CN110514811A - A kind of indoor simulation grouting and reinforcing experimental rig and method - Google Patents

A kind of indoor simulation grouting and reinforcing experimental rig and method Download PDF

Info

Publication number
CN110514811A
CN110514811A CN201910806116.7A CN201910806116A CN110514811A CN 110514811 A CN110514811 A CN 110514811A CN 201910806116 A CN201910806116 A CN 201910806116A CN 110514811 A CN110514811 A CN 110514811A
Authority
CN
China
Prior art keywords
fastening
sample
grouting
reinforcing
pressure head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910806116.7A
Other languages
Chinese (zh)
Inventor
张培森
李腾辉
赵成业
侯季群
孙亚楠
闫奋前
吴俊达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201910806116.7A priority Critical patent/CN110514811A/en
Publication of CN110514811A publication Critical patent/CN110514811A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Analytical Chemistry (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Remote Sensing (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of indoor simulation grouting and reinforcing experimental rig and method, experimental rig includes pressure-bearing platform, setting-out room, and pressure-bearing platform is set to the outside of setting-out room;Pressure-bearing platform includes disk on passive fastening pressure head, passive fastening pressure head lower wall, and setting-out room is set on passive fastening pressure head between disk and passive fastening pressure head lower wall;The application method of experimental rig completes the grouting and reinforcing of sample by multiple steps.Indoor simulation grouting and reinforcing experimental rig of the invention can carry out grouting and reinforcing to sample containing crack, be conducive to preferably carry out grouting and reinforcing mechanism analysis, carry out early-stage preparations to solve the practical problem in site operation;This experimental rig is designed using split cavity, and sampling is convenient, it can be achieved that whole fast demoulding after sample grouting and reinforcing;And experimental rig carries out grouting and reinforcing to sample using the method for " marginal not side pumping ", improves slip casting efficiency and slip casting effect.

Description

A kind of indoor simulation grouting and reinforcing experimental rig and method
Technical field
The present invention relates to a kind of experimental rig and method more particularly to a kind of indoor simulation grouting and reinforcing experimental rig and sides Method.
Background technique
In the construction of the underground engineering fields such as mine, tunnel, water conservancy, it is commonly encountered undesirable geologic body or fault belt, Since hole, crack etc. are developed containing permeable structure, and it is mingled with the weak soft rock mass medium of a large amount of self-stable ability, rock mass is initially Stress state easily changes under Engineering Disturbance, causes within the scope of certain depth country rock to occur rupturing and that crackle occurs is progressive Extension is eventually exhibited as rock mass relaxation cracking, wall caving, plate and the country rock cracking destruction from outward appearance to inner essence such as splits, to induced water inrush, collapse The engineering accidents such as side.In order to control certain depth range implosion country rock Disastrous years and fault activation caused by gushing water The geological disasters such as landslide, the method in engineering generally using slip casting reinforce the rock mass of country rock or loose crushing.
Research grouting and reinforcing mechanism most effectual way is to carry out grouting and reinforcing laboratory test, and existing grouting and reinforcing is tested Device is not suitable for carrying out grouting and reinforcing test to the standard sample of φ 50mm × 100mm, can not carry out grouting and reinforcing well Mechanism analysis can not carry out early-stage preparations to solve the practical problem in site operation.
Summary of the invention
In order to solve shortcoming present in above-mentioned technology, the present invention provides a kind of tests of indoor simulation grouting and reinforcing Device and method.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: a kind of indoor simulation grouting and reinforcing test Device, including pressure-bearing platform, setting-out room, pressure-bearing platform are set to the outside of setting-out room;Pressure-bearing platform includes disk, quilt on passive fastening pressure head Dynamic fastening pressure head lower wall, setting-out room are set on passive fastening pressure head between disk and passive fastening pressure head lower wall;
Setting-out room includes fastening support support, upper fastening end head, lower fastening end;Fastening support support is two, two Fastening support support is opposite to be connected, and setting-out area is formed between two fastening support supports;Setting-out is placed with sample in area;Upper fastening End, lower fastening end are respectively arranged at the upper end of sample, lower end, are provided in upper fastening end head and vacuumize conduit, vacuumize The nozzle that vacuumizes of conduit is connected with vacuum pump;Grouting pipe, the slip casting nozzle of grouting pipe are provided in lower fastening end It is connected with grouting pump;
Upper fastening end head is provided with flow deflector between lower fastening end and sample;Disk is set on passive fastening pressure head The upper end of upper fastening end head, the passive lower end for fastening pressure head lower wall and being set to lower fastening end;Disk and quilt on passive fastening pressure head Dynamic fastening pressure head lower wall is connected by high-strength bolt.
Further, flow deflector is rounded, and multiple through-holes are offered on flow deflector;One end that flow deflector is in contact with sample For smooth flat, the other end of flow deflector offers cyclic annular cross recess.
Further, fastening support support is c-type mold section, is provided with fastening bolt at the opening of external wall of c-type mold section;Tightly Fixing bolt be it is multiple, multiple fastening bolts up and down be alternatively arranged, for two c-type mold sections to be closed up fastening;The inner wall of c-type mold section It is provided with c-type rubber sleeve, is fixed for sealing sample.
Further, upper fastening end head, lower fastening end are T-shaped.
Further, setting-out room is multiple, and multiple setting-out interventricular septums are set to disk and passive fastening on passive fastening pressure head Between pressure head lower wall.
Further, the upper end of high-strength bolt is provided with reinforcing screw.
Further, grouting pump is Manual dual-liquid grouting pump.
A kind of the step of application method of indoor simulation grouting and reinforcing experimental rig are as follows:
Disk on passive fastening pressure head is removed first, the two fastening support supports to link together are opened, in lower fastening One flow deflector of upper ends of end, then sample is placed on the flow deflector of lower fastening end upper end, in the upper end of sample A flow deflector is placed, flow deflector is that its smooth flat is in contact with sample;Upper fastening end head is placed in sample upper end On flow deflector, then two fastening support supports are closed up and fastened, makes the rubber sleave of sample Yu fastening support support inner wall It fits closely;Then disk on passive fastening pressure head is covered, the reinforcing screw of high-strength bolt upper end is tightened;Finally starting grouting pump and Vacuum pump carries out grouting and reinforcing to sample, and grouting pump injects slurries in sample from the lower end of sample, pumping of the slurries in vacuum pump Slip casting is completed quickly through the crack of sample under power effect.
Indoor simulation grouting and reinforcing experimental rig of the invention can carry out grouting and reinforcing to sample containing crack, be conducive to more preferable Ground carries out grouting and reinforcing mechanism analysis, carries out early-stage preparations to solve the practical problem in site operation;This experimental rig uses Split cavity design, sampling are convenient, it can be achieved that whole fast demoulding after sample grouting and reinforcing;And experimental rig uses " marginal not The method of side pumping " carries out grouting and reinforcing to sample, improves slip casting efficiency and slip casting effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of indoor simulation grouting and reinforcing experimental rig.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the partial enlarged view of setting-out room in Fig. 1.
Fig. 4 is the structural schematic diagram of upper fastening end head.
Fig. 5 is the structural schematic diagram of lower fastening end.
Fig. 6 is the structural schematic diagram of fastening support support.
Fig. 7 is the top view of Fig. 6.
Fig. 8 is the side view of Fig. 6.
Fig. 9 is the structural schematic diagram of flow deflector.
In figure: 1, passively fastening disk on pressure head;2, pressure head lower wall is passively fastened;3, screw is reinforced;4, nozzle is vacuumized;5, Fasten steel ring;6, upper fastening end head;7, lower fastening end;8, fastening support support;9, sealing sleeve pipe;10, flow deflector;11, it tries Sample;12, slip casting nozzle;13, high-strength bolt;14, lower fastening end;15, through-hole.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1, a kind of indoor simulation grouting and reinforcing experimental rig, opens up the life of Pu'an company mainly for by France is top The standard cylindrical sample of Φ 50mm × 100mm used in the ROCK series resultant stress multi- scenarios method triaxial tester of production and set Meter, it can preferably be carried out for carrying out grouting and reinforcing to sample containing crack to carry out triaxial test again to slip casting sample Grouting and reinforcing mechanism analysis carries out early-stage preparations to solve the practical problem in site operation.
Indoor simulation grouting and reinforcing experimental rig includes pressure-bearing platform, setting-out room, and pressure-bearing platform is set to the outside of setting-out room;It holds It presents a theatrical performance as the last item on a programme including passively fastening disk 1 on pressure head, passive fastening pressure head lower wall 2, setting-out room is set to disk 1 and quilt on passive fastening pressure head Between dynamic fastening pressure head lower wall 2;Setting-out room be it is multiple, the setting of multiple setting-out interventricular septums can simultaneously infuse multiple samples Slurry improves test efficiency.
As shown in figure 3, setting-out room is designed using split cavity, setting-out room is made of two fastening support supports, two fastenings The opposite connection of support carriers and between form setting-out area, two fastening support supports split can close up, and examination is placed in setting-out area Sample 11, sample 11 are the fractured rock sample after resetting;As shown in figs 6-8, fastening support support 8 is c-type mold section, c-type mould Fastening bolt 7 is provided at the opening of external wall of valve;Fastening bolt 7 be it is multiple, multiple fastening bolts up and down be alternatively arranged, for will Two c-type mold sections close up fastening;The inner wall of c-type mold section is provided with c-type rubber sleeve, fixes for sealing sample 11, sealing effect Fruit is good, it can be achieved that grouting, and the setting-out room sampling of split cavity design is convenient, it can be achieved that whole after sample grouting and reinforcing Fast demoulding and interface sampling.
Setting-out room further includes 6, lower fastening end 14 of upper fastening end head, and upper fastening end head 6, lower fastening end 14 are respectively set Upper end, lower end in sample 11, as shown in Figure 4,5, upper fastening end head 6, lower fastening end 14 are T-shaped;In upper fastening end head 6 It is provided with and vacuumizes conduit, the nozzle 4 that vacuumizes for vacuumizing conduit is connected with vacuum pump;Note is provided in lower fastening end 14 Conduit is starched, the slip casting nozzle 12 of grouting pipe is connected with grouting pump, and grouting pump is Manual dual-liquid grouting pump, is controlled by compression bar Cylinder piston stretches to provide slip casting power, and adjustment cylinder piston stretching frequency can control the rate of slip casting.
Flow deflector 10 is provided between upper fastening end head 6, lower fastening end 14 and sample 11;Disk on passive fastening pressure head 1 is set to the upper end of fastening end head 6, the passive lower end for fastening pressure head lower wall 2 and being set to lower fastening end 14;Passive fastening pressure Disk 1 is connected with passive fastening pressure head lower wall 2 by high-strength bolt 13 on head.The upper end of high-strength bolt 13 is provided with reinforcing screw 3, the distance of pressure-bearing platform in-between is adjusted by turning reinforcing screw 3.
As shown in figure 9, flow deflector 10 is rounded, multiple through-holes 15 are offered on flow deflector 10;Flow deflector 10 and sample 11 The one end being in contact is smooth flat, and the other end of flow deflector 10 offers cyclic annular cross recess.
A kind of the step of application method of indoor simulation grouting and reinforcing experimental rig are as follows:
Disk 1 on passive fastening pressure head is removed first, the two fastening support supports to link together are opened, in lower fastening One flow deflector 10 of upper ends of end 14, then sample 11 is placed on the flow deflector of lower fastening end upper end, in sample 11 one flow deflector 10 of upper ends, flow deflector 10 are that its smooth flat is in contact with sample 11;Upper fastening end head 6 is put It is placed on the flow deflector 10 of 11 upper end of sample, then two fastening support supports is closed up and fastened, make sample 11 and fastening branch The rubber sleave of support support inner wall fits closely, and puts the connecing from sample 11 and fastening support support inner wall of slurries during only slip casting Contacting surface flows through;Then disk 1 on passive fastening pressure head is covered, the reinforcing screw 3 of 13 upper end of high-strength bolt is tightened;Finally start slip casting Pump and vacuum pump carry out grouting and reinforcing to sample 11, and experimental rig of the invention carries out sample using the method for " marginal not side pumping " Grouting and reinforcing, for grouting pump by slurries out of the injection of the lower end of sample 11 sample 11, slurries are quick under the draft effect of vacuum pump Slip casting is completed by the crack of sample 11, improves slip casting efficiency and slip casting effect.
Above embodiment is not limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the technical staff in domain is made within the scope of technical solution of the present invention, also belong to this hair Bright protection scope.

