CN104612753B CN201510043883.9A CN201510043883A CN104612753B CN 104612753 B CN104612753 B CN 104612753B CN 201510043883 A CN201510043883 A CN 201510043883A CN 104612753 B CN104612753 B CN 104612753B
Authority
CN
China
Prior art keywords
maokou limestone
area
maokou
water
limestone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510043883.9A
Other languages
Chinese (zh)
Other versions
CN104612753A (en
Inventor
赵延林
王卫军
万文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Chuxiang Construction Engineering Group Co.,Ltd.
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN201510043883.9A priority Critical patent/CN104612753B/en
Publication of CN104612753A publication Critical patent/CN104612753A/en
Application granted granted Critical
Publication of CN104612753B publication Critical patent/CN104612753B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of anti-method of harnessing the river closing stifled lean phase combination that maokou limestone underground grouting dams, comprise the steps: the exploiting field of high energy consumption under (1) closed-in well, safe power supply drainage condition difference;(2) elevation range in maokou limestone karsts developing area vertical zoning territory is determined;(3) in the maokou limestone duplexsyncline base plate underlied in the exploiting field of buttoned-up down-hole high energy consumption, safe power supply drainage condition difference, choose the subsidiary anticline ridge nearest away from infiltration area and design target area as underground grouting;(4) degree of depth and the orientation in maokou limestone underground grouting hole are determined;(5) maokou limestone subsoil water under Vatch basin;(6) electricity price low-valley interval draining.The present invention can take precautions against water inrush accident;Reduce the probability occurring Karst geomorphy to subside, and a large amount of electricity charge can be saved, increase economic efficiency.

Description

What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines
Technical field
The present invention relates to a kind of anti-method harnessed the river in colliery, especially relate to what a kind of maokou limestone underground grouting dammed Close the anti-method of harnessing the river that stifled lean phase combines.
Background technology
South China coalfield belongs to Huanan Late upper permian coalfield, and seat earth is mostly maokou limestone water-bearing layer, its hydrology Geological conditions is often between extremely complexity-Midpoint type.-2012 years calendar year 2001s, there is water inrush accident 179 in national colliery, extremely Number of dying 1598 people, wherein colliery, south occurs 96, and dead 917 people account for 53.6% and 57.4% respectively.Water inrush accident causes weight Big casualties, property loss and serious social and environmental problems.Colliery, south maokou limestone mine water disaster preventing and treating at present is typically adopted Taking ground leak stopping, down-hole forced-ventilated, based on the control measures of row.Due to maokou limestone mine hydrogeology complicated condition, adopted Pick destroys or the karst aquifer of impact, old empty water, surface water, and its nourishment condition is fine, and Source Of Supply is extremely abundant, and mine is dashed forward Water is frequent, and anti-riparian work amount is big, and effect is poor.
On the basis of long-term work is put into practice, preventing and treating water conservancy project author has successively explored approach and the side of some water hazard prediction Method is harnessed the river in colliery aspect, and " Draining hook " and " grouting for water blocking " is two large-engineering measures of mine water preventing and treating.Water hazard prediction The selection of technical method depends on to be fully realized hydrogeologic condition, with reference to the monitoring information of water inrush precursor.For Some disastrous water inrush accidents, for rescue and relief work, the method mostly taking grouting for water blocking.But often result in engineering more afterwards Repair or the waste of water resource and pollution.Seldom there is at present the colliery can be from the anti-angle of harnessing the river of mine entirety, by water-bearing layer slip casting Being modified to water barrier, it is achieved the carrying out of mine groundwater is rationally dammed, the discharge to full ore deposit subsoil water carries out integrated planning.Existing Underground grouting water blockoff stopped flow technique be primarily directed to the north mining area Ordovician limestone, be all for the purpose of water blockoff, do not examine Consider the drainage after groundwater trapping.
For colliery, south, the most perpendicular point of band domain characteristic of the karsts developing area in maokou limestone water-bearing layer, mine is to deep During developing, many inflow rate of mine water are the most obvious with different geohydrologic unit changes.Mine floor is by the strongest Tectonism, defines the duplexsyncline structure of complexity mostly.Duplexsyncline is by some subsidiary anticlines, to tiltedly combining One large-scale synclinal structure, the spine of the most same fold be the highest portion position of subsidiary anticline protuberance, groove portion for secondary to tiltedly The minimum position of depression.The stratum of this complicated structure is Middle P ermian maokou limestone, and karst is the most relatively grown, and subsoil water is very Abundant.How to make full use of karsts developing area vertical zoning territory characteristic and the duplexsyncline geology in maokou limestone water-bearing layer, colliery, south Structure, forced-ventilated drainage simply of correcting one's mistakes is to close the guarded drainage mode that stifled lean phase combines, to promote mine guarded drainage safety Protect well ability, improve mine economic profit, be the key subjects of worth research and development.
Summary of the invention
In order to solve above-mentioned technical problem, lean phase is blocked up in the pass that the present invention provides a kind of maokou limestone underground grouting to dam In conjunction with anti-method of harnessing the river, it can take precautions against water inrush accident;Reduce the probability occurring Karst geomorphy to subside, and can save big The amount electricity charge, increase economic efficiency.
The technical solution used in the present invention, comprises the steps:
(1) high energy consumption, the exploiting field of safe power supply drainage condition difference under closed-in well;
(2) elevation range in maokou limestone karsts developing area vertical zoning territory is determined;
(3) the maokou limestone that underlies of exploiting field of buttoned-up down-hole high energy consumption, safe power supply drainage condition difference compound to In inclined bottom plate, choose the subsidiary anticline ridge nearest away from infiltration area and design target area as underground grouting;
(4) degree of depth and the orientation in maokou limestone underground grouting hole are determined;
(5) maokou limestone subsoil water under Vatch basin;
(6) electricity price low-valley interval draining.
What above-mentioned maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines, the tool of step (1) Body operating process is as follows: by carrying out the statistical data for many years of coal mining output, displacement and the water yield in Nei Ge exploiting field, mining area point Analysis, determines the exploiting field of down-hole high energy consumption, safe power supply drainage condition difference, it is forever closed, and withdraws from all of closedown exploiting field Equipment.
What above-mentioned maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines, the tool of step (2) Body operating process is as follows: by holing mining area maokou limestone, and analysis solution cavity rate, along the Changing Pattern on stratum, obtains Mao Kou Limestone karst development degree is in three band domain of vertical direction: solution cavity development belt, fracture extension zone and karst aplasia band;According to Maokou limestone karstic development pattern, determine mine hydrogeology condition demarcation line be fracture extension zone and karst aplasia band point Interface.
