metal roof
- fitting
- adhesive tape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/14—Junctions of roof sheathings to chimneys or other parts extending above the roof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/16—Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
Abstract
The present invention relates to factory building construction field, the specifically metal Roof hot method of breaking of breaking hot fitting pedestal and metal roof tile junction;It is characterized in that: including that 1, EPDM adhesive tape positions: determining and break hot fitting transverse and longitudinal spacing, draw label with black marking pen, step 2 pastes EPDM adhesive tape, and requirement close and firm is without hollowing when stickup;The fixation of step 3, the hot fitting that breaks: will break hot fitting with bolt and lower metal watt be fastenedly connected, and the tool between hot fitting and lower metal watt that ensures to break during this accompanies EPDM adhesive tape.Originally hot method of breaking is particularly suitable for large area arc overlength airtight metal roof structure and has the occasion of rigors to airtight, watertight, heat-proof quality, cause silica gel rupture, upper layer watt by breaking hot fitting and lower layer watt carries out heat transfer to indoor problem by using bolt compresses can be effectively prevented in the hot fitting pedestal setting EPDM adhesive tape that breaks, for metal roof tile is airtight, watertight, thermal insulation provide good guarantee.
Description
Technical field
The present invention relates to factory building construction field, specifically metal Roof breaks hot fitting pedestal and metal roof tile joins
The hot method of breaking at place.
Background technique
In roofing construction operation, metal Roof breaks hot fitting pedestal using bolt fastening, due to handover position directly with
Bottom watt is connected and the position that is connected is provided with the silica gel to guarantee lower layer watt air-tightness, and the fastening force that bolt generates is straight for a long time
It connects and makees in easily cause silica gel fatigue, aging, fracture, have a certain impact to the heat-insulated of metal tile, watertight, air-tightness.
Summary of the invention
Originally the purpose for hot method of breaking is, provides a kind of structure and construction that can be avoided silica gel fatigue to loss of performance
Method.
In order to achieve the above object, the present invention is implemented as follows:
A kind of metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction, including
Step 1, the positioning of EPDM adhesive tape:
Step 1.1, the transverse and longitudinal spacing that the hot fitting that breaks is determined according to metal roof tile typesetting figure, are set away from as unit of by each column
Set one of control net;
Step 1.1.1, the reference line for the hot fitting that breaks should be determined according to the relative position of layer Steel Structure or mount wall space first;
Step 1.1.2, based on reference line, according to the longitudinal pitch for the hot fitting that breaks, first longitudinal heat insulation gold is determined
Have installation site line, and draw label with black marking pen on cornice metal plate and each span lower metal watt wave crest,
Step 1.1.3, to be labeled as pressing 4000mm spacing lower metal watt, transversely span direction carries out equal part, indulges
Elongated line is drawn respectively to every 4000mm,
Step 1.1.4, whether inspection and the logical line in previous longitudinal direction are parallel, if there is deviation that should eliminate in time;
Step 2 pastes EPDM adhesive tape:
Coiled EPDM adhesive tape is cut to strip by step 2.1, and length is identical as the base length of hot fitting that breaks,
Step 2.2, by the EPDM tape-stripping cut at the pin thread of two panels metal tile and female thread occlusion, wherein it is viscous
Require close and firm without hollowing when patch;
The fixation of step 3, the hot fitting that breaks:
Step 3.1 is to ensure that installation position is accurate, and the telltale mark with reference to EPDM adhesive tape in step 1 is golden to disconnected heat
Have installation site and carry out unwrapping wire,
Step 3.2 will break hot fitting with bolt and lower metal watt is fastenedly connected, and ensure to break hot fitting under during this
EPDM adhesive tape is accompanied between layer metal tile.
The metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction, the EPDM glue used
The width of band is not less than 15mm, and thickness is not less than 5mm.
