CN104631658B - The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes - Google Patents

The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes Download PDF

Info

Publication number
CN104631658B
CN104631658B CN201410481807.1A CN201410481807A CN104631658B CN 104631658 B CN104631658 B CN 104631658B CN 201410481807 A CN201410481807 A CN 201410481807A CN 104631658 B CN104631658 B CN 104631658B
Authority
CN
China
Prior art keywords
sun
dried mud
mud brick
wall
adobe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410481807.1A
Other languages
Chinese (zh)
Other versions
CN104631658A (en
Inventor
柏文峰
叶银霖
杜泉锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201410481807.1A priority Critical patent/CN104631658B/en
Publication of CN104631658A publication Critical patent/CN104631658A/en
Application granted granted Critical
Publication of CN104631658B publication Critical patent/CN104631658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to the construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes, belong to construction engineering technical field.The present invention by manufacturing polytype sun-dried mud brick, sun-dried mud brick privileged site brushing water proof and viscous power consumption layer.By the flat block of the sun-dried mud brick fissure of displacement, twice horizontal groove and some vertical circular holes through sun-dried mud brick wall overall height, pre-buried vertical reinforcement in strip footing at center of circular hole are formed in the range of adobe wall floor height.Longitudinal reinforcement catches on the vertical reinforcement in the vertical circular hole in adobe wall termination in horizontal groove.Adobe wall horizontal groove and vertical circular hole intersection set adobe wall sedimentation buffering area.Sleeper is formed to casting concrete in vertical circular hole, then the concrete of groove poured beyond sedimentation buffering area forms dark collar tie beam.After sun-dried mud brick wall settlement stability, buffering area is settled with concrete filling, dark collar tie beam constitutes armored concrete strengthening grid with sleeper in adobe wall.The present invention plays reinforcement adobe wall entirety, significantly improves the effect of shock resistance.

Description

The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes
Technical field
The present invention relates to the construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes, belong to building Field of engineering technology.
Background technology
Sun-dried mud brick agriculture room is gathered materials on the spot, cheap, the extensive utilization in the poor rural area in western China.Sun-dried mud brick agriculture room It is the important component in traditional characteristicses village, by taking province with rich ethnic culture Yunnan as an example, the traditional residence of its 26 Ge Shi resident race All more or less using the raw-soil as construction material.From in terms of present circumstances, sun-dried mud brick agriculture room is just increasingly exiting the stage of agriculture residence construction, Mainly there is three below reason:First, traditional sun-dried mud brick agriculture room anti-seismic performance is not good, and in all previous earthquake, adobe wall collapses and be all Cause the one of the main reasons of casualties;Secondly, the main body load-carrying members of traditional adobe house use timber structure, adobe wall master Play enclosure wall, timber price is high, be susceptible to fire, peasant is difficult to bear;Again, by traditional raw-soil building technology Limitation, traditional immature soil dwelling windowing is small, indoor dark, it is difficult to meet the requirement that living quality is improved in rural area.Thus, it is necessary to pin To the deficiency of traditional sun-dried mud brick wall technology, improved technology is proposed, for the succession and development of adobe house provide technical support.
There have been some antidetonation strengthening measures and structural system for adobe wall agriculture room, including cast-in-situs gypsum in the country at present Sun-dried mud brick wall construction, plank sandwich structure, gallows timber-sun-dried mud brick wall construction etc..The more traditional adobe wall of shock resistance of these technologies has It is certain to improve, but can't effectively solve the anti-seismic problem in highly seismic region sun-dried mud brick agriculture room.Timber is easily mouldy rotten rotten, and gypsum is not only It is by resource constraint and not water-fast.
To solve the above problems, " the earth building blocks wall that a kind of armored concrete is strengthened "(The patent No.: CN201020189029.6)Proposition reinforced concrete circle beam and column strengthen earth building blocks wall, it is characterised in that the wall base with Between vertical, horizontal earth building blocks wall, between floor plates and vertical, horizontal earth building blocks wall, roof and vertical, horizontal earth building blocks wall it Between, the reinforced concrete circle beam of horizontal positioned is respectively equipped with, armored concrete is provided with vertical, horizontal earth building blocks wall connecting and is stood Post, interval setting steel wire or reinforcing bar at vertical, horizontal earth building blocks wall connecting are used to strengthen the connection between earth building blocks wall, Avoid producing crack on earth building blocks wall, improve the overall performance and bearing capacity of earth building blocks fissure of displacement masonry panel.The method pair There is following obvious deficiency in sun-dried mud brick wall anti-seismic problem is solved:
1st, earth building blocks used by this technology are formed for Machine hydraulic, and with masonry of cement mortar, masonry strength is high, by vertical load Creep is small after effect, it is easy to keep overall stress with reinforced concrete circle beam and reinforced concrete upright column.And traditional-handwork is native Base masonry elastic modelling quantity is only about the 3% of C20 concrete, and uses masonry of cement mortar, and masonry strength is low, is made by vertical load It is larger with rear creep, it is difficult to keep overall stress with reinforced concrete circle beam and reinforced concrete upright column.
2nd, earth building blocks are formed for Machine hydraulic, and packing is high, and water absorption rate is low, and reinforced concrete circle beam and armored concrete are vertical After the concreting of post, little moisture loss, maintenance effect is good.But sun-dried mud brick water absorption rate is high, the pouring reinforcement concrete on sun-dried mud brick wall It is too fast that collar tie beam and reinforced concrete upright column are easily caused concrete dehydration, influences concrete curing effect, and concrete strength cannot Ensure.
3rd, this technology only sets reinforced concrete upright column in longitudinal cross wall intersection, and armored concrete is set at floor absolute altitude Adobe wall globality is kept without any stiffener in collar tie beam, the whole standard width of a room in an old-style house of wall, easy full wafer wall collapses during earthquake, jeopardizes Human life's property safety.
4th, this technology reinforced concrete upright column and reinforced concrete circle beam need installation form casting concrete, and construction is more It is cumbersome.
The content of the invention
The technical problem to be solved in the present invention is that adobe wall shock resistance is weak, is easy to cave in, reinforced concrete structural column, circle Beam is difficult to coordinate stress with sun-dried mud brick wall, and sun-dried mud brick water suction causes bad some problems of grade of concrete curing, there is provided Yi Zhongshi For the construction method of the adobe wall of highly seismic region of providing fortification against earthquakes, it is used to solve that adobe wall shock resistance is weak, is easy to cave in, reinforcing bar Concrete-constituted pile, collar tie beam be difficult to sun-dried mud brick wall coordinate stress, and sun-dried mud brick water suction cause the bad grade of concrete curing some Problem.
The technical scheme is that:1st, a kind of construction method of antidetonation adobe wall:
Step 1:Along adobe wall position of center line on reinforced concrete strip foundation, every 0.6 ~ 1.8m, pre-buried one is erected To the pre-buried spiral of sleeper;
Step 2:Sun-dried mud brick is prepared, prepared sun-dried mud brick at least includes standard sun-dried mud brick, groove profile sun-dried mud brick, circular hole sun-dried mud brick, short sun-dried mud brick, The groove profile sun-dried mud brick at least includes standard channel sun-dried mud brick, center band circular hole groove profile sun-dried mud brick, side band semicircle groove profile sun-dried mud brick;The circle Hole sun-dried mud brick at least includes center band circular hole sun-dried mud brick, side band semicircle orifice sun-dried mud brick;The short sun-dried mud brick at least includes that side band circular hole is short Sun-dried mud brick;
Step 3:Full coat water proof and viscous power consumption layer, full on the groove inner wall of groove profile sun-dried mud brick on the curved surfaces of sun-dried mud brick Apply water proof and viscous power consumption layer;
