CN103089301A - Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft - Google Patents
Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft Download PDFInfo
- Publication number
- CN103089301A CN103089301A CN2011103392449A CN201110339244A CN103089301A CN 103089301 A CN103089301 A CN 103089301A CN 2011103392449 A CN2011103392449 A CN 2011103392449A CN 201110339244 A CN201110339244 A CN 201110339244A CN 103089301 A CN103089301 A CN 103089301A
- Authority
- CN
- China
- Prior art keywords
- vertical shaft
- grouting
- liquid
- water
- grout
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention relates to a grouting reinforcement construction process capable of realizing a draining and plugging combined effect for underground water in a vertical shaft. The grouting reinforcement construction process includes steps of (1), temporarily sealing the bottom of the vertical shaft, arranging grouting pipes on inner and outer sides of the vertical shaft, arranging drain pipes matched with the grouting pipes on the vertical shaft and locally pumping the water by a vacuum pump; (2), diluting sodium silicate of raw grout 39Be' by water to obtain grout 28Be', mixing TGRM grouting materials with cement according to a proportion of 1:3 to obtain second grout, mixing the grout 28Be' with the second grout according to a proportion of 1:1 to obtain liquid A, diluting sodium silicate of raw grout 39Be' by water to obtain grout 30Be', diluting strong phosphoric acid by water according to a proportion of 1:6 to obtain diluted phosphoric acid, and mixing the grout 30Be' with the diluted phosphoric acid according to a proportion of 1:1 to obtain liquid B; (3), alternately filling the liquid A and the liquid B into reinforcement soil layers of the vertical shaft via the grouting pipes and completing grouting for the periphery of the vertical shaft; and (4), feeding small pipes within a 1.5m range of the periphery of the vertical shaft by the aid of high-pressure blast, and alternately filling the liquid A and the liquid B into the periphery of the vertical shaft via the small pipes. The grouting reinforcement construction process has the advantages that 'draining' and 'plugging' are combined and work along both lines in the grouting construction process for the vertical shaft, so that water layers are prevented from diffusing and permeating towards feeble grouted positions, the vertical shaft construction difficulty is lowered, and the construction safety degree is increased.
Description
[technical field]
The present invention relates to a kind of construction techniques, be specifically related to the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging in vertical shaft.
[background technology]
In vertical shaft, the grouting and reinforcing construction technology success or failure of underground water combining the two ways of dredging and plugging are related to whole workmanship and safety.In To Construction of Silo, often need to pass through the geological stratification in aquifer, in the situation that can not take precipitation face to face, if simple slip casting shutoff easily causes partial water pressure to increase, this has directly aggravated the trend of water layer to slip casting weakness scattering and permeating, has virtually promoted difficulty of construction.
For solving the problems of the technologies described above, the necessary construction technology that a kind of vertical shaft tunneling safety, reliable grouting and reinforcing are provided under groundwater environment is to overcome described defective of the prior art.
[summary of the invention]
For addressing the above problem, the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging in the vertical shaft of the object of the present invention is to provide a kind of " dredge, block up " combination, working along both lines.
For achieving the above object, the technical scheme that the present invention takes is: the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging in a kind of vertical shaft, it comprises following processing step: (1), with the interim back cover of vertical shaft, arranged outside Grouting Pipe in vertical shaft, simultaneously, be equipped with drain pipe, adopt the vacuum pump part to draw water; (2), the water glass of magma 39Be ' is diluted with water to 28Be ', the TGRM grouting material mixes according to the ratio of 1: 3 with cement, and above two kinds of slurries are mixed and made into A liquid at 1: 1; The water glass of magma 39Be ' is diluted with water to 30Be ', and SPA was diluted with water to phosphoric acid,diluted according to 1: 6, and above two kinds of slurries are mixed and made into B liquid at 1: 1; (3), adopt high-pressure blast ductule to be sent in the scope of vertical shaft surrounding 1.5m, A liquid and B liquid are alternately injected the vertical shaft surrounding by ductule; (4), A liquid and B liquid are alternately injected in vertical shaft by Grouting Pipe, the pressure that bi-material injects is 0.3Mpa~0.6Mpa, thereby completes the hydrophobic and slip casting of vertical shaft surrounding.
In vertical shaft of the present invention, the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging is further: 35 ° of the vertical inclinations of described Grouting Pipe, drain pipe vertically tilts 22 °, both coordinates.
In vertical shaft of the present invention, the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging is further: described Grouting Pipe and drain pipe are all selected Φ 32*3.5 boring seamless steel pipe.