Originally hot method of breaking be particularly suitable for large area arc overlength airtight metal roof structure and to airtight, watertight,
Heat-proof quality has the occasion of rigors, squeezes by using bolt can be effectively prevented in the hot fitting pedestal setting EPDM adhesive tape that breaks
Pressure causes silica gel rupture, upper layer watt to carry out heat transfer to indoor problem with lower layer watt by breaking hot fitting, is metal Roof
Watt airtight, watertight, thermal insulation provide good guarantee.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction, including
Step 1, the positioning of EPDM adhesive tape:
Step 1.1, the transverse and longitudinal spacing that the hot fitting that breaks is determined according to metal roof tile typesetting figure, are set away from as unit of by each column
Set one of control net;
Step 1.1.1, the reference line for the hot fitting that breaks should be determined according to the relative position of layer Steel Structure or mount wall space first;
Step 1.1.2, based on reference line, according to the longitudinal pitch for the hot fitting that breaks, first longitudinal heat insulation gold is determined
Have installation site line, and draw label with black marking pen on cornice metal plate and each span lower metal watt wave crest,
Step 1.1.3, to be labeled as pressing 4000mm spacing lower metal watt, transversely span direction carries out equal part, indulges
Elongated line is drawn respectively to every 4000mm,
Step 1.1.4, whether inspection and the logical line in previous longitudinal direction are parallel, if there is deviation that should eliminate in time;
Step 2 pastes EPDM adhesive tape:
Coiled EPDM adhesive tape is cut to strip by step 2.1, and length is identical as the base length of hot fitting that breaks,
Step 2.2, by the EPDM tape-stripping cut at the pin thread of two panels metal tile and female thread occlusion, wherein it is viscous
Require close and firm without hollowing when patch;
The fixation of step 3, the hot fitting that breaks:
Step 3.1 is to ensure that installation position is accurate, and the telltale mark with reference to EPDM adhesive tape in step 1 is golden to disconnected heat
Have installation site and carry out unwrapping wire,
Step 3.2 will break hot fitting with bolt and lower metal watt is fastenedly connected, and ensure to break hot fitting under during this
EPDM adhesive tape is accompanied between layer metal tile.
The metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction, the EPDM glue used
The width of band is not less than 15mm, and thickness is not less than 5mm.
Originally hot method of breaking be particularly suitable for large area arc overlength airtight metal roof structure and to airtight, watertight,
Heat-proof quality has the occasion of rigors, squeezes by using bolt can be effectively prevented in the hot fitting pedestal setting EPDM adhesive tape that breaks
Pressure causes silica gel rupture, upper layer watt to carry out heat transfer to indoor problem with lower layer watt by breaking hot fitting, is metal Roof
Watt airtight, watertight, thermal insulation provide good guarantee.
Claims (2)
- A kind of hot method of breaking of hot fitting pedestal and metal roof tile junction 1. metal Roof breaks, it is characterized in that: includingStep 1, the positioning of EPDM adhesive tape:Step 1.1, the transverse and longitudinal spacing that the hot fitting that breaks is determined according to metal roof tile typesetting figure, are arranged one by each column away from as unit of Road controls net;Step 1.1.1, the reference line for the hot fitting that breaks should be determined according to the relative position of layer Steel Structure or mount wall space first;Step 1.1.2, based on reference line, according to the longitudinal pitch for the hot fitting that breaks, first longitudinal heat insulation fitting peace is determined Holding position line, and label is drawn with black marking pen on cornice metal plate and each span lower metal watt wave crest,Step 1.1.3, to be labeled as pressing 4000mm spacing lower metal watt, transversely span direction carries out equal part, longitudinal every Elongated line is drawn respectively every 4000mm,Step 1.1.4, whether inspection is parallel with the elongated line in previous longitudinal direction, if there is deviation that should eliminate in time;Step 2 pastes EPDM adhesive tape:Coiled EPDM adhesive tape is cut to strip by step 2.1, and length is identical as the base length of hot fitting that breaks,Step 2.2, by the EPDM tape-stripping cut at the pin thread of two panels metal tile and female thread occlusion, wherein when stickup It is required that close and firm is without hollowing;The fixation of step 3, the hot fitting that breaks:Step 3.1 is to ensure that installation position is accurate, is pacified with reference to the telltale mark of EPDM adhesive tape in step 1 to the hot fitting that breaks Holding position carries out unwrapping wire,Step 3.2 will break hot fitting with bolt and lower metal watt is fastenedly connected, and ensure to break during this hot fitting and lower layer's gold EPDM adhesive tape is accompanied between category watt.