Step 4:On reinforced concrete strip foundation, cement is passed through using the other kinds of sun-dried mud brick in addition to groove profile sun-dried mud brick The mortar fissure of displacement is equalled the mode built and constructs adobe wall, and some vertical circular holes are formed in adobe wall, and vertical circular hole spacing is dark with vertical The pre-buried spiral spacing of post is identical;
Step 5:When adobe wall builds the certain altitude to floor height, groove profile is used on reinforced concrete strip foundation Sun-dried mud brick is built by laying bricks or stones side by side, centered on the pre-buried spiral of vertical sleeper pre-buried on reinforced concrete strip foundation, in adobe wall It is upper to form some vertical circular holes and elongated horizontal groove, vertical circular hole spacing and the pre-buried spiral spacing phase of vertical sleeper Together;
Step 6:To slow setting pea gravel concreten is poured in the vertical circular hole of adobe wall, when slow setting pea gravel concreten top surface in circular hole When absolute altitude reaches groove profile sun-dried mud brick bottom surface, stop to pouring slow setting pea gravel concreten in vertical circular hole;
Step 7:Plain steel-bar is processed into steel tie, is bundled with two dark beam longitudinal reinforcements of level, be put into In the elongated horizontal groove on adobe wall constructed by groove profile sun-dried mud brick, the dark beam longitudinal reinforcement of level in groove is held to the greatest extent in adobe wall Back bending at vertical circular hole, catches on adobe wall and holds the pre-buried spiral of vertical sleeper in circular hole to the greatest extent;
Step 8:To fast hardening concrete is poured in the elongated horizontal groove on adobe wall, the dark collar tie beam of wall waist is formed;Pour walling During the dark collar tie beam fast hardening concrete of waist, sleeper space in the dark collar tie beam groove profile sun-dried mud brick altitude range of wall waist is heavy for half storey eminence adobe wall Drop cushion space, must not casting concrete in this space;
Step 9:When the dark collar tie beam concrete strength of wall waist up to design strength more than 50%, continue to build adobe wall by laying bricks or stones;
Step 10:The sun-dried mud brick fissure of displacement is flat to be built, centered on the pre-buried vertical pre-buried spiral of sleeper, by different type sun-dried mud brick Combination, some vertical circular holes, vertical circular hole spacing and the pre-buried vertical pre-buried spiral spacing of sleeper are formed in adobe wall It is identical;
Step 11:When adobe wall is built to floor height, built by laying bricks or stones side by side using groove profile sun-dried mud brick, elongated level is formed on adobe wall Groove, the horizontal groove is used to form the dark collar tie beam of floor height, and reinforcing bar way is identical with the dark collar tie beam of wall waist in horizontal groove;
Step 12:To pouring slow setting knot concrete, then the coagulation for pouring the dark beam of floor height and floor in the vertical hole of adobe wall Soil;Sleeper space in the dark collar tie beam groove profile sun-dried mud brick altitude range in wall top and the floor entity part in the range of sleeper plane projection are Adobe wall sedimentation cushion space at floor height, must not casting concrete in this space;
Step 13:It is heavy with microdilatancy pea gravel concreten packed layer eminence adobe wall after after whole sun-dried mud brick wall stabilization Drop cushion space, antidetonation adobe wall construction is completed.
The water proof and viscous power consumption layer are emulsified asphalt, viscosity water-repellent paint.This water proof and viscous power consumption layer have three Recast is used:One is that the concrete curing water for protecting dark beam and sleeper in adobe wall is not siphoned away by sun-dried mud brick, it is ensured that the maintenance of concrete Quality;Two is have viscous power consumption to act on, the sun-dried mud brick surface reciprocal changing of the relative positions relative with dark beam and generations of sleeper surface during earthquake, water proof with The viscous damping effect of viscous power consumption layer can consume seismic energy, further improve adobe wall shock resistance.Three is to allow sun-dried mud brick Wall deformation is asynchronous with sleeper, with compatibility of deformation function.Adobe wall elastic modelling quantity is only about the 3% of C20 concrete, and uses Masonry of cement mortar, masonry strength is low, larger by creep after vertical uniform load q, difficult to keep entirety to receive with armored concrete sleeper Power.Due to thering is water proof and viscous power consumption layer to separate between armored concrete sleeper and adobe wall contact level, sun-dried mud brick wall creep Deformation is constrained small by armored concrete sleeper, is reduced both sides and was constrained produced secondary stress, protects the globality of adobe wall.
Configuration reinforcement in vertical hole and horizontal groove, casting concrete, form bidirectional crossed steel in the adobe wall Reinforced concrete sleeper and the dark beam of armored concrete, sleeper constitute the two-way reinforcing mat of stealthy armored concrete with dark beam in adobe wall Lattice.Adobe wall globality is improved, while shock resistance is improved, it is to avoid adobe wall bulk slump in earthquake, personnel is caused Life and property loss.And armored concrete sleeper and the dark beam of armored concrete are poured without template, timber, construction letter are saved Just.
Constrained by armored concrete sleeper to alleviate the deformation of creep of sun-dried mud brick wall, further reduce both sides and constrain too strong being produced Raw secondary stress, sedimentation cushion space is set in the armored concrete sleeper and the dark collar tie beam intersection of armored concrete, When building the sun-dried mud brick wall on cushion space by laying bricks or stones, the interior not casting concrete of cushion space, it is ensured that building by laying bricks or stones on cushion space Sun-dried mud brick wall free settling, after sun-dried mud brick wall free settling is basicly stable, then pours microdilatancy pea gravel concreten.Delay sleeper Concrete set time, to build the sun-dried mud brick wall being buffered on space by laying bricks or stones, further sedimentation creates conditions, it is ensured that adobe wall is built Build mortar joint compacting full.
The dark beam longitudinal reinforcement of level holds to the greatest extent back bending at vertical circular hole in adobe wall, directly catches on adobe wall and holds circular hole to the greatest extent The interior pre-buried spiral of vertical sleeper.This measure purpose is to improve the anti-unstability ability of adobe wall end sleeper, is strengthened to soil The constraint of base wall, further improves adobe wall shock resistance.
When adobe wall is built to floor height, using in-situ reinforced concrete slab, adobe wall cooperative bearing is further improved.
The sun-dried mud brick at least includes standard sun-dried mud brick, groove profile sun-dried mud brick, circular hole sun-dried mud brick, short sun-dried mud brick;The standard sun-dried mud brick is rectangular Body;The short sun-dried mud brick is the half of standard sun-dried mud brick.
The groove profile sun-dried mud brick at least includes standard channel sun-dried mud brick, center band circular hole groove profile sun-dried mud brick, side band semicircle groove profile soil Base;The standard channel sun-dried mud brick is to be provided with groove on standard sun-dried mud brick;The center band circular hole groove profile sun-dried mud brick is in standard channel The circular hole for running through is provided with geometric center in sun-dried mud brick groove;The side band semicircle groove profile sun-dried mud brick is standard channel sun-dried mud brick groove one Side or symmetrical both sides are provided with the semicircle orifice for running through.
The circular hole sun-dried mud brick at least includes center band circular hole sun-dried mud brick, side band semicircle orifice sun-dried mud brick;The center band circular hole soil Base is that the circular hole for running through is provided with standard sun-dried mud brick geometric center;Side band semicircle orifice sun-dried mud brick be in standard sun-dried mud brick side or Symmetrical both sides are provided with the semicircle orifice for running through.
The short sun-dried mud brick at least includes the side band short sun-dried mud brick of circular hole;The side band short sun-dried mud brick of circular hole is by center band circular hole Sun-dried mud brick is vertical or horizontal to be divided equally.
The width of the groove profile sun-dried mud brick groove is more than the diameter on circular hole sun-dried mud brick through circular hole.
The beneficial effects of the invention are as follows:
1), in adobe wall body form the length of side less than 1.8 meters of close square armored concrete strengthening grid.Yunnan Province Earthquake resistant engineering research center has carried out three full size adobe wall pseudo-static experimentals to this technology, and structural test result shows, by this The sun-dried mud brick wall of method construction, more existing technology improves adobe wall ductility more than 3 times, and vertical bearing capacity improves more than 2 times.Soil After base wall piece reaches ultimate lateral bearing capacity, remain able to bear more than 4 times of vertical working load without overall collapse.《Town (Township)Village's building aseismicity technical regulation》JGJ 161-2008 are professional standard of the China specifically designed for country building antidetonation, at this In professional standard, traditional two floor adobe house are only allowed at 6 degree and the non-area that provides fortification against earthquakes uses, 7 degree, 8 degree area's quilts of providing fortification against earthquakes Forbid.After using this technology, two layers of adobe house meet 8 degree of requirementss for fortification against earthquake, and one layer of adobe house meets 9 degree and provide fortification against earthquakes It is required that, the use scope of adobe house has been expanded significantly.
2), in adobe wall body form the length of side less than 1.8 meters of close square armored concrete strengthening grid, control ground Sun-dried mud brick wall crack extension is not across armored concrete strengthening grid during shake.Structural test result shows:Reached in adobe wall During ultimate bearing capacity, the full-length cracks for extending to full wafer wall, wall are not produced to keep complete, come off without bulk sun-dried mud brick.This Avoiding earthquake causes adobe wall to collapse caused personnel's property loss.
3), the way of the constructional column of original technology and collar tie beam centralized configuration is changed to be distributed.Every layer of soil of original technology Base wall sets one section 240 ~ 360mm wide, the reinforced concrete circle beam in section high 120 ~ 240, every layer of this technology at floor height Adobe wall certain altitude in the range of the floor height is each with floor height set together with section 80 ~ 140mm wide, section 60 ~ 80mm high it is dark Collar tie beam, concrete amount is not enough the 1/2 of original technology, amount of reinforcement reduction 20%.Original technology only sets steel in longitudinal cross wall intersection Reinforced concrete constructional column(Sectional dimension 240mmx240mm), construct intercolumniation greatly, this technology sleeper 80 ~ 140mm of diameter, spacing Less than 1.8m, the more former technology of concrete amount maintains an equal level, and amount of reinforcement reduces 30%.This technology is reducing armored concrete consumption Under the premise of, improve adobe wall shock resistance.
4), form the dark collar tie beam of armored concrete, the horizontal groove of sleeper and vertical circular hole by not in this technology adobe wall The combination of same type sun-dried mud brick is built by laying bricks or stones and is formed, without other formwork, easy construction economy during casting concrete.
5), this technology adobe wall armored concrete sleeper, the dark beam of armored concrete and sun-dried mud brick contact surface brush emulsification Pitch is used as waterproof layer.This waterproof layer also has in addition to the function of influenceing intensity with dehydration during preventing concrete curing There is two other function:One is viscous power consumption layer effect, under seismic loading, armored concrete sleeper, armored concrete When dark beam occurs the relative changing of the relative positions with sun-dried mud brick, there is emulsified asphalt viscous power consumption to act on, favourable configurations antidetonation;Two is that there is deformation to assist Conditioning function.The deformation of creep of sun-dried mud brick wall is more than the armored concrete sleeper in adobe wall body, due to armored concrete sleeper and soil There is emulsified asphalt to separate between base wall contact surface, the deformation of creep of sun-dried mud brick wall is constrained small by armored concrete sleeper, reduce double Side constrained produced secondary stress, protected the globality of adobe wall.
6)Constrained by armored concrete sleeper to alleviate the deformation of creep of sun-dried mud brick wall, further reduce both sides and constrain too strong institute The secondary stress for producing, sedimentation cushion space is set in armored concrete sleeper and the dark collar tie beam intersection of armored concrete.Building When building the sun-dried mud brick wall on cushion space, the interior not casting concrete of cushion space, it is ensured that building the soil on cushion space by laying bricks or stones Base wall free settling, after band free settling is basicly stable, then pours microdilatancy pea gravel concreten, delays sleeper concrete setting Time, to build the sun-dried mud brick wall on cushion space by laying bricks or stones, further sedimentation creates conditions, it is ensured that adobe wall mortar joint is closely knit full.
7)This technology adobe wall wall thickness is only 3/5ths of traditional sun-dried mud brick wall thickness, and few with soil amount, energy-conservation saves land.
8)The adobe wall that this technology is built can use in-situ reinforced concrete slab, resistance to compared with traditional adobe house Long property and fire-resistance capacity are significantly improved, and without timber, are conserved forests.
Brief description of the drawings
Fig. 1 is standard adobe construction schematic diagram of the invention;
Fig. 2 is center band circular hole adobe construction schematic diagram of the invention;
Fig. 3 is band semicircle orifice adobe construction schematic diagram in side of the invention;
Fig. 4 is standard channel adobe construction schematic diagram of the invention;
Fig. 5 is center band circular hole groove profile adobe construction schematic diagram of the invention;
Fig. 6 is band semicircle hole-and-slot adobe construction schematic diagram in side of the invention;
Fig. 7 is the band short adobe construction schematic diagram of circular hole in side of the invention;
Fig. 8 is that adobe wall of the invention builds schematic diagram by laying bricks or stones;
Fig. 9 is dark collar tie beam arrangement of reinforcement schematic diagram of the invention;
Figure 10 is adobe wall vertical section schematic diagram of the invention;
Figure 11 is adobe wall schematic cross section of the invention;
Figure 12 is adobe wall load-displacement wall skeleton curve map of the invention;
Figure 13 is adobe wall load-displacement wall hysteresis loop figure of the invention.
In figure:1- reinforced concrete strip foundations, 2- standard sun-dried mud bricks, 3- center band circular hole sun-dried mud bricks, 4- sides band semicircle orifice Sun-dried mud brick, 5- standard channel sun-dried mud bricks, 6- center band circular hole groove profile sun-dried mud bricks, 7- sides band semicircle hole-and-slot sun-dried mud brick, 8- sides band circular hole Short sun-dried mud brick, 9- water proofs and viscous power consumption layer, 10- sedimentation cushion spaces, 11- normal concretes, 12- slow setting knot concrete, 13- are erected To the pre-buried spiral of sleeper, the dark beam longitudinal reinforcement of 14- levels, 15- steel ties, 16- reinforced concrete floors.
Specific embodiment
With reference to the accompanying drawings and detailed description, the invention will be further described.
Embodiment 1:Adobe wall layout according to architectural design, the reinforced concrete strip foundation 1 of adobe wall of constructing first, On adobe wall position of center line on reinforced concrete strip foundation 1, every the perpendicular of the pre-buried 12 ~ 16mm of diameter of 0.6 ~ 1.8m To the pre-buried spiral 13 of sleeper.According to the standard sun-dried mud brick 2, the center band circular hole sun-dried mud brick 3, side that in Fig. 1-7, prepare varying number Band semicircle orifice sun-dried mud brick 4, standard channel sun-dried mud brick 5, center band circular hole groove profile sun-dried mud brick 6, side band semicircle hole-and-slot sun-dried mud brick 7, side band The short sun-dried mud brick 8 of circular hole.In center band circular hole sun-dried mud brick 3, side with curved surfaces of the semicircle orifice sun-dried mud brick 4, side with the short sun-dried mud brick 8 of circular hole Brushing emulsified asphalt 9 as water proof and viscous power consumption layer, in standard channel sun-dried mud brick 5, center band circular hole groove profile sun-dried mud brick 6, side band Full coat emulsified asphalt 9 is used as water proof and viscous power consumption layer on the groove inner wall of semicircle hole-and-slot sun-dried mud brick 7.
In fig. 8, these sun-dried mud bricks are built on reinforced concrete strip foundation 1 with the mortar fissure of displacement is flat, it is pre- with vertical sleeper Centered on burying spiral 13, by sun-dried mud brick standard sun-dried mud brick 2, center band circular hole sun-dried mud brick 3, side band semicircle orifice sun-dried mud brick 4, side band The combination of the short sun-dried mud brick 8 of circular hole, forms the vertical circular hole of some 80 ~ 140mm of diameter in adobe wall, vertical circular hole spacing with it is vertical The pre-buried spacing of spiral 13 of sleeper is identical.When adobe wall builds the certain altitude to floor height, using standard channel sun-dried mud brick 5th, center band circular hole groove profile sun-dried mud brick 6, side band semicircle hole-and-slot sun-dried mud brick 7, the side band short sun-dried mud brick 8 of circular hole is built by laying bricks or stones side by side, in sun-dried mud brick Elongated horizontal groove is formed on wall.Elongated horizontal groove width 80 ~ 140mm, 60 ~ 80mm of depth.To in the vertical circular hole of adobe wall Normal concrete 11 is poured, the concrete sleeper of the vertical pre-buried spiral 13 of sleeper is formed.When normal concrete 11 in circular hole Top surface absolute altitude reaches the bottom of groove profile sun-dried mud brick standard channel sun-dried mud brick 5, center band circular hole groove profile sun-dried mud brick 6, side band semicircle hole-and-slot sun-dried mud brick 7 During face, stop pouring normal concrete in vertical circular hole.
In fig .9, steel tie 15 is processed into the plain steel-bar of a diameter of 6mm, with two levels of 10 ~ 14mm of diameter Dark beam longitudinal reinforcement 14 is bundled, and is put into the elongated horizontal groove on adobe wall, the dark beam longitudinal direction steel of the level in groove Muscle 14 holds to the greatest extent back bending at vertical circular hole in adobe wall, catches on adobe wall and holds the pre-buried spiral 13 of the vertical sleeper in circular hole to the greatest extent.
In Fig. 10, to normal concrete 11 is poured in the elongated horizontal groove on adobe wall, the dark collar tie beam of wall waist is formed.Pour During the dark collar tie beam pea gravel concreten 11 of walling waist, center band circular hole groove profile sun-dried mud brick 6 or side band semicircle hole-and-slot at the dark collar tie beam of wall waist Normal concrete 11 must not be poured in the vertical circular hole of adobe wall in the altitude range of sun-dried mud brick 7, this scope is soil below the dark collar tie beam of wall waist The sedimentation cushion space 10 of base wall.When the dark intensity of collar tie beam normal concrete 11 of wall waist reaches more than the 50% of design strength, after It is continuous to build adobe wall by laying bricks or stones.The sun-dried mud brick fissure of displacement is flat to be built, centered on the pre-buried spiral 13 of vertical sleeper, by sun-dried mud brick sun-dried mud brick standard sun-dried mud brick 2nd, center band circular hole sun-dried mud brick 3, side is with combination of the semicircle orifice sun-dried mud brick 4, side with the short sun-dried mud brick 8 of circular hole, if being formed in adobe wall The vertical circular hole of dry 80 ~ 140mm of diameter, vertical circular hole spacing is identical with the pre-buried spacing of spiral 13 of vertical sleeper.In sun-dried mud brick Wall is built during to floor height, using sun-dried mud brick standard channel sun-dried mud brick 5, center band circular hole groove profile sun-dried mud brick 6, side band semicircle hole-and-slot sun-dried mud brick 7, The side band short sun-dried mud brick 8 of circular hole is built by laying bricks or stones side by side, and elongated horizontal groove is formed on adobe wall, and the horizontal groove is dark for forming floor height Collar tie beam.Reinforcing bar way is identical with the dark collar tie beam of wall waist in horizontal groove.To pouring slow setting knot concrete 12 in the vertical hole of adobe wall, When the top surface absolute altitude of slow setting knot concrete 12 reaches the groove profile sun-dried mud brick bottom surface absolute altitude to form the dark collar tie beam of floor height, stop casting concrete. When pouring the dark collar tie beam concrete 11 of floor height, center band circular hole groove profile sun-dried mud brick 6 or side band semicircle hole-and-slot soil at the dark collar tie beam of floor height In adobe wall in the altitude range of base 7 in vertical circular hole must not casting concrete, this scope be the floor height following adobe wall of dark collar tie beam The sedimentation cushion space 10 of body.After after whole sun-dried mud brick wall stabilization, the floor height following sun-dried mud brick of dark collar tie beam is filled with concrete 11 The sedimentation cushion space 10 of wall.
In fig. 11, the pouring reinforcement concrete floor 16 on the top surface of the dark collar tie beam of floor height, antidetonation adobe wall construction is completed.
Figure 12 is the load-displacement skeleton curve of antidetonation adobe wall result of the test, and wall displacement water occurs when being 7.88mm Plane fracture is stitched, correspondence horizontal loading 77.6kN.As displacement increases, wall body slit continuously emerges and develops, when being loaded onto 15.9mm, Horizontal loading reaches maximum for 144.1kN, continues to load, when being moved to 22.3mm, wall damage.
Figure 13 is the hysteresis loop of antidetonation adobe wall result of the test, and hysteresis loop surrounds area and represents loading procedure pilot scale The plastic deformation ability of part accumulation.From hysteresis loop figure can be seen that with loading amplitude increase, hysteretic loop turgor have by Gradually increased trend, shows that the plastic deformation ability of test specimen accumulation gradually increases, namely energy dissipation capacity is continuously increased.
3 experiment walls all experienced elasticity, elastoplasticity and three stages of destruction from starting to be loaded into destruction.Wall shearing resistance Test data is shown in Table 1
The test result of table 1
Due to testing, to use two layers of adobe house be reference, the horizontal earthquake shear under sun-dried mud brick wall geological process(Effect) This condition is also adopted by during calculating.Experiment adobe wall is drawn by theoretical calculation(3000mm long, 2400mm high)In 7 degree of basic intensities Bottom wall bears horizontal shear under geological process:The test wall calculated by preceding vertical wall bears horizontal earthquake action for 79.19kN; Horizontal earthquake action is born for 47.34kN by the test wall of interior horizontal reckoning.Bottom wall holds under 8 degree of basic intensity geological processes By horizontal shear:The test wall calculated by preceding vertical wall bears horizontal earthquake action for 154.92kN;By the test wall of interior horizontal reckoning Horizontal earthquake action is born for 92.61kN.Compare with result of the test such as table 2, table 3.
Under the conditions of 27 degree of table is provided fortification against earthquakes, the ratio between maximum load capacity and effect
Under the conditions of 38 degree of table is provided fortification against earthquakes, the ratio between maximum load capacity and effect
From table 2 it can be seen that novel earthquake-proof adobe wall meets 7 degree of requirementss for fortification against earthquake, shearing resistance has enough safety stocks; From experiment, after adobe wall reaches ultimate shear-carrying capacity, apply overall without occurring using the vertical load of 4 times of gravity Conquassation;Therefore, under the guidance of seismic Resistance Concept Design of Buildings principle, novel earthquake-proof adobe wall can be used for 7 degree of floor of area two of providing fortification against earthquakes The construction of adobe house.
From table 3, novel earthquake-proof adobe wall is close to 8 degree of shear-carrying capacity requirements of providing fortification against earthquakes.Further improve construction Afterwards, two layers of adobe wall building can meet 8 degree of fortification intensity requirements.One layer of adobe wall building can meet 9 degree of fortification intensities and want Seek
The sun-dried mud brick at least includes standard sun-dried mud brick, groove profile sun-dried mud brick, circular hole sun-dried mud brick, short sun-dried mud brick;The standard sun-dried mud brick is rectangular Body;The short sun-dried mud brick is the half of standard sun-dried mud brick.
The groove profile sun-dried mud brick at least includes standard channel sun-dried mud brick, center band circular hole groove profile sun-dried mud brick, side band semicircle groove profile soil Base;The standard channel sun-dried mud brick is to be provided with groove on standard sun-dried mud brick;The center band circular hole groove profile sun-dried mud brick is in standard channel The circular hole for running through is provided with geometric center in sun-dried mud brick groove;The side band semicircle groove profile sun-dried mud brick is standard channel sun-dried mud brick groove one Side or both sides are provided with the semicircle orifice for running through.
The circular hole sun-dried mud brick at least includes center band circular hole sun-dried mud brick, side band semicircle orifice sun-dried mud brick;The center band circular hole soil Base is that the circular hole for running through is provided with standard sun-dried mud brick geometric center;Side band semicircle orifice sun-dried mud brick be in standard sun-dried mud brick side or Symmetrical both sides are provided with the semicircle orifice for running through.
The short sun-dried mud brick at least includes the side band short sun-dried mud brick of circular hole;The side band short sun-dried mud brick of circular hole is by center band circular hole Sun-dried mud brick is vertical or horizontal to be divided equally.
The width of the groove profile sun-dried mud brick groove is more than the diameter on circular hole sun-dried mud brick through circular hole.
Specific embodiment of the invention is explained in detail above in conjunction with accompanying drawing, but the present invention be not limited to it is above-mentioned Implementation method, in the ken that those of ordinary skill in the art possess, can also be before present inventive concept not be departed from Put that various changes can be made.

Claims (4)

1. the construction method of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes, it is characterised in that:
Step 1:It is vertical dark every pre-buried one of 0.6 ~ 1.8m along adobe wall position of center line on reinforced concrete strip foundation The pre-buried spiral of post;
Step 2:Sun-dried mud brick is prepared, prepared sun-dried mud brick at least includes standard sun-dried mud brick, groove profile sun-dried mud brick, circular hole sun-dried mud brick, short sun-dried mud brick, described Groove profile sun-dried mud brick at least includes standard channel sun-dried mud brick, center band circular hole groove profile sun-dried mud brick, side band semicircle groove profile sun-dried mud brick;The circular hole soil Base at least includes center band circular hole sun-dried mud brick, side band semicircle orifice sun-dried mud brick;The short sun-dried mud brick at least includes the side band short sun-dried mud brick of circular hole;
Step 3:Full coat water proof and viscous power consumption layer material on the curved surfaces of sun-dried mud brick are full on the groove inner wall of groove profile sun-dried mud brick Apply water proof and viscous power consumption layer material;
Step 4:On reinforced concrete strip foundation, cement mortar is passed through using the other kinds of sun-dried mud brick in addition to groove profile sun-dried mud brick The fissure of displacement is equalled the mode built and constructs adobe wall, and some vertical circular holes are formed in adobe wall, and vertical circular hole spacing is pre- with vertical sleeper Bury spiral spacing identical;
Step 5:When adobe wall builds the certain altitude to floor height, groove profile sun-dried mud brick is used on reinforced concrete strip foundation Build by laying bricks or stones side by side, centered on the pre-buried spiral of vertical sleeper pre-buried on reinforced concrete strip foundation, the shape on adobe wall Into some vertical circular holes and elongated horizontal groove, vertical circular hole spacing is identical with the pre-buried spiral spacing of vertical sleeper;
Step 6:To slow setting pea gravel concreten is poured in the vertical circular hole of adobe wall, when slow setting pea gravel concreten top surface absolute altitude in circular hole When reaching groove profile sun-dried mud brick bottom surface, stop to pouring slow setting pea gravel concreten in vertical circular hole;
Step 7:Plain steel-bar is processed into steel tie, is bundled with two dark beam longitudinal reinforcements of level, be put into by groove In elongated horizontal groove on the adobe wall that type sun-dried mud brick is constructed, the dark beam longitudinal reinforcement of level in groove is held to the greatest extent vertically in adobe wall Back bending at circular hole, catches on adobe wall and holds the pre-buried spiral of vertical sleeper in circular hole to the greatest extent;
Step 8:To fast hardening concrete is poured in the elongated horizontal groove on adobe wall, the dark collar tie beam of wall waist is formed;Pour walling waist dark During collar tie beam fast hardening concrete, the sleeper space in the dark collar tie beam groove profile sun-dried mud brick altitude range of wall waist is slow for half storey eminence adobe wall is settled Space is rushed, must not casting concrete in this space;
Step 9:When the dark collar tie beam concrete strength of wall waist reaches more than the 50% of design strength, continue to build adobe wall by laying bricks or stones;
Step 10:The sun-dried mud brick fissure of displacement is flat to be built, centered on the pre-buried vertical pre-buried spiral of sleeper, by the group of different type sun-dried mud brick Close, some vertical circular holes are formed in adobe wall, vertical circular hole spacing is identical with the pre-buried spiral spacing of vertical sleeper;
Step 11:When adobe wall is built to floor height, built by laying bricks or stones side by side using groove profile sun-dried mud brick, elongated level is formed on adobe wall recessed Groove, the horizontal groove is used to form the dark collar tie beam of floor height, and reinforcing bar way is identical with the dark collar tie beam of wall waist in horizontal groove;
Step 12:To pouring slow setting knot concrete, then the concrete for pouring the dark beam of floor height and floor in the vertical hole of adobe wall;Wall It is floor height to push up the sleeper space in dark collar tie beam groove profile sun-dried mud brick altitude range and the floor entity part in the range of sleeper plane projection Place's adobe wall sedimentation cushion space, must not casting concrete in this space;
Step 13:After after whole sun-dried mud brick wall stabilization, settled with microdilatancy pea gravel concreten packed layer eminence adobe wall slow Space is rushed, the construction of antidetonation adobe wall is completed.
2. the construction method of antidetonation adobe wall according to claim 1, it is characterised in that:The water proof and viscous power consumption layer It is viscosity water-repellent paint.
3. the construction method of antidetonation adobe wall according to claim 1, it is characterised in that:Vertical hole in the adobe wall With configuration reinforcement in horizontal groove, casting concrete forms bidirectional crossed armored concrete sleeper and the dark beam of armored concrete, Sleeper constitutes the two-way strengthening grid of stealthy armored concrete with dark beam in adobe wall.
4. the construction method of antidetonation adobe wall according to claim 3, it is characterised in that:In the armored concrete sleeper Sedimentation cushion space, when the sun-dried mud brick wall on cushion space is built by laying bricks or stones, buffering are set with armored concrete dark collar tie beam intersection Not casting concrete in space, it is ensured that building the sun-dried mud brick wall free settling on cushion space by laying bricks or stones, treating that sun-dried mud brick wall freely sinks After drop is basicly stable, then pour microdilatancy pea gravel concreten.
CN201410481807.1A 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes Active CN104631658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410481807.1A CN104631658B (en) 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410481807.1A CN104631658B (en) 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes

Publications (2)

Publication Number Publication Date
CN104631658A CN104631658A (en) 2015-05-20
CN104631658B true CN104631658B (en) 2017-05-31

Family

ID=53210853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410481807.1A Active CN104631658B (en) 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes

Country Status (1)

Country Link
CN (1) CN104631658B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088445A (en) * 2016-07-08 2016-11-09 上海交通大学 A kind of without mortar raw-soil masonry structure system and building
CN107298569B (en) * 2017-08-08 2019-09-13 合肥工业大学 A kind of Modified soil blank material material and filling traditional empty wall body construction method
EP3456895B1 (en) 2017-09-19 2021-11-10 DiHa Patentverwertungs GbR Wall provided with concrete supports and method for the construction of such a wall
CN109296116A (en) * 2018-09-10 2019-02-01 重庆大学 Centralized transverse prestress binding masonry and its method for applying prestressing force built in one kind

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85105018A (en) * 1985-07-02 1986-12-31 北京建筑工程学院 Earthquake-proof construction block
AT400457B (en) * 1986-09-15 1996-01-25 Schmaranz Ing Rudolf COMPONENT AND METHOD FOR THE PRODUCTION THEREOF
CN2062356U (en) * 1989-03-31 1990-09-19 贺永安 Universal block for building wall material
CN201485965U (en) * 2009-08-11 2010-05-26 华侨大学 Novel energy-saving building structure
CN201485994U (en) * 2009-08-11 2010-05-26 华侨大学 Novel energy-saving composite load bearing wall body
CN103758248B (en) * 2014-01-15 2016-08-17 北京工业大学 T-frame insulation masonry single-row-reinforcelightweight lightweight concrete wall and manufacture method

Also Published As

Publication number Publication date
CN104631658A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN106121039B (en) Villages and small towns masonry structure assembled integral ring beam and construction column combined method
CN103469939A (en) Flexible connection anti-seismic structure for masonry infilled wall and main body, and construction method for flexible connection anti-seismic structure
Altın et al. Strengthening masonry infill walls with reinforced plaster
CN104631658B (en) The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes
CN205576955U (en) Raft foundation's reinforced structure is displaced into to strip footing
CN109386050A (en) A kind of multi-layer combined type house structure
CN106498973A (en) A kind of assembled type base for power transmission line iron tower and its installation method
Maheri et al. Seismic retrofitting methods for the jack arch masonry slabs
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN201224941Y (en) Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building
Palermo et al. Refined compression field theory for plastered straw bale walls
CN101967832B (en) Method for treating bottom structure of building in substation
Schacher et al. Construction guide for low-rise confined masonry buildings
Herskedal et al. Interlocking compressed earth block walls: Out-of-plane structural response
CN101748821B (en) Shockproof reinforcing method of stone wall
CN202416897U (en) Shock-proof reinforcing steel ring beam for masonry house
Macintosh et al. NO-FINES CONCRETE AS A STRUCTURAL MATERIAL.
CN201665934U (en) Quake-proof reinforcing structure for stone wall
CN110593442A (en) Building method of masonry infilled wall adaptive to deformation of external frame
Tripura et al. Failure analysis of earthen, masonry and concrete buildings during the 2017 Tripura earthquake
WO2023026091A1 (en) Prefabricated integrated structures with raft-foundations for seismic improvement
CN206956758U (en) A kind of load-bearing foundation structure for civil engineering Application in Building
Thamboo Reinforced Masonry, An Alternative to Reinforced Concrete
CN209025256U (en) A kind of brick mix structure exterior wall
Khan et al. Mortarless masonry with interlocking blocks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant