CN104652403B - One geotextiles lapped layup method under water - Google Patents

One geotextiles lapped layup method under water Download PDF

Info

Publication number
CN104652403B
CN104652403B CN201510044300.4A CN201510044300A CN104652403B CN 104652403 B CN104652403 B CN 104652403B CN 201510044300 A CN201510044300 A CN 201510044300A CN 104652403 B CN104652403 B CN 104652403B
Authority
CN
China
Prior art keywords
geotextiles
nail
under water
laying
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510044300.4A
Other languages
Chinese (zh)
Other versions
CN104652403A (en
Inventor
陶松垒
王掌权
俞元洪
滕峰
滕一峰
吴良勇
叶方蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo High-Tech Zone, Sea-Closure Engineering Technology Development Co., Ltd.
Original Assignee
Zhejiang Lover Health Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Lover Health Science and Technology Development Co Ltd filed Critical Zhejiang Lover Health Science and Technology Development Co Ltd
Priority to CN201510044300.4A priority Critical patent/CN104652403B/en
Publication of CN104652403A publication Critical patent/CN104652403A/en
Application granted granted Critical
Publication of CN104652403B publication Critical patent/CN104652403B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/10Placing gravel or light material under water inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0085Geotextiles

Abstract

One geotextiles lapped layup method under water, belongs to coastal engineering building construction technology.Due to the complexity of soft foundation, foundation bearing capacity unbalanced, geotextiles always occurs that ballast drifts about under water.The especially lap-joint two pieces of geotextiles always disconnects.This problem is difficult to effectively make up in engineering after continuous, buries hidden danger of quality.The present invention includes using GPS localization method, industrial PC screen real-time mark method, band acicular hook gang rope method and nail sandstone bag method.Making sandstone bag throw in precisely, effectively prevent the floating of geotextiles, curling, drift, make geotextile laying smooth-going under water and wrinkle resistant, the mutual clasp joint in edge is unified into a piece of, improves the quality of work efficiency and laying.Preferably resolve a difficult problem for geotextiles overlap joint under water.And there is location standard, error is little, and speed is fast, the feature that efficiency is high.

Description

One geotextiles lapped layup method under water
Technical field
The present invention relates to geotextiles lay under water, belong to coastal engineering building construction technology.
Background technology
Geotextiles, also known as geotextile, it is by the synthetic fibers water penetration geosynthetics by acupuncture or braiding. Geotextiles has outstanding filtration, draining, isolation, reinforcement, antiseepage, protective action, have lightweight, tensile strength is high, Good penetrability, high temperature resistant, anti-freezing, ageing-resistant, corrosion-resistant.In soft base embankment project, geotextiles can be effectively isolated The material of different physical properties, makes two or more storeroom not mix, and keeps overall structure and the function of material;Effectively will Concentrated stress spreads, transmits or decompose, and reduces uneven settlement of foundation;Effectively increase tensile strength and the resistance ability of the soil body, Strengthening the anti-shearing destruction of ground, therefore, geotextiles is extensively applied in seashore treatment of soft foundation.Rapid along with marine cause Development, coastal engineering is developed to deep water direction by shallow water.Its construction also by land to shallow water, more to deep water transition.So Geotextile laying technology is the most gradually paid close attention to by people under water.
In recent years, during this technology is applied to coastal engineering deep water deep soft soil treatment.Geotextile laying also exists the depth of water under water Stream is anxious, stormy waves is big, with a varied topography, and the feature that ground is weak, these are all that deep water geotextile laying is brought difficulty.And exist Subject matter be the floating drift of geotextiles, the overlap joint under water between geotextiles is unstable, cause work cloth by floating and fold, The most washed away.Impact on efficiency of construction and laying quality is the biggest.The method in the past not having advanced person, always seashore work Problem in the urgent need to address in journey.Chinese patent " underwater geotextile laying equipment " (ZL201020258420.7), is this The achievement in research of the early stage of a person of good sense, is a kind of profundal zone or even the new construction equipment of abysmal area geotextile laying.Main research Special earthwork cloth laying ship under water, is to solve safety work and raising efficiency of construction equipment under the complex working condition of deep-sea.In and State's patent " geotextile laying method under water " (201210202475.X) is new technology and the new method of geotextile laying under water, Solving under deep water complexity hydrologic condition, the construction equipment using geotextile laying new carries out the desired technique of unconventional construction and side Method.Then, under water in the quality inspection of the laying of geotextiles, finding again a lot of problem, scientific and technological invention is exactly that relay is run, Constantly pinpoint the problems and research and solve in problem, promoting scientific and technological progress.Due to the complexity of soft foundation, foundation bearing capacity is not Equilibrium, geotextiles always occurs that ballast drifts about under water.Always there is the changing of the relative positions and discrepancy in the especially lap-joint two pieces of geotextiles. And after finding this problem, be difficult to effectively make up in engineering, bury hidden danger of quality.The present invention is directed in early-stage Study On the basis of, through research practice repeatedly, putting into engineer applied, effect is notable, solves geotextiles lapped layup method under water difficult Topic.
Summary of the invention
The present invention is to solve above-mentioned technical barrier, it is ensured that the laying quality of geotextiles under water.Invent one geotextiles under water to take Connect method, including using band acicular hook gang rope and nail sand bag method.
The technology of the present invention includes that operation field is measured, and installation apparatus positions, geotextiles sewing splicing, and geotextiles lifting is laid, sand Stone bag is thrown in, and jackstone ballast is characterized in that:
A., according to operation field Measurement situation when industrial PC input related data, it is simultaneously entered the overlapping edges of adjacent geotextiles Size, and the corresponding site laying ship corresponding on the screen of industrial PC carries out scale mark, as throwing in nail sandstone The position of bag;
B., when geotextiles sewing splicing, geotextiles edge sewing one band acicular hook gang rope, as the overlap joint of two geotextiles under water Hook;
C., before geotextile laying, band acicular hook gang rope is connected with the steel pipe grasp on the front end of geotextiles, is then rolled up Being wound on cylinder, lifting is to operation ship;
D. equipped with the nail of band barb bottom the sandstone bag used by two geotextiles overlapping parts, and be placed on laying ship carry out labelling Position, laying limit, limit throws in, and at non-overlapping position, the line space with 3~5m throws in sandstone bag, overlapping at two geotextiles overlap joints On position, the line space with 1~3m throws in nail sandstone bag;Nail with barb pierces through two geotextiles overlapping parts, two-layer Geotextiles is linked together
When E. laying next geotextiles, under the effect sinking to the bottom cylinder, the tartar that band acicular hook gang rope sets inserts geotextiles, Tied with the mutual hook of barb, be unified into a piece of;
F. use during jackstone ballast particle diameter less than the metaling of 15cm, first to two geotextiles overlapping parts and geotextile laying Throwing on edge placement, throwing is whole the most again has laid district.
The overlapping edges of described geotextiles is the position of the two geotextiles overlaps adjacent when laying, and two width geotextiles are at crossover region Lap width should be greater than 30~80cm, be coated with face ground the weakest more take high level.
Described overlap joint hook uses band acicular hook gang rope, is also called barbed wire, thorn rope, among the people is commonly called as barbed wire.Bifilar or multiply Thorn rope is twisted volume formed by thorn rope machine, barb spacing between 15~60cm, sting a length of laid geotextiles thickness 3~6 times, Ci Toushang With barb.When geotextiles sewing splicing, sew the edge in geotextiles.
Equipped with the nail of band barb, referred to as nail sandstone bag bottom described sandstone bag, it is equipped at least with one bottom sandstone bag The nail of individual band barb, 3~6 times of a length of the laid geotextiles thickness of nail, suitable for reading at cloth bag loads onto float.It is deposited in Lay on ship standby, be specifically designed to two geotextiles overlapping parts.
Advantages of the present invention
Be band acicular hook gang rope owing to using one overlap joint hook of geotextiles edge sewing, and before geotextile laying, band acicular hook gang rope with Steel pipe grasp on the front end of geotextiles is connected.During geotextile laying, the surrounding in geotextiles all has protection, Do not result in geotextiles curling drift again.After geotextile laying, nail penetrates geotextiles, with barb in nail head.Make two Geotextiles phase clasp joint, no longer removes.
Owing to using the corresponding site laying ship corresponding on the industrial PC screen of GPS location to carry out scale mark, and in advance Nail sandstone bag is placed on laying ship and carries out the position of labelling.Make sandstone bag throw in precisely, improve work efficiency.
Owing to using the upper band acicular hook gang rope with barb of tartar, barb spacing, between 15~60cm, stings a length of laid geotextiles thickness 3~6 times of degree.The mutual clasp joint in edge making geotextiles under water is unified into a piece of.
Owing to using at non-overlapping position the line space with 3~5m to throw in sand bag, overlap in crossover position in two geotextiles, nail sand The line space of stone bag 1~3m throws in nail sand bag.When throwing particle diameter is less than the metaling of 15cm, first to two geotextiles overlap joints Throwing on the paving location of position, makes two-layer geotextiles be linked together.Effectively prevent the floating drift of geotextiles, make geotextiles Lay smooth-going and wrinkle resistant.
The present invention can be guaranteed in the depth of water 2~20m, flow velocity 0~3m/s, tidal range≤9m, wind-force≤7 grade, the wave≤environment of 2 grades Stable construction, all weather operations, ensure the quality laid.And there is location standard, error is little, and speed is fast, and efficiency is high Feature.
Accompanying drawing explanation
Fig. 1 is sandstone bag layout drawing, and Fig. 2 is the nail state diagram of the bottom installation band acicular hook of sandstone bag, and Fig. 3 is geotechnological under water Cloth overlap joint figure, Fig. 4 is band acicular hook gang rope Local map.Including: float 1, band 2, sand material 3, woven bag 4, sheet iron 5, nail 6, suture 7, band acicular hook gang rope 8, geotextiles 9, soft base 10, bifilar thorn rope 11, barbed wire 12, tartar 13.
Detailed description of the invention
Below in conjunction with the accompanying drawings, the present invention is further illustrated.
Embodiment 1: certain embankment project is that inland rivers port area grows the most complete, largest Tidal Flat Resources.Last 100 years Constantly slowly to deposit extension, deposits deep mud and silt clay and fine powder chiltern soil layer, the long 16.5k of present beach face M, wide 4.5km, gradient 0.4~10.68 ‰, more than mean tide tlevel, there are 3.2 ten thousand mu, other are all below mean tide tlevel. Sea wall dike line is always about 18.5km, total cost 6.6 hundred million, and levee body structure is jackstone embankment structure, and it is flat that dike both sides set 1~2 grade of suppression Platform, dike both sides side slope uses top layer boulder, fills building block stone and concrete profiled block pavement structure.Levee body based process uses geotechnique Cloth adds the composite consolidation method of blotter and plastic draining, and combines ballast processing method.This engineering levee foundation uses geotextile laying Sector width is 36~98m.Lay district maximum water depth 18.6m, flow velocity 2.6m/s, tidal range 6.1m.Owing to engineering is located in edge, the southeast Haiti district, 6~8 grades of strong wind are regular weather, and stormy waves is big.Harsh environmental conditions, the impact on geotextile laying quality is bigger.
In order to ensure laying quality, improve work efficiency, use geotextiles lapped layup method under water.
Construction equipment: hull system non-boat formula disjunctor basement process operation ship, overall length 36m, beam overall 12m, moldeed depth 3.0m, eats Water depth is 1.6m, and displacement is 300t, joins Horizontal electronic windlass and the Hall of 400kg of 5t about bow tail deck Each 4 of anchor, anchor cable uses φ 22.5mm, and the steel wire rope of 200m × 4, as mobile device and the job platform of ship.
Alignment system: geotextile laying machine is placed on operation ship, can carry out vertical and horizontal at construction area and move.Waterborne fixed Position device uses advanced GPS real-time requiring system, is made up of 3 high-precision GPSs.This system carries out full-computerized Operation, not only receives information fast, and is not affected by weather, stormy waves, can be at round-the-clock positioning operation.
Nail sandstone packs work: nail 6 of burn-oning on the sheet iron 5 of one piece of triangle, a length of 2.5cm of nail 6, nail 6 On with barb.Nail 6 penetrates woven bag 4 down, and is fixed on the bottom of woven bag 4 with suture 7 line;It is less than with particle diameter The sand material 3 of 5cm seals after 25kg loads cloth bag altogether;Suitable for reading at cloth bag loads onto a floater of foam 1;Then with pricking Band 2 ties bag mouth.Multiple sandstone bags are deposited on laying ship standby.The nail sandstone bag that said method does is deposited on laying ship; With support vessel, the sandstone bag of suppression geotextiles is loaded by sandstone contracted affreightment to laying ship together the opposite side of laying ship.
Geotextiles 9 sewing splicing: on land the geotextiles 9 of single width width 5 meters is sewed, be spliced into width 25 ± 0.5m, length is 36~98m.Band acicular hook gang rope 8 is sewed in the two edges of geotextiles 9.Then it is wound on cylinder, Side seam limit winds, in case the bending fold that geotextiles 9 is in winding process;Cut off by design length, and in geotextiles 9 The steel pipe of a piece a diameter of 90cm and 4 grasps are installed on external end head, band acicular hook gang rope 8 with on the front end of geotextiles 9 Steel pipe grasp is connected.Band acicular hook gang rope 8 uses bifilar thorn rope 11, fixes barbed wire 12 at a distance of 40cm.Barbed wire 12 It is provided with tartar 13, stings a length of 2cm, with two-sided barb on tartar 13.
Use and sink to the bottom the way that cylinder launches at the bottom to pave, carry out geotextiles 9 under water and lay.During operation, fixed after opening computer Position system starts, multiple satellite-signals are through fore gps antenna, fore GPS, through stern gps antenna, ship Tail GPS enters industrial PC.The base station signal that movement station communication antenna receives simultaneously is by receiving radio station input industry control Computer.The location windlass of the corner laying ship is controlled by positioner, and various signals are resolved by industrial PC, and use one The folding and unfolding of set four anchor hawsers of working software reed time controll, adjusts the position that boats and ships are correct.On computers by the design good institute of setting coordinate The construction area of geotextiles 9 need to be laid, show on screen in operation process ballast district, lay district, lay district, Do not lay district and crossover region, use different colours to mark in real time.It is simultaneously entered overlapping edges size 50cm of adjacent geotextiles, and The corresponding site laying ship corresponding on the screen of industrial PC carries out scale mark.Used by two geotextiles 9 overlapping parts Equipped with the nail 6 of band barb bottom sandstone bag, and it is placed on and lays ship and carry out the position of labelling;Reality according to every width geotextiles 9 Border size and construction area plane of arrangement divide the cell plane construction drawing of every width geotextiles 9, show ship by computer screen The position and attitude laying district cell that body sets, then carry out hull with 4 windlass and move accommodation, make hull sideline, location and set Cell lattice are laid district and are initiateed sideline coincidence, illustrate that hull accurate positioning can carry out laying operation.
Laying after ship positionning, put down cylinder to painting face, geotextiles 9 grasp is pricked into soft base 10 mash, and front two anchor hawsers tighten up, and rear two Anchor hawser loosens, and lays ship and slowly advances, and geotextiles 9 is being coated with drawout on thin-skinned base 10, and then sandstone bag puts down, and is uniformly pressed in In geotextiles 9, first paving location completes.Promote and lay cylinder, move to second paving location laying ship, carry out The laying of next width geotextiles 9.When laying second geotextiles 9, under the effect sinking to the bottom cylinder, on the both sides of geotextiles 9 The tartar 13 set on the barbed wire 12 of edge, is mutually inserted, and upper and lower two-layer geotextiles 9 is tied with the mutual hook of barb, is unified into one Sheet.Sand bag is thrown in the line space of 4m in non-overlapping position, overlaps in crossover position in two geotextiles 9, nail sandstone bag 2m it Line space is thrown in.
When nail sandstone bag sink to two geotextiles 9 overlap crossover position time, not only press geotextiles 9, and nail 6 be down Penetrate geotextiles 9, with barb on nail 6.Two geotextiles 9 are made no longer to remove.
When laying ship and moving to the 3rd paving location, it is less than 15 centimetres with split barge throwing particle diameter on first paving location Metaling, when throwing particle diameter is less than the metaling of 15 centimetres, first to two geotextiles 9 overlapping parts and geotextile laying Throwing on edge placement, throwing is whole the most again has laid district.So moved in circles geotextile laying under water.

Claims (3)

1. a geotextiles lapped layup method under water, measures including operation field, and installation apparatus positions, geotextiles sewing splicing, Geotextiles lifting is laid, and sandstone bag is thrown in, and jackstone ballast is characterized in that:
A., according to operation field Measurement situation when industrial PC input related data, it is simultaneously entered the overlapping edges of adjacent geotextiles Size, and the corresponding site laying ship corresponding on the screen of industrial PC carries out scale mark, as throwing in nail sandstone The position of bag;
B., when geotextiles sewing splicing, geotextiles edge sewing one band acicular hook gang rope, as the overlap joint of two geotextiles under water Hook;
C., before geotextile laying, band acicular hook gang rope is connected with the steel pipe grasp on the front end of geotextiles, is then rolled up Being wound on cylinder, lifting is to operation ship;
D. equipped with the nail of band barb bottom the sandstone bag used by two geotextiles overlapping parts, and be placed on laying ship carry out labelling Position, laying limit, limit throws in, and at non-overlapping position, the line space with 3~5m throws in sandstone bag, overlapping at two geotextiles overlap joints On position, the line space with 1~3m throws in nail sandstone bag;Nail with barb pierces through two geotextiles overlapping parts, two-layer Geotextiles is linked together;
When E. laying next geotextiles, under the effect sinking to the bottom cylinder, the tartar that band acicular hook gang rope sets inserts geotextiles, Tied with the mutual hook of barb, be unified into a piece of;
F. use during jackstone ballast particle diameter less than the metaling of 15cm, first to two geotextiles overlapping parts and geotextile laying Throwing on edge placement, throwing is whole the most again has laid district.
2. one geotextiles lapped layup method under water as claimed in claim 1, is characterized in that: overlap joint hook uses band acicular hook guiding principle Restricting, bifilar or multiply thorn rope is twisted volume by thorn rope machine and is formed, and barb spacing, between 15~60cm, stings a length of laid geotextiles thickness 3~6 times, tartar is upper with barb, when geotextiles sewing splicing, sews the edge in geotextiles.
3. one geotextiles lapped layup method under water as claimed in claim 1, is characterized in that: nail sandstone bag is at sandstone Equipped at least with the nail of a band barb bottom bag, 3~6 times of a length of the laid geotextiles thickness of nail, suitable for reading at cloth bag Load onto float, be specifically designed to two geotextiles overlapping parts.
CN201510044300.4A 2015-01-28 2015-01-28 One geotextiles lapped layup method under water Active CN104652403B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510044300.4A CN104652403B (en) 2015-01-28 2015-01-28 One geotextiles lapped layup method under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510044300.4A CN104652403B (en) 2015-01-28 2015-01-28 One geotextiles lapped layup method under water

Publications (2)

Publication Number Publication Date
CN104652403A CN104652403A (en) 2015-05-27
CN104652403B true CN104652403B (en) 2016-08-31

Family

ID=53243997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510044300.4A Active CN104652403B (en) 2015-01-28 2015-01-28 One geotextiles lapped layup method under water

Country Status (1)

Country Link
CN (1) CN104652403B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862670A (en) * 2016-04-01 2016-08-17 陆振富 Riverway ecological grid laying method and riverway
CN111058452B (en) * 2019-12-25 2021-07-30 中交第一航务工程局有限公司 Offshore underwater geotextile spreading tool and use method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1019915C (en) * 1990-03-11 1993-02-17 山西省交通厅 Device of automatically laying rollers for preventing flushing
RU2165495C1 (en) * 1999-12-17 2001-04-20 Закрытое акционерное общество "НЕЙРОКОМ" Method for checking characteristics of liquid column in the course of its production
CN101041954A (en) * 2007-04-17 2007-09-26 张志铁 Large-area soft foundation soil bag and foundation trench composite consolidation method
CN100516374C (en) * 2007-06-15 2009-07-22 河海大学 Movable feeding and constructing method for dynamic reinforcing surface layer of large area flabbiness foundation
CN201785741U (en) * 2010-07-13 2011-04-06 红阳建设集团有限公司 Underwater geotextile laying equipment
CN103485308B (en) * 2012-06-09 2015-06-10 浙江科技学院 Underwater geotextile fabric laying method

Also Published As

Publication number Publication date
CN104652403A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN104846787B (en) Construction method for carrying out sand-blowing sea-filling land-making in shallow sea area by using cutter suction dredger
CN100516384C (en) Underwater vacuum prepressing reinforcement soft base technique method
CN106120823B (en) A kind of Temporary Cofferdam combination against seepage structure and rapid constructing method
CN101158149B (en) Full-enclosed type flexible deepwater enclosure
CN109113020B (en) Seaport breakwater structure and construction method thereof
CN211692490U (en) Shield constructs reinforcing structure who wears river course under shallow earthing
CN102953341A (en) Overhead trestle structure built on non-covering steep bare rocks in deep rapids
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN1773022A (en) Fast soft foundation dyke building method and technology
CN202626978U (en) Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group
CN109780325A (en) A kind of water factory's water intaking tunnel submarine pipeline installation method
CN108930251A (en) A kind of harbour submerged breakwater structure and its construction method
CN103485308B (en) Underwater geotextile fabric laying method
CN102561379A (en) Novel bridge installation foundation and construction method thereof
CN104652403B (en) One geotextiles lapped layup method under water
CN101289860B (en) Underwater slope protection construction method for foundation ditch in water
CN109235474B (en) Structure of super-large cofferdam based on marine environment and construction process thereof
CN205152888U (en) An anchor bag and a concrete interlocking software volleyball association body structure
CN104612128B (en) Vacuum preloading reinforcement construction method applicable to underwater silt environment
CN108729411A (en) A kind of rubble pad river bottom protection soft raft and its construction method
CN113718739A (en) Rolling-sliding stacking construction method for scour-prevention flexible sand blowing bags of offshore wind power pile foundation
CN103938581B (en) Batch production manufactures the method for dykes and dams component and fast construction dykes and dams
CN207608912U (en) Side slope body supporting construction
CN204356731U (en) A kind of abysmal area sea wall sand is laid equipment
CN110397051A (en) A kind of cofferdam structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200103

Address after: 315040 4th Floor, 1009 Guangxian Road, Ningbo High-tech Zone, Zhejiang Province

Patentee after: Ningbo High-Tech Zone, Sea-Closure Engineering Technology Development Co., Ltd.

Address before: 310023 C2-403, No. 318 ho Wan Road, Zhejiang, Hangzhou

Patentee before: Zhejiang Institute of Science and Technology

TR01 Transfer of patent right