What above-mentioned maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines, the tool of step (3) Body operating process is as follows: find out groundwater in mining area feeding area, runoff zones, stratigraphic sequence and geological structure, in buttoned-up down-hole In the maokou limestone duplexsyncline base plate underlied in the exploiting field of high energy consumption, safe power supply drainage condition difference, choose away from the recharge of ground water The nearest subsidiary anticline ridge in district designs target area, above-mentioned subsidiary anticline ridge and the recharge of ground water as underground grouting A secondary is at least there is to oblique depressed area between district.
What the slurry of above-mentioned maokou limestone down-hole dammed closes the anti-method of harnessing the river that stifled lean phase combines, the tool of step (4) Body operating process is as follows: utilize karsts developing area vertical zonality, determines the degree of depth and the orientation of each injected hole, by " first reconnoitre hole, Grouting behind shaft or drift lining hole, a hole are multiplex " principle use double dislocation mode to arrange inlet well in the plane, the degree of depth of injected hole should surpass More mine hydrogeology condition demarcation line, the azimuth of injected hole controls 65o~85 oBetween, the spacing of injected hole is less than 2 times of slurry dilation angle.
What above-mentioned maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines, the tool of step (5) Body operating process is as follows: in the subsidiary anticline ridge slip casting of described maokou limestone duplexsyncline, by described maokou limestone again Formula is transformed into water proof band to oblique subsidiary anticline axle portion near zone, and subsoil water is enclosed in described subsidiary anticline ridge and ground Between Xia Shui feeding area, and away from the nearest secondary of subsidiary anticline ridge in oblique depressed area, subsoil water also passes through Projective water point pours in buttoned-up down-hole high energy consumption, the exploiting field of safe power supply drainage condition difference;Groundwater trapping is at slip casting tunnel water Flat, stop superficial part one step subsoil water to permeate to deep.
What above-mentioned maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines, the tool of step (6) Body operating process is as follows: due to the existence of water proof band, and secondary lies prostrate buttoned-up high energy consumption, safe power supply row in oblique depressed area The exploiting field of water condition difference essentially becomes the huge sump in mining area, during night shift, is stored by subsoil water in huge sump, mornig shift electricity price Low-valley interval, drains into earth's surface by storing the subsoil water in huge sump.
Compared with prior art, the invention has the beneficial effects as follows:
The present invention is directed to south maokou limestone base plate karsts developing area vertical zoning territory, colliery characteristic and there is duplexsyncline Geological structure proposes, and under closed-in well, the preventing and treating that stifled lean phase combines (is i.e. closed in high energy consumption, the exploiting field of safe power supply drainage condition difference "Off" in water method), the subsidiary anticline ridge at maokou limestone duplexsyncline base plate implements underground grouting, by subsoil water The secondary dammed between subsidiary anticline ridge and infiltration area is to oblique depressed area, and is poured in by projective water point Anti-the harnessing the river in method of stifled lean phase combination (is i.e. closed in down-hole high energy consumption, the exploiting field of safe power supply drainage condition difference closed " block up ");Groundwater trapping in slip casting tunnel level, is stoped superficial part subsoil water to permeate to deep so that lower level is opened by the present invention The water yield adopted greatly reduces, and mine groundwater is raised to slip casting tunnel level, reduces maokou limestone dewatering funnel face, mining area Long-pending, greatly reduce the probability occurring Karst geomorphy to subside;The present invention, stores in secondary to the most recessed at night shift period subsoil water Fall into lie prostrate on position and be turned off in exploiting field (having essentially become the huge sump in mining area), morning electricity price low-valley interval, will store in The subsoil water of huge sump drains into earth's surface (i.e. closing anti-" dredging " harnessed the river in method that stifled lean phase combines).Due under karst region Water dams in slip casting tunnel level, greatly reduces draining lift, saves a large amount of electricity charge, increases economic efficiency.
Accompanying drawing explanation
Fig. 1 maokou limestone duplexsyncline board structure and karsts developing area vertical zoning territory schematic diagram.
Anti-the harnessing the river that the stifled lean phase in pass that Fig. 2 maokou limestone duplexsyncline ridge underground grouting dams combines is shown It is intended to.
Fig. 3 underground grouting pore size distribution schematic diagram.
Fig. 4 is the A-A sectional view in Fig. 2.
Fig. 5 is the B-B sectional view in Fig. 3.
1, high energy consumption, the exploiting field 2 of safe power supply drainage condition difference, solution cavity development belt 3, fracture extension zone 4, karst are not Development belt 5, mine hydrogeology condition demarcation line 6, subsidiary anticline ridge 7, the injected hole degree of depth 8, water proof band 9, prominent Water spot 10, slip casting tunnel 11, lower level 12, huge sump 13, draining lift 14, injected hole 15, slurry dilation angle 16, top board 17, elementary stream 18, injected hole azimuth 19, subsidiary anticline 20, secondary to oblique 21, spine 22, groove portion 23, Infiltration area 24, maokou limestone duplexsyncline base plate 25, secondary are to oblique depressed area 26, coal measure strata.
Detailed description of the invention
With embodiment, the present invention is further described below below in conjunction with the accompanying drawings.
Colliery, south maokou limestone floor water-bearing rock, by repeatedly strong tectonism, defines the duplexsyncline of complexity mostly Structure, described duplexsyncline structure refers to by some subsidiary anticlines 19, secondary large-scale to tiltedly to oblique 20 one combined Structure, highest portion position, groove portion 22 that the spine 21 of the most same fold swells for subsidiary anticline are secondary to tiltedly caving in Low position.The present invention makes full use of karsts developing area vertical zoning territory characteristic and the duplexsyncline in maokou limestone water-bearing layer, colliery, south Geological structure, forced-ventilated drainage simply of correcting one's mistakes is to close the guarded drainage mode that stifled lean phase combines, and is greatly promoted the anti-row of mine Water security protects well ability, especially big raising mine economic profit.Specific implementation method is as follows:
