CN104631658A - Construction method of adobe wall suitable for seismic fortification high-seismic-intensity area and adobes - Google Patents

Construction method of adobe wall suitable for seismic fortification high-seismic-intensity area and adobes Download PDF

Info

Publication number
CN104631658A
CN104631658A CN201410481807.1A CN201410481807A CN104631658A CN 104631658 A CN104631658 A CN 104631658A CN 201410481807 A CN201410481807 A CN 201410481807A CN 104631658 A CN104631658 A CN 104631658A
Authority
CN
China
Prior art keywords
sun
adobe
dried mud
mud brick
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410481807.1A
Other languages
Chinese (zh)
Other versions
CN104631658B (en
Inventor
柏文峰
叶银霖
杜泉锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201410481807.1A priority Critical patent/CN104631658B/en
Publication of CN104631658A publication Critical patent/CN104631658A/en
Application granted granted Critical
Publication of CN104631658B publication Critical patent/CN104631658B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及一种适用于抗震设防高烈度区的土坯墙的施工方法及土坯,属于建筑工程技术领域。本发明通过制做多种类型土坯,在土坯特定部位涂刷隔水和粘滞耗能层。将土坯错缝平砌,在土坯墙层高范围内形成两道水平凹槽和若干贯穿土坯墙体全高的竖向圆孔,圆孔中心处条形基础上预埋竖向钢筋。水平凹槽内纵向钢筋勾住土坯墙端头竖向圆孔内的竖向钢筋。土坯墙水平凹槽和竖向圆孔交汇处设置土坯墙沉降缓冲区。向竖向圆孔内浇筑混凝土形成暗柱,再浇筑沉降缓冲区以外的凹槽的混凝土形成暗圈梁。土坯墙体沉降稳定后,用混凝土充填沉降缓冲区,暗圈梁与暗柱在土坯墙内构成钢筋混凝土加强网格。本发明起到加强土坯墙整体,显著提高抗震能力的作用。

The invention relates to a construction method of an adobe wall suitable for high-intensity areas of earthquake-resistant fortification and the adobe, belonging to the technical field of construction engineering. The invention makes various types of adobes, and paints water-proof and viscous energy-dissipating layers on specific parts of the adobes. The adobe is laid flat with staggered joints, and two horizontal grooves and several vertical round holes that run through the entire height of the adobe wall are formed within the height range of the adobe wall. The vertical steel bars are pre-embedded on the strip foundation at the center of the round holes. The longitudinal reinforcement in the horizontal groove hooks the vertical reinforcement in the vertical circular hole at the end of the adobe wall. The settlement buffer zone of the adobe wall is set at the intersection of the horizontal groove of the adobe wall and the vertical circular hole. Concrete is poured into the vertical circular hole to form a hidden column, and then the concrete in the groove outside the settlement buffer zone is poured to form a dark circle beam. After the settlement of the adobe wall is stable, the settlement buffer zone is filled with concrete, and the dark circle beams and hidden columns form a reinforced concrete reinforced grid in the adobe wall. The invention plays the role of strengthening the whole adobe wall and significantly improving the anti-seismic ability.

Description

一种适用于抗震设防高烈度区的土坯墙的施工方法及土坯A construction method and adobe for an adobe wall suitable for high-intensity areas of seismic fortification

技术领域 technical field

本发明涉及一种适用于抗震设防高烈度区的土坯墙的施工方法及土坯,属于建筑工程技术领域。 The invention relates to a construction method of an adobe wall suitable for high-intensity areas of earthquake-resistant fortification and the adobe, belonging to the technical field of construction engineering.

背景技术 Background technique

土坯农房就地取材,造价低廉,在我国西部地区贫困乡村中广泛运用。土坯农房也是传统特色村落的重要组成部分,以民族文化大省云南为例,其26个世居民族的传统民居都或多或少采用生土作为建筑材料。从目前情况看,土坯农房正日渐退出农宅建设的舞台,主要有以下三个原因:首先,传统土坯农房抗震性能不佳,在历次地震中,土坯墙倒塌都是导致人员伤亡的主要原因之一;其次,传统土坯建筑的主体承重结构采用木结构,土坯墙主要起围护墙的作用,木料价格高,容易发生火灾,农民难于承受;再次,受传统生土建造技术限制,传统生土民居开窗小,室内阴暗,难于满足农村提高居住质量的要求。所以,有必要针对传统土坯墙技术的不足,提出改进技术,为土坯建筑的传承和发展提供技术支持。 The adobe farmhouses are made from local materials, and the cost is low, so they are widely used in poor villages in western my country. Adobe farmhouses are also an important part of traditional characteristic villages. Taking Yunnan, a major ethnic and cultural province, as an example, the traditional dwellings of its 26 traditional ethnic groups all use raw soil as building materials to a greater or lesser extent. Judging from the current situation, adobe farm houses are gradually withdrawing from the stage of farm house construction. There are three main reasons: First, the traditional adobe farm houses have poor seismic performance. In previous earthquakes, the collapse of adobe walls was the main cause of casualties. One of the reasons; secondly, the main load-bearing structure of the traditional adobe building adopts a wooden structure, and the adobe wall mainly acts as an enclosure wall. The native houses have small windows and dark interiors, making it difficult to meet the requirements of improving the quality of living in rural areas. Therefore, it is necessary to address the deficiencies of traditional adobe wall technology and propose improved technologies to provide technical support for the inheritance and development of adobe buildings.

目前国内已经有一些针对土坯墙农房的抗震加强措施与结构体系,包括现浇石膏土坯墙结构、木板夹芯结构、木构架-土坯墙结构等。这些技术的抗震能力较传统土坯墙有一定提高,但还不能有效解决高烈度区土坯农房的抗震问题。木材容易发霉朽烂,石膏不但受资源限制,而且不耐水。 At present, there are already some anti-seismic strengthening measures and structural systems for farm houses with adobe walls in China, including cast-in-place gypsum adobe wall structures, wood sandwich structures, and wood frame-adobe wall structures. Compared with the traditional adobe wall, the anti-seismic ability of these technologies has been improved to a certain extent, but it cannot effectively solve the anti-seismic problem of adobe farm houses in high-intensity areas. Wood is prone to mildew and decay, and gypsum is not only limited by resources, but also not resistant to water.

为解决上述问题,“一种钢筋混凝土加强的土砌块墙体”(专利号:CN201020189029.6)提出用钢筋混凝土圈梁和立柱加强土砌块墙体,其特征在于在墙基与纵、横向土砌块墙体之间,楼层板与纵、横向土砌块墙体之间,屋顶与纵、横向土砌块墙体之间,分别设有水平放置的钢筋混凝土圈梁,在纵、横向土砌块墙体连接处设有钢筋混凝土立柱,在纵、横向土砌块墙体连接处间隔设置钢丝网或钢筋,用以加强土砌块墙体间的连接,避免土砌块墙体上产生裂缝,提高土砌块错缝砌筑墙体的整体性能及承载能力。此方法对于解决土坯墙体抗震问题存在以下明显不足: In order to solve the above problems, "a reinforced concrete reinforced earth block wall" (patent number: CN201020189029.6) proposes to use reinforced concrete ring beams and columns to strengthen the earth block wall, which is characterized in that the wall foundation and longitudinal, Between the horizontal earth block walls, between the floor slab and the longitudinal and transverse earth block walls, and between the roof and the longitudinal and transverse earth block walls, there are respectively horizontally placed reinforced concrete ring beams. Reinforced concrete columns are arranged at the joints of the horizontal earth block walls, and steel wire mesh or steel bars are arranged at intervals at the joints of the longitudinal and transverse earth block walls to strengthen the connection between the earth block walls and prevent the earth block walls from Cracks are generated on the top of the earth block, and the overall performance and bearing capacity of the wall of the earth block staggered masonry are improved. This method has the following obvious deficiencies in solving the seismic problem of adobe walls:

1、此技术所用土砌块为机器液压而成,用水泥砂浆砌筑,砌体强度高,受竖向荷载作用后蠕变微小,易于与钢筋混凝土圈梁及钢筋混凝土立柱保持整体受力。而传统手工土坯砌体弹性模量仅约为C20混凝土的3%,且采用水泥砂浆砌筑,砌体强度低,受竖向荷载作用后蠕变较大,难于与钢筋混凝土圈梁及钢筋混凝土立柱保持整体受力。 1. The soil blocks used in this technology are machine-hydraulic and built with cement mortar. The masonry has high strength and slight creep after being subjected to vertical loads. It is easy to maintain the overall force with the reinforced concrete ring beam and reinforced concrete column. However, the elastic modulus of traditional handmade adobe masonry is only about 3% of that of C20 concrete, and it is built with cement mortar. The column maintains the overall force.

