CN103017620A - 一种岩石基坑控制爆破施工方法 - Google Patents

一种岩石基坑控制爆破施工方法 Download PDF

Info

Publication number
CN103017620A
CN103017620A CN2012104941607A CN201210494160A CN103017620A CN 103017620 A CN103017620 A CN 103017620A CN 2012104941607 A CN2012104941607 A CN 2012104941607A CN 201210494160 A CN201210494160 A CN 201210494160A CN 103017620 A CN103017620 A CN 103017620A
Authority
CN
China
Prior art keywords
damping groove
foundation pit
line
foundation ditch
vibration damping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104941607A
Other languages
English (en)
Inventor
陶桂华
陈钧颐
姚建国
朱玉
汪瀚
朱春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Original Assignee
TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd filed Critical TAIXING FIRST CONSTRUCTION INSTALLATION CO Ltd
Priority to CN2012104941607A priority Critical patent/CN103017620A/zh
Publication of CN103017620A publication Critical patent/CN103017620A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明涉及一种岩石基坑控制爆破施工方法,包括以下步骤:切割线测定;以切割线为基准线定位基坑外围开挖减振槽向切割线内垂直开挖一减振槽,减振槽内为爆破区域,减振槽外为保护区域;基坑爆破开挖:爆破后岩石破碎、清渣;分层切割、爆破:重复减振槽开挖和爆破区域爆破,分层开挖减振槽以及基坑爆破开挖直至基坑完全开挖。在岩石基坑开挖区域内开挖减振槽,阻断开挖区域内爆破振动传播,降低对基坑岩壁和周围结构的震动影响,配合基坑切割线外移复核线随时校正切割基准,满足基坑开挖的精度要求,具有工艺简单,能兼顾开挖效率、安全,不破坏基坑围岩结构,提高基坑爆破安全和基坑开挖精度,适合各种土石方的基坑开挖。