- The hot method of breaking of hot fitting pedestal and metal roof tile junction 2. metal Roof according to claim 1 breaks, Be characterized in: the width of EPDM adhesive tape is not less than 15mm, and thickness is not less than 5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611143184.2A CN106760262B (en) | 2016-12-13 | 2016-12-13 | Metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611143184.2A CN106760262B (en) | 2016-12-13 | 2016-12-13 | Metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106760262A CN106760262A (en) | 2017-05-31 |
CN106760262B true CN106760262B (en) | 2019-09-10 |
Family
ID=58880531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611143184.2A Active CN106760262B (en) | 2016-12-13 | 2016-12-13 | Metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760262B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409811A (en) * | 2011-08-12 | 2012-04-11 | 中国建筑第八工程局有限公司 | Air-tight heat insulation metal roof and construction method thereof |
CN103291011A (en) * | 2013-05-17 | 2013-09-11 | 中天建设集团有限公司 | Process for constructing metal roof of building with super-large space |
CN203213427U (en) * | 2013-05-14 | 2013-09-25 | 中天建设集团有限公司 | Secondary water-proof structure of metal roof |
CN104141366A (en) * | 2014-07-24 | 2014-11-12 | 上海精锐金属建筑系统有限公司 | Sealing waterproof base of upright seam metal roofing board support |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2563509A1 (en) * | 2004-04-19 | 2005-11-03 | Martin J. Rotter | Rib vent system for roofing panels |
-
2016
- 2016-12-13 CN CN201611143184.2A patent/CN106760262B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409811A (en) * | 2011-08-12 | 2012-04-11 | 中国建筑第八工程局有限公司 | Air-tight heat insulation metal roof and construction method thereof |
CN203213427U (en) * | 2013-05-14 | 2013-09-25 | 中天建设集团有限公司 | Secondary water-proof structure of metal roof |
CN103291011A (en) * | 2013-05-17 | 2013-09-11 | 中天建设集团有限公司 | Process for constructing metal roof of building with super-large space |
CN104141366A (en) * | 2014-07-24 | 2014-11-12 | 上海精锐金属建筑系统有限公司 | Sealing waterproof base of upright seam metal roofing board support |
Non-Patent Citations (1)
Title |
---|
断热气密工法金属屋面系统设计与施工;李建全等;《钢结构》;20130831;第28卷(第8期);第14,71-74页 |
Also Published As
Publication number | Publication date |
---|---|
CN106760262A (en) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202187487U (en) | Metal roof ridge | |
CN204615300U (en) | Cable snake shaped laying fixedly uses fixture | |
US9322176B2 (en) | Sustainable energy efficient roof system | |
CN209855069U (en) | Waterproof and heat-insulating integrated roof with upright overlock sector plates | |
CN102182271B (en) | Waterproof system for sliding metal roof under parapet wall | |
CN113107142B (en) | Construction method of wind-resistant metal roof structure | |
JP2008196230A (en) | Metal fitting for installation on roof, and mounting structure of frame for installation object on roof | |
CN106760262B (en) | Metal Roof breaks the hot method of breaking of hot fitting pedestal and metal roof tile junction | |
CN110552450A (en) | Construction method of large-span short-vertical-edge vertical double-lock-edge titanium-zinc alloy metal roof | |
CN213653940U (en) | Heat-preservation heat tracing system for steel bar truss floor support plate | |
US20170138052A1 (en) | Connecting element for corrugated panels and method of use of same | |
CN107795075A (en) | Metal Roof breaks the disconnected hot method of hot gold utensil base and metal roof tile junction | |
CN105952065A (en) | Standing seam roof having deformation resisting capability and installing process thereof | |
KR102100754B1 (en) | Wedge type of exterior material fixing device for constructing the exterior material on the outer wall surface of the building | |
KR20090055805A (en) | Insulated stone panel method | |
CN202031258U (en) | Roof slidable support | |
CN109469233A (en) | A kind of abnormity curtain wall system and its construction method | |
CN106759856A (en) | A kind of T-shaped attachment structure of heat-insulation wall plate | |
CN202073241U (en) | Connecting piece of metallic roofing daylighting board | |
CN110195497B (en) | Thermal insulation and waterproof integrated construction method for slope-finding gutter of passive ultra-low energy consumption dry operation flat roof | |
CN104879053A (en) | Decorative louver | |
CN202209002U (en) | Extensible inner gutter | |
CN205370274U (en) | Can reduce vice frame of window of cold bridge | |
CN206655405U (en) | A kind of photovoltaic module installs fixture | |
CN214169604U (en) | Wind-resistant snow-proof ridge structure of metal roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |