CN101266123B - 一种破碎站基坑掘凿方法 - Google Patents

一种破碎站基坑掘凿方法 Download PDF

Info

Publication number
CN101266123B
CN101266123B CN2007100106434A CN200710010643A CN101266123B CN 101266123 B CN101266123 B CN 101266123B CN 2007100106434 A CN2007100106434 A CN 2007100106434A CN 200710010643 A CN200710010643 A CN 200710010643A CN 101266123 B CN101266123 B CN 101266123B
Authority
CN
China
Prior art keywords
hole
presplitting
row
blast hole
main blast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100106434A
Other languages
English (en)
Other versions
CN101266123A (zh
Inventor
沈占功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Engineering Corp
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN2007100106434A priority Critical patent/CN101266123B/zh
Publication of CN101266123A publication Critical patent/CN101266123A/zh
Application granted granted Critical
Publication of CN101266123B publication Critical patent/CN101266123B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明公开一种破碎站基坑掘凿方法,所采用的技术方案包括爆破孔的穿孔、爆破及爆破后的除渣工艺,其主要特点是采用预裂孔控制爆破、中深孔爆破及斜坡除渣工艺,由于采用预裂孔控制爆破及斜坡除渣工艺,具有可实现一次性爆破的优点,其技术可行、安全可靠、经济合理,适用于露天矿山破碎站基坑及其它领域中类似基坑的施工。在基坑施工过程中,效率可提高50%,基坑施工时间可减少3~5个月,本发明工艺也适用于其它工程领域中一些类似的基坑掘凿,同时它不仅适用于垂直立面基坑的掘凿,也适用于斜面基坑的掘凿。

Description

一种破碎站基坑掘凿方法
技术领域
本发明属于矿山采矿技术领域,涉及到间断——连续工艺系统中破碎站基坑掘凿方法。 
背景技术
间断——连续工艺拥有工艺简单、运输量大和运营成本低等特点,目前已在国外很多露天铁矿、有色金属矿山和建材开采矿山得到采用,随着该工艺使用经验的日益丰富及技术的逐渐成熟,已经得到国内外很多大型露天矿的重视,许多国家也在准备采用该工艺,以解决深凹露天矿的开拓运输难题。但该工艺存在施工量大、难度高、施工周期长、工程费用高等缺点。 
现有的间断——连续工艺中破碎站基坑断面面积一般为300~500m2,基坑深度为24~28m,土石方量一般为7000~14000m3左右。由于破碎站基坑较深,造成人员和设备不能直接出入基坑,无法采用高效、节能的大型设备,往往只能采用效率低、成本高的人工方式进行施工。而目前破碎站基坑掘凿采用的是类似于井下矿竖井掘凿的方法,基坑的掘凿工艺包括穿孔、爆破、除渣、提升等环节,即采用小型凿岩机(一般采用7655型凿岩机)由上至下分层穿浅孔、爆破、分层除渣。由于破碎站基坑一般位于较硬的岩体(矿体)中,硬度系数较高,一般为f=10~16,采用现有掘凿方法,爆破分层高度每次只能达到1m左右,造成爆破次数多、一次爆破量少等缺点,难以 实现大规模爆破;爆破后采用人工方式将碎石集中,后采用塔吊将土石方提升至地表面。该方法存在掘凿难度高、爆破效果差、施工效率低和成本高等缺点,建一座破碎站基坑掘凿时间约为6~8个月。 
发明内容
为克服破碎站基坑现有施工方法的不足,本发明公开一种适用所有露天铁矿山、有色金属矿、和建材开采矿山在软岩和硬岩中破碎站基坑掘凿方法,通过对穿孔、爆破等工艺采取一系列的特殊措施,以达到提高劳动生产率和节能降耗的目的。 
本发明所采用的技术方案包括爆破孔的穿孔、爆破及爆破后的除渣工艺,其主要特点是采用预裂孔控制爆破、中深孔爆破及斜坡除渣工艺,具体工艺如下 
1、穿孔:本发明的爆破孔穿孔包括预裂孔、预裂辅助孔、主爆破孔的穿孔工艺; 
a)预裂孔 
沿破碎站基坑边缘用钻机穿预裂孔,其预裂孔的参数为: 
孔径d1为53~110mm之间,但如受条件限制没有专用钻孔设备或对基坑壁面要求不高,也可采用其它钻机进行穿孔,但孔径不能大于150mm; 
孔深H2大于基坑深度2~3m; 
孔距a1为孔径的8~12倍; 
预裂孔穿凿角度为基坑斜面的角度;预裂孔为斜孔时,预裂孔底部距主爆破孔的距离为1~2m。 
b)预裂辅助孔布置在预裂孔的里层,与预裂孔的中心距为S1,S1为2~3m; 
预裂辅助孔参数与预裂孔参数相同;预裂孔为斜孔时,预裂孔和预裂辅助孔始终保持平行,预裂辅助孔底部距主爆破孔的距离为1~2m;预裂孔为垂直孔时,辅助孔距主爆破孔的距离为主爆破孔孔距的0.7~1.0倍。 
c)主爆破孔 
沿破碎站基坑的长轴方向布置主爆破孔;其主爆破孔的参数为: 
孔径d最小为170mm,最大为250mm; 
孔深H1为大于基坑深度2~3m; 
孔距为a,按下式计算: 
a = Q 1 H 1 Wq
式中:a——孔距,米; 
Q1——单孔装药量,kg; 
H1——孔深,米; 
W——抵抗线,米,根据矿山实际矿岩性质确定; 
q——炸药单耗,kg/m3,根据矿山实际矿岩性质确定。 
主爆破孔数量按下式计算: 
(1)主爆破孔排数的计算 
n 1 = 1 + S - 2 × S 1 ( 0.7 ~ 0.9 ) a
式中:n1——为主爆破孔的排数; 
S——为基坑的宽度,米; 
S1——为预裂辅助孔与预裂孔的间距,米; 
a——孔距,米; 
计算结果按四舍五入原则取整数。 
(2)主爆破孔数量的计算 
①单排孔主爆破孔数量的计算 
n 2 = L - 2 × S 1 a
式中:n2——为单排孔主爆破孔的数量,个; 
n1——为主爆破孔的排数; 
L——为基坑的长度,米; 
S1——为预裂辅助孔与预裂孔的间距,米; 
a——孔距,米; 
计算结果按四舍五入原则取整数。 
②多排孔主爆破孔数量的计算 
n3=n1×n2
式中:n3——为多排矿主爆破孔的数量,个; 
n2——为单排孔主爆破孔的数量,个; 
2、爆破:爆破工艺包括预裂孔、预裂辅助孔、主爆破孔的爆破工艺, 
a)预裂孔 
装药量的选择: 
线装药密度Δ:线装药密度是指预裂孔装药量与不包括填塞部分的炮孔长度之比,为了控制爆炸对新壁面的破坏,线装药密度根据下式计算: 
Δ=0.36[σ]0.63a1 0.67
式中:Δ——线装药密度,g/m; 
σ——岩石极限抗压强度,Mpa; 
a1——孔距,m。 
装药结构的选择: 
采用不耦合装药,炮孔底部线装药密度要加大2~3倍,不耦合系数为3~5; 
填塞长度:预裂孔径的10~20倍; 
预裂孔起爆时必须超前主爆破孔起爆至少50~100毫秒; 
b)预裂孔辅助孔: 
预裂孔辅助孔的爆破参数与预裂孔相同; 
c)主爆破孔 
单孔装药量Q1:根据实际的矿岩性质,确定炸药单耗q,然后可按下式计算单孔装药量Q1: 
Q1=qH1W2
式中:Q1——单孔装药量,kg; 
其余符号含义与预裂孔计算公式相同; 
爆破方式:爆破时采用多孔微差爆破,起爆方法可采用非电起爆系统起爆。 
3、除渣: 
采用斜坡道进行除渣,由前端式装载机出入基坑装渣; 
斜坡道角度为15~20°,宽度为4~6m; 
在钻机穿凿主爆破孔时,应连同斜坡道的爆破孔一起穿凿,随主爆破孔一起起爆。 
本发明的有益效果是:由于采用预裂孔控制爆破及斜坡除渣工艺,具有可实现一次性爆破的优点,其技术可行、安全可靠、经济合理,适用于露天矿山破碎站基坑及其它领域中类似基坑的施工。在基坑施工过程中,效率可提高50%,基坑施工时间可减少3~5个月,本发明工艺也适用于其它工程领域中一些类似的基坑掘凿,同时它不仅适用于垂直立面基坑的掘凿,也适用于斜面基坑的掘凿。 
附图说明
图1为本发明的示意图。 
图2为图1的俯视图。 
具体实施方式
下面结合附图对本发明的具体实施例做详细说明。 
如图1、2所示,本发明所采用的技术方案包括爆破孔的穿孔、爆破及爆破后的除渣工艺,其主要特点是采用预裂孔、预裂辅助孔的爆破及斜坡除渣工艺, 
1、穿孔:本发明的爆破孔穿孔包括预裂孔、预裂辅助孔、主爆破孔的穿孔工艺; 
a)预裂孔 
为减少中深孔爆破对破碎站基坑侧壁的冲击影响及减少土石方量,在破碎站基坑边缘用边坡钻机(或潜孔钻机)穿预裂孔,爆破时先起爆预裂孔,在破碎站基坑边缘形成一条裂缝,使破碎站基坑需要 除渣部分与原岩分离,然后再先起主爆破孔将其破碎。 
其预裂孔2的参数为: 
采用矿山专用钻孔设备进行穿孔,孔径一般在53~110mm之间,如受条件限制没有专用钻孔设备或对基坑壁面要求不高,也可采用其它钻机进行穿孔,但孔径不能大于150mm; 
预裂孔深H2大于基坑深度2~3m; 
预裂爆破时孔距a1与孔径有很大的关系,一般为孔径的8~12倍,基坑围岩硬度大时取大值; 
预裂孔2穿凿角度根据基坑斜面的角度而定,可以是垂直或有一定角度;预裂孔2为斜孔时,预裂孔2底部距主爆破孔1的距离为1~2m。 
b)预裂辅助孔3布置在预裂孔2的里层,与预裂孔2的中心距为S1,S1为2~3m; 
预裂辅助孔3参数与预裂孔2参数相同; 
预裂孔2为斜孔时,预裂孔和辅助孔始终保持平行,辅助孔3底部距主爆破孔1的距离为1~2m,预裂孔2为垂直孔时,辅助孔3距主爆破孔1的距离为主爆破孔1的孔距的0.7~1.0倍。 
c)主爆破孔 
沿破碎站基坑长轴方向布置主爆破孔1;其主爆破孔1参数如下: 
为减少主爆破孔1起爆后冲击波对破碎站基坑壁面的破坏,主爆破孔1的孔径一般为矿山采用牙轮钻机所能穿凿的最小孔径,或为施工单位钻机所能穿凿的最大孔径,孔径d最小为170mm,但主爆破孔1的孔径不应大于250mm; 
孔深H1大于基坑深度2~3m; 
孔距为a,按下式计算: 
Figure DEST_PATH_GSB00000780178100021
式中:a——孔距,米; 
Q1——单孔装药量,kg; 
H1——孔深,米; 
W——抵抗线,米,根据矿山实际矿岩性质确定; 
q——炸药单耗,kg/m3,根据矿山实际矿岩性质确定主爆破孔1数量,按下式计算: 
(1)主爆破孔1排数的计算 
n 1 = 1 + S - 2 × S 1 ( 0.7 ~ 0.9 ) a
式中:n1——为主爆破孔1的排数; 
S——为基坑的宽度,米; 
S1——为预裂辅助孔3与预裂孔2的间距,米; 
a——孔距,米; 
计算结果按四舍五入原则取整数。 
(2)主爆破孔1数量的计算 
①单排孔主爆破孔1数量的计算 
n 2 = L - 2 × S 1 a
式中:n2——为单排孔主爆破孔1的数量,个; 
n1——为主爆破孔1的排数; 
L——为基坑的长度,米; 
S1——为预裂辅助孔3与预裂孔2的间距,米; 
a——孔距,米; 
计算结果按四舍五入原则取整数。 
②多排孔主爆破孔1数量的计算 
n3=n1×n2
式中:n3——为多排矿主爆破孔1的数量,个; 
n2——为单排孔主爆破孔1的数量,个; 
主爆破孔1的孔径一般为矿山采用牙轮钻机所能穿凿的最小孔径,或为施工单位钻机所能穿凿的最大孔径,但主爆破孔1的孔径不应大于250mm; 
2、爆破:爆破工艺包括预裂孔、预裂辅助孔、主爆破孔的爆破工艺, 
a)预裂孔 
装药量的选择: 
预裂孔线装药密度Δ:线装药密度是指预裂孔装药量与不包括填塞部分的炮孔长度之比,为了控制爆炸对新壁面的破坏,可根据基坑实际围岩的情况,根据下式计算或通过实地试验加以确定, 
Δ=0.36[σ]0.63a1 0.67
式中:Δ——线装药密度,g/m; 
σ——岩石极限抗压强度,Mpa; 
a1——孔距,m。 
装药结构的选择:预裂爆破要求炸药均匀分布在炮孔内,采用不耦合装药,炮孔底部线装药密度要加大2~3倍,不耦合系数为3~5; 
填塞长度:为孔径的10~20倍;预裂孔2起爆时必须超前主爆破孔1起爆50~100毫秒; 
b)预裂孔辅助孔: 
辅助孔3爆破参数与预裂孔2相同。 
c)主爆破孔 
单孔装药量Q1:根据实际的矿岩性质,确定炸药单耗q,然后可按下式计算单孔装药量Q1: 
Q1=qH1W2
式中:Q1——单孔装药量,kg; 
其余符号含义与预裂孔计算公式相同; 
爆破方式:爆破时采用多孔微差爆破,起爆方法可采用非电起爆系统起爆。 
3、除渣: 
采用斜坡道4进行除渣,由前端式装载机出入基坑装渣; 
斜坡道4角度为15~20°,宽度S为4~6m; 
在钻机穿凿主爆破孔时,应连同斜坡道的爆破孔一起穿凿,随主爆破孔一起起爆。 
当受钻机、基坑较深、岩石性质等因数限制时,可将基坑分为上、下两部份,分两次爆破,基坑上半部份按本发明实施,基坑下半部分应可按本发明实施也可以采用传统的方法进行,采用本发明方法时,其爆破范围按基坑边缘轮廓线向内缩小2~3m,穿孔、爆破、除渣结束后,剩余部分采用原施工方法。 

Claims (4)

1.一种破碎站基坑掘凿方法,其特征在于,采用的技术方案包括爆破孔的穿孔、爆破及爆破后的除渣工艺,具体工艺为:
1)穿孔:爆破孔穿孔包括预裂孔、预裂辅助孔、主爆破孔的穿孔工艺;
a)预裂孔
沿破碎站基坑边缘用钻机穿预裂孔,其预裂孔的参数为:
孔径d1为53~150mm;
孔深H2大于基坑深度2~3m;
孔距a1为孔径d1的8~12倍;
预裂孔穿凿角度为基坑斜面的角度;
b)预裂辅助孔布置在预裂孔的里层,与预裂孔的中心距为S1,S1为2~3m;
预裂辅助孔参数与预裂孔参数相同;
c)主爆破孔
沿破碎站基坑的长轴方向布置主爆破孔;其主爆破孔的参数为孔径d最小为170mm,最大为250mm;
孔深H1为大于基坑深度2~3m;
孔距为a,按下式计算:
Figure FSB00000755458000011
式中:a——孔距,米; 
Q1——单孔装药量,kg;
H1——孔深,米;
W——抵抗线,米,根据矿山实际矿岩性质确定;
q——炸药单耗,kg/m3,根据矿山实际矿岩性质确定;
主爆破孔数量,按下式计算:
(1)主爆破孔排数的计算
式中:n1——为主爆破孔的排数;
S——为基坑的宽度,米;
S1——为预裂辅助孔与预裂孔的间距,米;
a——孔距,米;
计算结果按四舍五入原则取整数;
(2)主爆破孔数量的计算
①单排孔主爆破孔数量的计算
Figure FSB00000755458000022
式中:n2——为单排孔主爆破孔的数量,个;
n1——为主爆破孔的排数;
L——为基坑的长度,米;
S1——为预裂辅助孔与预裂孔的间距,米;
a——孔距,米;
计算结果按四舍五入原则取整数;
②多排孔主爆破孔数量的计算 
n3=n1×n2
式中:n3——为多排矿主爆破孔的数量,个;
n2——为单排孔主爆破孔的数量,个;
2)爆破:爆破工艺包括预裂孔、预裂辅助孔、主爆破孔的爆破工艺,
a)预裂孔
装药量的选择:预裂孔线装药密度Δ:根据下式计算:
Δ=0.36[σ]0.63a1 0.67
式中:Δ——线装药密度,g/m;
σ——岩石极限抗压强度,Mpa;
a1——孔距,m;
装药结构的选择:采用不耦合装药,炮孔底部线装药密度要加大2~3倍,不耦合系数为3~5;
填塞长度:预裂孔径的10~20倍;
预裂孔起爆时必须超前主爆破孔起爆至少50~100毫秒;
b)预裂孔辅助孔:
辅助孔爆破参数与预裂孔相同;
c)主爆破孔
单孔装药量Q1:根据实际的矿岩性质,确定炸药单耗q,然后按下式计算单孔装药量Q1:Q1=qH1W2
式中:Q1——单孔装药量,kg;
其余符号含义与预裂孔计算公式相同;
爆破方式:爆破时采用多孔微差爆破,起爆方法采用非电起爆系 统起爆;
3)除渣:
采用斜坡道进行除渣;
斜坡道角度为15~20°,宽度S为4~6m;
在钻机穿凿主爆破孔时,连同斜坡道的爆破孔一起穿凿,随主爆破孔一起起爆。
2.根据权利要求1所述的一种破碎站基坑掘凿方法,其特征在于,采用矿山专用钻机或其它钻机进行穿孔。
3.根据权利要求1所述的一种破碎站基坑掘凿方法,其特征在于,预裂孔穿凿角度为基坑斜面的角度,预裂孔为斜孔时,预裂孔和预裂辅助孔始终保持平行,预裂孔和预裂辅助孔底部距主爆破孔的距离为1~2m,预裂孔为垂直孔时,辅助孔距主爆破孔的距离为主爆破孔孔距的0.7~1.0倍。
4.根据权利要求1所述的一种破碎站基坑掘凿方法,其特征在于,当受钻机、基坑较深、岩石性质因数限制时,基坑分为上、下两部份,采用上述方法分两次爆破,按基坑边缘轮廓线向内缩小2~3m。 
CN2007100106434A 2007-03-15 2007-03-15 一种破碎站基坑掘凿方法 Expired - Fee Related CN101266123B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100106434A CN101266123B (zh) 2007-03-15 2007-03-15 一种破碎站基坑掘凿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100106434A CN101266123B (zh) 2007-03-15 2007-03-15 一种破碎站基坑掘凿方法

Publications (2)

Publication Number Publication Date
CN101266123A CN101266123A (zh) 2008-09-17
CN101266123B true CN101266123B (zh) 2012-07-04

Family

ID=39988701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100106434A Expired - Fee Related CN101266123B (zh) 2007-03-15 2007-03-15 一种破碎站基坑掘凿方法

Country Status (1)

Country Link
CN (1) CN101266123B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799261B (zh) * 2010-03-26 2011-12-28 重庆钢铁(集团)有限责任公司 一种基坑开挖的布孔及爆破方法
CN101806066B (zh) * 2010-03-26 2011-07-27 重庆钢铁(集团)有限责任公司 深基坑直壁成型方法
CN102252570B (zh) * 2011-06-29 2014-02-12 中国一冶集团有限公司 深坑岩体爆破开挖施工方法
CN102927863B (zh) * 2011-08-11 2016-08-24 李立华 一种全岩巷道爆破施工的新方法
CN102926756B (zh) * 2012-03-02 2015-03-18 江西稀有稀土金属钨业集团有限公司 露天矿山坚硬矿岩体的采剥工艺与系统
CN103017620A (zh) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 一种岩石基坑控制爆破施工方法
CN107227805A (zh) * 2017-07-19 2017-10-03 武汉大学 地下减振墙的建造方法
CN111042061B (zh) * 2019-12-30 2020-09-25 中国水电基础局有限公司 超深防渗墙施工方法
CN112696998A (zh) * 2020-12-29 2021-04-23 包头钢铁(集团)有限责任公司 一种露天矿山破碎站基坑控制爆破成型方法
CN114234746A (zh) * 2021-11-25 2022-03-25 河北钢铁集团矿业有限公司 一种新型高边坡半移动式破碎站基坑爆破方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2208221C2 (ru) * 2001-07-18 2003-07-10 ОАО "Восточный научно-исследовательский горнорудный институт" Способ селективной выемки качественного полезного ископаемого в карьере
CN1434191A (zh) * 2002-01-25 2003-08-06 中国人民解放军工程兵第四十一旅 深井爆破成井施工方法
CN1560557A (zh) * 2004-03-10 2005-01-05 马芹永 深厚表土冻结法施工人工冻土控制爆破的工艺方法
CN1886635A (zh) * 2003-11-28 2006-12-27 澳瑞凯炸药技术有限公司 爆破岩石的多个岩层或主平巷的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2208221C2 (ru) * 2001-07-18 2003-07-10 ОАО "Восточный научно-исследовательский горнорудный институт" Способ селективной выемки качественного полезного ископаемого в карьере
CN1434191A (zh) * 2002-01-25 2003-08-06 中国人民解放军工程兵第四十一旅 深井爆破成井施工方法
CN1886635A (zh) * 2003-11-28 2006-12-27 澳瑞凯炸药技术有限公司 爆破岩石的多个岩层或主平巷的方法
CN1560557A (zh) * 2004-03-10 2005-01-05 马芹永 深厚表土冻结法施工人工冻土控制爆破的工艺方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘文华,王自力,顾文彬.预裂爆破参数的选择与改进.《西部探矿工程》.1999,第11卷(第5期),第61-62页. *
李彬峰.预裂爆破参数设计及其在边坡工程中的应用分析.《有色金属》.2003,第55卷(第2期),第25-28页. *
石伟,徐连生,邓克.深孔控制爆破开挖破碎井技术的研究及应用.《金属矿山》.2004,(第332期),第17-19页. *

Also Published As

Publication number Publication date
CN101266123A (zh) 2008-09-17

Similar Documents

Publication Publication Date Title
CN101266123B (zh) 一种破碎站基坑掘凿方法
CN106223958B (zh) 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法
CN102587916B (zh) 一种崩矿嗣后充填采矿方法
CN101328809B (zh) 无底柱深孔后退式采矿方法
CN100535387C (zh) 一种改进的无底柱分段崩落法
CN102493806B (zh) 一种壁式缓倾斜薄矿体机械化连续采矿方法
CN104989404A (zh) 急倾斜薄矿体脉内伪倾斜落矿中深孔采矿法
CN102182461A (zh) 倾斜中厚金属矿体高效采矿方法
CN103437768B (zh) 一种不留顶底柱预置空间充填采矿法
CN105952450B (zh) 一种地下矿山井下双采场协同开采的新方法
CN103244180B (zh) 一种留小煤柱沿空掘巷围岩控制方法
CN104532818A (zh) 一种露天矿采空区的治理方法
CN102720500A (zh) 一种急倾斜薄矿体机械化地下开采方法
CN106869936A (zh) 一种适于陡坡地形的露天采矿新方法
CN108729924A (zh) 一种城市硬岩隧道机械开挖快速施工方法
CN103306679A (zh) “︱型”自由面掏槽一次成井工艺
CN101725350A (zh) 下盘沿脉凿岩穿脉进路出矿式崩落采矿法
CN104296609B (zh) 深孔梯段爆破中含不同坚硬程度岩层的控制爆破方法
CN102086765A (zh) 一种极薄铜矿体高分段多分层采矿法
CN110595308B (zh) 露天矿超深孔爆破处理采空区的方法
CN101718199B (zh) 煤矿大断面硐室施工方法
CN104613831A (zh) 一种在竖井周边眼外围增设周边辅助眼的施工方法
CN103982186B (zh) 无底柱后退式竖向倾斜分条分段崩落采矿法
CN103470263A (zh) 一种露天金属矿山的新水平开拓方法
CN102620614B (zh) 洞库出渣漏斗的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: MINING DESIGN AND RESEARCH INSTITUTE, ANSHAN IRON

Free format text: FORMER OWNER: ANGANG GROUP MINE COMPANY

Effective date: 20130607

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130607

Address after: 114001 Liaoning Province, the eastern part of the Anshan iron green street, No. 27

Patentee after: INST OF MINING DESIGN ANSHAN IRON AND STEEL Group Corp.

Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Patentee before: Ansteel Group Mining Co.,Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 114001 Liaoning Province, the eastern part of the Anshan iron green street, No. 27

Patentee after: ANGANG GROUP MINING ENGINEERING Corp.

Address before: 114001 Liaoning Province, the eastern part of the Anshan iron green street, No. 27

Patentee before: INST OF MINING DESIGN ANSHAN IRON AND STEEL Group Corp.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

CF01 Termination of patent right due to non-payment of annual fee