CN104612410B - 条状型材提升装置 - Google Patents
条状型材提升装置 Download PDFInfo
- Publication number
- CN104612410B CN104612410B CN201510086305.3A CN201510086305A CN104612410B CN 104612410 B CN104612410 B CN 104612410B CN 201510086305 A CN201510086305 A CN 201510086305A CN 104612410 B CN104612410 B CN 104612410B
- Authority
- CN
- China
- Prior art keywords
- strip section
- support
- fastening piece
- fixed
- collet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
条状型材提升装置,它包括一根条形的支架,支架的下端侧面固定有一个筒状的底托,支架的上端与底托相应的一侧固定有一个空心柱,空心柱内上下活动地套装有移动杆,移动杆的下端固定有一个用于围束条状型材的紧箍件,支架的上端还固定有一个用于连接到提升设备上的连接件。本装置结构简单、使用方便、制造成本低,可以保证条状型材在提升过程中不发生倾斜、掉落等状况,而且在提升过程中,本装置和条状型材均保持在竖直状态,在这种状态下,物体的重心非常稳定,不易出现打转、晃动等现象,这样就大大减小了本装置和条状型材与建筑物发生碰撞、刮擦的几率,从而保证提升工作的安全性,并防止造成本装置、条状型材以及建筑物的破损。
Description
技术领域
本发明涉及建材提升设备,具体地说涉及一种条状型材提升装置。
背景技术
目前,在建筑施工领域,常用的将圆钢、角钢、方钢、槽钢等条状型材提升到建筑物顶部的方式为:将条状型材捆绑成一捆,然后将绑绳连接到提升设备上即可开始提升;或是先将条状型材装载到钢筋笼内,然后将钢筋笼连接到提升设备上。
上述两种方式在提升过程中,条状型材处于横置状态,这样其重心不稳,极易出现打转和晃动,不仅有掉落的风险,而且极易与建筑物发生碰撞和刮擦,造成条状型材和建筑物的破损。
发明内容
本发明所要解决的技术问题是提供一种结构简单、使用安全方便、能防止条状型材破损的条状型材提升装置。
为了解决上述技术问题,本发明采用如下技术方案:条状型材提升装置,它包括一根条形的支架,支架的下端侧面固定有一个筒状的底托,支架的上端与底托相应的一侧固定有一个空心柱,空心柱内上下活动地套装有移动杆,移动杆的下端固定有一个用于围束条状型材的紧箍件,支架的上端还固定有一个用于连接到提升设备上的连接件。
为简洁描述起见,以下本发明所述的条状型材提升装置简称为本装置。
本装置装载条状型材的工作过程为:先通过移动杆将紧箍件移动到上方,然后将条状型材的下端伸入底托内,最后通过移动杆使紧箍件逐渐下移并最终令紧箍件套在条状型材的上端;或者直接令条状型材从上方穿过紧箍件,并最终伸入底托内。具体实践中,根据条状型材的类型、粗细、长短等因素来确定装载方式,而且根据条状型材的长短不同,紧箍件的高度可通过移动杆做相应的调整,使用非常方便。
从上述技术方案可知,条状型材的下端被底托限制、上端被紧箍件限制,从而使条状型材被牢牢固定在本装置上,保证了条状型材在提升过程中不发生倾斜、掉落等状况,此时再通过连接件与提升设备相连,即可开始提升工作。
综上,本装置结构简单、使用方便、制造成本低,可以保证条状型材在提升过程中不发生倾斜、掉落等状况,而且在提升过程中,本装置和条状型材均保持在竖直状态,在这种状态下,物体的重心非常稳定,不易出现打转、晃动等现象,即使是出现打转、晃动等现象,本装置和条状型材的活动半径也很小,这样就大大减小了本装置和条状型材与建筑物发生碰撞、刮擦的几率,从而保证提升工作的安全性,并防止造成本装置、条状型材以及建筑物的破损。
进一步的,所述移动杆具有两根,所述紧箍件为具有一缺口的弹性圆环体,两根移动杆分别连接在紧箍件的两端部,所述紧箍件的与移动杆相对的一端向下倾斜。紧箍件具有向外扩张的弹性,在紧箍件向上移动到抵住空心柱时,由于空心柱将两根移动杆渐渐收拢到一起,在移动杆的拉扯下,紧箍件渐渐收紧,从而能够增大紧箍件的围束力,使其牢牢固定住条状型材,而且两根移动杆由于受到紧箍件的反向作用力,令它们与空心柱内表面之间的摩擦力增大,从而能够使移动杆得到有效定位;当移动杆向下伸出空心柱一段较大距离时,没了空心柱的收拢作用,紧箍件的弹性张力得到释放而渐渐向外扩张,从而可以在装载条状型材时,方便条状型材穿过。另外,紧箍件的一端向下倾斜,这种结构可以进一步增大紧箍件与条状型材之间的摩擦力,提高围束效果。
进一步的,所述支架为角钢结构,底托和空心柱设于支架的凹面侧,连接件设于支架的凸面侧。采用这种结构,底托、空心柱和连接件与支架之间的固定接触面增大,从而增强了本装置的稳定性。
附图说明
图1是本发明一实施例的立体图。
图2是图1的Ⅰ处放大图。
图3是本发明一实施例的主视图。
图4是图3的B—B向放大剖视图。
图5是图3的右视图。
图6是图3的后视图。
图7是本发明一实施例的使用状态图。
具体实施方式
下面结合附图对本发明作进一步描述:
参见图1、图2、图3、图4、图5和图6。
本发明一实施例的条状型材提升装置,它包括一根条形的支架1,支架1为角钢结构,支架1的下端凹面侧固定有一个圆筒状的底托2,当然,在实际中,根据型材的结构不同,底托2的截面形状还可以是方形、不规则多边形等其它形状,支架1的上端凹面侧固定有一个空心柱3,空心柱3内上下活动地套装有两根移动杆4,移动杆4的下端固定有一个用于围束条状型材的紧箍件5,紧箍件5在位置上与底托2相互配合,所述紧箍件5为具有一缺口的弹性圆环体,两根移动杆4分别连接在紧箍件5的两端部,所述紧箍件5的与移动杆4相对的一端向下倾斜,支架1的上端凸面侧还固定有一个用于连接到提升设备上的连接件6,该连接件6为一挂环,挂环的使用比较方便,当然该连接件6还可以是卸扣等其它结构件,上述各部件之间可用焊接的方式进行固定。
参见图7。
通过本实施例的条状型材提升装置进行提升作业时,将条状型材7的下端伸入底托2内,令紧箍件5围束在条状型材7的上端,这样即可将条状型材7牢牢固定在本装置上,从而保证提升过程的安全和稳定。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.条状型材提升装置,其特征在于:它包括一根条形的支架,支架的下端侧面固定有一个筒状的底托,支架的上端与底托相应的一侧固定有一个空心柱,空心柱内上下活动地套装有移动杆,移动杆的下端固定有一个用于围束条状型材的紧箍件,支架的上端还固定有一个用于连接到提升设备上的连接件。
2.如权利要求1所述的条状型材提升装置,其特征在于:所述移动杆具有两根,所述紧箍件为具有一缺口的弹性圆环体,两根移动杆分别连接在紧箍件的两端部,所述紧箍件的与移动杆相对的一端向下倾斜。
3.如权利要求1或2所述的条状型材提升装置,其特征在于:所述支架为角钢结构,底托和空心柱设于支架的凹面侧,连接件设于支架的凸面侧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510086305.3A CN104612410B (zh) | 2015-02-18 | 2015-02-18 | 条状型材提升装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510086305.3A CN104612410B (zh) | 2015-02-18 | 2015-02-18 | 条状型材提升装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104612410A CN104612410A (zh) | 2015-05-13 |
CN104612410B true CN104612410B (zh) | 2016-09-14 |
Family
ID=53147037
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510086305.3A Expired - Fee Related CN104612410B (zh) | 2015-02-18 | 2015-02-18 | 条状型材提升装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104612410B (zh) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2626380B2 (ja) * | 1991-11-12 | 1997-07-02 | 株式会社大林組 | クレーン用吊治具の旋回防止装置 |
CN202645023U (zh) * | 2012-05-10 | 2013-01-02 | 中建三局第二建设工程有限责任公司 | 一种用于吊运钢管、木枋的钢筋笼 |
CN202645024U (zh) * | 2012-06-13 | 2013-01-02 | 江苏欧美钢结构幕墙科技有限公司 | 钢结构檩条安装提升装置 |
CN203403582U (zh) * | 2013-08-23 | 2014-01-22 | 中国二十二冶集团有限公司 | 吊杆固定装置 |
CN204510840U (zh) * | 2015-02-18 | 2015-07-29 | 中建五局蚌埠建筑工程有限公司 | 条状型材提升装置 |
-
2015
- 2015-02-18 CN CN201510086305.3A patent/CN104612410B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104612410A (zh) | 2015-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205242466U (zh) | 一种预埋式基桩竖向抗拔载荷试验连接装置 | |
CN113530192B (zh) | 超高垂直岩质边坡的多支撑悬挑脚手架结构 | |
CN203867159U (zh) | 一种套筒式悬挑脚手架结构 | |
CN204112335U (zh) | 一种可减少基坑围檩水平分力的拉力装置 | |
CN104612410B (zh) | 条状型材提升装置 | |
CN102182300B (zh) | 一种增加水平剪刀撑提高并确定支撑架承载力的方法 | |
CN102021997A (zh) | 一种悬挑脚手架底部平台的搭建方法 | |
CN204510840U (zh) | 条状型材提升装置 | |
CN203654708U (zh) | 边坡脚手架卸荷装置 | |
CN103375029B (zh) | 预应力穹顶起重悬臂吊 | |
CN102434088A (zh) | 护笼式钢爬梯及其制备方法 | |
CN203977300U (zh) | 一种挂篮施工连续梁的附着式防护棚 | |
CN214786052U (zh) | 桁架操作平台 | |
CN210086845U (zh) | 一种圆形钢筋梁加工架 | |
CN109403548B9 (zh) | 装配柱箍筋的方法 | |
CN102182311B (zh) | 一种增加连墙件提高并确定支撑架承载力方法 | |
CN102182310B (zh) | 一种增加水平约束提高并确定支撑架承载力方法 | |
CN102677881A (zh) | 一种减小支撑架顶层悬臂长度提高支撑架承载力方法 | |
JP5983165B2 (ja) | ロープ材の固定構造とこれを用いた柵 | |
CN203728530U (zh) | 适用于横梁结构的吊篮安装架 | |
CN205399858U (zh) | 阳台护栏 | |
CN217173075U (zh) | 一种高压线防护架 | |
CN215829978U (zh) | 悬置在超高陡岩质边坡上的脚手架结构 | |
CN205753180U (zh) | 一种电缆敷设用卷筒组合支架 | |
CN203917788U (zh) | 一种铆接工作台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170426 Address after: 410116 Changsha Yuhua District, Hunan Zhongyi Road, No. 158 Patentee after: China Construction Fifth Engineering Division Co., Ltd. Address before: Anhui city of Bengbu Province on the 233099 century iron building homes six four unit 10 Patentee before: In build Bangbu construction work Co., Ltd five innings |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 Termination date: 20170218 |
|
CF01 | Termination of patent right due to non-payment of annual fee |