CN102182310B CN2011100746808A CN201110074680A CN102182310B CN 102182310 B CN102182310 B CN 102182310B CN 2011100746808 A CN2011100746808 A CN 2011100746808A CN 201110074680 A CN201110074680 A CN 201110074680A CN 102182310 B CN102182310 B CN 102182310B
Authority
CN
China
Prior art keywords
supporting frame
vertical rod
bracing frame
horizontal restraint
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100746808A
Other languages
English (en)
Other versions
CN102182310A (zh
Inventor
徐钢
敖海军
姜凌
刘群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dahua Construction Group Co., Ltd.
Original Assignee
ZHEJIANG DAHUA CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DAHUA CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG DAHUA CONSTRUCTION GROUP CO Ltd
Priority to CN2011100746808A priority Critical patent/CN102182310B/zh
Publication of CN102182310A publication Critical patent/CN102182310A/zh
Application granted granted Critical
Publication of CN102182310B publication Critical patent/CN102182310B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种增加水平约束提高并确定支撑架承载力方法,支撑架纵向8跨,横向6跨,在5跨×5跨范围内加载;加载区外纵向一侧2跨,另一侧1跨;加载区外横向一侧1跨,另一侧无加跨;架高8.2m,立杆步距1.24m,立杆纵向间距0.9m,立杆横向间距0.9m,支撑架高宽比为1.5,用Φ48×3.2钢管搭设,各节点用扣件连接;支撑架上部由可调托座托顶Φ48×3.2双钢管作为支撑荷载主梁,可调托座底部插入支撑架立杆固定,可调托座上表面至支撑架最上横管上皮0.55m,可调托座伸出立杆0.3m,在0.3m范围内调节,其特征在于:在高度5.3m处反力架上设置水平约束杆,水平约束杆距最近立杆距离12cm~15cm,支撑架加载到临界荷载24kN,荷载不变,支撑架立杆变形增大,立杆向水平约束杆方向变形12cm~15cm时,立杆与水平约束杆接触,增加横向水平约束,临界荷载增加到26.5kN。本发明的方法,通过增加水平约束或支撑架水平杆与四面主体结构顶紧提高并确定支撑架承载力,可使扣件支撑架结构经济合理、安全适用。

Description

一种增加水平约束提高并确定支撑架承载力方法
技术领域
本发明涉及一种增加水平约束提高并确定支撑架承载力方法,在建筑工地使用的支撑架,尤其是扣件式钢管支撑架四周与主体结构顶紧等水平约束,可有效的提高承载力。
背景技术
目前建筑工地使用的支撑架,对设置水平约束比较随意,有的不设置,设置的也无法确定临界荷载增加值,没有搭设结构增加水平约束后与临界荷载的对应关系,现场凭经验搭设,一方面,造成材料浪费成本增加,另一方面,造成安全隐患,有的甚至发生重大安全事故。
发明内容
本发明的目的在于提供一种设置水平约束的扣件式钢管支撑架结构,并给出对应的临界荷载,使扣件钢管支撑架经济合理,安全适用。
本发明是这样来实现上述目的的:
一种增加水平约束提高并确定支撑架承载力方法,采用扣件式钢管支撑架,包括立杆钢管、纵向水平杆、横向水平杆和可锻铸铁扣件;架高8.2m,立杆步距1.24m,立杆纵向间距0.9m,立杆横向间距0.9m,支撑架高宽比为1.5;用Φ48×3.2钢管搭设,各节点用扣件连接;支撑架上部由可调托座托顶Φ48×3.2双钢管;可调托座底部插入支撑架立杆固定,可调托座上表面至支撑架最上横管上皮0.55m;其特征在于:在高度5.3m处反力架上设置水平约束杆,水平约束杆距最近立杆距离12cm~15cm,支撑架加载到临界荷载24kN,荷载不变,支撑架立杆变形增大,立杆向水平约束杆方向变形12cm~15cm时,立杆与水平约束杆接触,在立杆变形方向增加水平约束或四周水平杆与主体结构顶紧,临界荷载增加到26.5kN。
在施工现场,支撑架可以四周水平杆与主体结构顶紧,达到提供增加水平约束提高支撑架承载力的目的,这种支撑架结构简单,搭拆方便,经济合理,安全适用。
附图说明
图1是扣件式钢管支撑架与反力架主视图;
图2是扣件式钢管支撑架与反力架俯视图;
图3是扣件式钢管支撑架主视图;
图4是扣件式钢管支撑架俯视图;
图5是扣件式钢管支撑架侧视图;
图6是扣件式钢管支撑架载荷试验装配图;
图中:1、可调托座;2、双钢管;3、纵向水平杆;4、立杆;5、横向水平杆;6、可锻铸铁扣件;7、反力架;8、固定反力架钢管;9、分配梁;10、工字钢;11、千斤顶;12、水平约束杆。
具体实施方式
如图1~5所示,支撑架采用扣件式钢管支撑架,其包括立杆钢管4、纵向水平杆3、横向水平杆5、可锻铸铁扣件6;支撑架上部由可调托座1托顶Φ48×3.2双钢管2;由可调托座上表面到立杆钢管底面距离,即架高C为8.2m,相邻纵向水平杆或相邻横向水平杆轴线距离,即立杆步距E为1.24m,立杆钢管纵向间距A为0.9m,立杆钢管横向间距B为0.9m,扫地杆高度D为0.2m。
支撑架高宽比=8.2÷(6×0.9)=1.5;扫地杆为支撑架下部横杆,D为扫地杆高度。可调托座1上表面至支撑架最上横管上皮距离F为0.55m,可调托座1伸出立杆4长度不大于0.3m(图中G所示)。
试验如图6所示,扣件式钢管支撑架经千斤顶11加荷,顶反力架7主梁,反力架回顶将荷载传至分配梁9,分配梁9将荷载传至工字钢10,工字钢10将荷载传至支撑架双钢管2,实现支撑架荷载试验。经荷载试验,无水平约束时,支撑架平均单立杆加载到24kN时,荷载不变,支撑架立杆4变形增大(即平均单立杆临界荷载24kN);在高度L为5.3m处反力架上设置水平约束杆,水平约束杆距最近立杆4距离H为12cm~15cm,立杆4向水平约束杆12方向变形H为12cm~15cm时,立杆4与水平约束杆12接触,平均单立杆临界荷载增加到26.5kN。

Claims (1)

1.一种增加水平约束提高并确定支撑架承载力方法,采用扣件式钢管支撑架,其包括立杆(4)、纵向水平杆(3)、横向水平杆(5)和可锻铸铁扣件(6);架高8.2m,立杆步距1.24m,立杆纵向间距0.9m,立杆横向间距0.9m,支撑架高宽比为1.5;用Φ48×3.2钢管搭设,各节点用扣件连接;支撑架上部由可调托座(1)托顶Φ48×3.2双钢管(2);可调托座底部插入支撑架立杆固定,可调托座上表面至支撑架最上横管上皮0.55m;其特征在于:在高度5.3m处反力架上设置水平约束杆(12),水平约束杆(12)距最近立杆(4)距离12cm~15cm,支撑架加载到临界荷载24kN,荷载不变,支撑架立杆(4)变形增大,立杆(4)向水平约束杆(12)方向变形12cm~15cm时,立杆(4)与水平约束杆(12)接触,在立杆变形方向增加水平约束,临界荷载增加到26.5kN。
CN2011100746808A 2011-03-28 2011-03-28 一种增加水平约束提高并确定支撑架承载力方法 Expired - Fee Related CN102182310B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100746808A CN102182310B (zh) 2011-03-28 2011-03-28 一种增加水平约束提高并确定支撑架承载力方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100746808A CN102182310B (zh) 2011-03-28 2011-03-28 一种增加水平约束提高并确定支撑架承载力方法

Publications (2)

Publication Number Publication Date
CN102182310A CN102182310A (zh) 2011-09-14
CN102182310B true CN102182310B (zh) 2012-07-18

Family

ID=44568587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100746808A Expired - Fee Related CN102182310B (zh) 2011-03-28 2011-03-28 一种增加水平约束提高并确定支撑架承载力方法

Country Status (1)

Country Link
CN (1) CN102182310B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797345A (zh) * 2012-08-31 2012-11-28 刘群 一种增加支撑架加载区外跨度提高架体结构承载力方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008096053A2 (fr) * 2006-12-21 2008-08-14 Stylaxion S.A.R.L. Dispositif mobile d'ancrage anti-chute
CN101275432A (zh) * 2008-05-23 2008-10-01 北京城建建设工程有限公司 后置预埋式连墙件的搭设施工方法
CN201284559Y (zh) * 2008-10-27 2009-08-05 浙江省建工集团有限责任公司 一种扣件式钢管脚手架模板支架
CN201381637Y (zh) * 2008-10-20 2010-01-13 刘群 一种扣件式钢管脚手架模板支架
CN101892738A (zh) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 一种预埋式脚手架连墙件及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008096053A2 (fr) * 2006-12-21 2008-08-14 Stylaxion S.A.R.L. Dispositif mobile d'ancrage anti-chute
CN101275432A (zh) * 2008-05-23 2008-10-01 北京城建建设工程有限公司 后置预埋式连墙件的搭设施工方法
CN201381637Y (zh) * 2008-10-20 2010-01-13 刘群 一种扣件式钢管脚手架模板支架
CN201284559Y (zh) * 2008-10-27 2009-08-05 浙江省建工集团有限责任公司 一种扣件式钢管脚手架模板支架
CN101892738A (zh) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 一种预埋式脚手架连墙件及其施工方法

Also Published As

Publication number Publication date
CN102182310A (zh) 2011-09-14

Similar Documents

Publication Publication Date Title
CN102182300B (zh) 一种增加水平剪刀撑提高并确定支撑架承载力的方法
CN204125899U (zh) 一种高桩码头超大排架现浇墩台底模支撑系统
CN105544398A (zh) 一种水平力自平衡式八字重型高空支架系统及其安装方法
CN102322134B (zh) 一种扣件式满堂支撑架与满堂脚手架
CN102182310B (zh) 一种增加水平约束提高并确定支撑架承载力方法
CN102182311B (zh) 一种增加连墙件提高并确定支撑架承载力方法
CN212358363U (zh) 一种悬空式塔吊基础
CN100554629C (zh) 一种扣件式钢管脚手架模板支架
CN106149920A (zh) 一种墙体内部的k型支撑结构
CN201381637Y (zh) 一种扣件式钢管脚手架模板支架
CN201284559Y (zh) 一种扣件式钢管脚手架模板支架
CN101560829B (zh) 大高宽比扣件式钢管脚手架模板支架
CN201284550Y (zh) 一种扣件式钢管满堂脚手架
CN101560828B (zh) 剪刀撑扣件式钢管脚手架模板支架
CN102677881A (zh) 一种减小支撑架顶层悬臂长度提高支撑架承载力方法
CN102677882A (zh) 一种减小支撑架高宽比提高支撑架承载力方法
CN204575311U (zh) 铁路t梁静载试验桁架
CN204080848U (zh) 输电线路双杆门型杆塔自调基础
CN202744941U (zh) 加强型交叉缆索式大桥
CN102797345A (zh) 一种增加支撑架加载区外跨度提高架体结构承载力方法
CN100540826C (zh) 一种扣件式钢管脚手架模板支架
CN204326571U (zh) 一种顶升用支撑系统
CN201310182Y (zh) 一种扣件式钢管满堂脚手架
CN103939579A (zh) 建筑用滑轮滚装置
CN201310191Y (zh) 一种扣件式钢管脚手架模板支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHEJIANG DAHUA CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: LIU QUN

Effective date: 20120518

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Gang

Inventor after: Ao Haijun

Inventor after: Jiang Ling

Inventor after: Liu Qun

Inventor before: Liu Qun

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 065000 LANGFANG, HEBEI PROVINCE TO: 310022 HANGZHOU, ZHEJIANG PROVINCE

Free format text: CORRECT: INVENTOR; FROM: LIU QUN TO: XU GANG AO HAIJUN JIANG LING LIU QUN

TA01 Transfer of patent application right

Effective date of registration: 20120518

Address after: 12, building 333, No. 310022, Wen two road, Zhejiang, Hangzhou, China

Applicant after: Zhejiang Dahua Construction Group Co., Ltd.

Address before: Langfang City, Hebei Province, Jinguang road 065000 Guangyang District Sheng Chunli 6 Building 2 unit 102 room

Applicant before: Liu Qun

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120718

Termination date: 20200328