Claims (8)

1. a kind of indoor simulation grouting and reinforcing experimental rig, it is characterised in that: including pressure-bearing platform, setting-out room, pressure-bearing platform is set to The outside of setting-out room;The pressure-bearing platform includes disk (1), passive fastening pressure head lower wall (2), the setting of setting-out room on passive fastening pressure head It is fastened on pressure head between disk (1) and passive fastening pressure head lower wall (2) in passive;
The setting-out room includes fastening support support (8), upper fastening end head (6), lower fastening end (14);The fastening support branch Seat (8) is two, and two fastening support supports are opposite to be connected, and setting-out area is formed between two fastening support supports;The setting-out Sample (11) are placed in area;The upper fastening end head (6), lower fastening end (14) be respectively arranged at sample (11) upper end, Lower end, interior be provided with of upper fastening end head (6) vacuumize conduit, and the nozzle (4) that vacuumizes for vacuumizing conduit is connected with vacuum pump; It is provided with grouting pipe in the lower fastening end (14), the slip casting nozzle (12) of grouting pipe is connected with grouting pump;
Flow deflector (10) are provided between the upper fastening end head (6), lower fastening end (14) and sample (11);It is described passive Disk (1) is set to the upper end of fastening end head (6) on fastening pressure head, and passive fasten pressure head lower wall (2) are set to lower fastening end (14) lower end;Disk (1) is connected with passive fastening pressure head lower wall (2) by high-strength bolt (13) on the passive fastening pressure head It connects.
2. indoor simulation grouting and reinforcing experimental rig according to claim 1, it is characterised in that: the flow deflector (10) is in Circle offers multiple through-holes (15) on flow deflector (10);One end that the flow deflector (10) is in contact with sample (11) is light Sliding plane, the other end of flow deflector (10) offer cyclic annular cross recess.
3. indoor simulation grouting and reinforcing experimental rig according to claim 1, it is characterised in that: the fastening support support (8) it is c-type mold section, fastening bolt (7) is provided at the opening of external wall of c-type mold section;The fastening bolt (7) be it is multiple, it is more A fastening bolt is alternatively arranged up and down, for two c-type mold sections to be closed up fastening;The inner wall of the c-type mold section is provided with c-type rubber Gum cover is fixed for sealing sample (11).
4. indoor simulation grouting and reinforcing experimental rig according to claim 1, it is characterised in that: the upper fastening end head (6), lower fastening end (14) is T-shaped.
5. indoor simulation grouting and reinforcing experimental rig according to claim 1, it is characterised in that: the setting-out room is more A, multiple setting-out interventricular septums are set on passive fastening pressure head between disk (1) and passive fastening pressure head lower wall (2).
6. indoor simulation grouting and reinforcing experimental rig according to claim 1, it is characterised in that: the high-strength bolt (13) Upper end be provided with reinforce screw (3).
7. indoor simulation grouting and reinforcing experimental rig according to claim 1, it is characterised in that: the grouting pump is manual Double-liquid mud-injection pump.
8. a kind of application method of indoor simulation grouting and reinforcing experimental rig as claimed in claim 6, it is characterised in that: described The step of method are as follows:
Disk on pressure head (1) will be passively fastened first to remove, and the two fastening support supports to link together be opened, in lower fastening end One flow deflector (10) of upper ends of head (14), then sample (11) is placed on the flow deflector of lower fastening end upper end, In One flow deflector (10) of upper ends of sample (11), flow deflector (10) are that its smooth flat is in contact with sample (11);It will Upper fastening end head (6) is placed on the flow deflector (10) of sample (11) upper end, then closes up two fastening support supports simultaneously tight Gu fitting closely sample (11) and the rubber sleave of fastening support support inner wall;Then disk on passive fastening pressure head is covered (1), the reinforcing screw (3) of high-strength bolt (13) upper end is tightened;Finally start grouting pump and vacuum pump infuses sample (11) Slurry is reinforced, and for grouting pump by slurries out of the injection of the lower end of sample (11) sample (11), slurries are fast under the draft effect of vacuum pump Speed completes slip casting by the crack of sample (11).
CN201910806116.7A 2019-08-29 2019-08-29 A kind of indoor simulation grouting and reinforcing experimental rig and method Pending CN110514811A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910806116.7A CN110514811A (en) 2019-08-29 2019-08-29 A kind of indoor simulation grouting and reinforcing experimental rig and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910806116.7A CN110514811A (en) 2019-08-29 2019-08-29 A kind of indoor simulation grouting and reinforcing experimental rig and method

Publications (1)

Publication Number Publication Date
CN110514811A true CN110514811A (en) 2019-11-29

Family

ID=68627972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910806116.7A Pending CN110514811A (en) 2019-08-29 2019-08-29 A kind of indoor simulation grouting and reinforcing experimental rig and method

Country Status (1)

Country Link
CN (1) CN110514811A (en)

