CN103307941B - 一种提高矿山平巷掘进掏槽爆破效果的方法 - Google Patents

一种提高矿山平巷掘进掏槽爆破效果的方法 Download PDF

Info

Publication number
CN103307941B
CN103307941B CN201310225115.6A CN201310225115A CN103307941B CN 103307941 B CN103307941 B CN 103307941B CN 201310225115 A CN201310225115 A CN 201310225115A CN 103307941 B CN103307941 B CN 103307941B
Authority
CN
China
Prior art keywords
centre bore
hole
powder charge
surrounding
detonating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310225115.6A
Other languages
English (en)
Other versions
CN103307941A (zh
Inventor
文柏茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fangyuan (Dean) Mining Investment Co., Ltd.
Original Assignee
Jiangxi Rare Earth and Rare Metals Tungsten Group Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Rare Earth and Rare Metals Tungsten Group Holding Co Ltd filed Critical Jiangxi Rare Earth and Rare Metals Tungsten Group Holding Co Ltd
Priority to CN201310225115.6A priority Critical patent/CN103307941B/zh
Publication of CN103307941A publication Critical patent/CN103307941A/zh
Application granted granted Critical
Publication of CN103307941B publication Critical patent/CN103307941B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种提高矿山平巷掘进掏槽爆破效果的方法,包括在平巷掘进作业面中心钻凿五个垂直于作业面的掏槽炮孔,中心孔四周的是装药孔;中心孔深度比装药孔深度大10-20cm,中心孔底部装入1-2节起爆炸药卷;确保中心孔与装药孔中起爆炸药卷外侧的炮泥卷的填塞质量及填塞长度不小于60cm;中心孔的炸药在四周的装药孔起爆后再起爆,利用导爆管和雷管延时控制,延后时间控制在50-100 ms;确保四周的装药孔爆破后,中心孔底部的炸药再起爆,起到加强岩石抛掷力量的作用,把四个装药孔爆破先破碎的岩石从掏槽框内抛出,创造良好的自由面,提高爆破效果。本发明提高炮孔利用率达到95%以上,提高掘进效率,降低掘进成本。

Description

一种提高矿山平巷掘进掏槽爆破效果的方法
技术领域
本发明涉及一种矿山平巷或隧道掘进工艺,特别是一种提高矿山平巷或隧道掘进掏槽爆破效果的方法。
背景技术
我国大部分地下矿山是中小型矿山,开掘的巷道绝大多数为小断面,掘进方法均为浅孔掏槽爆破,因断面小,岩石夹制作用大,炮孔孔径小,一次性炮孔深度受到限制,炮孔利用率一般在85%以内,还有15%的炮孔没有利用,影响掘进效果和效率。在孔径、断面受限制的情况下,平巷掘进爆破效果的好坏,炮孔利用率的高低,关键取决于掏槽效果的好坏;掏槽爆破失败,导致掘进爆破失利,将影响整个掘进循环和掘进效率,造成成本浪费。掏槽效果的好坏,主要看掏槽框范围内岩石是否按预期的深度、直径要求完全抛出,创造了较好空框自由面。
现有矿山小断面浅孔掘进如附图3、4所示,在平巷掘进作业面中心,钻凿五个深度相同、垂直于作业面的掏槽炮孔,中心孔是空心孔,中心孔四周的是装药孔;空心孔不装药,只是给其他装药掏槽孔起到补偿空间的作用。掏槽爆破时,一是由于受岩石夹制作用,空间小,爆破破碎后的岩石不能完全被抛出掏槽框,有时出现挤死现象,而影响爆破效果造成爆破失败,成本浪费;二是掏槽效果较差,造成炮孔利用率相对偏低,掏槽深度受限制,影响掘进效率。
发明内容
本发明要解决的技术问题是提供一种提高矿山平巷掘进掏槽爆破效果的方法,主要适应于小断面、小孔径、浅孔平巷(隧道)掘进,即断面一般在20平方以内、孔径在50mm以下、孔深在5以下的平巷掘进平行直孔掏槽,对提高掏槽效果明显。
为解决上述技术问题,本发明的技术方案是:一种提高矿山平巷掘进掏槽爆破效果的方法,包括在平巷掘进作业面中心钻凿五个垂直于作业面的掏槽炮孔,中心孔是空心孔,中心孔四周的是装药孔,本发明的特征是:
① 以中心孔为圆心、半径为8-15 cm的圆周上均匀分布四个装满起爆炸药卷的装药孔,确保中心孔与四个装药孔互相平行;
② 中心孔深度比四周的装药孔深度大10-20cm;
③ 中心孔底部装入1-2节起爆炸药卷;
④ 确保中心孔与装药孔中起爆炸药卷外侧的炮泥卷的填塞质量,炮泥卷的填塞长度不小于60cm;
⑤ 中心孔的炸药在四周的装药孔起爆后再起爆,利用导爆管和雷管延时控制,延后时间控制在50-100 ms;确保四周的装药孔爆破后,中心孔底部的炸药再起爆,起到加强岩石抛掷力量的作用,把四个装药孔爆破先破碎的岩石从掏槽框内抛出,创造良好的自由面,提高爆破效果。
本发明的有益效果是:1、应用本发明,利用空心孔加装1-2节炸药,在掏槽孔后起爆,利用炸药爆炸后的冲击波和产生的高压气体的作用,达到对四个装药孔爆破后破碎的岩石完全抛出掏槽框的作用,可提高炮孔利用率达到95%以上,且根据实际岩石性质,可适当加深单循环炮孔深度,提高掘进效率,降低掘进成本,加快工程进度,提高企业效益。
2、安全可靠;微差爆破技术成熟,非电雷管、矿用岩石炸药较为安全可靠。
3、应用方便;本发明便于作业人员掌握,利用现有的凿岩工具,爆破器材,一次性凿岩爆破,简单培训便可熟练掌握应用。
4、成本低,效果、效益明显;应用本方法,可提高炮孔利用率10%以上,即加快了工程进度,又节约了生产掘进成本。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明的工艺结构示意图。
图2是图1的左视图。
图3是现有的工艺结构示意图。
图4是图3的左视图。
具体实施方式
实施例1如图1、2所示:现有的矿山平巷掘进掏槽爆破方法是在平巷掘进作业面中心钻凿五个深度相同、垂直于作业面的掏槽炮孔,中心孔是空心孔,中心孔四周的是装药孔;本发明的特征是:
① 以中心孔3为圆心、半径为8-15 cm的圆周上均匀分布四个装满起爆炸药卷6的装药孔2,确保中心孔3与四个装药孔2互相平行;
② 中心孔3深度比四周的装药孔2深度大10-20cm;
③ 中心孔3底部装入1-2节起爆炸药卷6;
④ 确保中心孔3与装药孔2中起爆炸药卷6外侧的炮泥卷5填塞质量,炮泥卷5的填塞长度不小于60cm;
⑤ 中心孔3的炸药在四周的装药孔2起爆后再起爆,利用导爆管4和雷管7延时控制,延后时间控制在50-100 ms;确保四周的装药孔2爆破后,中心孔3底部的炸药再起爆,起到加强岩石抛掷力量的作用,把四个装药孔2爆破先破碎的岩石从掏槽框内抛出,创造良好的自由面,提高爆破效果。

Claims (1)

1.一种提高矿山平巷掘进掏槽爆破效果的方法,包括在平巷掘进作业面中心钻凿五个垂直于作业面(1)的掏槽炮孔,中心孔(3)是空心孔,中心孔四周的是装药孔(2),本发明的特征是:
① 以中心孔(3)为圆心、半径为11-15 cm的圆周上均匀分布四个装满起爆炸药卷卷(6)的装药孔(2);
② 中心孔(3)深度比四周的装药孔(2)深度大10-20cm;
③ 中心孔(3)底部装入1-2节起爆炸药卷(6);
④ 确保中心孔(3)与装药孔(2)中起爆炸药卷(6)外侧的炮泥卷(5)的填塞质量,炮泥卷(5)的填塞长度不小于60cm;
⑤ 中心孔(3)的炸药在四周的装药孔(2)起爆后再起爆,利用导爆管(4)和雷管(7)延时控制,延后时间控制在50-100 ms;确保四周的装药孔(2)爆破后,中心孔(3)底部的炸药再起爆,起到加强岩石抛掷力量的作用,把四个装药孔(2)爆破先破碎的岩石从掏槽框内抛出,创造良好的自由面,提高爆破效果。
CN201310225115.6A 2013-06-07 2013-06-07 一种提高矿山平巷掘进掏槽爆破效果的方法 Expired - Fee Related CN103307941B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310225115.6A CN103307941B (zh) 2013-06-07 2013-06-07 一种提高矿山平巷掘进掏槽爆破效果的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310225115.6A CN103307941B (zh) 2013-06-07 2013-06-07 一种提高矿山平巷掘进掏槽爆破效果的方法

Publications (2)

Publication Number Publication Date
CN103307941A CN103307941A (zh) 2013-09-18
CN103307941B true CN103307941B (zh) 2015-09-09

Family

ID=49133440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310225115.6A Expired - Fee Related CN103307941B (zh) 2013-06-07 2013-06-07 一种提高矿山平巷掘进掏槽爆破效果的方法

Country Status (1)

Country Link
CN (1) CN103307941B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107843156A (zh) * 2016-09-20 2018-03-27 南京梅山冶金发展有限公司 平巷(隧道)掘进增强掏槽爆破效率的方法
CN109029176A (zh) * 2018-08-30 2018-12-18 西北矿冶研究院 一种分段式掏槽方法
CN113776398A (zh) * 2021-08-13 2021-12-10 安徽金日晟矿业有限责任公司 一种定向控制光面爆破方法
CN114674186B (zh) * 2022-03-11 2024-03-26 北京中煤矿山工程有限公司 隧道竖井深孔爆破掘进准直眼掏槽方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4047987A (en) * 1973-02-27 1977-09-13 Director-General Of The Agency Of Industrial Science And Technology Underwater blasting explosives
JP4074021B2 (ja) * 1999-01-25 2008-04-09 東急建設株式会社 発破方法
CN201731826U (zh) * 2010-02-11 2011-02-02 西部矿业股份有限公司 中深孔孔底起爆装置
CN103063094A (zh) * 2013-02-04 2013-04-24 山东科技大学 一种井巷快速爆破的掏槽方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3065871B2 (ja) * 1993-12-11 2000-07-17 株式会社奥村組 発破工法
KR20020082501A (ko) * 2001-03-20 2002-10-31 티앤알비 주식회사 천공간격, 장약량 및 발파순서를 조절한 암파쇄벤치발파방법

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4047987A (en) * 1973-02-27 1977-09-13 Director-General Of The Agency Of Industrial Science And Technology Underwater blasting explosives
JP4074021B2 (ja) * 1999-01-25 2008-04-09 東急建設株式会社 発破方法
CN201731826U (zh) * 2010-02-11 2011-02-02 西部矿业股份有限公司 中深孔孔底起爆装置
CN103063094A (zh) * 2013-02-04 2013-04-24 山东科技大学 一种井巷快速爆破的掏槽方法

Also Published As

Publication number Publication date
CN103307941A (zh) 2013-09-18

Similar Documents

Publication Publication Date Title
CN101644156B (zh) 煤岩体水力爆破致裂弱化方法
CN105952450B (zh) 一种地下矿山井下双采场协同开采的新方法
CN102661689B (zh) 煤矿坚硬顶板分层爆破方法
CN104266557B (zh) 预控顶分段落矿一次成井方法
CN103278055A (zh) 一种坚硬顶板深孔预裂爆破切顶卸压方法
CN104790949B (zh) 巨厚坚硬顶板高瓦斯厚煤层顶板控制和提高瓦斯抽放效率的方法及钻孔机具
CN103244180B (zh) 一种留小煤柱沿空掘巷围岩控制方法
CN105569659A (zh) 一种巷道水力割缝定向爆破切顶卸压方法
CN103575172A (zh) 一种全新的井巷爆破施工方法
CN103307941B (zh) 一种提高矿山平巷掘进掏槽爆破效果的方法
CN101876520A (zh) 大倾角煤层坚硬顶板超前预爆破工艺
CN104864782A (zh) 一种坚硬岩巷复合加强垂直楔形掏槽方法
CN104613831A (zh) 一种在竖井周边眼外围增设周边辅助眼的施工方法
CN103206903A (zh) 一种坚硬顶板定向承压爆破控制方法
CN103498680A (zh) 提高综放工作面初采期间顶煤回收率的方法
CN105909225A (zh) 综放工作面架间定向水压致裂顶煤弱化方法
CN104406470A (zh) 西部白垩系软岩地区大直径冻结井筒深孔掏槽爆破方法
CN104819670A (zh) 预钻中孔竖井开挖爆破方法
CN106643355B (zh) 一种深部煤矿巨厚坚硬顶板的强制放顶方法
CN103868420A (zh) 一种矿山平巷掘进掏槽爆破方法
CN112983418A (zh) 一种煤矿井下采煤工作面回撤通道水力压裂卸压的方法
CN105443133B (zh) 一种非开挖施工中的地下岩石聚能装药爆破装置和方法
CN204177294U (zh) 一种矿山平巷掘进掏槽炮孔结构
CN102817633A (zh) 深孔裂隙控制爆破的抽放瓦斯的装置及预裂方法
CN106288991B (zh) 一种地下采矿切割上山拉槽方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170824

Address after: 330400 Jiangxi province Jiujiang De'an County Jianfongpo tin mining area

Patentee after: Fangyuan (Dean) Mining Investment Co., Ltd.

Address before: 330046 Beijing West Road, Jiangxi, China, No. 118, No.

Patentee before: Jiangxi Rare Earth & Rare Metals Tungsten Group Holding Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20190607