Description

一种岩石基坑控制爆破施工方法
技术领域
本发明涉及一种基坑施工方法,具体说是一种岩石基坑控制爆破施工方法。
背景技术
随着西部大开发的进一步发展,城市建设速度进一步加快,在综合考虑城市功能、景观要求、建筑安全的前提下,一批高层建筑、超限高层建筑的地下空间的利用价值日趋明显,扩展、利用地下空间有着广泛的前景。当拟建项目位于临近建筑物、市政管网、地下人防设施、地下轻轨隧道等复杂环境时,使得岩质基坑开挖更趋困难。传统人工凿打和机械开挖基坑已远不能满足建设的需要,现有采用定向爆破技术配合机械开挖基坑,能有效节约开挖时间,提高开挖效率,但在爆破过程中,爆破地震波易对基坑围岩产生扰动,破坏围岩结构,基坑围岩存在后续安全隐患。
发明内容
为了解决现有技术中采用爆破施工基坑过程中易破坏基坑围岩结构的不足,本发明提供了一种工艺简单,能兼顾开挖效率、安全,不破坏基坑围岩结构的岩石基坑控制爆破施工方法。
本发明采用的技术方案是:一种岩石基坑控制爆破施工方法,其特征在于:包括以下步骤:
a. 切割线测定:根据基坑总平面设计图标定基坑转角点坐标及转角点之间每隔8m的补点坐标,利用全站仪精确测定基坑各点坐标作切割线,现场标定后以切割线外移0.1m作复核线; 
b.基坑外围开挖减振槽:以切割线为基准线定位向切割线内垂直开挖一减振槽,每皮切割深度0.5m,减振槽宽1.5-3m,切割工作每沿基准线推进15m,由开岩机将减振槽中的岩石破碎、外运,减振槽每切完一皮后清渣,用全站仪依据复核线内移0.1m进行复核、修正切割线,校正切割机位置,控制减振槽外侧垂直度,实现基坑岩壁垂直开挖,减振槽内为爆破区域,减振槽外为保护区域;
c.基坑爆破开挖:在爆破区域内均匀布置多个爆破孔,爆破孔深度小于减振槽深度,最外围的爆破孔与减振槽间留有抵抗线,抵抗线宽为爆破孔深的一半;爆破孔内装药、填塞后,在爆破区域上覆盖炮被,采用毫秒微差雷管分段起爆,爆破微差时间≥50ms,爆破后岩石破碎、清渣;
d.分层切割、爆破:重复步骤b、c,分层开挖减振槽以及基坑爆破开挖直至基坑完全开挖。
进一步地,所述步骤b中每皮切割的减振槽深度大于炮孔深度的1.5倍。
再进一步地,沿基坑切割线每隔10m向基坑内挂垂线,根据垂直平面的偏差值确定岩壁表面的抹灰找平厚度,采用吊篮上下进行基层抹灰整平,抹灰厚度为30~50mm并养护一周。
与现有技术相比,本发明的优点是:
1、在基坑坐标切割线内开挖一定宽度的减振槽,在减振槽内区域进行爆破,能阻断爆破地震波的传播,确保爆破冲击对基坑外的区域无冲击影响,不损坏基坑外壁以及基坑外岩石结构,提高基坑周围结构的安全;同时减振槽分皮开挖,配合每皮减振槽切割完成后,对减振槽内区域单独完成爆破,且爆破深度小于减振槽深度,能进一步提高切割精度和爆破安全;
2、在切割线外移0.1m作复核线,便于在切割减振槽时,切割机随时以复核线为基准,在切割过程中对切割精度进行校正,以满足基坑切割精度要求。
本发明在岩石基坑开挖区域内开挖减振槽,阻断开挖区域内爆破振动传播,降低对基坑岩壁和周围结构的震动影响,配合基坑切割线外移复核线随时校正切割基准,满足基坑开挖的精度要求,具有工艺简单,能兼顾开挖效率、安全,不破坏基坑围岩结构,提高基坑爆破安全和基坑开挖精度,适合各种土石方的基坑开挖。
附图说明
图1为本发明施工图;
图2为图1的剖面图。
图中:基坑1,切割线2,复核线3,减振槽4,爆破孔5。
具体实施方式
以下结合附图对本发明作进一步说明。
图1、2所示,基坑1的边线为切割线2,以切割线2外移0.1m作复核线3,切割线2向内1.5-3.0m为减振槽4区域,减振槽4内部区域为爆破区域,爆破孔5均匀设置于爆破区域内,爆破区域内最外围的爆破孔5与减振槽4间留有抵抗区。
本发明岩石基坑控制爆破施工方法包括以下步骤:
a. 切割线测定:根据基坑1总平面设计图标定基坑转角点坐标及转角点之间每隔8m的补点坐标,利用全站仪精确测定基坑各点坐标作切割线2,现场标定后以切割线2外移0.1m作复核线3; 
b.基坑外围开挖减振槽:以切割线2为基准线定位向切割线内垂直开挖一减振槽4,每皮切割深度0.5m,减振槽宽1.5-3m,切割工作每沿基准线推进15m,由开岩机将减振槽中的岩石破碎、外运,减振槽每切完一皮后清渣,用全站仪依据复核线3内移0.1m进行复核、修正切割线,校正切割机位置,控制减振槽4外侧垂直度,实现基坑岩壁垂直开挖,减振槽内为爆破区域,减振槽外为保护区域;
c.基坑爆破开挖:在爆破区域内均匀布置多个爆破孔5,每皮切割的减振槽深度大于炮孔深度的1.5倍,最外围的爆破孔与减振槽间留有抵抗线,抵抗线宽为爆破孔深的一半;爆破孔内装药、填塞后,在爆破区域上覆盖炮被,采用毫秒微差雷管分段起爆,爆破微差时间≥50ms,爆破后岩石破碎、清渣;
d.分层切割、爆破:重复步骤b、c,分层开挖减振槽以及基坑爆破开挖直至基坑完全开挖;
e、基坑完全开挖后,沿基坑切割线每隔10m向基坑内挂垂线,根据垂直平面的偏差值确定岩壁表面的抹灰找平厚度,采用吊篮上下进行基层抹灰整平,抹灰厚度为30~50mm并养护一周。

Claims (3)