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4725169A (en) * 1986-03-04 1988-02-16 Nitto Chemical Industry Co., Ltd. Grout impregnation method
US4956032A (en) * 1988-04-28 1990-09-11 Keller Industries Ltd. Method of grouting using a vacuum
US5172587A (en) * 1991-03-13 1992-12-22 Arctic Foundations, Inc. Pile load testing device
CN1508392A (en) * 2002-12-16 2004-06-30 柳州欧维姆机械有限责任公司 Vertical pipe vacuum pre pressing bidirectional slip casting method and sealed slip casting system thereof
JP2005226372A (en) * 2004-02-16 2005-08-25 Naoharu Ikeda Method for filling pc grout and device therefor
CN103089301A (en) * 2011-11-01 2013-05-08 北京市政建设集团有限责任公司 Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft
CN203133053U (en) * 2013-02-04 2013-08-14 陕西煤业化工建设(集团)有限公司 Indoor simulation grouting testing device
CN103267722A (en) * 2013-05-07 2013-08-28 中国矿业大学 Pressure bearing permeation grouting strengthening test apparatus and method
US20140105689A1 (en) * 2011-08-26 2014-04-17 American Piledriving Equipment, Inc. Grout plug assembly to facilitate grouting during pipe piling placement
CN104786345A (en) * 2015-03-31 2015-07-22 中国船舶重工集团公司第七二五研究所 Automatic pressure casting molding device for preparing ITO green bodies
CN105716967A (en) * 2016-02-03 2016-06-29 山东科技大学 Grout-rock interface feature test method using induction splitting grouting device
CN106567722A (en) * 2015-10-09 2017-04-19 山东科技大学 Novel composite type groutable anchor rod
CN106644625A (en) * 2016-10-09 2017-05-10 重庆大学 Three-axis test sample preparation device of low-strength microorganism calcareous sand and application method thereof
CN106988703A (en) * 2017-04-12 2017-07-28 中国石油化工股份有限公司 The consolidation device and consolidation method of a kind of chemical sand control agent
CN206520083U (en) * 2017-03-03 2017-09-26 中交第三公路工程局有限公司 Vacuum grouting system
CN206862784U (en) * 2017-06-19 2018-01-09 中国科学院武汉岩土力学研究所 A kind of indoor Triaxial tester for testing sand slip casting setting strength
CN207879313U (en) * 2017-12-25 2018-09-18 山东科技大学 A kind of test block building mortion of slip casting Seed harvest experiment
CN108678360A (en) * 2018-04-17 2018-10-19 绍兴明煌建材科技有限公司 A kind of slip casting screw connecting structure and processing, method for dismounting
CN208024326U (en) * 2018-03-22 2018-10-30 刘彦俊 A kind of underground coal mine deep hole rapid hole sealing grouting device
CN110258501A (en) * 2019-07-13 2019-09-20 北京中岩大地科技股份有限公司 A kind of negative pressure of vacuum grouting method and device

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4725169A (en) * 1986-03-04 1988-02-16 Nitto Chemical Industry Co., Ltd. Grout impregnation method
US4956032A (en) * 1988-04-28 1990-09-11 Keller Industries Ltd. Method of grouting using a vacuum
US5172587A (en) * 1991-03-13 1992-12-22 Arctic Foundations, Inc. Pile load testing device
CN1508392A (en) * 2002-12-16 2004-06-30 柳州欧维姆机械有限责任公司 Vertical pipe vacuum pre pressing bidirectional slip casting method and sealed slip casting system thereof
JP2005226372A (en) * 2004-02-16 2005-08-25 Naoharu Ikeda Method for filling pc grout and device therefor
US20140105689A1 (en) * 2011-08-26 2014-04-17 American Piledriving Equipment, Inc. Grout plug assembly to facilitate grouting during pipe piling placement
CN103089301A (en) * 2011-11-01 2013-05-08 北京市政建设集团有限责任公司 Grouting reinforcement construction process capable of realizing draining and plugging combined effect for underground water in vertical shaft
CN203133053U (en) * 2013-02-04 2013-08-14 陕西煤业化工建设(集团)有限公司 Indoor simulation grouting testing device
CN103267722A (en) * 2013-05-07 2013-08-28 中国矿业大学 Pressure bearing permeation grouting strengthening test apparatus and method
CN104786345A (en) * 2015-03-31 2015-07-22 中国船舶重工集团公司第七二五研究所 Automatic pressure casting molding device for preparing ITO green bodies
CN106567722A (en) * 2015-10-09 2017-04-19 山东科技大学 Novel composite type groutable anchor rod
CN105716967A (en) * 2016-02-03 2016-06-29 山东科技大学 Grout-rock interface feature test method using induction splitting grouting device
CN106644625A (en) * 2016-10-09 2017-05-10 重庆大学 Three-axis test sample preparation device of low-strength microorganism calcareous sand and application method thereof
CN206520083U (en) * 2017-03-03 2017-09-26 中交第三公路工程局有限公司 Vacuum grouting system
CN106988703A (en) * 2017-04-12 2017-07-28 中国石油化工股份有限公司 The consolidation device and consolidation method of a kind of chemical sand control agent
CN206862784U (en) * 2017-06-19 2018-01-09 中国科学院武汉岩土力学研究所 A kind of indoor Triaxial tester for testing sand slip casting setting strength
CN207879313U (en) * 2017-12-25 2018-09-18 山东科技大学 A kind of test block building mortion of slip casting Seed harvest experiment
CN208024326U (en) * 2018-03-22 2018-10-30 刘彦俊 A kind of underground coal mine deep hole rapid hole sealing grouting device
CN108678360A (en) * 2018-04-17 2018-10-19 绍兴明煌建材科技有限公司 A kind of slip casting screw connecting structure and processing, method for dismounting
CN110258501A (en) * 2019-07-13 2019-09-20 北京中岩大地科技股份有限公司 A kind of negative pressure of vacuum grouting method and device