(1) high energy consumption, the exploiting field of safe power supply drainage condition difference under closed-in well.By the coal mining to Nei Ge exploiting field, mining area The statistical data for many years of amount, displacement and water yield is analyzed, and determines adopting of down-hole high energy consumption, safe power supply drainage condition difference District 1, forever closes it, and withdraws from all devices closing exploiting field.
(2) elevation range in maokou limestone karsts developing area vertical zoning territory is determined.By mining area maokou limestone is bored Hole, analysis solution cavity rate, along the Changing Pattern on stratum, obtains the maokou limestone karst development degree three band domain in vertical direction: molten Hole development belt 2, fracture extension zone 3 and karst aplasia band 4, more develop toward deep according to maokou limestone, solution cavity cranny development rate The lowest Changing Pattern, determines the separating surface that mine hydrogeology condition demarcation line 5 is fracture extension zone and karst aplasia band.
(3) the maokou limestone that underlies of exploiting field 1 of buttoned-up down-hole high energy consumption, safe power supply drainage condition difference compound to In inclined bottom plate 24, choose the subsidiary anticline ridge 6 nearest from infiltration area 23 and design target area as underground grouting, enter , between above-mentioned subsidiary anticline ridge 6 and infiltration area 23, at least there is a secondary to oblique depressed area in one step 25。
(4) degree of depth and the orientation in maokou limestone underground grouting hole are determined.Expand according to karsts developing area vertical zonality and slurry Dissipate radius 15, determine the injected hole degree of depth 7 of each injected hole 14, injected hole azimuth 18 and the spacing of injected hole, by " first reconnoitring Hole, grouting behind shaft or drift lining hole, a hole are multiplex " principle, use double dislocation mode to arrange injected hole in the plane, the injected hole degree of depth 7 should Surmounting hydrogeologic condition demarcation line 5, injected hole azimuth 18 controls 65o~85 oBetween, the spacing of injected hole is less than slurry 2 times of bulk diffusion radius 15.
(5) maokou limestone subsoil water under Vatch basin.On the subsidiary anticline ridge 6 of above-mentioned maokou limestone duplexsyncline Choose suitable slip casting tunnel 10, subsidiary anticline axle region is carried out slip casting, subsidiary anticline axle portion near zone is transformed into Water proof band 8, subsoil water is enclosed in from the nearest secondary of subsidiary anticline ridge 6 in oblique depressed area 25, subsoil water And poured in by projective water point 9 and secondary in oblique depressed area 25, to lie prostrate buttoned-up high energy consumption, the adopting of safe power supply drainage condition difference In district 1;So groundwater trapping is in slip casting tunnel 10 level, stops superficial part subsoil water to permeate to deep.Lower level 11 is opened The water yield adopted greatly reduces, and mine groundwater is raised to slip casting tunnel 10 level, reduces mining area maokou limestone dewatering funnel Area, greatly reduces the probability occurring Karst geomorphy to subside.
(6) electricity price low-valley interval draining.Due to the existence of water proof band 8, secondary volt in oblique depressed area 25 is turned off height The exploiting field 1 of energy consumption, safe power supply drainage condition difference essentially becomes the huge sump 12 in mining area, and the night shift period, subsoil water stores In above-mentioned huge sump 12, mornig shift electricity price low-valley interval, drain into earth's surface by storing the subsoil water in huge sump 12.Due to thatch After mouth limestone groundwater trapping, subsoil water stores in above-mentioned huge sump 12, stops superficial part subsoil water to permeate to deep, huge Sump 12 to the draining lift 13 of top drainage than the draining lift much less of deep mining.Save a large amount of electric energy, and Draining during electricity price low ebb, is greatly saved the electricity charge, increases economic efficiency.
Embodiment:
The administrative Meitanba mining area of dark fund epoch Changsha, Hunan mining industry company limited is a well-known throughout the country inundation mine area, ore deposit District existing five mu of punchings, Xifeng logical sequence, pools, Zhushan County three are to mine, and Mine area geologic structure is medium, and hydrogeologic condition is the most complicated, along with ore deposit The continuous pit haulage system of well, mine dewatering funnel constantly expands, and drainage area has currently reached 368km2.Have been enter into later stage deep to open Adopting the stage, production cost remains high, waterproof guarantor's well arduous task, and pressure is huge, is only harnessed the river by earth's surface, closed-in well bottom Divide the exploiting field of high energy consumption, safe power supply drainage condition difference, the mining area of essential safety, high benefit could be reached comprehensively, make mining area shine Generation machine.The enforcement region of the present invention is Dong Yi exploiting field, colliery, the pool, Zhushan County.This region is positioned at Meitanba mining area the east, for mining area , there are Yang Quan lake groundwater run-off band, great achievement bridge groundwater run-off band in the main feeding area of subsoil water, and He Shiqiao groundwater run-off band is altogether With supply, abundant water.Use of Geophysical Data shows that this groundwater level is mild, and hydraulic gradient is 3-5 ‰, the most past east, this region, Catchment area is the biggest.And disclose through down-hole, eastern seven crossdrift 34 transportation roadway-170 flowing water lanes, colliery, the pool, Zhushan County-170, for The subsidiary anticline ridge of Tang Hejia gulf, Zhushan County duplexsyncline, this position underlies Dong Yi exploiting field, colliery, the pool, Zhushan County, is bamboo Dong Yi exploiting field, pond on a hill colliery maokou limestone duplexsyncline base plate, the subsidiary anticline protuberance nearest away from the main feeding area of eastern subterranean water Position.Use the present invention, specifically comprising the following steps that for the treatment of groundwater
(1) exploiting field that high energy consumption under closed-in well, safe power supply drainage condition are poor.Dong Yi exploiting field, colliery, the pool, Zhushan County includes- 235 levels ,-207 levels are the exploiting field 1 that high energy consumption, safe power supply drainage condition are poor.Dong Yi exploiting field, colliery, the pool, whole Zhushan County is existing There is beveloped coal reserve only 7.0 ten thousand tons, and wing exploiting field, east inflow rate of mine water is 8800m to the maximum3/ h, average out to 6400 m3/ h, accounts for complete The 70% of company's inflow rate of mine water.It is first shut off-235 horizontal Dong great lane floodgate wall gate valves, withdraws from that-235 levels are all to be set as far as possible Standby.According to the projective water point water yield mutation analysis of east, colliery, the pool, Zhushan County wing, progressively close the whole exploiting field of the wing, east, colliery, the pool, Zhushan County.
(2) elevation range in maokou limestone karsts developing area vertical zoning territory is determined.Well is obtained according to Meitanba mining area boring It is 2.1% that the solution cavity rate of lower different level is respectively as follows :-120m~-200 m solution cavity rate, and-200 m~-250 m solution cavity rates are 1.31% ,-250 m~-300 m solution cavity rates are 0.14%, and-300~-400 solution cavity rates are 0.1%.Obtain from drilling result analysis The elevation range of the solution cavity development belt 2 in this mining area is :-120m~-200 m, and the elevation range of fracture extension zone 3 is :-200 m ~-240 m, karst aplasia band 4 elevation range is :-240 m area below.Visible maokou limestone more develops toward deep, The Changing Pattern that solution cavity cranny development rate is the lowest, determines that mine hydrogeology condition demarcation line 5 is located for absolute altitude-240m.
(3) the maokou limestone that underlies of exploiting field of buttoned-up down-hole high energy consumption, safe power supply drainage condition difference compound to In inclined bottom plate 24, choose the subsidiary anticline ridge 6 nearest away from infiltration area 23 and design target area as underground grouting.Coal Main nourishment source, mining area, charcoal dam is the ground such as Yang Quan lake, great achievement bridge, has Yang Quan lake groundwater run-off band, great achievement bridge groundwater flow Band and He Shiqiao groundwater run-off band feed jointly, and the water yield is very abundant, and the average hydraulic gradient is 5 ‰.Colliery, the pool, Zhushan County- 170 eastern seven crossdrift 34 transportation roadway-170 flowing water lanes, the subsidiary anticline for Tang Hejia gulf, Zhushan County duplexsyncline swells Position 6, this position underlies Dong Yi exploiting field, colliery, the pool, Zhushan County, be the maokou limestone base plate in Dong Yi exploiting field, colliery, the pool, Zhushan County compound to Tiltedly, the subsidiary anticline ridge 6 nearest away from the main feeding area of eastern subterranean water, play " ridge ", " hump " and cross water bottle neck Effect, is underground grouting design target area, maokou limestone tunnel.
(4) degree of depth and the orientation in maokou limestone underground grouting hole are determined.At 34 transportation roadway of colliery, the pool, Zhushan County absolute altitude-170m In the subsidiary anticline ridge of Tang Hejia gulf, Zhushan County duplexsyncline, as slip casting tunnel 10, carry out underground grouting, root According to karsts developing area vertical zonality and slurry dilation angle 15, determining that the injected hole degree of depth 7 is 80m, the azimuth 18 of slip casting is about 75o, injected hole spacing is 15m, and wherein injected hole degree of depth 80m surmounts hydrogeologic condition demarcation line 5, by " first reconnoitring hole, note afterwards Slurry hole, a hole is multiplex " principle, use double dislocation mode to arrange injected hole in the plane.After slip casting completes, maokou limestone is multiple Formula has been transformed into water proof band 8, water proof band 8 total length 450 meters to oblique subsidiary anticline axle portion near zone.
(5) maokou limestone groundwater trapping.The subsidiary anticline axle portion near zone of maokou limestone duplexsyncline be transformed into every After water band 8, the secondary that subsoil water is enclosed between subsidiary anticline ridge 6 and infiltration area is to oblique depressed area 25 In, and pouring in buttoned-up high energy consumption, the exploiting field 1 of safe power supply drainage condition difference by projective water point 9, groundwater trapping is above-mentioned It is turned off in exploiting field, thus stops superficial part subsoil water to permeate to deep.After maokou limestone groundwater trapping, east, colliery, the pool, Zhushan County wing The subsoil water outburst amount of absolute altitude-170m level reaches 2600 m3/ h, and lower horizontal 11(be-270 levels) water yield be only 700 m3/h.It is owing to the subsoil water overwhelming majority is gushed out from east, colliery, the pool, Zhushan County wing-170m level, the least from the water yield of-270 levels, So will reduce about 100 meters from mine to the lift of top drainage.
(6) electricity price low-valley interval draining.Due to the existence of water proof band 8, what secondary lied prostrate in oblique depressed area 25 is turned off High energy consumption, the exploiting field 1 of safe power supply drainage condition difference essentially become the huge sump 12 in mining area, night shift subsoil water store in In huge sump, cumulative volume about 30000 m3, by 2600 m3/ h flow can water-retention 11.5 hours, night shift can be realized and stop draining, enter Row water-retention, mornig shift electricity price low-valley interval drains, and compared with electricity price peak interval of time, uses mornig shift electricity price low-valley interval draining, its row Water power price differential 0.4 yuan/degree.
Use the present invention, it is possible to reduce draining lift 100 meters, every year can saves energy 2732.6 ten thousand degree, minimizing labour force Recruitment 48 people, utilizes electricity price low-valley interval draining, year can power cost saving 10,930,000 yuan, simultaneously because east the wing close after, whole ore deposit Draining cost in district's reduces, and can reduce total lease production, the Yanchang Area length of service, and social benefit is the most clearly.

Claims (7)

1. the anti-method of harnessing the river that the pass that maokou limestone underground grouting dams-stifled-lean phase combines, comprises the steps:
(1) high energy consumption, the exploiting field of safe power supply drainage condition difference under closed-in well;
(2) elevation range in maokou limestone karsts developing area vertical zoning territory is determined;
(3) at the bottom of the maokou limestone duplexsyncline underlied in the exploiting field of buttoned-up down-hole high energy consumption, safe power supply drainage condition difference In plate, choose the subsidiary anticline ridge nearest away from infiltration area and design target area as underground grouting;
(4) degree of depth and the orientation in maokou limestone underground grouting hole are determined;
(5) maokou limestone subsoil water under Vatch basin;
(6) electricity price low-valley interval draining.
What maokou limestone underground grouting the most according to claim 1 dammed closes the anti-method of harnessing the river that stifled lean phase combines, The specific operation process of step (1) is as follows: by the statistics for many years of coal mining output, displacement and water yield to Nei Ge exploiting field, mining area Data are analyzed, and determine the exploiting field of down-hole high energy consumption, safe power supply drainage condition difference, it are forever closed, withdraw from closedown and adopt The all devices in district.
What maokou limestone underground grouting the most according to claim 1 dammed closes the anti-method of harnessing the river that stifled lean phase combines, The specific operation process of step (2) is as follows: by holing mining area maokou limestone, analyzes the solution cavity rate change rule along stratum Rule, obtains the maokou limestone karst development degree three band domain in vertical direction: solution cavity development belt, fracture extension zone and karst are not Development belt;According to maokou limestone karstic development pattern, determine that mine hydrogeology condition demarcation line is fracture extension zone and karst The separating surface of aplasia band.
What maokou limestone underground grouting the most according to claim 1 dammed closes the anti-method of harnessing the river that stifled lean phase combines, The specific operation process of step (3) is as follows: find out groundwater in mining area feeding area, runoff zones, stratigraphic sequence and geological structure, In the down-hole high energy consumption closed, the maokou limestone duplexsyncline base plate that underlies of exploiting field of safe power supply drainage condition difference, choose away from The nearest subsidiary anticline ridge in infiltration area designs target area as underground grouting, above-mentioned subsidiary anticline ridge and A secondary is at least there is to oblique depressed area between infiltration area.
What maokou limestone underground grouting the most according to claim 1 dammed closes the anti-method of harnessing the river that stifled lean phase combines, The specific operation process of step (4) is as follows: according to karsts developing area vertical zonality and slurry dilation angle, determine each injected hole The degree of depth and orientation, use double dislocation mode to arrange in the plane by the principle of " first reconnoitre hole, grouting behind shaft or drift lining hole, a hole multiplex " Inlet well, the degree of depth of injected hole should surmount mine hydrogeology condition demarcation line, and the azimuth of injected hole controls 65o~85 oBetween, the spacing of injected hole is less than 2 times of slurry dilation angle.
What maokou limestone underground grouting the most according to claim 1 dammed closes the anti-method of harnessing the river that stifled lean phase combines, The specific operation process of step (5) is as follows: in the subsidiary anticline ridge slip casting of maokou limestone duplexsyncline, by described secondary Anticlinal axis portion near zone is transformed into water proof band, and subsoil water is enclosed between subsidiary anticline ridge and infiltration area, And from the nearest secondary of subsidiary anticline ridge in oblique depressed area, subsoil water being poured in by projective water point is turned off Down-hole high energy consumption, safe power supply drainage condition difference exploiting field;Groundwater trapping, in slip casting tunnel level, stops superficial part subsoil water Permeate to deep.
What maokou limestone underground grouting the most according to claim 1 dammed closes the anti-method of harnessing the river that stifled lean phase combines, The specific operation process of step (6) is as follows: due to the existence of water proof band, and secondary volt in oblique depressed area is turned off exploiting field essence On become the huge sump in mining area, during night shift, subsoil water is stored in huge sump, mornig shift electricity price low-valley interval, will store Subsoil water in huge sump drains into earth's surface.
CN201510043883.9A 2015-01-29 2015-01-29 What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines Active CN104612753B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510043883.9A CN104612753B (en) 2015-01-29 2015-01-29 What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510043883.9A CN104612753B (en) 2015-01-29 2015-01-29 What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines

Publications (2)

Publication Number Publication Date
CN104612753A CN104612753A (en) 2015-05-13
CN104612753B true CN104612753B (en) 2016-07-13

Family

ID=53147378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510043883.9A Active CN104612753B (en) 2015-01-29 2015-01-29 What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines

Country Status (1)

Country Link
CN (1) CN104612753B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804754B (en) * 2016-05-16 2017-10-27 中国矿业大学 A kind of coal seam is Main aquifer pitshaft method for uncovering coal
CN107152309B (en) * 2017-07-19 2018-10-16 中国矿业大学 A kind of coal seam is the high water level and high-speed drainage water damage control method of Main aquifer
CN108825263B (en) * 2018-05-30 2019-07-30 陕煤集团神木张家峁矿业有限公司 It is a kind of from appearing to the curtain-grouting method in real coal body section part burnt rock water-bearing layer
CN109139057B (en) * 2018-10-29 2020-02-07 六盘水师范学院 Coal mining roadway floor water absorption bottom heave treatment method
CN113027521B (en) * 2021-02-03 2023-12-22 淮北矿业股份有限公司 Method for evaluating full-area thinning effect after curtain interception

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518470A (en) * 2011-12-27 2012-06-27 陕西彬长矿业集团有限公司 Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN102705005A (en) * 2012-04-01 2012-10-03 中国矿业大学(北京) Technology for plugging water bursting in mine by directional diversion grouting
CN103089301A (en) * 2011-11-01 2013-05-08 北京市政建设集团有限责任公司 Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft
CN103742145A (en) * 2013-12-24 2014-04-23 山东新阳能源有限公司 Water control method for abnormal water-enriched region of coal mine
CN103867229A (en) * 2014-03-12 2014-06-18 河北煤炭科学研究院 Coal mine large-mining-depth and next-group coal exploitation water control comprehensive treatment method
CN104033151A (en) * 2014-05-26 2014-09-10 辽宁工程技术大学 Safe mining method of ten million-ton mine under complicated conditions of dual-system coal seams
CN203939522U (en) * 2014-06-24 2014-11-12 高渐飞 A kind of KARST CAVES IN flow monitoring device that drips

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089301A (en) * 2011-11-01 2013-05-08 北京市政建设集团有限责任公司 Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft
CN102518470A (en) * 2011-12-27 2012-06-27 陕西彬长矿业集团有限公司 Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN102705005A (en) * 2012-04-01 2012-10-03 中国矿业大学(北京) Technology for plugging water bursting in mine by directional diversion grouting
CN103742145A (en) * 2013-12-24 2014-04-23 山东新阳能源有限公司 Water control method for abnormal water-enriched region of coal mine
CN103867229A (en) * 2014-03-12 2014-06-18 河北煤炭科学研究院 Coal mine large-mining-depth and next-group coal exploitation water control comprehensive treatment method
CN104033151A (en) * 2014-05-26 2014-09-10 辽宁工程技术大学 Safe mining method of ten million-ton mine under complicated conditions of dual-system coal seams
CN203939522U (en) * 2014-06-24 2014-11-12 高渐飞 A kind of KARST CAVES IN flow monitoring device that drips

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
南方煤矿特殊开采条件下的突水机理分析;李青锋等;《矿业工程研究》;20100620;第25卷(第2期);全文 *
帷幕注浆堵水技术在竹山塘煤矿的应用;张友军;《低碳世界》;20140708(第13期);全文 *
帷幕注浆应用于煤炭坝矿区防治水工作的可行性研究;邓建长;《湖南安全与防灾》;20091108(第11期);全文 *
重庆松藻煤矿茅口灰岩岩溶水害与治理;周述和;《中国煤田地质》;20051030;第17卷(第5期);全文 *

Also Published As

Publication number Publication date
CN104612753A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104612753B (en) What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines
Morin et al. Environmental geochemistry of minesite drainage: Practical theory and case studies, Digital Edition
Polak et al. Causes and effects of uncontrolled water inrush into a decommissioned mine shaft
CN104480950A (en) Strong draining and seepage-based upstream type tailings pond fill dam and damming technology thereof
Fernandez-Rubio et al. Mine water drainage
CN113027522B (en) Coal mine drainage same-layer recharging method
Edwards et al. Surface water management and encapsulation of mine waste to reduce water pollution from Frongoch Mine, Mid Wales
ZHANG et al. Technology of groundwater reservoir construction in goafs of shallow coalfields
Perras Tunnelling in horizontally laminated ground: the influence of lamination thickness on anisotropic behaviour and practical observations from the Niagara Tunnel Project
Bell Salt mining and associated subsidence in mid-Cheshire, England, and its influence on planning
Leonteva et al. Anthropogenic impact on the resources and composition of groundwater in the North-Western slope of the Moscow Artesian Basin
Erg CHANGES IN GROUNDWATER SULPHATE CONTENT IN ESTONIAN OIL SHALE MINING AREA.
Šubaranović et al. Multi-Attribute Scenario Analysis of Protection of Drmno Open Pit Mine against Groundwater
CN1174281A (en) Exploitation of placer mine by means of special tunnel and drainage method
CN220621952U (en) Mining overburden composite curtain for improving overburden separation layer grouting effect
CN104995688A (en) Water intake installation for cooling a nuclear power plant, and nuclear power plant comprising such an installation
CN113931646B (en) Water control system and method for open TBM construction of special inclined shaft of coal mine
Zhang et al. The water-disaster characteristic of coal mine in Shandong province and the research on prevention and control countermeasures
Yuan et al. Shanghai Coastal Reservoirs: Their Development and Experience from Their Design
Ma Consideration of the Allowable Groundwater Discharge in a Tunnel Project
FILATIEVA et al. DEVELOPMENT OF METHODS FOR FORECASTING THE DURATION OF RECOVERY GROUNDWATER LEVEL
Straskraba et al. Konkola Mine dewatering study
Baimirzaev et al. Substantiation and Selection of Optimal Method of Angren Section Field Drainage
Yutao Evaluation of influence of mining cracks on reservoir leakage
Li et al. Typical Cases and Analysis of Water and Mud Inrush in Tunnels

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220113

Address after: 410000 No. 102, Xinmei Road, Tianxin District, Changsha City, Hunan Province

Patentee after: Hunan Chuxiang Construction Engineering Group Co.,Ltd.

Address before: 411101 Taoyuan Road, Yuhu District, Xiangtan City, Hunan Province

Patentee before: HUNAN University OF SCIENCE AND TECHNOLOGY