1.一种岩石基坑控制爆破施工方法,其特征在于:包括以下步骤:
a. 切割线测定:根据基坑总平面设计图标定基坑转角点坐标及转角点之间每隔8m的补点坐标,利用全站仪精确测定基坑各点坐标作切割线,现场标定后以切割线外移0.1m作复核线; 
b.基坑外围开挖减振槽:以切割线为基准线定位向切割线内垂直开挖一减振槽,每皮切割深度0.5m,减振槽宽1.5-3m,切割工作每沿基准线推进15m,由开岩机将减振槽中的岩石破碎、外运,减振槽每切完一皮后清渣,用全站仪依据复核线内移0.1m进行复核、修正切割线,校正切割机位置,控制减振槽外侧垂直度,实现基坑岩壁垂直开挖,减振槽内为爆破区域,减振槽外为保护区域;
c.基坑爆破开挖:在爆破区域内均匀布置多个爆破孔,爆破孔深度小于减振槽深度,最外围的爆破孔与减振槽间留有抵抗线,抵抗线宽为爆破孔深的一半;爆破孔内装药、填塞后,在爆破区域上覆盖炮被,采用毫秒微差雷管分段起爆,爆破微差时间≥50ms,爆破后岩石破碎、清渣;
d.分层切割、爆破:重复步骤b、c,分层开挖减振槽以及基坑爆破开挖直至基坑完全开挖。
2.根据权利要求1所述的一种岩石基坑控制爆破施工方法,其特征是:所述步骤b中每皮切割的减振槽深度大于炮孔深度的1.5倍。
3.根据权利要求1所述的一种岩石基坑控制爆破施工方法,其特征是:沿基坑切割线每隔10m向基坑内挂垂线,根据垂直平面的偏差值确定岩壁表面的抹灰找平厚度,采用吊篮上下进行基层抹灰整平,抹灰厚度为30~50mm并养护一周。
CN2012104941607A 2012-11-28 2012-11-28 一种岩石基坑控制爆破施工方法 Pending CN103017620A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104941607A CN103017620A (zh) 2012-11-28 2012-11-28 一种岩石基坑控制爆破施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104941607A CN103017620A (zh) 2012-11-28 2012-11-28 一种岩石基坑控制爆破施工方法

Publications (1)

Publication Number Publication Date
CN103017620A true CN103017620A (zh) 2013-04-03

Family

ID=47966504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104941607A Pending CN103017620A (zh) 2012-11-28 2012-11-28 一种岩石基坑控制爆破施工方法

Country Status (1)

Country Link
CN (1) CN103017620A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103983148A (zh) * 2014-04-24 2014-08-13 中铁四局集团第二工程有限公司 隧道光面爆破全自动炮孔放样方法
CN105135960A (zh) * 2015-09-08 2015-12-09 中建八局第四建设有限公司 一种石方静态爆破方法
CN105297741A (zh) * 2015-10-20 2016-02-03 上海交通大学 上软下硬地层爆破引起基坑围护结构洞穿涌水防治方法
CN105627843A (zh) * 2014-11-27 2016-06-01 华北冶建工程建设有限公司 岩石地基爆破新方法
CN105865276A (zh) * 2016-03-30 2016-08-17 中铁二院重庆勘察设计研究院有限责任公司 建筑密集区大型岩质深基坑鱼骨形施工导槽高效减震爆破开挖方法
CN106088098A (zh) * 2016-06-15 2016-11-09 龙元建设集团股份有限公司 支撑拆除施工方法
CN106440980A (zh) * 2016-09-22 2017-02-22 广东省建筑工程机械施工有限公司 一种多边界基坑爆破方法
CN106592602A (zh) * 2016-12-16 2017-04-26 武汉科技大学 用于待爆破拆除深基坑钢筋混凝土支撑梁的预制沟槽
CN106592604A (zh) * 2017-01-04 2017-04-26 武汉科技大学 深基坑爆破施工中围护桩预留保护层最佳厚度的确定方法
CN110029679A (zh) * 2019-04-28 2019-07-19 三峡大学 采用主动方式促使滑坡体分级滑坡的方法
CN110360906A (zh) * 2019-07-29 2019-10-22 华侨大学 一种降低地表震动的电梯井待爆破区域的结构及方法
CN112982483A (zh) * 2021-02-08 2021-06-18 中国电建集团北京勘测设计研究院有限公司 一种地下泵站高转速机组抗振结构的施工方法
CN114215066A (zh) * 2021-11-24 2022-03-22 中国水利水电第九工程局有限公司 一种明挖基坑侧壁防坍塌开挖施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1405409A (zh) * 2002-10-11 2003-03-26 贾金青 一种基坑侧壁的柔性支护方法
CN101266123A (zh) * 2007-03-15 2008-09-17 鞍钢集团矿业公司 一种破碎站基坑掘凿方法
CN101418571A (zh) * 2008-10-15 2009-04-29 上海市第二市政工程有限公司 宽大基坑逆作法施工的中板施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1405409A (zh) * 2002-10-11 2003-03-26 贾金青 一种基坑侧壁的柔性支护方法
CN101266123A (zh) * 2007-03-15 2008-09-17 鞍钢集团矿业公司 一种破碎站基坑掘凿方法
CN101418571A (zh) * 2008-10-15 2009-04-29 上海市第二市政工程有限公司 宽大基坑逆作法施工的中板施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金少军等: "复杂环境下的深基坑岩石爆破及坑壁垂直开挖综合施工技术", 《建筑技术》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103983148A (zh) * 2014-04-24 2014-08-13 中铁四局集团第二工程有限公司 隧道光面爆破全自动炮孔放样方法
CN105627843A (zh) * 2014-11-27 2016-06-01 华北冶建工程建设有限公司 岩石地基爆破新方法
CN105135960A (zh) * 2015-09-08 2015-12-09 中建八局第四建设有限公司 一种石方静态爆破方法
CN105297741A (zh) * 2015-10-20 2016-02-03 上海交通大学 上软下硬地层爆破引起基坑围护结构洞穿涌水防治方法
CN105865276A (zh) * 2016-03-30 2016-08-17 中铁二院重庆勘察设计研究院有限责任公司 建筑密集区大型岩质深基坑鱼骨形施工导槽高效减震爆破开挖方法
CN106088098A (zh) * 2016-06-15 2016-11-09 龙元建设集团股份有限公司 支撑拆除施工方法
CN106440980A (zh) * 2016-09-22 2017-02-22 广东省建筑工程机械施工有限公司 一种多边界基坑爆破方法
CN106592602A (zh) * 2016-12-16 2017-04-26 武汉科技大学 用于待爆破拆除深基坑钢筋混凝土支撑梁的预制沟槽
CN106592604A (zh) * 2017-01-04 2017-04-26 武汉科技大学 深基坑爆破施工中围护桩预留保护层最佳厚度的确定方法
CN110029679A (zh) * 2019-04-28 2019-07-19 三峡大学 采用主动方式促使滑坡体分级滑坡的方法
CN110360906A (zh) * 2019-07-29 2019-10-22 华侨大学 一种降低地表震动的电梯井待爆破区域的结构及方法
CN112982483A (zh) * 2021-02-08 2021-06-18 中国电建集团北京勘测设计研究院有限公司 一种地下泵站高转速机组抗振结构的施工方法
CN114215066A (zh) * 2021-11-24 2022-03-22 中国水利水电第九工程局有限公司 一种明挖基坑侧壁防坍塌开挖施工方法
CN114215066B (zh) * 2021-11-24 2023-09-22 中国水利水电第九工程局有限公司 一种明挖基坑侧壁防坍塌开挖施工方法

Similar Documents

Publication Publication Date Title
CN103017620A (zh) 一种岩石基坑控制爆破施工方法
CN103291308B (zh) 用于隧道施工的悬臂式掘进机及隧道施工方法
CN110924953A (zh) 一种隧道洞身开挖施工工艺
CN107643028A (zh) 浅埋铁路隧道下穿民房软弱段爆破施工方法
CN104089551B (zh) 老闸定向倾斜倒塌爆破拆除施工方法
CN102183184B (zh) 在隧道施工中实现早龄期混凝土衬砌减振防护的爆破方法
CN107024154A (zh) 一种复杂环境下高边坡深孔爆破施工方法
CN105952460A (zh) 一种城市硬岩隧道非爆施工方法
CN108489601B (zh) 一种隧道近距穿越地下管线的爆破振动监测及控制方法
CN110541422A (zh) 一种隧道穿越洞口偏压滑坡带的施工方法
CN102661688B (zh) 一种整板岩石区的桩基控制爆破开挖方法
CN105423832B (zh) 一种厚壁砖烟囱定向窗的爆破施工方法
CN109252868A (zh) 软硬不均地层盾构施工孤石及基岩凸起处理方法
CN109000525A (zh) 一种盾构掘进上软下硬地层预裂爆破施工方法
CN112922606A (zh) 一种适用iii、iv级围岩大断面铁路隧道全电脑三臂凿岩台车全断面光面爆破施工方法
CN101793487A (zh) 小净距隧道施工控制爆破技术
CN208717894U (zh) 一种紧邻地铁入岩30米地下连续墙施工结构
CN105065004B (zh) 一种浅埋大跨度岩石隧道洞口段弱爆破开挖施工方法
CN112880501B (zh) 一种控制隧道爆破飞石的限飞洞钻爆方法
CN102435114A (zh) 隧道下大导坑超前及后续扩挖法爆破震动控制施工方法
CN204495211U (zh) 一种隧道明挖段的爆破炮孔布置系统
US11982596B2 (en) Method and system for blast-induced vibration monitoring of tunnels in high asymmetric in-situ stresses
CN112432566A (zh) 一种大断面隧道全断面快速开挖方法
CN101672613A (zh) 空气弹簧减振爆破施工方法
CN111810183A (zh) 一种上下交叉隧道综合施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403