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
GUANGLI ZHU ET AL.: "Experimental Research on Characteristics of Fault Activation and Confined Water Rising", 《GEOTECHNICAL AND GEOLOGICAL ENGINEERING》 *
YONGSHUIKANG ET AL.: "Application of a combined support system to the weak floor reinforcement in deep underground coal mine", 《INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES》 *
刘银 等: "《无机非金属材料工艺学》", 30 September 2015, 中国科学技术大学出版社 *
干焕军: "真空灌浆加固软土地基的试验研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
张培森 等: "含水层上工作面回采诱发顶底板破坏及应力演化规律试验研究", 《中国煤炭》 *
许垒: "水泥基—玻璃纤维浆液在岩溶隧道注浆堵水加固工程中的应用研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
边兵兵 等: "纸浆模塑包装制品分体式吸滤成形模具设计", 《包装工程》 *

Similar Documents

Publication Publication Date Title
CN106644625B (en) A kind of test method based on three axis sample sample preparation device of low-intensity microorganism calcareous sand
CN106053240B (en) A kind of the concrete component hydraulic fracture simulated experiment design method and device of synchronous load
CN203191270U (en) Experimental device for pulse hydraulic fracturing reforms transform shale reservoir
CN106568698B (en) It is a kind of to utilize microorganism remediation distress in concrete and permeability test method
Xue et al. Permeability and pressure distribution characteristics of the roadway surrounding rock in the damaged zone of an excavation
CN105334142B (en) A kind of experimental provision formed for simulating shield mud film
CN103884597B (en) The analogue measurement device and method of coal seam hydraulic fracture induction surrouding rock stress change
CN207181166U (en) A kind of anchorage body interface mechanical characteristic test device for considering surrouding rock stress and influenceing
CN205776141U (en) Static cone penetration model test device
CN105865874A (en) Sample preparing device suitable for sandy soil laboratory tests
CN109342274A (en) High polymer crack grouting model test apparatus and test method under pressure-bearing river channels
CN206862784U (en) A kind of indoor Triaxial tester for testing sand slip casting setting strength
CN209878238U (en) Steel pipeline hydrostatic testing machine
CN111006952A (en) Experimental test device and grouting method for reinforcing fractured rock sample through high-pressure permeation grouting
CN107288163A (en) The device and method tested for rich water soft stratum anchoring body interfacial bond property
CN205643310U (en) Move and fill type solution cavity prevention of seepage slip casting simulation experiment device under water condition
CN206056982U (en) A kind of assay device of high water head rich water tunnel
CN110346261A (en) A kind of three axis of self-balancing type coal petrography load seepage flow and displacement experiment instrument and method
CN203249841U (en) Hypotonic rock transient air pressure pulse permeability measuring device
CN116047024A (en) Grouting lifting three-dimensional model test device and test method
CN110847889A (en) Hydraulic fracturing test system and test method
CN214749268U (en) Sand body slip casting test piece making devices
CN113156079B (en) Experimental device for testing space-time evolution and mechanical parameters of liquid nitrogen immersed coal sample cracks
CN110514811A (en) A kind of indoor simulation grouting and reinforcing experimental rig and method
CN212964408U (en) A high-efficient experimental apparatus for rock mechanics triaxial experiment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination