CN103375029B - 预应力穹顶起重悬臂吊 - Google Patents
预应力穹顶起重悬臂吊 Download PDFInfo
- Publication number
- CN103375029B CN103375029B CN201210110462.XA CN201210110462A CN103375029B CN 103375029 B CN103375029 B CN 103375029B CN 201210110462 A CN201210110462 A CN 201210110462A CN 103375029 B CN103375029 B CN 103375029B
- Authority
- CN
- China
- Prior art keywords
- counterweight
- cantilevered rail
- leg support
- support
- parapet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种预应力穹顶起重悬臂吊,包括配重支撑腿架,悬臂导轨设于配重支撑腿架上,所述的悬臂导轨与配重支撑腿架的轴线垂直并与配重支撑腿架形成悬臂梁结构;在配重支撑腿架上,与悬臂导轨相对的另一侧设有配重支座,配重支座上安装有配重;配重支撑腿架上端设有与悬臂导轨前端连接的斜拉结;单轨吊车活动地安装在悬臂导轨上,在悬臂导轨前端还设有车档。本发明由于可以避免用塔吊直接吊装千斤顶来回晃动,危险性高的缺陷;也不需要在施工平面上搭设密集脚手架;从而使施工更方便,快捷。
Description
技术领域
本发明涉及预应力穹顶施工领域,特别是用于在预应力穹顶施工中方便的起吊千斤顶的预应力穹顶起重悬臂吊。
背景技术
在核电预应力工程施工中,穹顶预应力张拉施工堪称难中之难,主要困难在于:穹顶钢束呈不规则球面状布置,张拉区域分布在半球面下端,张拉点多而广,无法搭设张拉专用移动平台。以往采用的方式主要分两种:一种为利用塔吊吊装千斤顶进行千斤顶的安装;一种为搭设密集脚手架,在脚手架上安装工字钢进行吊装千斤顶安装。两种方法都存在有明显的弊端,一是塔吊吊装千斤顶安装时,由于塔吊移动的幅度较大,而千斤顶的安装精度要求高,很难控制千斤顶吊至合适位置,且人员在穹顶张拉平台上面接装千斤顶受塔吊摆动幅度的影响,危险性高。二是密集脚手架钢管间距太小,造成施工空间局限,人员在脚手架内走动,来回倒运千斤顶频繁被脚手架所阻挡,需要来回拆卸、恢复脚手架,移动千斤顶非常困难。
发明内容
本发明所要解决的技术问题是提供一种预应力穹顶起重悬臂吊,可以方便精确地在预应力穹顶施工中用于吊装千斤顶。
为解决上述技术问题,本发明所采用的技术方案是:一种预应力穹顶起重悬臂吊,包括配重支撑腿架,悬臂导轨设于配重支撑腿架上,所述的悬臂导轨与配重支撑腿架的轴线垂直并与配重支撑腿架形成悬臂梁结构;
在配重支撑腿架上,与悬臂导轨相对的另一侧设有配重支座,配重支座上安装有配重;
配重支撑腿架上端设有与悬臂导轨前端连接的斜拉结;
单轨吊车活动地安装在悬臂导轨上,在悬臂导轨前端还设有车档。
悬臂导轨搁置在预应力穹顶的混凝土面层上,悬臂导轨从穹顶女儿墙上向外伸出。
所述的悬臂导轨下方还设有用于作为支点的女儿墙支腿, 女儿墙支腿的纵向宽度超过悬臂导轨的宽度,用于分散压力。
所述的悬臂导轨下方还设有用于辅助支撑的女儿墙支撑腿, 女儿墙支撑腿紧贴穹顶女儿墙。
所述的配重支撑腿架和配重支座采用槽钢焊接制成。
所述的悬臂导轨采用工字钢制成。
所述的斜拉结采用角钢制成。
本发明,利用20号工字钢加工出来的,悬挂千斤顶的呈悬臂梁形状的悬臂导轨作为起重挂架,并在悬臂导轨后面装载2t配重,用以平衡千斤顶的重量。悬臂导轨搁置在预应力穹顶的混凝土面层上,悬臂导轨从穹顶女儿墙上向外伸出,伸出长度1.8m,梁上安装单轨吊车,单轨吊车上配置导链,施工时,先用塔吊将本发明吊至需要位置,千斤顶吊至悬臂导轨下方,利用悬臂导轨下的导链和单轨吊车的移动来上下前后移动千斤顶。一举解决了现有技术中塔吊直接吊运、安装千斤顶不准确和危险性大的技术问题,同时也克服了密集脚手架所造成的施工不便的技术问题。本发明由于可以避免用塔吊直接吊装千斤顶来回晃动,危险性高的缺陷;也不需要在施工平面上搭设密集脚手架;从而使施工更方便,快捷。
附图说明
下面结合附图和实施例对本发明作进一步说明:
图1为本发明的主视结构示意图。
图2为图1的A-A剖视示意图。
图3为图1的B-B剖视示意图。
图4为本发明使用时的俯视示意图。
图中:配重1,纵梁2,斜拉结3,车档4,单轨吊车5,导链6,悬臂导轨7,配重支座8,配重支撑腿架9,女儿墙支腿10,女儿墙支撑腿11,预应力穹顶12,穹顶女儿墙13。
具体实施方式
如图1—图3中,一种预应力穹顶起重悬臂吊,包括配重支撑腿架9,悬臂导轨7设于配重支撑腿架9上,所述的悬臂导轨7与配重支撑腿架9的轴线垂直并与配重支撑腿架9形成悬臂梁结构;
