CN104652714B - Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels - Google Patents

Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels Download PDF

Info

Publication number
CN104652714B
CN104652714B CN201510050129.8A CN201510050129A CN104652714B CN 104652714 B CN104652714 B CN 104652714B CN 201510050129 A CN201510050129 A CN 201510050129A CN 104652714 B CN104652714 B CN 104652714B
Authority
CN
China
Prior art keywords
interior lining
lining panel
purlin
construction
roofing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510050129.8A
Other languages
Chinese (zh)
Other versions
CN104652714A (en
Inventor
谢茂兵
邓迪
黄华高
李淑玲
韦克雪
唐峰
周善学
何勇
欧志永
廖立波
黄霄章
李利平
谢植二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Industry Group Metallurgical Construction Co., Ltd.
Original Assignee
Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Zhuang Autonomous Region Metallurgical Construction Co filed Critical Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority to CN201510050129.8A priority Critical patent/CN104652714B/en
Publication of CN104652714A publication Critical patent/CN104652714A/en
Application granted granted Critical
Publication of CN104652714B publication Critical patent/CN104652714B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction method for pore-forming installation of a self-made mold for steel structure roofing lining panels. The construction method comprises the following steps of surveying and setting out, installing purlines, making the mold, forming holes in the lining panels, hanging the lining panels to an operating platform, installing the roofing lining panels and cleaning. Nail lines of the roofing lining panels of which the construction is finished through the steps are horizontally and vertically straight, and the roofing lining panels have an attractive impression. The construction method disclosed by the invention has the advantages of being light and fast, labor-saving, high in construction speed, shortened in construction period, energy-saving, reduced in consumption and very low in input cost, simple in operation and easy to master, and capable of obtaining a fairly good effect without use of large-scale equipment.

Description

The construction method that a kind of steel structural roof interior lining panel is installed from molding jig pore-forming
Technical field
The present invention relates to the construction method that a kind of steel structural roof interior lining panel is installed from molding jig pore-forming, for building neck Domain.
Background technology
At present in architectural engineering industrial premises, public building long-span roofing, for reducing roofing deadweight, mitigate load, Usually adopt interior lining panel roofing, interior lining panel roofing is a kind of novel construction process being formed in recent years, due to its easy construction, work The superioritys such as skill uniqueness, the good, attractive appearance of water resistance, are used widely in recent years, and achieve preferable economic benefit And social benefit.But the steel structure roofing liner interior lining panel of traditional method construction is uneven, in base surface, presence nail road is not straight, Leave the phenomenons such as nail is excessive after finished product, have a strong impact on the sensorial effects of roofing.
Content of the invention
For solving problem above, the present invention provides the construction party that a kind of steel structural roof interior lining panel is installed from molding jig pore-forming Method.
The technical scheme is that the construction method that a kind of steel structural roof interior lining panel is installed from molding jig pore-forming, bag Include surveying setting-out, mounting purlines, make mould and interior lining panel punching, interior lining panel be hung to operating platform, roofing interior lining panel install with And cleanup step, concrete operations condition is as follows:
Described surveying setting-out is to carry out roofing interior lining panel row in advance according to design drawing and engineering entity size before construction Plate layout drawing, further according to row plate layout drawing carry out live unwrapping wire, by often across or node eject roof purline installation control line;
Described mounting purlines are by traditional steel house panel installation techniques construction;During construction, main purlin and bearing section Point plate, secondary purlin are with bolts with main purlin, and between secondary purlin and secondary purlin, spreading is with bolts by purlin supporting plate, The connecting bolt of primary and secondary purlin must be tightened shimming one by one;Main purlin must strictly check slope top and toe absolute altitude when installing, draws Line corrects, fixes;Meet when joint installs straight it is necessary to scene be carried out using specific purpose tool again take hole, secondary purlin typesetting When to ensure gutter position accurately, first by fixed flat at gutter during installation;
The described mould and interior lining panel punching of making is that first the width according to interior lining panel and purlin center distance make a square Shape base, width ratio interior lining panel width 2mm, length direction 1m shorter than pre- making interior lining panel length, it is easy to the interior lining panel making hole Carry away base, be fixed into a firm base using steel nail, then carry out labelling according to purlin centre-to-centre spacing on base length direction, This be labeled as after on surface layer interior lining panel, snap the line is ready, base is put on one piece of smooth ground well, in 5 20 pieces Liner plate is put in mould, according to being marked at the good line of ink marker of bullet on surface layer interior lining panel, then drilling on base;
It is after the completion of pore-forming on the mould of ground that described interior lining panel is hung to operating platform, puts neat, profit by length classification With the hole position accomplished fluently as suspension centre, sling into punch die with the rope made of hemp on the operational platform;Once 45 pieces can be lifted by crane, peace simultaneously Install and lift by crane again after finishing, it is to avoid on operating platform load is excessive and the security performance that has influence on operating platform.For preventing from lifting Journey interior lining panel deforms, and should make backing using shaped steel, it is to avoid interior lining panel deforms in hoisting process, should combine simultaneously during lifting Consider that material placement location holding capacity situation determines and once lift quantity, reduce manually secondary transhipment as far as possible.Vertical transport sheet material When it should be noted that guaranteeing that all of interior lining panel is face-up, and all of overlap edge (female rib) should be towards installing the direction starting.
It is to be not less than a pitch of waves according to the transverse lap of interior lining panel that described roofing interior lining panel is installed, and longitudinal lap joint is not less than 120mm, is fixed on roofing time purlin using the crest that tap bolt penetrates interior lining panel vertical wave stricture of vagina, tap bolt must be with secondary purlin Bar supporting surface is vertical, fixing firm;
Described cleaning is after the interior lining panel in installation operating platform region, and workmen is with water by interior lining panel bottom surface Scrub at pollution, for there is scratching place, application is mended with the paint-adding pen of mother matrix solid colour, it is to avoid formation aberration and shadow Sound is attractive in appearance.
Know-why:
In traditional method, workman faces upward head on the operational platform and exerts oneself nailing, the shortcoming causing hole position wayward and training off, So that the interior lining panel nail road that construction completes is horizontal uneven vertical, have a strong impact on attractive in appearance.Key technology of the present invention is on ground Pore-forming on mould, improves drilling precision and drilling efficiency, overcomes workman and faces upward head on the operational platform and exert oneself nailing, causes hole The shortcoming that position is wayward and trains off, ensures that the construction quality of roofing coloured silk steel lining plate.
The present invention has the prominent advantages that:
1. economical: using mould construction, there is light and fast, about 20 pieces of interior lining panels of a rapid shaping, save manpower, apply Work speed is fast, and the reduction of erection time, energy-saving, the cost of input is considerably less, obtains effect fairly good;
2. attractive in appearance: the steel structure roofing interior lining panel nail road being completed using present invention construction is smooth vertical and horizontal, attractive in appearance;
3. simple to operate: simple to operate it is easy to grasp it is not necessary to main equipment.
Brief description
Fig. 1 is the technological process of the construction method that steel structural roof interior lining panel of the present invention is installed from molding jig pore-forming Figure.
Specific embodiment
Below by way of drawings and Examples, technical scheme is further illustrated.
Embodiment 1
One instantiation of the construction method that steel structural roof interior lining panel of the present invention is installed from molding jig pore-forming, Comprise the steps:
On probation, construction in five meters of car technological transformation project assembly shop civil engineerings of certain company with the construction of public work roof boarding Front roofing interior lining panel row's plate layout drawing has been carried out according to engineering entity size, and carry out live unwrapping wire by figure;Traditionally apply Work mounting purlines;Width according to interior lining panel and purlin center distance one rectangular base of making, width ratio interior lining panel width 2mm, Length direction makes the slightly short 1m of interior lining panel length than pre-, then using steel nail be fixed on smooth good ground one firm Base, then carry out labelling according to purlin centre-to-centre spacing on base length direction, 15 pieces of interior lining panels are put in mould, the bottom of according to simultaneously It is marked at the good line of ink marker of bullet on surface layer interior lining panel on seat, then punch;After the completion of pore-forming, put neat by length classification, using The hole position accomplished fluently, as suspension centre, according to a conventional method in interior lining panel handling to operating platform, once lifts by crane 5 pieces simultaneously;Using wearing Thoroughly formula fixed installation interior lining panel, first by interior lining panel according to the direction orthogonal with gutter, is emitted on mounted purlin, by setting Meter requirement extend in gutter, first produced hole position is directed at purlin position when fixing, straight after squeezed into tapping screw right Answer hole position;After the interior lining panel in operating platform region installs, with water by scrub at the pollution of interior lining panel bottom surface, for going out Now scratch place, the paint-adding pen for mother matrix solid colour mends.After the completion of construction, quality is very good, obtains the favorable comment of Construction Party.
Embodiment 2
Another of the construction method that steel structural roof interior lining panel of the present invention is installed from molding jig pore-forming is specifically real Example, comprises the steps:
Move on probation during a phase technological transformation project press workshop civil engineering is constructed with public work roof boarding in certain company's passenger car, Before construction, roofing interior lining panel row's plate layout drawing is carried out according to design drawing, and carried out live unwrapping wire by figure;Traditionally apply Work mounting purlines;Width according to interior lining panel and purlin center distance one rectangular base of making, width ratio interior lining panel width 2mm, Length 1m shorter than interior lining panel length, is then fixed into firm base using steel nail on smooth good ground, rectangular in base Carry out labelling according to purlin centre-to-centre spacing upwards, 20 pieces of interior lining panels are put in mould simultaneously, according to being marked on surface layer interior lining panel The good line of ink marker of bullet, then punches;After the completion of pore-forming, put neat by length classification, by the use of the hole position accomplished fluently as suspension centre, by normal Rule method, in interior lining panel handling to operating platform, once lifts by crane 4 pieces simultaneously;Interior lining panel is fixedly mounted using penetration, first will Interior lining panel, according to the direction orthogonal with gutter, is emitted on mounted purlin, is first directed at produced hole position when fixing Purlin position, straight after squeeze into corresponding hole position with tapping screw;After the interior lining panel in operating platform region installs, will with water Scrub at the pollution of interior lining panel bottom surface, for occurring scratching place, the paint-adding pen for mother matrix solid colour mends.Construction completes Quality is very good afterwards, after this completion of works is checked and accepted, obtains Guangxi high grade project prize.
Embodiment 3
One instantiation of the construction method that steel structural roof interior lining panel of the present invention is installed from molding jig pore-forming, Comprise the steps:
On probation in certain passenger car resettlement one phase technological transformation project body workshop engineering roof boarding construction, according to engineering before construction Entity size has carried out roofing interior lining panel row's plate layout drawing, and carries out live unwrapping wire by figure;Traditionally construction and installation purlin; Width according to interior lining panel and purlin center distance make a rectangular base, width ratio interior lining panel width 2mm, and length compares interior lining panel The short 1m of length, is then fixed into firm base using steel nail on smooth good ground, then according to purlin on base length direction Bar centre-to-centre spacing carries out labelling, 20 pieces of interior lining panels is put in mould simultaneously, and according to being marked on base, bullet on surface layer interior lining panel is good The line of ink marker, then punches;After the completion of pore-forming, put neat by length classification, by the use of the hole position accomplished fluently as suspension centre, routinely side Method, in interior lining panel handling to operating platform, once lifts by crane 5 pieces simultaneously;Interior lining panel is fixedly mounted using penetration, first by liner Plate, according to the direction orthogonal with gutter, is emitted on mounted purlin, first produced hole position is directed at purlin when fixing Position, straight after squeeze into corresponding hole position with tapping screw;After the interior lining panel in operating platform region installs, with water by liner Scrub at the pollution of plate bottom surface, for occurring scratching place, the paint-adding pen for mother matrix solid colour mends.Matter after the completion of construction Amount is very good, after this completion of works is checked and accepted, obtains national high grade project prize.

Claims (1)

1. a kind of steel structural roof interior lining panel is installed from molding jig pore-forming construction method it is characterised in that include surveying setting-out, Mounting purlines, making mould and interior lining panel punching, interior lining panel are hung to operating platform, roofing interior lining panel is installed and cleanup step, Concrete operations condition is as follows:
Described surveying setting-out is to carry out roofing interior lining panel row's plate cloth in advance according to design drawing and engineering entity size before construction Put figure, further according to row plate layout drawing carry out live unwrapping wire, by often across or node eject roof purline installation control line;
Described mounting purlines are by traditional steel house panel installation techniques construction;During construction, main purlin and support node plate, Secondary purlin is with bolts with main purlin, and between secondary purlin and secondary purlin, spreading is with bolts by purlin supporting plate, primary and secondary The connecting bolt of purlin must be tightened shimming one by one;Main purlin must strictly check slope top and toe absolute altitude, bracing wire school when installing Just, fixing;Meet when joint installs straight it is necessary to scene be carried out using specific purpose tool again take hole, will during secondary purlin typesetting Ensure gutter position accurately, first by fixed flat at gutter during installation;
The described mould and interior lining panel punching of making is that first the width according to interior lining panel and purlin center distance make a rectangular base Seat, width ratio interior lining panel width 2mm, length direction makes the short 1m of interior lining panel length than pre-, using steel nail be fixed into one firm Base, then carry out labelling according to purlin centre-to-centre spacing on base length direction, this be labeled as after on surface layer interior lining panel snap the line do Good preparation, puts base on one piece of smooth ground well, 5 20 pieces of interior lining panels is put in mould, be marked at according on base The good line of ink marker of bullet, then drilling on surface layer interior lining panel;
It is after the completion of pore-forming on the mould of ground that described interior lining panel is hung to operating platform, puts neat by length classification, using The hole position accomplished fluently, as suspension centre, slings into punch die with the rope made of hemp on the operational platform;
It is to be not less than a pitch of waves according to the transverse lap of interior lining panel that described roofing interior lining panel is installed, and longitudinal lap joint is not less than 120mm, is fixed on roofing time purlin using the crest that tap bolt penetrates interior lining panel vertical wave stricture of vagina, tap bolt must be with secondary purlin Bar supporting surface is vertical, fixing firm;
Described cleaning is after the interior lining panel in installation operating platform region, and interior lining panel bottom surface is polluted by workmen with water Place's scrub, for there is scratching place, application is mended with the paint-adding pen of mother matrix solid colour, it is to avoid forms aberration and affects U.S. See.
CN201510050129.8A 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels Active CN104652714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510050129.8A CN104652714B (en) 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510050129.8A CN104652714B (en) 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels

Publications (2)

Publication Number Publication Date
CN104652714A CN104652714A (en) 2015-05-27
CN104652714B true CN104652714B (en) 2017-01-18

Family

ID=53244301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510050129.8A Active CN104652714B (en) 2015-01-30 2015-01-30 Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels

Country Status (1)

Country Link
CN (1) CN104652714B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2632196Y (en) * 2003-08-11 2004-08-11 于田 Roof screw hided composite lighting boards
JP2008266888A (en) * 2007-04-16 2008-11-06 Gantan Beauty Ind Co Ltd Fixing structure of roofing material and roofing material construction method
CN201395899Y (en) * 2009-03-12 2010-02-03 厦门新长诚钢构浪板有限公司 Water interruption line structure of lightweight steel factory building roof boards
CN201420340Y (en) * 2009-04-13 2010-03-10 百安力钢结构应用科技有限公司 Metal roofing system
CN201972319U (en) * 2011-02-28 2011-09-14 厦门市国安特机械工程有限公司 Connecting device for profiled steel plate and purline
CN102409811B (en) * 2011-08-12 2013-09-25 中国建筑第八工程局有限公司 Air-tight heat insulation metal roof and construction method thereof
CN202745285U (en) * 2012-08-21 2013-02-20 森特士兴集团股份有限公司 Composite waterproof roofing system
CN202882239U (en) * 2012-08-27 2013-04-17 上海精锐金属建筑系统有限公司 Profiled metal roofing board free end portion wind-resistant connecting piece

Also Published As

Publication number Publication date
CN104652714A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN101691191A (en) Self-climbing tower crane
CN107974944A (en) A kind of Y types road-cum-rail bridge floorings hanging apparatus and hanging method
CN205804904U (en) A kind of leveling unit
CN204510650U (en) A kind of precast splice type stringer type stairway
CN104652714B (en) Construction method for pore-forming installation of self-made mold for steel structure roofing lining panels
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN202401753U (en) Sliding die device
CN108035553A (en) Large-span steel workshop contour plate in-situ precast construction technique
CN106522544A (en) Root-rotting-preventing compensating device for formwork
CN102777026A (en) Method for constructing ultra-long rear casting plate supporting system by using Bailey frames
CN102900233A (en) Dual face raw slurry clean water concrete construction method
CN207073234U (en) A kind of new-type antiskid bar of vestibule concrete walkway board
CN105089194B (en) A kind of furred ceiling conversion layer prolongs the construction method of formula erecting by overhang certainly
CN205529917U (en) A support fixing device that is used for high mound, U type abutment form setting
CN204367159U (en) A kind of anchor plate positioner
CN204418666U (en) A kind of building site is with there being side wall stair template
CN106869387A (en) Multi-ribbed plate Structural Floor System HZ concrete film construction methods
CN107558604A (en) A kind of method for exempting from form removal raised table building
CN209145185U (en) A kind of staircase external angle protective device and constructing device
CN204737653U (en) Large -scale tower machine ballast structure
CN205804940U (en) The standardized panel structure in a kind of template screw hole position
CN207004150U (en) A kind of environmentally friendly flag platform easy to assemble that can be reused
CN205955050U (en) Antiskid stair apron of marking time
CN204282624U (en) Indoor glass ceiling
CN111005556B (en) Long and narrow deformation joint template and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xie Maobing

Inventor after: Liao Libo

Inventor after: Huang Xiaozhang

Inventor after: Li Liping

Inventor after: Xie Zhier

Inventor after: Deng Di

Inventor after: Huang Huagao

Inventor after: Li Shuling

Inventor after: Wei Kexue

Inventor after: Tang Feng

Inventor after: Zhou Shanxue

Inventor after: He Yong

Inventor after: Ou Zhiyong

Inventor before: Deng Di

Inventor before: Wei Kexue

Inventor before: Huang Huagao

Inventor before: Xie Zhier

Inventor before: Xie Maobing

Inventor before: Li Shuling

Inventor before: He Yong

Inventor before: Wei Yuanji

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Construction Industry Group Metallurgical Construction Co., Ltd.

Address before: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: Guangxi Zhuang Autonomous Region metallurgical construction company

CP01 Change in the name or title of a patent holder