Compared with prior art, the present invention has following beneficial effect: the grouting and reinforcing construction technology of vertical shaft of the present invention by " dredge, stifled " in conjunction with, work along both lines, thereby avoided the trend of water layer to slip casting weakness scattering and permeating, strengthened the construction safety degree; Simultaneously, will recharge at the place of selecting in segment limit is completed in construction for the underground water of dredging out, to guarantee that in soil layer, water content is stable, avoid surface subsidence; Reduce groundwater abstraction quantity, favourable to environmental protection; Reduce grouting amount, save cost, reduce and pollute.
[specific embodiment]
The present invention is the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging in vertical shaft, and it comprises following processing step: (1), and when To Construction of Silo is met underground water, at first with the interim back cover of vertical shaft, and bilateral arranges Grouting Pipe inside and outside vertical shaft, simultaneously, is equipped with drain pipe.35 ° of the vertical inclinations of described Grouting Pipe, drain pipe vertically tilts 22 °.Described Grouting Pipe and drain pipe are all selected Φ 32*3.5 boring seamless steel pipe.
(2), the water glass of magma 39Be ' is diluted with water to 28Be ', the TGRM grouting material mixes according to the ratio of 1: 3 with cement, and above two kinds of slurries are mixed and made into A liquid at 1: 1; The water glass of magma 39Be ' is diluted with water to 30Be ', and SPA was diluted with water to phosphoric acid,diluted according to 1: 6, and above two kinds of slurries are mixed and made into B liquid at 1: 1.
(3), A liquid and B liquid are alternately injected in vertical shaft by Grouting Pipe, the pressure that bi-material injects is 0.3Mpa~0.6Mpa, thereby completes the slip casting of vertical shaft surrounding.
(4), adopt high-pressure blast ductule to be sent in the scope of vertical shaft surrounding 1.5m, A liquid and B liquid are alternately injected the vertical shaft surrounding by ductule, this grouting pressure is controlled at 0.6Mpa.Described ductule is 0.5m in side and the base plate spacing of vertical shaft.
In vertical shaft of the present invention the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging by " dredge, stifled " combination, work along both lines, thereby avoided the trend of water layer to slip casting weakness scattering and permeating, the difficulty of To Construction of Silo is reduced greatly, improved the construction safety degree; Simultaneously, will recharge at the place of selecting in segment limit is completed in construction for the underground water of dredging out, to guarantee that in soil layer, water content is stable, avoid surface subsidence.
The above specific embodiment is only the preferred embodiment of this creation, not in order to limiting this creation, all in this creation spirit and principle within make any modification, be equal to replacement, improvement etc., within all should being included in the protection domain of this creation.
Claims (3)
1. the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging in a vertical shaft is characterized in that: comprise following processing step:
(1), with the interim back cover of vertical shaft, arranged outside Grouting Pipe in vertical shaft simultaneously, is equipped with drain pipe, adopts the vacuum pump part to draw water;
(2), the water glass of magma 39Be ' is diluted with water to 28Be ', the TGRM grouting material mixes according to the ratio of 1: 3 with cement, and above two kinds of slurries are mixed and made into A liquid at 1: 1; The water glass of magma 39Be ' is diluted with water to 30Be ', and SPA was diluted with water to phosphoric acid,diluted according to 1: 6, and above two kinds of slurries are mixed and made into B liquid at 1: 1;
(3), adopt high-pressure blast ductule to be sent in the scope of vertical shaft surrounding 1.5m, A liquid and B liquid are alternately injected the vertical shaft surrounding by ductule;
(4), A liquid and B liquid are alternately injected in vertical shaft by Grouting Pipe, the pressure that bi-material injects is 0.3Mpa~0.6Mpa, thereby completes the hydrophobic and slip casting of vertical shaft surrounding.
2. the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging in vertical shaft as claimed in claim 1 is characterized in that: described Grouting Pipe is vertical tilts 35 °, and drain pipe vertically tilts 22 °, both coordinates.
3. the grouting and reinforcing construction technology of underground water combining the two ways of dredging and plugging in vertical shaft as claimed in claim 2, it is characterized in that: described Grouting Pipe and drain pipe are all selected Φ 32*3.5 boring seamless steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110339244.9A CN103089301B (en) | 2011-11-01 | 2011-11-01 | Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110339244.9A CN103089301B (en) | 2011-11-01 | 2011-11-01 | Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103089301A true CN103089301A (en) | 2013-05-08 |
CN103089301B CN103089301B (en) | 2015-02-04 |
Family
ID=48202370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110339244.9A Expired - Fee Related CN103089301B (en) | 2011-11-01 | 2011-11-01 | Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103089301B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103388338A (en) * | 2013-07-24 | 2013-11-13 | 中铁十六局集团有限公司 | Novel rapid water stopping and soil mass improving method |
CN104612753A (en) * | 2015-01-29 | 2015-05-13 | 湖南科技大学 | Closing-blocking-draining combined water prevention and control method for Maokou limestone underground grouting and closure |
CN105155541A (en) * | 2015-08-21 | 2015-12-16 | 中铁城建集团第三工程有限公司 | Double-slurry closing construction method for sump |
CN105971637A (en) * | 2015-03-12 | 2016-09-28 | 中铁隆工程集团有限公司 | Application of WSS construction method in shield end reinforcement of water-rich sand layer |
CN105971638A (en) * | 2015-03-12 | 2016-09-28 | 中铁隆工程集团有限公司 | Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer |
CN108118724A (en) * | 2016-11-29 | 2018-06-05 | 中国二十冶集团有限公司 | T-bolt anchor box leak blocking method |
CN109555559A (en) * | 2018-11-16 | 2019-04-02 | 北京中煤矿山工程有限公司 | A kind of metal mine km grade interior shaft water control technique method |
CN110514811A (en) * | 2019-08-29 | 2019-11-29 | 山东科技大学 | A kind of indoor simulation grouting and reinforcing experimental rig and method |
CN110965567A (en) * | 2019-12-06 | 2020-04-07 | 广东省重工建筑设计院有限公司 | Foundation pit water burst treatment device |
CN114351740A (en) * | 2022-01-14 | 2022-04-15 | 成都华阳建筑股份有限公司 | Plugging method for high-water-level basement pressure-bearing dewatering well |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1158938A (en) * | 1996-08-02 | 1997-09-10 | 北京市地下铁道建设公司 | Drainage and construction method for building subway |
CN1376851A (en) * | 2002-05-14 | 2002-10-30 | 何益寿 | Channels and collaterals type water-proof drainage structure for underground engineering and its construction method |
KR100823103B1 (en) * | 2007-02-22 | 2008-04-18 | 고려대학교 산학협력단 | A method for construting waterproofing system of tunel and pipe |
CN101255698A (en) * | 2008-01-23 | 2008-09-03 | 湖南省建筑工程集团总公司 | Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method |
CN101638898A (en) * | 2009-08-19 | 2010-02-03 | 郑州市市政工程总公司 | Suspension type construction method of top pipe shaft |
CN101761346A (en) * | 2009-12-30 | 2010-06-30 | 中铁十二局集团第二工程有限公司 | Method for constructing metamorphic rock confined water tunnel |
-
2011
- 2011-11-01 CN CN201110339244.9A patent/CN103089301B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1158938A (en) * | 1996-08-02 | 1997-09-10 | 北京市地下铁道建设公司 | Drainage and construction method for building subway |
CN1376851A (en) * | 2002-05-14 | 2002-10-30 | 何益寿 | Channels and collaterals type water-proof drainage structure for underground engineering and its construction method |
KR100823103B1 (en) * | 2007-02-22 | 2008-04-18 | 고려대학교 산학협력단 | A method for construting waterproofing system of tunel and pipe |
CN101255698A (en) * | 2008-01-23 | 2008-09-03 | 湖南省建筑工程集团总公司 | Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method |
CN101638898A (en) * | 2009-08-19 | 2010-02-03 | 郑州市市政工程总公司 | Suspension type construction method of top pipe shaft |
CN101761346A (en) * | 2009-12-30 | 2010-06-30 | 中铁十二局集团第二工程有限公司 | Method for constructing metamorphic rock confined water tunnel |
Non-Patent Citations (4)
Title |
---|
杨文国等: "秀山隧道(出口)防涌水突砂施工配套技术", 《铁道建筑》, no. 06, 30 June 2011 (2011-06-30), pages 78 - 80 * |
王全胜等: "浅谈隧道涌水灾害应对措施", 《中国土木工程学会第十二届年会暨隧道及地下工程分会第十四届年会论文集》, 1 November 2006 (2006-11-01), pages 603 - 607 * |
蔡俊华: "山区高速公路隧道特大涌水病害治理", 《筑路机械与施工机械化》, no. 08, 10 August 2009 (2009-08-10), pages 50 - 52 * |
陈璋等: "注浆技术在龙潭特长公路隧道中的应用", 《重庆交通学院学报》, no. 06, 30 December 2005 (2005-12-30), pages 36 - 39 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103388338B (en) * | 2013-07-24 | 2015-10-14 | 中铁十六局集团有限公司 | A kind of method of novel quick sealing and soil improvement |
CN103388338A (en) * | 2013-07-24 | 2013-11-13 | 中铁十六局集团有限公司 | Novel rapid water stopping and soil mass improving method |
CN104612753A (en) * | 2015-01-29 | 2015-05-13 | 湖南科技大学 | Closing-blocking-draining combined water prevention and control method for Maokou limestone underground grouting and closure |
CN104612753B (en) * | 2015-01-29 | 2016-07-13 | 湖南科技大学 | What maokou limestone underground grouting dammed closes the anti-method of harnessing the river that stifled lean phase combines |
CN105971638A (en) * | 2015-03-12 | 2016-09-28 | 中铁隆工程集团有限公司 | Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer |
CN105971637A (en) * | 2015-03-12 | 2016-09-28 | 中铁隆工程集团有限公司 | Application of WSS construction method in shield end reinforcement of water-rich sand layer |
CN105155541A (en) * | 2015-08-21 | 2015-12-16 | 中铁城建集团第三工程有限公司 | Double-slurry closing construction method for sump |
CN105155541B (en) * | 2015-08-21 | 2017-03-01 | 中铁城建集团第三工程有限公司 | A kind of dual slurry closure construction method of catch pit |
CN108118724A (en) * | 2016-11-29 | 2018-06-05 | 中国二十冶集团有限公司 | T-bolt anchor box leak blocking method |
CN109555559A (en) * | 2018-11-16 | 2019-04-02 | 北京中煤矿山工程有限公司 | A kind of metal mine km grade interior shaft water control technique method |
CN110514811A (en) * | 2019-08-29 | 2019-11-29 | 山东科技大学 | A kind of indoor simulation grouting and reinforcing experimental rig and method |
CN110965567A (en) * | 2019-12-06 | 2020-04-07 | 广东省重工建筑设计院有限公司 | Foundation pit water burst treatment device |
CN114351740A (en) * | 2022-01-14 | 2022-04-15 | 成都华阳建筑股份有限公司 | Plugging method for high-water-level basement pressure-bearing dewatering well |
Also Published As
Publication number | Publication date |
---|---|
CN103089301B (en) | 2015-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103089301B (en) | Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft | |
CN103089280B (en) | Grouting water sealing and reinforcement construction process capable of realizing draining and plugging combined effect for underground water in tunnel | |
CN105041325A (en) | Construction method of high-tension water-rich extra-large-section weak breccia tunnel | |
CN103899351B (en) | A kind of filling reinforcement means of processing complicated cavity | |
CN106869949A (en) | A kind of method that shield machine is received with steel bushing | |
CN104594914A (en) | Coal mine tunnel broken surrounding rock layering grouting technology and method | |
CN104141314B (en) | The method of complete seepage proof curtain is formed in rock, native two media | |
CN106121722A (en) | A kind of method quickly constructing fire dam | |
CN102660952B (en) | Controllable clay paste slurry grouting technique | |
CN105484204A (en) | Stone masonry dam or concrete dam sealing anti-seepage reinforcement structure and construction method thereof | |
CN103291313A (en) | Arch crown pressure supporting system of excavation of earth pressure shield and construction method thereof | |
CN103114609A (en) | Connection device of new and old underground diaphragm walls and construction method | |
CN104047266A (en) | Seepage-proofing and leaking-stoppage method of leakage passage | |
CN103742162B (en) | Shield tail top is provided with shield machine and the synchronous grouting device of synchronous grouting device | |
CN104314106A (en) | Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof | |
CN103174135B (en) | Repair method of unqualified post-grouting bored concrete pile | |
CN106089245B (en) | One kind postpones grouting method after being used for single shield TBM walls | |
CN102535518B (en) | Plugging method of large seam of underground diaphragm wall | |
CN110469338A (en) | A kind of artesian water stratum shield method of reseptance | |
CN102174818A (en) | Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system | |
CN214697785U (en) | Device for solidifying coal bed by utilizing microorganisms in cross-cut coal uncovering process | |
CN105862872A (en) | Deep foundation pit support structure joint water stop construction method | |
CN103205986A (en) | Concrete raft foundation construction-joint grouting device and construction method | |
CN204298860U (en) | Lid digs the inverse side wall construction joint waterproofing node that does and constructs | |
CN203769790U (en) | Shield tunneling machine with shield tail top provided with synchronous grouting device and synchronous grouting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150204 Termination date: 20151101 |
|
EXPY | Termination of patent right or utility model |