在配重支撑腿架9上,与悬臂导轨7相对的另一侧设有配重支座8,配重支座8上安装有配重1;在本例中,所述的配重支撑腿架9、配重支撑腿架9内的纵梁2和配重支座8采用20号槽钢焊接制成。所述的悬臂导轨7采用20号工字钢制成。配重1采用2T配重。
配重支撑腿架9上端设有与悬臂导轨7前端连接的斜拉结3;所述的斜拉结3采用∠80×8角钢制成。斜拉结3一端与配重支撑腿架9焊接连接,另一端通过强力螺栓与悬臂导轨7连接。本例中的前端,是指图1、图2中的右侧。
单轨吊车5活动地安装在悬臂导轨7上,在悬臂导轨7前端还设有车档4。车档4用于单轨吊车5的前端限位。本例中的单轨吊车5为2T单轨吊,单轨吊车5上设有2T导链。
所述的悬臂导轨7下方还设有用于作为支点的女儿墙支腿10。所述的悬臂导轨7下方还设有用于辅助支撑的女儿墙支撑腿11。
使用时,如图4中所示,将本发明吊放在预应力穹顶12的混凝土面层上,与预应力拉伸钢索锚具垂直相对应的位置。女儿墙支撑腿11紧贴穹顶女儿墙13,女儿墙支腿10立于穹顶女儿墙13上作为支点,优化的方案中,女儿墙支腿10的纵向宽度大大超过悬臂导轨7的宽度,用于分散本发明及千斤顶的压力,悬臂导轨7伸出穹顶女儿墙13外,将千斤顶吊放在悬臂导轨7下方的施工平台上,将千斤顶挂在单轨吊车5的导链6上,手动拉动单轨吊车5将千斤顶前后位置进行调整,拉动导链6对千斤顶上下位置进行调整,使预应力千斤顶精确地安装在预应力拉伸钢索锚具后端。
Claims (4)
1.一种预应力穹顶起重悬臂吊,包括配重支撑腿架(9),其特征是:悬臂导轨(7)设于配重支撑腿架(9)上,所述的悬臂导轨(7)与配重支撑腿架(9)的轴线垂直并与配重支撑腿架(9)形成悬臂梁结构;
在配重支撑腿架(9)上,与悬臂导轨(7)相对的另一侧设有配重支座(8),配重支座(8)上安装有配重(1);
配重支撑腿架(9)上端设有与悬臂导轨(7)前端连接的斜拉结(3);
单轨吊车(5)活动地安装在悬臂导轨(7)上,在悬臂导轨(7)前端还设有车档(4);
悬臂导轨搁置在预应力穹顶的混凝土面层上,悬臂导轨(7)从穹顶女儿墙(13)上向外伸出;
所述的悬臂导轨(7)下方还设有用于作为支点的女儿墙支腿(10),女儿墙支腿(10)的纵向宽度超过悬臂导轨(7)的宽度,用于分散压力;
所述的悬臂导轨(7)下方还设有用于辅助支撑的女儿墙支撑腿(11),女儿墙支撑腿(11)紧贴穹顶女儿墙(13)。
2.根据权利要求1所述的一种预应力穹顶起重悬臂吊,其特征是:所述的配重支撑腿架(9)和配重支座(8)采用槽钢焊接制成。
3.根据权利要求1所述的一种预应力穹顶起重悬臂吊,其特征是:所述的悬臂导轨(7)采用工字钢支成。
4.根据权利要求1所述的一种预应力穹顶起重悬臂吊,其特征是:所述的斜拉结(3)采用角钢制成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210110462.XA CN103375029B (zh) | 2012-04-16 | 2012-04-16 | 预应力穹顶起重悬臂吊 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210110462.XA CN103375029B (zh) | 2012-04-16 | 2012-04-16 | 预应力穹顶起重悬臂吊 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103375029A CN103375029A (zh) | 2013-10-30 |
CN103375029B true CN103375029B (zh) | 2016-08-31 |
Family
ID=49460827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210110462.XA Active CN103375029B (zh) | 2012-04-16 | 2012-04-16 | 预应力穹顶起重悬臂吊 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103375029B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103832932B (zh) * | 2014-03-31 | 2016-01-20 | 葛洲坝集团第一工程有限公司 | 预应力张拉液压千斤顶悬吊移动装置 |
CN107100090A (zh) * | 2017-05-23 | 2017-08-29 | 王燏斌 | 一种用于悬索桥的架桥机及其施工法 |
CN111470434B (zh) * | 2020-04-30 | 2024-07-30 | 中建五局第三建设有限公司 | 一种岩壁锚索预应力张拉千斤顶安装装置 |
CN114382272B (zh) * | 2022-03-24 | 2022-06-07 | 中铁十七局集团建筑工程有限公司 | 一种用于搭建圆形建筑的施工装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201056468Y (zh) * | 2007-05-12 | 2008-05-07 | 于宝秋 | 提升货物装置 |
CN201264878Y (zh) * | 2008-09-09 | 2009-07-01 | 谢峰 | 易于拆装的吊装组合架 |
CN201626780U (zh) * | 2009-11-25 | 2010-11-10 | 南阳二机石油装备(集团)有限公司 | 定柱式悬臂起吊装置 |
CN202578008U (zh) * | 2012-04-16 | 2012-12-05 | 中国核工业第二二建设有限公司 | 预应力穹顶起重悬臂吊 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3312077B2 (ja) * | 1994-05-06 | 2002-08-05 | 株式会社竹中工務店 | 曲面屋根用揚重設備 |
-
2012
- 2012-04-16 CN CN201210110462.XA patent/CN103375029B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201056468Y (zh) * | 2007-05-12 | 2008-05-07 | 于宝秋 | 提升货物装置 |
CN201264878Y (zh) * | 2008-09-09 | 2009-07-01 | 谢峰 | 易于拆装的吊装组合架 |
CN201626780U (zh) * | 2009-11-25 | 2010-11-10 | 南阳二机石油装备(集团)有限公司 | 定柱式悬臂起吊装置 |
CN202578008U (zh) * | 2012-04-16 | 2012-12-05 | 中国核工业第二二建设有限公司 | 预应力穹顶起重悬臂吊 |
Also Published As
Publication number | Publication date |
---|---|
CN103375029A (zh) | 2013-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202881856U (zh) | 混凝土浇筑支架预压装置 | |
CN202706503U (zh) | 用于主体建筑施工的电动升降卸料平台 | |
CN103375029B (zh) | 预应力穹顶起重悬臂吊 | |
CN109973112B (zh) | 一种超大倾角窄空间隧道锚散索鞍门架系统及其安装方法 | |
CN106150057B (zh) | 一种分片式液压提升爬架 | |
CN101537976A (zh) | 双塔桅巨型自升降起重设备及其跟携吊装方法 | |
CN201785162U (zh) | 一种拱网架施工用拔杆吊机 | |
CN205223871U (zh) | 一种悬索桥桥塔横梁支架预压装置 | |
CN103288002A (zh) | 简易组合门架高空重物吊装装置 | |
CN206095814U (zh) | 一种单梁静载试验加载系统 | |
CN102635070A (zh) | 斜拉桥钢塔互拉式竖向转体施工方法 | |
CN203113793U (zh) | 一种倾斜结构大模板安装系统 | |
CN201786010U (zh) | 一种施工用升降平台 | |
CN111877165B (zh) | 有限空间下贝雷梁平移装置及其施工方法 | |
CN103643791B (zh) | 用于皮带廊的移动式脚手架装置 | |
CN203284126U (zh) | 简易组合门架高空重物吊装装置 | |
CN102926330B (zh) | 一种适用于桥梁施工用挂蓝的安装方法 | |
CN202578008U (zh) | 预应力穹顶起重悬臂吊 | |
CN203479511U (zh) | 铁路t梁静载试验台座 | |
CN107217669B (zh) | 拔桩设备及其快速移动方法 | |
CN105350698A (zh) | 一种大跨度穹顶安装施工方法 | |
CN212426804U (zh) | 挂篮移动系统 | |
CN202689498U (zh) | 简易建筑外墙可升降脚手架 | |
CN201722937U (zh) | 网架安装滑移平台 | |
CN113914225A (zh) | 一种大吨位牵索挂篮主桁架纵向滑移竖向提升施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |