CN104613831A - 一种在竖井周边眼外围增设周边辅助眼的施工方法 - Google Patents

一种在竖井周边眼外围增设周边辅助眼的施工方法 Download PDF

Info

Publication number
CN104613831A
CN104613831A CN201510025769.3A CN201510025769A CN104613831A CN 104613831 A CN104613831 A CN 104613831A CN 201510025769 A CN201510025769 A CN 201510025769A CN 104613831 A CN104613831 A CN 104613831A
Authority
CN
China
Prior art keywords
periphery
reliever
hole
eye
auxiliary holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510025769.3A
Other languages
English (en)
Inventor
张馨
陈历珊
张湘平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201510025769.3A priority Critical patent/CN104613831A/zh
Publication of CN104613831A publication Critical patent/CN104613831A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

一种在竖井周边眼外围增设周边辅助眼的施工方法,按下列步骤进行:①伞钻打完周边眼后打周边辅助眼,眼深为1500mm。②周边辅助眼与周边眼同时装药,周边眼、周边辅助眼雷管段号分别为7段、9段。③周边辅助眼在周边眼后起爆。本发明具有如下的优点和经济技术效果:①伞钻打完周边眼后利用6台YT-28型风钻打周边辅助眼,钻眼时间并未延长。②有效解决井帮超挖和欠挖问题,避免了周边眼爆破后的“留帽”现象,缩短了出矸和挂网、锚喷时间。③节约了风、水、电、人工、喷射混凝土和其他材料费用。提高了初期支护的质量,保证了大段高施工安全。④提高了爆破效率,加快了施工进度,取得了良好的技术经济效果。

Description

一种在竖井周边眼外围增设周边辅助眼的施工方法
技术领域
本发明涉及一种有效提高竖井开挖分项工程质量的施工方法,具体而言,是在竖井周边眼外增设周边辅助眼的全断面一次光面爆破的施工方法。
背景技术
深竖井综合机械化配套施工中,开挖采用伞钻打眼、中深孔爆破,每个深竖井只配1台造价昂贵的伞钻。但深竖井地质条件复杂,在岩层软弱地段,混凝土衬砌要加厚,甚至设计钢筋混凝土,直接导致开挖荒径变大,伞钻的支撑范围有限,容易造成井帮超挖和欠挖,欠挖处要重新打眼爆破,浪费材料、工时,超挖处要多出石碴、多填混凝土等,施工成本明显增大。
发明内容
本发明的目的就在于克服现有竖井施工开挖中伞钻支撑范围小的不足,提出一种有效解决超挖和欠挖的施工方法,该方法工艺简单、操作简便,经济高效。
本发明的技术方案是:一种在竖井周边眼外增设周边辅助眼的全断面一次光面爆破的施工方法,其中基岩段掘进炮眼分布结构包括掏槽眼1、第1圈辅助眼2、第2圈辅助眼3、周边眼4、周边辅助眼5、井筒中心线6,其中,井筒中心线6即伞形钻架中心线。
该方法依照下列步骤进行,
①伞钻打完周边眼4后,使用YT-28型手持式风钻打周边辅助眼5。
②周边辅助眼5与周边眼4按照设计的钻爆参数进行装药。
③周边辅助眼5在周边眼4后一段起爆。 
上述周边辅助眼采用6台YT-28型风钻打眼,周边眼4和周边辅助眼5定位半径、钻眼深度要准确,眼位互相错开,眼间距均匀。周边眼倾角基本一致,周边辅助眼要竖直。
上述周边辅助眼施工完成后,按照设计的钻爆参数同时进行装药,周边眼4和周边辅助眼5均装药到眼底,眼口均使用水炮泥封口300~600mm,周边眼4和周边辅助眼5使用两段雷管,后者后起爆,作为前者的补充和修边。
本发明具有如下的优点和经济技术效果:
①伞钻打完周边眼后利用风钻打周边辅助眼,施工干扰小,钻眼时间并未延长。
②有效减少超挖,并控制了欠挖,避免了周边眼爆破后上部“留帽”补爆、下部围岩松动圈增大现象,保证了大段高施工安全,提高了爆破效率,缩短了出矸石和衬砌时间。
③缩短了挂网和锚喷时间,提高了初期支护的质量,保证了平整度,节约了风、水、电、人工和其他材料费用,能大幅降低施工成本,经济效益好。
④加快了施工进度,取得了良好的技术经济效果。
附图说明
图1为冷泉矿副井基岩段掘进炮眼布置图。
图2为冷泉矿副井基岩段掘进炮眼B-B剖视图。
图中:1—掏槽眼;2—第1圈辅助眼;3—第2圈辅助眼;4—周边眼;5—周边辅助眼;6—井筒中心线。
具体实施方式
如图1-2所示,一种在竖井周边眼外增设周边辅助眼的施工方法,具体实施过程如下:①伞钻打完周边眼后用6台手持式YT-28型风钻打周边辅助眼,眼深1500mm,要求其定位半径准确,眼位互相错开,眼间距均匀,周边眼倾角基本一致,周边辅助眼要竖直。②周边眼和周边辅助眼按钻爆设计参数同时装药,均装药到眼底,眼口均使用水炮泥封口300~600mm,使用两段雷管,周边辅助眼后起爆,作为周边眼的补充和修边。
表1 冷泉矿副井基岩段钻爆参数设计
表2 冷泉矿副井基岩段钻爆原始条件及爆破效果

Claims (3)

1.一种在竖井周边眼外增设周边辅助眼的全断面一次光面爆破的施工方法,其特征在于:基岩段掘进炮眼分布结构包括掏槽眼(1)、第1圈辅助眼(2)、第2圈辅助眼(3)、周边眼(4)、周边辅助眼(5)、井筒中心线(6),其中,井筒中心线(6)即伞形钻架中心线;
该方法依照下列步骤进行,
①伞钻打完周边眼(4)后,使用手持式风钻打周边辅助眼(5);
②周边辅助眼(5)与周边眼(4)按照设计的钻爆参数进行装药;
③周边辅助眼5在周边眼4后一段起爆;
上述周边辅助眼采用6台YT-28型风钻打眼,周边眼(4)和周边辅助眼(5)定位半径、钻眼深度要准确,眼位互相错开,眼间距均匀;周边眼倾角基本一致,周边辅助眼要竖直;
上述周边辅助眼施工完成后,按照设计的钻爆参数同时进行装药,周边眼(4)和周边辅助眼(5)均装药到眼底,眼口均使用水炮泥封口300~600mm,周边眼(4)和周边辅助眼(5)使用两段雷管,后者后起爆,作为前者的补充和修边。
2.根据权利要求1所述的一种在竖井周边眼外围增设周边辅助眼的施工方法,其特征在于:周边辅助眼与周边眼同时装药,必须按光爆眼设计装药量,均装药到眼底,眼口均使用水炮泥封口300~600mm。
3.根据权利要求1所述的一种在竖井周边眼外围增设周边辅助眼的施工方法,其特征在于:周边眼和周边辅助眼使用两段雷管,周边辅助眼后起爆,作为周边眼的补充和修边,确保爆破后荒壁成形规整,有利于钢筋网施工和保证喷射混凝土的平整度。
CN201510025769.3A 2015-01-19 2015-01-19 一种在竖井周边眼外围增设周边辅助眼的施工方法 Pending CN104613831A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510025769.3A CN104613831A (zh) 2015-01-19 2015-01-19 一种在竖井周边眼外围增设周边辅助眼的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510025769.3A CN104613831A (zh) 2015-01-19 2015-01-19 一种在竖井周边眼外围增设周边辅助眼的施工方法

Publications (1)

Publication Number Publication Date
CN104613831A true CN104613831A (zh) 2015-05-13

Family

ID=53148393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510025769.3A Pending CN104613831A (zh) 2015-01-19 2015-01-19 一种在竖井周边眼外围增设周边辅助眼的施工方法

Country Status (1)

Country Link
CN (1) CN104613831A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486181A (zh) * 2015-11-19 2016-04-13 中国华冶科工集团有限公司 竖井深孔分段爆破方法
CN105674825A (zh) * 2016-02-25 2016-06-15 中铁十八局集团有限公司 一种在竖井周边眼外围增设周边辅助眼的施工方法
CN105737700A (zh) * 2016-02-25 2016-07-06 中铁十八局集团有限公司 一种应用于竖井深孔锅底型光底光爆施工方法
CN105823387A (zh) * 2016-02-25 2016-08-03 中铁十八局集团有限公司 一种竖井冻结基岩深孔爆破的快速施工方法
CN110345822A (zh) * 2019-07-29 2019-10-18 中铁隧道局集团有限公司 隧道周边眼炮孔定位装置和方法
CN110823199A (zh) * 2019-11-15 2020-02-21 安徽金寨抽水蓄能有限公司 竖井超欠挖快速测量结构及其应用方法
CN111238328A (zh) * 2020-03-02 2020-06-05 中铁十八局集团有限公司 一种复式周边眼及隧道高效减振、光面光底爆破方法
CN112595190A (zh) * 2020-12-15 2021-04-02 中国矿业大学(北京) 一种竖井深孔大循环爆破施工方法
CN113389552A (zh) * 2021-07-09 2021-09-14 中铁二局第四工程有限公司 针对硬塑岩层小断面超深竖井的死角区域施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175451A (zh) * 2013-03-13 2013-06-26 中国建筑土木建设有限公司 一种隧道减震孔控制爆破的施工方法
CN103615941A (zh) * 2013-12-11 2014-03-05 中铁二十三局集团有限公司 现代化铁路隧道浅埋段爆破方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175451A (zh) * 2013-03-13 2013-06-26 中国建筑土木建设有限公司 一种隧道减震孔控制爆破的施工方法
CN103615941A (zh) * 2013-12-11 2014-03-05 中铁二十三局集团有限公司 现代化铁路隧道浅埋段爆破方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张馨: ""周边辅助眼工艺与光底爆破技术在立井施工中的应用"", 《焦作工学院学报》 *
张馨等: ""采用周边辅助眼控制立井掘进井帮质量"", 《建井技术》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486181A (zh) * 2015-11-19 2016-04-13 中国华冶科工集团有限公司 竖井深孔分段爆破方法
CN105674825A (zh) * 2016-02-25 2016-06-15 中铁十八局集团有限公司 一种在竖井周边眼外围增设周边辅助眼的施工方法
CN105737700A (zh) * 2016-02-25 2016-07-06 中铁十八局集团有限公司 一种应用于竖井深孔锅底型光底光爆施工方法
CN105823387A (zh) * 2016-02-25 2016-08-03 中铁十八局集团有限公司 一种竖井冻结基岩深孔爆破的快速施工方法
CN110345822A (zh) * 2019-07-29 2019-10-18 中铁隧道局集团有限公司 隧道周边眼炮孔定位装置和方法
CN110823199A (zh) * 2019-11-15 2020-02-21 安徽金寨抽水蓄能有限公司 竖井超欠挖快速测量结构及其应用方法
CN111238328A (zh) * 2020-03-02 2020-06-05 中铁十八局集团有限公司 一种复式周边眼及隧道高效减振、光面光底爆破方法
CN111238328B (zh) * 2020-03-02 2022-08-02 中铁十八局集团有限公司 一种复式周边眼及隧道高效减振、光面光底爆破方法
CN112595190A (zh) * 2020-12-15 2021-04-02 中国矿业大学(北京) 一种竖井深孔大循环爆破施工方法
CN112595190B (zh) * 2020-12-15 2021-11-09 中国矿业大学(北京) 一种竖井深孔大循环爆破施工方法
CN113389552A (zh) * 2021-07-09 2021-09-14 中铁二局第四工程有限公司 针对硬塑岩层小断面超深竖井的死角区域施工方法
CN113389552B (zh) * 2021-07-09 2023-11-10 中铁二局第四工程有限公司 针对硬塑岩层小断面超深竖井的死角区域施工方法

Similar Documents

Publication Publication Date Title
CN104613831A (zh) 一种在竖井周边眼外围增设周边辅助眼的施工方法
CN105937395B (zh) 一种煤矿大断面硬岩巷道综掘与炮掘联合快速高效掘进方法
CN102493806B (zh) 一种壁式缓倾斜薄矿体机械化连续采矿方法
CN107829742B (zh) 一种崩落-充填-空场-崩落采矿方法
CN105952450B (zh) 一种地下矿山井下双采场协同开采的新方法
CN106223958A (zh) 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法
CN105626073B (zh) 一种基于充填采矿法预留切割槽的采矿方法
CN109236295A (zh) 一种适用于深部厚大矿床的三步骤回采方法
CN103244180B (zh) 一种留小煤柱沿空掘巷围岩控制方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN103437768B (zh) 一种不留顶底柱预置空间充填采矿法
CN108086979B (zh) 一种垂直深孔柱状药包落矿阶段矿房法采矿工艺
CN101266123B (zh) 一种破碎站基坑掘凿方法
CN103306679A (zh) “︱型”自由面掏槽一次成井工艺
CN105909247A (zh) 无底柱分段胶结充填采矿方法
CN103726858A (zh) 地下大型洞库工程球柱组合体开挖方法
CN106223956A (zh) 中深孔天井采矿嗣后充填法
CN108362179A (zh) 一种星形节能掏槽方法
CN108625855A (zh) 一种充填体下安全高效的采矿方法
CN103471475B (zh) 一种渐深式孔底补偿螺旋形强力掏槽方法
CN103982186A (zh) 无底柱后退式竖向倾斜分条分段崩落采矿法
CN102620614B (zh) 洞库出渣漏斗的施工方法
CN109539915B (zh) 切割天井爆破施工方法
CN104389604A (zh) 一种崩落采矿法覆盖层的形成方法
CN103307941B (zh) 一种提高矿山平巷掘进掏槽爆破效果的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150513