2、土砌块为机器液压而成,密实度高,吸水率低,钢筋混凝土圈梁及钢筋混凝土立柱的混凝土浇筑后,失水少,养护效果好。但土坯吸水率高,在土坯墙体上浇筑钢筋混凝土圈梁及钢筋混凝土立柱容易导致混凝土失水过快,影响混凝土养护效果,混凝土强度无法保证。 2. The soil block is made of machine hydraulic pressure, with high density and low water absorption. After the concrete of the reinforced concrete ring beam and reinforced concrete column is poured, the water loss is small and the maintenance effect is good. However, the adobe has a high water absorption rate, and pouring reinforced concrete ring beams and reinforced concrete columns on the adobe wall will easily cause the concrete to lose water too quickly, which will affect the curing effect of the concrete, and the strength of the concrete cannot be guaranteed.

3、此技术仅在纵横墙交汇处设置钢筋混凝土立柱,在楼层标高处设置钢筋混凝土圈梁,墙体整个开间内无任何加强构件保持土坯墙整体性,地震时容易整片墙体倒塌,危及人员生命财产安全。 3. This technology only sets reinforced concrete columns at the intersection of vertical and horizontal walls, and sets reinforced concrete ring beams at the floor elevation. There is no strengthening member in the entire wall to maintain the integrity of the adobe wall. The entire wall is likely to collapse during an earthquake, endangering the integrity of the adobe wall. Safety of life and property of personnel.

4、此技术钢筋混凝土立柱和钢筋混凝土圈梁需要安装模板浇筑混凝土,施工较为繁琐。 4. The reinforced concrete column and the reinforced concrete ring beam of this technology need to install formwork to pour concrete, and the construction is relatively cumbersome.

发明内容 Contents of the invention

本发明要解决的技术问题是土坯墙抗震能力弱、易于坍塌,钢筋混凝土构造柱、圈梁难于与土坯墙体协调受力,以及土坯吸水导致混凝土养护不良等一些问题,提供一种适用于抗震设防高烈度区的土坯墙的施工方法,用以解决土坯墙抗震能力弱、易于坍塌,钢筋混凝土构造柱、圈梁难于与土坯墙体协调受力,以及土坯吸水导致混凝土养护不良等一些问题。 The technical problem to be solved by the present invention is that the adobe wall has weak anti-seismic ability and is easy to collapse. The construction method of the adobe wall in the fortified high-intensity area is used to solve some problems such as weak earthquake resistance and easy collapse of the adobe wall, difficulty in coordinating the force of the reinforced concrete structural columns and ring beams with the adobe wall, and poor concrete maintenance caused by adobe water absorption.

本发明的技术方案是:1、一种抗震土坯墙的施工方法: Technical scheme of the present invention is: 1, a kind of construction method of anti-seismic adobe wall:

步骤1:在钢筋混凝土条形基础上沿土坯墙中心线位置,每隔0.6~1.8m预埋一根竖向暗柱预埋螺纹钢筋; Step 1: On the reinforced concrete strip foundation along the center line of the adobe wall, pre-embed a vertical hidden column pre-embedded threaded steel bars every 0.6~1.8m;

步骤2:制备土坯,所制备的土坯至少包括标准土坯、槽型土坯、圆孔土坯、短土坯,所述槽型土坯至少包括标准槽型土坯、中心带圆孔槽型土坯、侧边带半圆槽型土坯;所述圆孔土坯至少包括中心带圆孔土坯、侧边带半圆孔土坯;所述短土坯至少包括侧边带圆孔短土坯; Step 2: Prepare adobe, the prepared adobe at least includes standard adobe, adobe with groove, adobe with round hole, and short adobe, and the adobe with groove at least includes adobe with standard groove, adobe with groove in center, adobe with semicircle on side Groove-shaped adobe; the adobe with round holes at least includes adobe with round holes in the center and adobe with semi-circular holes in the side; the short adobe at least includes short adobe with round holes in the side;

步骤3:在土坯的弧形表面上满涂隔水和粘滞耗能层,在槽型土坯的凹槽内壁上满涂隔水和粘滞耗能层; Step 3: Fully coat the water-proof and viscous energy-dissipating layer on the curved surface of the adobe, and fully coat the water-proof and viscous energy-dissipating layer on the inner wall of the groove of the adobe;

步骤4:在钢筋混凝土条形基础上,利用除槽型土坯外的其他类型的土坯通过水泥砂浆错缝平筑的方式构筑土坯墙,在土坯墙内形成若干竖向圆孔,竖向圆孔间距与竖向暗柱预埋螺纹钢筋间距相同; Step 4: On the strip foundation of reinforced concrete, use other types of adobe except the channel adobe to construct the adobe wall through the way of cement mortar staggered joints, and form several vertical round holes in the adobe wall. The spacing is the same as that of the pre-embedded threaded reinforcement in the vertical concealed column;

步骤5:在土坯墙砌至层高范围内一定高度时,在钢筋混凝土条形基础上采用槽型土坯并列砌筑,以钢筋混凝土条形基础上预埋的竖向暗柱预埋螺纹钢筋为中心,在土坯墙上形成若干竖向圆孔以及通长水平凹槽,竖向圆孔间距与竖向暗柱预埋螺纹钢筋间距相同; Step 5: When the adobe wall is built to a certain height within the storey height range, the grooved adobe is used to build side by side on the reinforced concrete strip foundation, and the pre-buried vertical hidden column pre-embedded threaded steel bars on the reinforced concrete strip foundation are used as In the center, several vertical round holes and full-length horizontal grooves are formed on the adobe wall, and the spacing between the vertical round holes is the same as that of the pre-embedded threaded steel bars in the vertical concealed columns;

步骤6:向土坯墙竖向圆孔内浇筑缓凝细石混凝土,当圆孔内缓凝混凝土顶面标高到达槽型土坯底面时,停止向竖向圆孔内浇筑缓凝混凝土; Step 6: Pour retarded fine stone concrete into the vertical circular hole of the adobe wall, and stop pouring retarded concrete into the vertical circular hole when the elevation of the top surface of the retarded concrete in the circular hole reaches the bottom surface of the groove-shaped adobe;

步骤7:将光面钢筋加工成拉结钢筋,与两根水平暗梁纵向钢筋捆绑在一起,放入由槽型土坯构筑的土坯墙上的通长水平凹槽内,凹槽内的水平暗梁纵向钢筋在土坯墙尽端竖向圆孔处回弯,勾住土坯墙尽端圆孔内的竖向暗柱预埋螺纹钢筋; Step 7: Process smooth steel bars into tie bars, bind them together with two longitudinal steel bars of horizontal hidden beams, and put them into the long horizontal grooves on the adobe wall constructed by channel-shaped adobes. The horizontal darkened bars in the grooves The longitudinal steel bar of the beam is bent back at the vertical round hole at the end of the adobe wall, hooking the pre-embedded threaded steel bar of the vertical hidden column in the round hole at the end of the adobe wall;

步骤8:向土坯墙上的通长水平凹槽内浇筑速凝混凝土,形成墙腰暗圈梁;浇筑墙腰暗圈梁速凝混凝土时,墙腰暗圈梁槽型土坯高度范围内的暗柱空间为半层高处土坯墙沉降缓冲空间,此空间内不得浇筑混凝土; Step 8: Pour quick-setting concrete into the full-length horizontal groove on the adobe wall to form the wall waist hidden circle beam; The column space is the settlement buffer space of the adobe wall at the height of half a storey, and no concrete shall be poured in this space;

步骤9:待墙腰暗圈梁混凝土强度达设计强度的50%以上时,继续砌筑土坯墙; Step 9: When the concrete strength of the hidden ring beam at the waist of the wall reaches more than 50% of the design strength, continue to build the adobe wall;

步骤10:土坯错缝平砌,以预埋竖向暗柱预埋螺纹钢筋为中心,通过不同类型土坯的组合,在土坯墙内形成若干竖向圆孔,竖向圆孔间距与预埋竖向暗柱预埋螺纹钢筋间距相同; Step 10: The adobe is built with staggered joints, centered on the pre-embedded vertical concealed column and the pre-embedded threaded steel bar, and through the combination of different types of adobe, several vertical round holes are formed in the adobe wall. The spacing of the pre-embedded threaded steel bars to the concealed column is the same;

步骤11:在土坯墙砌至层高时,采用槽型土坯并列砌筑,在土坯墙上形成通长水平凹槽,该水平凹槽用于形成层高暗圈梁,水平凹槽内钢筋做法与墙腰暗圈梁相同; Step 11: When the adobe wall is built up to the storey height, groove-shaped adobes are used to build side by side, and a long horizontal groove is formed on the adobe wall. The horizontal groove is used to form a dark ring beam of the storey height. The method of reinforcing bars in the horizontal groove It is the same as the dark ring beam at the waist of the wall;

步骤12:向土坯墙竖向孔洞内浇筑缓凝结混凝土,再浇筑层高暗梁与楼板的混凝土;墙顶暗圈梁槽型土坯高度范围内的暗柱空间及暗柱平面投影范围内的楼板实体部分为层高处土坯墙沉降缓冲空间,此空间内不得浇筑混凝土; Step 12: Pour slow-setting concrete into the vertical hole of the adobe wall, and then pour the concrete for the hidden beam and floor slab; the dark column space within the height range of the dark ring beam groove type adobe on the top of the wall and the floor slab within the projection range of the hidden column plane The solid part is the settlement buffer space of the adobe wall at the storey height, and no concrete shall be poured in this space;

步骤13:待整个土坯墙体变形稳定后,用微膨胀细石混凝土填充层高处土坯墙沉降缓冲空间,抗震土坯墙施工完成。 Step 13: After the deformation of the entire adobe wall is stable, the settlement buffer space of the adobe wall at the height of the storey is filled with micro-expanded fine stone concrete, and the construction of the anti-seismic adobe wall is completed.

所述隔水和粘滞耗能层为乳化沥青、粘滞型防水涂料。此隔水和粘滞耗能层有三重作用:一是保护土坯墙内暗梁及暗柱的混凝土养护水不被土坯吸走,确保混凝土的养护质量;二是有粘滞耗能作用,地震时土坯表面与暗梁及暗柱表面产生相对往复错动,隔水和粘滞耗能层的粘滞阻尼作用可以消耗地震能,进一步提高土坯墙抗震能力。三是允许土坯墙变形与暗柱不同步,具有变形协调功能。土坯墙弹性模量仅约为C20混凝土的3%,且采用水泥砂浆砌筑,砌体强度低,受竖向荷载作用后蠕变较大,难与钢筋混凝土暗柱保持整体受力。由于钢筋混凝土暗柱与土坯墙体接触面之间有隔水和粘滞耗能层分隔,土坯墙体蠕变变形受钢筋混凝土暗柱约束小,减少双方约束过所产生的次生应力,保护土坯墙的整体性。 The water-proof and viscous energy-dissipating layer is emulsified asphalt and viscous waterproof paint. This water-proof and viscous energy-dissipating layer has three functions: one is to protect the concrete curing water of the concealed beams and columns in the adobe wall from being absorbed by the adobe, so as to ensure the maintenance quality of the concrete; When the surface of the adobe and the surface of the hidden beam and the hidden column produce relative reciprocating stagger, the viscous damping effect of the water-proof and viscous energy-dissipating layer can consume the seismic energy, and further improve the seismic capacity of the adobe wall. The third is to allow the deformation of the adobe wall to be asynchronous with the concealed column, which has the function of deformation coordination. The elastic modulus of the adobe wall is only about 3% of that of C20 concrete, and it is built with cement mortar. The strength of the masonry is low, and the creep is relatively large after being subjected to vertical loads, so it is difficult to maintain the overall force with the reinforced concrete concealed column. Since the reinforced concrete concealed column and the contact surface of the adobe wall are separated by a water-proof and viscous energy-dissipating layer, the creep deformation of the adobe wall is less constrained by the reinforced concrete concealed column, which reduces the secondary stress caused by the restraint of both parties and protects The integrity of the adobe walls.

所述土坯墙内竖向孔洞和水平凹槽内配置钢筋,浇筑混凝土,形成双向交叉的钢筋混凝土暗柱和钢筋混凝土暗梁,暗柱与暗梁在土坯墙内构成隐形钢筋混凝土双向加强网格。提高土坯墙整体性,在提高抗震能力的同时,避免土坯墙在地震时大块塌落,造成人员生命财产损失。而且钢筋混凝土暗柱和钢筋混凝土暗梁不用模板浇筑,节约木材,施工简便。 The vertical holes and horizontal grooves in the adobe wall are equipped with steel bars, and concrete is poured to form two-way intersecting reinforced concrete concealed columns and reinforced concrete concealed beams, and the concealed columns and concealed beams form an invisible reinforced concrete two-way reinforced grid in the adobe wall . Improve the integrity of the adobe wall, while improving the earthquake resistance, prevent the adobe wall from collapsing in large pieces during an earthquake, causing loss of life and property. Moreover, the reinforced concrete concealed column and the reinforced concrete concealed beam do not need formwork pouring, which saves wood and is easy to construct.

为缓解土坯墙体蠕变变形受钢筋混凝土暗柱约束,进一步减少双方约束过强所产生的次生应力,在所述钢筋混凝土暗柱与钢筋混凝土暗圈梁交汇处设置沉降缓冲空间,在砌筑缓冲空间之上的土坯墙体时,缓冲空间内不浇筑混凝土,保证在砌筑缓冲空间之上的土坯墙体自由沉降,待土坯墙体自由沉降基本稳定后,再浇筑缓粘结混凝土。延缓暗柱混凝土凝固时间,为砌筑缓冲在空间之上的土坯墙体进一步沉降创造条件,保证土坯墙砌筑灰缝压实饱满。 In order to alleviate the creep deformation of the adobe wall constrained by the reinforced concrete concealed column, and further reduce the secondary stress caused by the excessive restraint of both sides, a settlement buffer space is set at the intersection of the reinforced concrete concealed column and the reinforced concrete concealed circle beam, and the When building the adobe wall above the buffer space, no concrete shall be poured in the buffer space to ensure the free settlement of the adobe wall above the masonry buffer space. After the free settlement of the adobe wall is basically stable, slow-bonding concrete shall be poured. Delaying the solidification time of the concrete of the concealed column creates conditions for the further settlement of the adobe wall buffered above the space, and ensures that the mortar joints of the adobe wall are compacted and full.

所述水平暗梁纵向钢筋在土坯墙尽端竖向圆孔处回弯,直接勾住土坯墙尽端圆孔内的竖向暗柱预埋螺纹钢筋。此措施目的是提高土坯墙端部暗柱的抗失稳能力,加强对土坯墙体的约束,进一步提高土坯墙抗震能力。 The longitudinal steel bar of the horizontal hidden beam is bent back at the vertical hole at the end of the adobe wall, and directly hooks the pre-embedded threaded steel bar of the vertical hidden column in the round hole at the end of the adobe wall. The purpose of this measure is to improve the anti-instability ability of the concealed column at the end of the adobe wall, strengthen the restraint on the adobe wall, and further improve the anti-seismic ability of the adobe wall.

在土坯墙砌至层高时,采用现浇钢筋混凝土楼板,进一步提高土坯墙协同受力。 When the adobe wall is built to the storey height, the cast-in-place reinforced concrete floor slab is used to further improve the coordinated force of the adobe wall.

所述土坯至少包括标准土坯、槽型土坯、圆孔土坯、短土坯;所述标准土坯为长方体;所述短土坯为标准土坯的一半。 The adobe at least includes a standard adobe, a trough adobe, a round hole adobe, and a short adobe; the standard adobe is a cuboid; the short adobe is half of the standard adobe.

所述槽型土坯至少包括标准槽型土坯、中心带圆孔槽型土坯、侧边带半圆槽型土坯;所述标准槽型土坯为在标准土坯上开有凹槽;所述中心带圆孔槽型土坯为在标准槽型土坯槽内的几何中心处开有贯穿的圆孔;所述侧边带半圆槽型土坯为标准槽型土坯凹槽一侧或对称两侧开有贯穿的半圆孔。 The grooved adobe at least includes a standard grooved adobe, a grooved adobe with a round hole in the center, and a semicircular grooved adobe on the side; the standard grooved adobe has grooves on the standard adobe; the center has a round hole The groove-shaped adobe has a through hole in the geometric center of the standard groove-shaped adobe groove; the side with a semicircular groove-type adobe has a through-through semicircular hole on one side or symmetrical sides of the groove of the standard groove-shaped adobe .

所述圆孔土坯至少包括中心带圆孔土坯、侧边带半圆孔土坯;所述中心带圆孔土坯为在标准土坯几何中心处开有贯穿的圆孔;所述侧边带半圆孔土坯为在标准土坯一侧或对称的两侧开有贯穿的半圆孔。 The adobe with round holes at least includes adobe with round holes in the center and adobe with semicircular holes in the side; the adobe with round holes in the center has a through hole at the geometric center of the standard adobe; the adobe with semicircular holes in the side is There are semicircular holes through the standard adobe on one side or on both symmetrical sides.

所述短土坯至少包括侧边带圆孔短土坯;所述侧边带圆孔短土坯为将中心带圆孔土坯纵向或横向均分。 The short adobe at least includes a short adobe with round holes on the sides; the short adobe with round holes on the sides is divided into longitudinal or transverse portions of the adobe with a round hole in the center.

所述槽型土坯凹槽的宽度大于圆孔土坯上贯穿圆孔的直径。 The groove width of the groove-shaped adobe is greater than the diameter of the through hole on the adobe with the round hole.

本发明的有益效果是: The beneficial effects of the present invention are:

1)、在土坯墙体内形成边长小于1.8米的接近方形的钢筋混凝土加强网格。云南省工程抗震研究中心对此技术进行了三片足尺土坯墙拟静力试验,结构试验结果表明,按本方法施工的土坯墙体,较既有技术提高土坯墙延性3倍以上,竖向承载能力提高2倍以上。土坯墙片达到水平极限承载力后,仍然能够承受4倍以上的竖向使用荷载而不整体失稳。《镇(乡)村建筑抗震技术规程》JGJ 161-2008是我国专门针对村镇建筑抗震的行业标准,在该行业标准中,传统二层土坯建筑只允许在6度及非抗震设防区使用, 7度、8度抗震设防区被禁止。采用本技术后,二层土坯建筑满足8度抗震设防要求,一层土坯建筑满足9度抗震设防要求,大大拓展了土坯建筑的使用范围。 1) A nearly square reinforced concrete reinforcement grid with a side length of less than 1.8 meters is formed in the adobe wall. The Yunnan Engineering Seismic Research Center conducted a quasi-static test on three full-scale adobe walls for this technology. The structural test results show that the adobe walls constructed according to this method can increase the ductility of the adobe walls by more than 3 times compared with the existing technology, and the vertical load capacity The capacity is increased by more than 2 times. After the adobe wall sheet reaches the horizontal ultimate bearing capacity, it can still withstand more than 4 times the vertical service load without overall instability. "Seismic Technical Regulations for Town (Township) and Village Buildings" JGJ 161-2008 is my country's industry standard for anti-seismic buildings in villages and towns. In this industry standard, traditional two-story adobe buildings are only allowed to be used in 6-degree and non-seismic fortification areas. 7 Degree and 8 degree earthquake fortified areas are prohibited. After adopting this technology, the two-story adobe building meets the seismic fortification requirements of 8 degrees, and the one-story adobe building meets the seismic fortification requirements of 9 degrees, which greatly expands the use range of adobe buildings.

2)、在土坯墙体内形成边长小于1.8米的接近方形的钢筋混凝土加强网格,控制地震时土坯墙裂缝延展范围不跨越钢筋混凝土加强网格。结构试验结果表明:在土坯墙达到极限承载能力时,不产生延伸至整片墙体的通长裂缝,墙体保持完整,无大块土坯脱落。这就避免了地震导致土坯墙倒塌导致的人员财产损失。 2) A nearly square reinforced concrete reinforced grid with a side length less than 1.8 meters is formed in the adobe wall, so as to control the extension range of cracks in the adobe wall not to cross the reinforced concrete reinforced grid during earthquakes. Structural test results show that: when the adobe wall reaches the ultimate bearing capacity, there will be no full-length cracks extending to the entire wall, the wall will remain intact, and no large pieces of adobe will fall off. This avoids the loss of personnel and property caused by the collapse of the adobe wall caused by the earthquake.

3)、将原有技术的构造柱和圈梁集中配置的做法改为分散配置。原有技术每层土坯墙在层高处设置一道截面宽240~360mm、截面高120~240的钢筋混凝土圈梁,本技术每层土坯墙在层高范围内一定高度和层高处各设置一道截面宽80~140mm、截面高60~80mm的暗圈梁,混凝土用量不足原技术的1/2,钢筋用量减少20%。原有技术仅在纵横墙交汇处设置钢筋混凝土构造柱(截面尺寸240mmx240mm),构造柱间距大,本技术暗柱直径80~140mm,间距小于1.8m,混凝土用量较原技术持平,钢筋用量减少30%。本技术在减少钢筋混凝土用量的前提下,提高土坯墙抗震能力。 3) Change the centralized configuration of structural columns and ring beams in the original technology to decentralized configuration. In the original technology, a reinforced concrete ring beam with a section width of 240-360mm and a section height of 120-240mm is installed at the storey height for each layer of adobe wall. In this technology, each layer of adobe wall is provided with a certain height within the storey height range and at the storey height. For dark circle beams with a section width of 80-140mm and a section height of 60-80mm, the amount of concrete used is less than 1/2 of the original technology, and the amount of steel bars is reduced by 20%. The original technology only sets reinforced concrete structural columns (section size 240mmx240mm) at the intersection of vertical and horizontal walls, and the spacing between the structural columns is large. The diameter of the hidden columns of this technology is 80~140mm, and the spacing is less than 1.8m. The amount of concrete is the same as that of the original technology, and the amount of steel bars is reduced by 30. %. The technology improves the seismic capacity of the adobe wall on the premise of reducing the amount of reinforced concrete.

4)、本技术土坯墙内形成钢筋混凝土暗圈梁、暗柱的水平凹槽和竖向圆孔均由不同类型土坯组合砌筑而成,浇筑混凝土时无需另外支模,施工简便经济。 4) The horizontal grooves and vertical round holes forming the reinforced concrete hidden circle beams and hidden columns in the adobe wall of this technology are all made of different types of adobe combinations. No additional formwork is required when pouring concrete, and the construction is simple and economical.

5)、本技术土坯墙钢筋混凝土暗柱、钢筋混凝土暗梁与土坯接触表面均涂刷乳化沥青作为防水层。此防水层除具有防止混凝土养护过程中失水而影响强度的功能外,还具有另外两个功能:一是粘滞耗能层作用,在地震荷载作用下,钢筋混凝土暗柱、钢筋混凝土暗梁与土坯发生相对错动时,乳化沥青具有粘滞耗能作用,有利结构抗震;二是具有变形协调功能。土坯墙体蠕变变形大于土坯墙体内的钢筋混凝土暗柱,由于钢筋混凝土暗柱与土坯墙体接触面之间有乳化沥青分隔,土坯墙体蠕变变形受钢筋混凝土暗柱约束小,减少双方约束过所产生的次生应力,保护土坯墙的整体性。 5). In this technology, the reinforced concrete concealed column of the adobe wall, the reinforced concrete concealed beam and the contact surface of the adobe are all painted with emulsified asphalt as a waterproof layer. In addition to the function of preventing the strength of the concrete from being affected by water loss during the curing process, this waterproof layer also has two other functions: one is the action of the viscous energy-dissipating layer. When relative displacement occurs with the adobe, the emulsified asphalt has a viscous energy-dissipating effect, which is beneficial to the earthquake resistance of the structure; second, it has the function of deformation coordination. The creep deformation of the adobe wall is greater than that of the reinforced concrete concealed column in the adobe wall. Since the contact surface between the reinforced concrete concealed column and the adobe wall is separated by emulsified asphalt, the creep deformation of the adobe wall is less constrained by the reinforced concrete concealed column, reducing The two sides restrain the secondary stress generated and protect the integrity of the adobe wall.

6)为缓解土坯墙体蠕变变形受钢筋混凝土暗柱约束,进一步减少双方约束过强所产生的次生应力,在钢筋混凝土暗柱与钢筋混凝土暗圈梁交汇处设置沉降缓冲空间。在砌筑缓冲空间之上的土坯墙体时,缓冲空间内不浇筑混凝土,保证在砌筑缓冲空间之上的土坯墙体自由沉降,带自由沉降基本稳定后,再浇筑缓粘结混凝土,延缓暗柱混凝土凝固时间,为砌筑缓冲空间之上的土坯墙体进一步沉降创造条件,保证土坯墙灰缝密实饱满。 6) In order to alleviate the creep deformation of the adobe wall constrained by the reinforced concrete concealed column, and further reduce the secondary stress caused by the excessive restraint of both sides, a settlement buffer space is set at the intersection of the reinforced concrete concealed column and the reinforced concrete concealed ring beam. When building the adobe wall above the buffer space, no concrete is poured in the buffer space to ensure the free settlement of the adobe wall above the masonry buffer space. After the free settlement is basically stable, pour slow-bonding concrete to delay The setting time of the concrete of the concealed column creates conditions for the further settlement of the adobe wall above the buffer space of the masonry, and ensures that the mortar joints of the adobe wall are dense and full.

7)本技术土坯墙墙厚仅为传统土坯墙厚度的五分之三,用土量少,节能节地。 7) The wall thickness of the adobe wall of this technology is only three-fifths of the thickness of the traditional adobe wall, and the soil consumption is small, which saves energy and land.

8)本技术建造的土坯墙可以采用现浇钢筋混凝土楼板,与传统土坯建筑相比,耐久性和抗火能力显著提高,不用木材,保护森林。 8) The adobe walls built with this technology can use cast-in-place reinforced concrete floors. Compared with traditional adobe buildings, the durability and fire resistance are significantly improved, and no wood is used to protect the forest.

附图说明 Description of drawings

图1是本发明的标准土坯结构示意图; Fig. 1 is the standard adobe structural representation of the present invention;

图2是本发明的中心带圆孔土坯结构示意图; Fig. 2 is the structural representation of the adobe with circular holes in the center of the present invention;

图3是本发明的侧边带半圆孔土坯结构示意图; Fig. 3 is a schematic diagram of the structure of the adobe with semicircular holes on the side of the present invention;

图4是本发明的标准槽型土坯结构示意图; Fig. 4 is a schematic view of the structure of the standard groove type adobe of the present invention;

图5是本发明的中心带圆孔槽型土坯结构示意图; Fig. 5 is a schematic diagram of the structure of a grooved adobe with a circular hole in the center of the present invention;

图6是本发明的侧边带半圆孔槽型土坯结构示意图; Fig. 6 is a schematic view of the structure of the grooved adobe with semicircular holes on the sides of the present invention;

图7是本发明的侧边带圆孔短土坯结构示意图; Fig. 7 is a short adobe structure schematic diagram with round holes on the sides of the present invention;

图8是本发明的土坯墙砌筑示意图; Fig. 8 is a schematic diagram of adobe wall masonry of the present invention;

图9是本发明的暗圈梁配筋示意图; Fig. 9 is a schematic diagram of dark circle beam reinforcement of the present invention;

图10是本发明的土坯墙纵剖面示意图; Fig. 10 is a schematic diagram of the longitudinal section of the adobe wall of the present invention;

图11是本发明的土坯墙横剖面示意图; Fig. 11 is a schematic cross-sectional view of the adobe wall of the present invention;

图12是本发明的土坯墙荷载-位移墙体骨架曲线图; Fig. 12 is a load-displacement wall skeleton curve diagram of the adobe wall of the present invention;

图13是本发明的土坯墙荷载-位移墙体滞回曲线图。 Fig. 13 is a load-displacement wall hysteresis curve of the adobe wall of the present invention.

图中:1-钢筋混凝土条形基础,2-标准土坯,3-中心带圆孔土坯,4-侧边带半圆孔土坯,5-标准槽型土坯,6- 中心带圆孔槽型土坯,7-侧边带半圆孔槽型土坯,8-侧边带圆孔短土坯,9-隔水和粘滞耗能层,10-沉降缓冲空间,11-普通混凝土,12-缓凝结混凝土,13-竖向暗柱预埋螺纹钢筋,14-水平暗梁纵向钢筋,15-拉结钢筋,16-钢筋混凝土楼板。 In the figure: 1-reinforced concrete strip foundation, 2-standard adobe, 3-adobe with round hole in the center, 4-adobe with semi-circular hole in the side, 5-standard groove adobe, 6- groove adobe with round hole in the center, 7-Trough adobe with semicircular holes on the side, 8-Short adobe with round holes on the side, 9-Water-proof and viscous energy-dissipating layer, 10-Settlement buffer space, 11-Ordinary concrete, 12-Slow setting concrete, 13 - Pre-embedded threaded steel bars for vertical hidden columns, 14 - Longitudinal steel bars for horizontal hidden beams, 15 - Tension steel bars, 16 - Reinforced concrete floor.

具体实施方式 Detailed ways

下面结合附图和具体实施方式,对本发明作进一步说明。 The present invention will be further described below in combination with the accompanying drawings and specific embodiments.

实施例1:根据建筑设计的土坯墙布局,首先施工土坯墙的钢筋混凝土条形基础1,在钢筋混凝土条形基础1上土坯墙中心线位置上,每隔0.6~1.8m预埋一根直径12~16mm的竖向暗柱预埋螺纹钢筋13。根据图1-7中,制备不同数量的标准土坯2、中心带圆孔土坯3、侧边带半圆孔土坯4、标准槽型土坯5、中心带圆孔槽型土坯6、侧边带半圆孔槽型土坯7、侧边带圆孔短土坯8。在中心带圆孔土坯3、侧边带半圆孔土坯4、侧边带圆孔短土坯8的弧形表面上涂刷乳化沥青9作为隔水和粘滞耗能层,在标准槽型土坯5、中心带圆孔槽型土坯6、侧边带半圆孔槽型土坯7的凹槽内壁上满涂乳化沥青9作为隔水和粘滞耗能层。 Embodiment 1: According to the layout of the adobe wall in the architectural design, first construct the reinforced concrete strip foundation 1 of the adobe wall, and pre-bury a diameter of every 0.6~1.8m on the center line of the adobe wall on the reinforced concrete strip foundation 1. 12~16mm vertical hidden column pre-embedded threaded steel bar 13. According to Figure 1-7, prepare different quantities of standard adobe 2, adobe with round hole in the center 3, adobe with semicircle hole in the side 4, standard groove adobe 5, groove adobe 6 with round hole in the center, and semicircle hole in the side Grooved adobe 7, short adobe 8 with round holes on the sides. Brush emulsified asphalt 9 on the curved surface of the adobe 3 with round holes in the center, adobe 4 with semi-circular holes in the side, and short adobe 8 with round holes in the side as a water-proof and viscous energy-dissipating layer. 1. The groove inner wall of the groove-shaped adobe 6 with round holes in the center and the groove-type adobe 7 with semi-circular holes in the side is fully coated with emulsified asphalt 9 as a water-proof and viscous energy-dissipating layer.

在图8中,将这些土坯在钢筋混凝土条形基础1上用砂浆错缝平筑,以竖向暗柱预埋螺纹钢筋13为中心,通过土坯标准土坯2、中心带圆孔土坯3、侧边带半圆孔土坯4、侧边带圆孔短土坯8的组合,在土坯墙内形成若干直径80~140mm的竖向圆孔,竖向圆孔间距与竖向暗柱预埋螺纹钢筋13间距相同。在土坯墙砌至层高范围内一定高度时,采用标准槽型土坯5、中心带圆孔槽型土坯6、侧边带半圆孔槽型土坯7、侧边带圆孔短土坯8并列砌筑,在土坯墙上形成通长水平凹槽。通长水平凹槽宽度80~140mm,深度60~80mm。向土坯墙竖向圆孔内浇筑普通混凝土11,形成竖向暗柱预埋螺纹钢筋13的混凝土暗柱。当圆孔内普通混凝土11顶面标高到达槽型土坯标准槽型土坯5、中心带圆孔槽型土坯6、侧边带半圆孔槽型土坯7底面时,停止向竖向圆孔内浇筑普通混凝土。 In Fig. 8, these adobes are built on the reinforced concrete strip foundation 1 with mortar staggered joints, with the vertical concealed column pre-embedded threaded steel bar 13 as the center, through the adobe standard adobe 2, the adobe with round holes in the center 3, the side The combination of adobe 4 with semi-circular holes on the side and short adobe 8 with round holes on the side forms a number of vertical round holes with a diameter of 80-140 mm in the adobe wall, and the distance between the vertical round holes and the distance between the embedded threaded steel bars 13 in the vertical concealed columns same. When the adobe wall is built to a certain height within the storey height range, the standard grooved adobe 5, the grooved adobe with a round hole in the center 6, the grooved adobe with a semicircular hole in the side 7, and the short adobe 8 with a round hole in the side are used side by side. , forming a full-length horizontal groove in the adobe wall. The width of the long horizontal groove is 80~140mm, and the depth is 60~80mm. Pour ordinary concrete 11 into the vertical circular hole of the adobe wall to form a concrete concealed column with pre-embedded threaded steel bars 13 in the vertical concealed column. When the elevation of the top surface of ordinary concrete 11 in the circular hole reaches the bottom surface of the standard channel adobe 5 of the channel adobe, the channel adobe 6 with a round hole in the center, and the bottom surface of the channel adobe 7 with a semicircular hole on the side, stop pouring the ordinary concrete into the vertical circular hole. concrete.

在图9中,用直径为6mm的光面钢筋加工成拉结钢筋15,与两根直径10~14mm的水平暗梁纵向钢筋14捆绑在一起,放入土坯墙上的通长水平凹槽内,凹槽内的水平暗梁纵向钢筋14在土坯墙尽端竖向圆孔处回弯,勾住土坯墙尽端圆孔内的竖向暗柱预埋螺纹钢筋13。 In Fig. 9, the smooth steel bar with a diameter of 6 mm is processed into a tie bar 15, which is bound together with two horizontal hidden beam longitudinal bars 14 with a diameter of 10-14 mm, and put into the long horizontal groove on the adobe wall , the horizontal concealed beam longitudinal reinforcement 14 in the groove is bent back at the vertical hole at the end of the adobe wall, and hooks the pre-embedded threaded steel bar 13 of the vertical concealed column in the end circular hole of the adobe wall.

在图10中,向土坯墙上的通长水平凹槽内浇筑普通混凝土11,形成墙腰暗圈梁。浇筑墙腰暗圈梁细石混凝土11时,墙腰暗圈梁处中心带圆孔槽型土坯6或侧边带半圆孔槽型土坯7高度范围内土坯墙竖向圆孔内不得浇筑普通混凝土11,此范围为墙腰暗圈梁以下土坯墙体的沉降缓冲空间10。待墙腰暗圈梁普通混凝土11强度达到设计强度的50%以上时,继续砌筑土坯墙。土坯错缝平砌,以竖向暗柱预埋螺纹钢筋13为中心,通过土坯土坯标准土坯2、中心带圆孔土坯3、侧边带半圆孔土坯4、侧边带圆孔短土坯8的组合,在土坯墙内形成若干直径80~140mm的竖向圆孔,竖向圆孔间距与竖向暗柱预埋螺纹钢筋13间距相同。在土坯墙砌至层高时,采用土坯标准槽型土坯5、中心带圆孔槽型土坯6、侧边带半圆孔槽型土坯7、侧边带圆孔短土坯8并列砌筑,在土坯墙上形成通长水平凹槽,该水平凹槽用于形成层高暗圈梁。水平凹槽内钢筋做法与墙腰暗圈梁相同。向土坯墙竖向孔洞内浇筑缓凝结混凝土12,缓凝结混凝土12顶面标高到达形成层高暗圈梁的槽型土坯底面标高时,停止浇筑混凝土。浇筑层高暗圈梁混凝土11时,层高暗圈梁处中心带圆孔槽型土坯6或侧边带半圆孔槽型土坯7高度范围内的土坯墙内竖向圆孔内不得浇筑混凝土,此范围为层高暗圈梁以下土坯墙体的沉降缓冲空间10。待整个土坯墙体变形稳定后,用混凝土11填充层高暗圈梁以下土坯墙体的沉降缓冲空间10。 In Fig. 10, ordinary concrete 11 is poured into the long horizontal groove on the adobe wall to form a dark ring beam at the waist of the wall. When pouring the fine stone concrete 11 of the hidden ring beam at the waist of the wall, ordinary concrete 11 shall not be poured in the vertical round hole of the adobe wall within the height range of the height range of the adobe wall with a round hole groove 6 in the center of the wall waist dark ring beam or with a semicircle hole groove 7 on the side. This range is the settlement buffer space 10 of the adobe wall below the dark ring beam at the wall waist. When the strength of the ordinary concrete 11 of the hidden ring beam at the wall waist reaches more than 50% of the design strength, continue to build the adobe wall. The adobe is built with staggered joints, with the vertical hidden column pre-embedded threaded steel bar 13 as the center, through the adobe adobe standard adobe 2, the adobe with a round hole in the center 3, the adobe with a semi-round hole in the side 4, and the short adobe 8 with a round hole in the side Combined, a number of vertical circular holes with a diameter of 80-140 mm are formed in the adobe wall, and the spacing of the vertical circular holes is the same as that of the embedded threaded steel bars 13 of the vertical concealed columns. When the adobe wall is built up to the storey height, the adobe standard groove adobe 5, the groove adobe 6 with a round hole in the center, the groove adobe 7 with a semicircle hole in the side, and the short adobe 8 with a round hole in the side are used to build side by side. A full-length horizontal groove is formed in the wall, which is used to form a story height dark circle beam. The method of reinforcement in the horizontal groove is the same as that of the dark ring beam at the wall waist. Slow-setting concrete 12 is poured in the vertical hole of the adobe wall, and when the elevation of the top surface of the slow-setting concrete 12 reaches the elevation of the bottom surface of the grooved adobe forming the layer height dark circle beam, stop pouring concrete. When pouring the concrete 11 of the story-high dark ring beam, no concrete shall be poured in the vertical round hole in the adobe wall within the height range of the height of the dark ring beam at the center with a circular hole groove 6 or the side with a semicircular hole groove 7. This range is the settlement buffer space 10 of the adobe wall below the story height dark circle beam. After the deformation of the whole adobe wall is stable, concrete 11 is used to fill the settlement buffer space 10 of the adobe wall below the dark ring beam of the storey height.

在图11中,在层高暗圈梁的顶面上浇筑钢筋混凝土楼板16,抗震土坯墙施工完成。 In Fig. 11, the reinforced concrete floor slab 16 is poured on the top surface of the story-height dark circle beam, and the construction of the anti-seismic adobe wall is completed.

 图12为抗震土坯墙试验结果的荷载-位移骨架曲线,墙体位移为7.88mm时出现水平裂缝,对应水平荷载77.6kN。随着位移增加,墙体裂缝不断出现并发展,加载至15.9mm时,水平荷载达到最大值为144.1kN,继续加载,位移至22.3mm时,墙体破坏。 Figure 12 shows the load-displacement skeleton curve of the seismic adobe wall test results. When the wall displacement is 7.88mm, horizontal cracks appear, corresponding to a horizontal load of 77.6kN. As the displacement increases, cracks in the wall continue to appear and develop. When the load reaches 15.9mm, the horizontal load reaches a maximum value of 144.1kN. When the load continues, the wall is destroyed when the displacement reaches 22.3mm.

图13为抗震土坯墙试验结果的滞回曲线,滞回曲线所包围面积代表加载过程中试件累积的塑性变形能。从滞回曲线图可以看出,随着加载幅值的增加,滞回环饱满程度有逐渐增加的趋势,表明试件累积的塑性变形能逐渐增大,也即耗能能力不断增加。 Figure 13 is the hysteresis curve of the test results of the seismic adobe wall, and the area enclosed by the hysteresis curve represents the accumulated plastic deformation energy of the specimen during the loading process. It can be seen from the hysteresis curve that as the loading amplitude increases, the fullness of the hysteresis loop tends to increase gradually, indicating that the accumulated plastic deformation energy of the specimen gradually increases, that is, the energy dissipation capacity continues to increase.

3片试验墙体从开始加载到破坏,都经历了弹性、弹塑性及破坏三阶段。墙体抗剪试验数据见表1 From the beginning of loading to failure, the three test walls have gone through three stages of elasticity, elastoplasticity and failure. The wall shear test data are shown in Table 1

表1测试结果 Table 1 Test results

由于试验采用二层土坯建筑为参照,土坯墙体地震作用下的水平地震剪力(作用)计算时也采用此条件。通过理论计算得出试验土坯墙(长3000mm、高2400mm)在7度基本烈度地震作用下底层墙体承受水平剪力:按前纵墙推算的试验墙承受水平地震作用为79.19kN;按内横推算的试验墙承受水平地震作用为47.34kN。在8度基本烈度地震作用下底层墙体承受水平剪力:按前纵墙推算的试验墙承受水平地震作用为154.92kN;按内横推算的试验墙承受水平地震作用为92.61kN。与试验结果比较如表2、表3。 Since the test uses a two-story adobe building as a reference, this condition is also used in the calculation of the horizontal seismic shear force (action) of the adobe wall under earthquake action. Through theoretical calculation, it is obtained that the test adobe wall (3000mm in length and 2400mm in height) will bear the horizontal shear force of the ground floor wall under the action of an earthquake with a basic intensity of 7 degrees: the horizontal shear force of the test wall calculated based on the front longitudinal wall is 79.19kN; The estimated horizontal seismic action of the test wall is 47.34kN. Under the action of an earthquake with a basic intensity of 8 degrees, the ground floor wall is subjected to horizontal shear force: the horizontal seismic action of the test wall calculated according to the front longitudinal wall is 154.92kN; the horizontal seismic action of the test wall calculated according to the inner transverse is 92.61kN. The comparison with the test results is shown in Table 2 and Table 3.

表2  7度抗震设防条件下,最大承载力与作用之比 Table 2 The ratio of the maximum bearing capacity to the effect under the condition of seismic fortification of degree 7

表3  8度抗震设防条件下,最大承载力与作用之比 Table 3 The ratio of the maximum bearing capacity to the effect under the condition of seismic fortification of degree 8

从表2可以看出,新型抗震土坯墙满足7度抗震设防要求,抗剪有足够的安全储备;由试验可知,当土坯墙达到抗剪极限承载力后,施加使用重力4倍的竖向荷载而不发生整体压溃;因此,在建筑抗震概念设计原则指导下,新型抗震土坯墙可用于抗震设防7度区二层土坯建筑的建设。 It can be seen from Table 2 that the new type of seismic-resistant adobe wall meets the seismic fortification requirements of 7 degrees, and has sufficient safety reserve for shear resistance; it can be seen from the test that when the adobe wall reaches the ultimate shear bearing capacity, a vertical load of 4 times the gravity is applied No overall crushing occurs; therefore, under the guidance of the building's seismic concept design principles, the new type of earthquake-resistant adobe wall can be used for the construction of two-story adobe buildings in the seismic fortification area of 7 degrees.

由表3可见,新型抗震土坯墙接近8度抗震设防抗剪承载力要求。进一步完善构造后,二层土坯墙建筑可以满足8度设防烈度要求。一层土坯墙建筑可以满足9度设防烈度要求. It can be seen from Table 3 that the new type of earthquake-resistant adobe wall is close to the shear bearing capacity requirements for earthquake-resistant fortifications of 8 degrees. After further improving the structure, the two-story adobe wall building can meet the requirements of the 8-degree fortification intensity. A one-story adobe wall building can meet the requirements of the 9-degree fortification intensity.

所述土坯至少包括标准土坯、槽型土坯、圆孔土坯、短土坯;所述标准土坯为长方体;所述短土坯为标准土坯的一半。 The adobe at least includes a standard adobe, a trough adobe, a round hole adobe, and a short adobe; the standard adobe is a cuboid; the short adobe is half of the standard adobe.

所述槽型土坯至少包括标准槽型土坯、中心带圆孔槽型土坯、侧边带半圆槽型土坯;所述标准槽型土坯为在标准土坯上开有凹槽;所述中心带圆孔槽型土坯为在标准槽型土坯槽内的几何中心处开有贯穿的圆孔;所述侧边带半圆槽型土坯为标准槽型土坯凹槽一侧或两侧开有贯穿的半圆孔。 The grooved adobe at least includes a standard grooved adobe, a grooved adobe with a round hole in the center, and a semicircular grooved adobe on the side; the standard grooved adobe has grooves on the standard adobe; the center has a round hole The groove-shaped adobe has a through circular hole at the geometric center of the groove of the standard groove-shaped adobe; the said groove-shaped adobe with a semicircle on the side is a standard groove-shaped adobe with a through semicircular hole on one or both sides of the groove.

所述圆孔土坯至少包括中心带圆孔土坯、侧边带半圆孔土坯;所述中心带圆孔土坯为在标准土坯几何中心处开有贯穿的圆孔;所述侧边带半圆孔土坯为在标准土坯一侧或对称的两侧开有贯穿的半圆孔。 The adobe with round holes at least includes adobe with round holes in the center and adobe with semicircular holes in the side; the adobe with round holes in the center has a through hole at the geometric center of the standard adobe; the adobe with semicircular holes in the side is There are semicircular holes through the standard adobe on one side or on both symmetrical sides.

所述短土坯至少包括侧边带圆孔短土坯;所述侧边带圆孔短土坯为将中心带圆孔土坯纵向或横向均分。 The short adobe at least includes a short adobe with round holes on the sides; the short adobe with round holes on the sides is divided into longitudinal or transverse portions of the adobe with a round hole in the center.

所述槽型土坯凹槽的宽度大于圆孔土坯上贯穿圆孔的直径。 The groove width of the groove-shaped adobe is greater than the diameter of the through hole on the adobe with the round hole.

上面结合附图对本发明的具体实施方式作了详细说明,但是本发明并不限于上述实施方式,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。 The specific implementation of the present invention has been described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned implementation, within the knowledge of those of ordinary skill in the art, it can also be made without departing from the gist of the present invention. Variations.

Claims (11)

1. be applicable to provide fortification against earthquakes the construction method of adobe wall of highly seismic region and a sun-dried mud brick, it is characterized in that:
Step 1: along adobe wall position of center line on reinforced concrete strip foundation, every the pre-buried pre-buried indented bars of vertical sleeper of 0.6 ~ 1.8m;
Step 2: prepare sun-dried mud brick, prepared sun-dried mud brick at least comprises standard sun-dried mud brick, grooved sun-dried mud brick, circular hole sun-dried mud brick, short sun-dried mud brick, and described grooved sun-dried mud brick at least comprises standard channel sun-dried mud brick, middle its central band circle hole groove type sun-dried mud brick, side band semicircle grooved sun-dried mud brick; Described circular hole sun-dried mud brick at least comprises middle its central band circular hole sun-dried mud brick, side band semicircle orifice sun-dried mud brick; Described short sun-dried mud brick at least comprises the short sun-dried mud brick of side band circular hole;
Step 3: full coat water proof and viscous power consumption layer material on the curved surfaces of sun-dried mud brick, full coat water proof and viscous power consumption layer material on the groove inner wall of grooved sun-dried mud brick;
Step 4: on reinforced concrete strip foundation, utilize the sun-dried mud brick of the other types except grooved sun-dried mud brick to equal the mode of building by the cement mortar fissure of displacement and construct adobe wall, in adobe wall, form some vertical circular holes, vertical circular hole spacing is identical with vertical sleeper pre-buried indented bars spacing;
Step 5: adobe wall build to certain altitude within the scope of floor height constantly, reinforced concrete strip foundation adopt grooved sun-dried mud brick build by laying bricks or stones side by side, centered by the pre-buried indented bars of vertical sleeper pre-buried on reinforced concrete strip foundation, adobe wall is formed some vertical circular holes and elongated horizontal groove, and vertical circular hole spacing is identical with vertical sleeper pre-buried indented bars spacing;
Step 6: build slow setting pea gravel concreten in the vertical circular hole of adobe wall, when retarded concrete end face absolute altitude in circular hole arrives grooved sun-dried mud brick bottom surface, stops building retarded concrete in vertical circular hole;
Step 7: plain steel-bar is processed into steel tie, bundle with two dark beam longitudinal reinforcements of level, put into the elongated horizontal groove on the adobe wall constructed by grooved sun-dried mud brick, level in groove dark beam longitudinal reinforcement holds to the greatest extent vertical circular hole place back bending at adobe wall, catches on adobe wall and holds to the greatest extent the pre-buried indented bars of vertical sleeper in circular hole;
Step 8: build fast hardening concrete in the elongated horizontal groove on adobe wall, forms the dark collar tie beam of wall waist; When watering the dark collar tie beam fast hardening concrete of walling waist, the sleeper space in wall waist dark collar tie beam grooved sun-dried mud brick altitude range is half storey eminence adobe wall sedimentation cushion space, must not concreting in this space;
Step 9: when the dark collar tie beam concrete strength of wall waist reaches more than 50% of design strength, continue to build adobe wall by laying bricks or stones;
Step 10: the sun-dried mud brick fissure of displacement is flat to be built, and centered by the pre-buried indented bars of pre-buried vertical sleeper, by the combination of dissimilar sun-dried mud brick, form some vertical circular holes in adobe wall, vertical circular hole spacing is identical with vertical sleeper pre-buried indented bars spacing;
Step 11: when adobe wall is built to floor height, adopt grooved sun-dried mud brick to build by laying bricks or stones side by side, adobe wall is formed elongated horizontal groove, and this horizontal groove is for the formation of the dark collar tie beam of floor height, and in horizontal groove, reinforcing bar way is identical with the dark collar tie beam of wall waist;
Step 12: build slow setting knot concrete in the vertical hole of adobe wall, then build the concrete of the dark beam of floor height and floor; Sleeper space in the dark collar tie beam grooved sun-dried mud brick altitude range of wall top and the floor entity part within the scope of sleeper plane projection are floor height place adobe wall sedimentation cushion space, must not concreting in this space;
Step 13: after whole adobe wall body deformability is stable, with microdilatancy pea gravel concreten packed layer eminence adobe wall sedimentation cushion space, antidetonation adobe wall has been constructed.
2. the construction method of antidetonation adobe wall according to claim 1, is characterized in that: described water proof and viscous power consumption layer are mulseal, viscosity water-repellent paint.
3. the construction method of antidetonation adobe wall according to claim 1, it is characterized in that: configuration reinforcement in vertical hole and horizontal groove in described adobe wall, concreting, form bidirectional crossed steel concrete sleeper and the dark beam of steel concrete, sleeper and dark beam form the two-way strengthening grid of stealthy steel concrete in adobe wall.
4. the construction method of antidetonation adobe wall according to claim 3, it is characterized in that: at described steel concrete sleeper and steel concrete dark collar tie beam intersection, sedimentation cushion space is set, when building the sun-dried mud brick body of wall on cushion space by laying bricks or stones, not concreting in cushion space, ensure building the sun-dried mud brick body of wall free settling on cushion space by laying bricks or stones, after the free settling of sun-dried mud brick body of wall is basicly stable, then build slow cohesion concrete.
5. the construction method of the antidetonation adobe wall according to claims 1, is characterized in that: described level dark beam longitudinal reinforcement holds to the greatest extent vertical circular hole place back bending at adobe wall, directly catches on adobe wall and holds to the greatest extent the pre-buried indented bars of vertical sleeper in circular hole.
6. the construction method of the antidetonation adobe wall according to claims 1, is characterized in that being: when adobe wall is built to floor height, adopt in-situ reinforced concrete slab, improve adobe wall cooperative bearing further.
7. for a sun-dried mud brick for the antidetonation adobe wall described in the power of constructing 1, it is characterized in that: described sun-dried mud brick at least comprises standard sun-dried mud brick, grooved sun-dried mud brick, circular hole sun-dried mud brick, short sun-dried mud brick; Described standard sun-dried mud brick is cuboid; Described short sun-dried mud brick is the half of standard sun-dried mud brick.
8. the sun-dried mud brick of the antidetonation adobe wall according to claims 7, is characterized in that being: described grooved sun-dried mud brick at least comprises standard channel sun-dried mud brick, middle its central band circle hole groove type sun-dried mud brick, side band semicircle grooved sun-dried mud brick; Described standard channel sun-dried mud brick for have groove on standard sun-dried mud brick; Described middle its central band circle hole groove type sun-dried mud brick is that the geometric center place in standard channel sun-dried mud brick groove has the circular hole run through; Described side band semicircle grooved sun-dried mud brick is that the both sides of standard channel sun-dried mud brick groove side or symmetry have the semicircle orifice run through.
9. the sun-dried mud brick of the antidetonation adobe wall according to claims 7, is characterized in that being: described circular hole sun-dried mud brick at least comprises middle its central band circular hole sun-dried mud brick, side band semicircle orifice sun-dried mud brick; Described middle its central band circular hole sun-dried mud brick is have at standard sun-dried mud brick geometric center place the circular hole run through; Described side band semicircle orifice sun-dried mud brick is have in the both sides of standard sun-dried mud brick side or symmetry the semicircle orifice run through.
10. the sun-dried mud brick of the antidetonation adobe wall according to claims 7, is characterized in that being: described short sun-dried mud brick at least comprises the short sun-dried mud brick of side band circular hole; The short sun-dried mud brick of described side band circular hole is for divide equally vertical or horizontal for middle its central band circular hole sun-dried mud brick.
The sun-dried mud brick of 11. antidetonation adobe walls according to claims 7, is characterized in that being: the width of described grooved sun-dried mud brick groove is greater than diameter circular hole sun-dried mud brick running through circular hole.
CN201410481807.1A 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes Expired - Fee Related CN104631658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410481807.1A CN104631658B (en) 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410481807.1A CN104631658B (en) 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes

Publications (2)

Publication Number Publication Date
CN104631658A true CN104631658A (en) 2015-05-20
CN104631658B CN104631658B (en) 2017-05-31

Family

ID=53210853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410481807.1A Expired - Fee Related CN104631658B (en) 2014-09-19 2014-09-19 The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes

Country Status (1)

Country Link
CN (1) CN104631658B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088445A (en) * 2016-07-08 2016-11-09 上海交通大学 A kind of without mortar raw-soil masonry structure system and building
CN107298569A (en) * 2017-08-08 2017-10-27 合肥工业大学 A kind of Modified soil blank material material and the traditional rowlock wall body construction method of filling
CN109296116A (en) * 2018-09-10 2019-02-01 重庆大学 A kind of built-in centralized transverse prestressing restraint masonry and its prestressing method
EP3456895B1 (en) 2017-09-19 2021-11-10 DiHa Patentverwertungs GbR Wall provided with concrete supports and method for the construction of such a wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85105018A (en) * 1985-07-02 1986-12-31 北京建筑工程学院 Earthquake-proof construction block
CN2062356U (en) * 1989-03-31 1990-09-19 贺永安 Universal block for building wall material
EP0261101B1 (en) * 1986-09-15 1992-02-26 Rudolf Schmaranz Building element and process for manufacturing the same
CN201485965U (en) * 2009-08-11 2010-05-26 华侨大学 A new type of energy-saving building structure
CN201485994U (en) * 2009-08-11 2010-05-26 华侨大学 A new type of energy-saving composite load-bearing wall
CN103758248A (en) * 2014-01-15 2014-04-30 北京工业大学 T-frame insulation masonry single-row-reinforcement lightweight concrete wall and manufacturing method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85105018A (en) * 1985-07-02 1986-12-31 北京建筑工程学院 Earthquake-proof construction block
EP0261101B1 (en) * 1986-09-15 1992-02-26 Rudolf Schmaranz Building element and process for manufacturing the same
CN2062356U (en) * 1989-03-31 1990-09-19 贺永安 Universal block for building wall material
CN201485965U (en) * 2009-08-11 2010-05-26 华侨大学 A new type of energy-saving building structure
CN201485994U (en) * 2009-08-11 2010-05-26 华侨大学 A new type of energy-saving composite load-bearing wall
CN103758248A (en) * 2014-01-15 2014-04-30 北京工业大学 T-frame insulation masonry single-row-reinforcement lightweight concrete wall and manufacturing method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088445A (en) * 2016-07-08 2016-11-09 上海交通大学 A kind of without mortar raw-soil masonry structure system and building
CN107298569A (en) * 2017-08-08 2017-10-27 合肥工业大学 A kind of Modified soil blank material material and the traditional rowlock wall body construction method of filling
CN107298569B (en) * 2017-08-08 2019-09-13 合肥工业大学 A modified adobe material and a construction method for filling a traditional empty bucket wall
EP3456895B1 (en) 2017-09-19 2021-11-10 DiHa Patentverwertungs GbR Wall provided with concrete supports and method for the construction of such a wall
CN109296116A (en) * 2018-09-10 2019-02-01 重庆大学 A kind of built-in centralized transverse prestressing restraint masonry and its prestressing method

Also Published As

Publication number Publication date
CN104631658B (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN103046665B (en) Insulating mortar strengthening layer rowlock wall with steel wire mesh for setting hose tooth constructional column and manufacturing method thereof
CN203129359U (en) Single row reinforced concrete shear wall with cross inclined ribs
CN103835413B (en) Foamed concrete load-bearing wall with one-shaped frame of outsourcing steel wire mesh mortar board and its method
CN207377168U (en) Add layer steel column base node
CN103469939A (en) Masonry infilled wall and main body flexible connection anti-seismic structure and construction method thereof
CN103835404B (en) Covered with Angles silk screen Mortar Plates L-shaped frame foamed concrete bearing wall and the practice
CN204326299U (en) The antidetonation adobe wall that a kind of steel concrete sleeper and dark beam are strengthened
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN104631658B (en) The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes
CN103343572A (en) Novel prefabricated composite wallboard anti-seismic energy-saving rural residence structural system
CN102518230A (en) Earthquake isolating house with glass bead-fine sand-cementing material compound layer and building method for earthquake isolating house
CN105735517B (en) Prefabricated reinforced concrete wall structure based on thermal bridge partition technology
CN209837372U (en) Prestressed machine cut strip stone masonry wall structural members
Calderoni et al. Seismic vulnerability of “ancient” masonry buildings and strengthening intervention strategies
CN202787504U (en) Rubber shock-insulating support maintaining system
CN202627617U (en) Shock insulation house with glass bead-fine sand-gelling material compound layer
CN105604245A (en) Production method of steel-section-concrete +-shaped section column
CN103835401A (en) Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with cross-shaped frame and construction method
CN100587212C (en) Masonry-reinforced concrete cylinder structure and its construction method
CN103015563B (en) Outer-block inner-masonry building structure system
CN203080733U (en) External built-mold and internal masonry building structure system
CN215907080U (en) A large direct corrugated pipe grout anchor lap joint assembled shear wall
CN207453222U (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN205691309U (en) A kind of big than chi assembled integral Shear wall tube structure structure
CN103835414B (en) Outsourcing steel wire mesh mortar board Z-shaped frame foam concrete load-bearing wall and its method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

CF01 Termination of patent right due to non-payment of annual fee