CN104609202A - 一种大吨位托盘的集装箱装箱方法 - Google Patents
一种大吨位托盘的集装箱装箱方法 Download PDFInfo
- Publication number
- CN104609202A CN104609202A CN201410357187.0A CN201410357187A CN104609202A CN 104609202 A CN104609202 A CN 104609202A CN 201410357187 A CN201410357187 A CN 201410357187A CN 104609202 A CN104609202 A CN 104609202A
- Authority
- CN
- China
- Prior art keywords
- pallet
- container
- fork truck
- wooden unit
- packing method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G65/00—Loading or unloading
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2814/00—Indexing codes relating to loading or unloading articles or bulk materials
- B65G2814/03—Loading or unloading means
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pallets (AREA)
Abstract
本发明涉及一种集装箱装箱方法。一种大吨位托盘的集装箱装箱方法,包括:制作无轮子、四角均设置一吊耳的打包托盘;将两条挂带分别挂在托盘两侧吊耳上,挂带另一端分别挂在二台行车上;两台行车将托盘吊运到集装箱门处;待托盘端头入箱后在托盘两侧框架底部放置木块,两台行车同时降下托盘;托盘前端两侧框架与木块接触后,取下前部行车上吊带,此时装有叉车推杆的叉车顶在托盘横梁上;叉车将托盘推进集装箱中,行车跟进;当托盘后端吊耳接近箱门时,将一组木块放于托盘框架底部;后部行车降下、取掉挂带;将托盘剩余部分推入集装箱后叉车退出;将托盘固定在箱中,关闭箱门。本发明提高装箱效率,降低成本。
Description
技术领域
本发明涉及集装箱,尤其涉及一种集装箱装箱方法。
背景技术
当前,集装箱装箱多采用托盘,而20-25吨或以上的托盘由于重量、规格均较大,因此在装箱过程中易出现托盘变形、构件与箱碰撞破损、装箱周期较长等问题。常见的方法有
1.无滑轮的托盘;
无滑轮的托盘在装箱过程中,由于托盘底部与箱体直接接触摩擦力较大,在叉车推动托盘入箱时需要较大动力,容易使托盘变形导致构件变形、油漆破损。装箱过程需要不断矫正托盘角度,装箱周期较长,需要人工较多。
2.安装滑轮的托盘:
托盘底部安装滑轮,这样在装箱时减小了摩擦力。但由于轮子过于灵活,容易在装箱过程中使托盘上的构件与箱体相撞损坏构件,破坏箱体。且这种托盘构造复杂,还需要在集装箱中安装轨道,成本较高。
发明内容
本发明旨在解决上述缺陷,提供一种大吨位托盘的集装箱装箱方法。本发明。本发明提高装箱效率和装箱质量,在不增加成本的情况下对装箱的整个过程进行了优化;有效的减少箱体破损,装箱过程实现机械化操作,降低工人劳动强度、提高效率、节约成本。
为解决上述问题,一种大吨位托盘的集装箱装箱方法,它包括下列步骤:
步骤一,制作底部无轮子的打包托盘,托盘四角均设置一吊耳,
步骤二,将两条挂带分别挂在托盘两侧吊耳上,挂好托盘的挂带分别挂在二台50t行车上;确保挂带与托盘连接牢靠后起吊托盘;两台行车协同工作将托盘吊运到集装箱门处;
步骤三,待托盘端头入箱后在托盘两侧框架底部放置木块,木块与箱底接触一面需要涂适量黄油,托盘角度调整好后两台行车同时缓慢降下托盘;
步骤四,托盘前端两侧框架与木块接触后,取下前部行车上吊带,此时装有叉车推杆的叉车顶在托盘横梁上;叉车作用为提供托盘进箱推力和调整托盘入箱角度,控制好托盘与箱体两侧的距离;
步骤五,叉车将托盘缓慢推进集装箱中,此时行车跟进;当托盘后端吊耳接近箱门时,将一组木块放于托盘框架底部;木块放置好后后部行车降下、取掉挂带;
步骤六,最后叉车将托盘剩余部分推入集装箱,托盘进入箱门30cm后叉车退出;装箱工人进入集装箱将托盘固定在箱中,关闭箱门。
所述的一种大吨位托盘的集装箱装箱方法,所述步骤一中的托盘括一个矩形的框架,所述框架靠近两侧位置设有连杆,框架内四角设有斜支撑,所述框架的两个长边两端各自焊接一个吊耳。
所述的一种大吨位托盘的集装箱装箱方法,所述步骤二和三中的木块与托盘接触面宜粗糙、与箱底接触面宜光滑。
本发明的托盘制作简单、快捷。普通水平铆工即可实现下料、装配、焊接整个制作过程。通常20t打包托盘的重量在1.4t左右,本发明在打包同等重量构件下,自重降低到0.382t,大大减少了材料,降低了成本;本发明取消了滑轮,在运输过程中托盘在集装箱地面有较好的附着力。减少了运输过程中构件对箱体的冲击导致箱体破损、构件损坏的经济损失。
行车通过吊耳起吊托盘,避免了吊带与构件的接触造成的构件损伤,确保了吊带与托盘的连接可靠,增加起吊过程的稳定性、安全性。
托盘下垫有木片避免了托盘与箱体直接接触摩擦造成箱体的破损。通过抹黄油的量能控制托盘与集装箱底板间的摩擦力,有效避免了装箱过程中由于托盘变形而导致的构件变形、油漆破损,且易控制入箱角度。
新的装箱技术基本实现机械化操作,工人只需指挥行车、叉车工作,减少工人劳动强度。有效缩短装箱周期。
综上,本发明的方法会大大提高装箱效率、保证了装箱质量,优化的技术方案不增加任何成本。
附图说明
下面结合附图对本发明作进一步的说明:
图1为本发明示意图;
图2为所述托盘示意图。
具体实施方式
如图1及图2所示,一种大吨位托盘的集装箱装箱方法,它包括下列步骤:
步骤一,制作底部无轮子的打包托盘,托盘为一个矩形的框架1,所述框架靠近两侧位置设有连杆2,框架内四角设有斜支撑4,所述框架的两个长边两端各自焊接一个吊耳4;
步骤二,将两条挂带5分别挂在托盘前后两端吊耳上,挂好托盘的挂带分别挂在二台50t行车上;确保挂带与托盘连接牢靠后起吊托盘;两台行车协同工作将托盘吊运到集装箱6门处;
步骤三,待托盘端头入箱后在托盘两侧框架底部放置木块,木块与箱底接触一面需要涂适量黄油,托盘角度调整好后两台行车同时缓慢降下托盘;
步骤四,托盘前端两侧框架与木块接触后,取下前部行车上吊带,此时装有叉车推杆的叉车顶在托盘横梁上;叉车作用为提供托盘进箱推力和调整托盘入箱角度,控制好托盘与箱体两侧的距离;
步骤五,叉车将托盘缓慢推进集装箱中,此时行车跟进;当托盘后端吊耳接近箱门时,将一组木块放于托盘框架底部;木块放置好后后部行车降下、取掉挂带;
步骤六,最后叉车将托盘剩余部分推入集装箱,托盘进入箱门30cm后叉车退出;装箱工人进入集装箱将托盘固定在箱中,关闭箱门。
所述步骤二和三中的木块与托盘接触面宜粗糙、与箱底接触面光滑。
Claims (3)
1.一种大吨位托盘的集装箱装箱方法,其特征在于,它包括下列步骤:
步骤一,制作底部无轮子的打包托盘,托盘四角均设置一吊耳,
步骤二,将两条挂带分别挂在托盘两侧吊耳上,挂好托盘的挂带分别挂在二台50t行车上;确保挂带与托盘连接牢靠后起吊托盘;两台行车协同工作将托盘吊运到集装箱门处;
步骤三,待托盘端头入箱后在托盘两侧框架底部放置木块,木块与箱底接触一面需要涂适量黄油,托盘角度调整好后两台行车同时缓慢降下托盘;
步骤四,托盘前端两侧框架与木块接触后,取下前部行车上吊带,此时装有叉车推杆的叉车顶在托盘横梁上;叉车作用为提供托盘进箱推力和调整托盘入箱角度,控制好托盘与箱体两侧的距离;
步骤五,叉车将托盘缓慢推进集装箱中,此时行车跟进;当托盘后端吊耳接近箱门时,将一组木块放于托盘框架底部;木块放置好后后部行车降下、取掉挂带;
步骤六,最后叉车将托盘剩余部分推入集装箱,托盘进入箱门30cm后叉车退出;装箱工人进入集装箱将托盘固定在箱中,关闭箱门。
2.根据权利要求1所述的一种大吨位托盘的集装箱装箱方法,其特征在于,所述步骤一中的托盘括一个矩形的框架,所述框架靠近两侧位置设有连杆,框架内四角设有斜支撑,所述框架的两个长边两端各自焊接一个吊耳。
3.根据权利要求1所述的一种大吨位托盘的集装箱装箱方法,其特征在于,所述步骤二和三中的木块与托盘接触面宜粗糙、与箱底接触面宜光滑。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410357187.0A CN104609202A (zh) | 2013-11-04 | 2014-07-25 | 一种大吨位托盘的集装箱装箱方法 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310536741 | 2013-11-04 | ||
CN2013105367417 | 2013-11-04 | ||
CN201410357187.0A CN104609202A (zh) | 2013-11-04 | 2014-07-25 | 一种大吨位托盘的集装箱装箱方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104609202A true CN104609202A (zh) | 2015-05-13 |
Family
ID=53143907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410357187.0A Pending CN104609202A (zh) | 2013-11-04 | 2014-07-25 | 一种大吨位托盘的集装箱装箱方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104609202A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109473189A (zh) * | 2018-09-22 | 2019-03-15 | 中核能源科技有限公司 | 一种用于高温气冷堆核电站堆芯卸料装置的安装机构 |
CN109625660A (zh) * | 2018-12-06 | 2019-04-16 | 安徽马钢比亚西钢筋焊网有限公司 | 一种焊网产品集装箱的装箱方法 |
CN110282453A (zh) * | 2019-05-08 | 2019-09-27 | 大连埃玛玻璃配套服务有限公司 | 一种将玻璃装入40尺集装箱的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2068488U (zh) * | 1990-03-02 | 1991-01-02 | 重庆钢铁公司 | 货物运输用轻型集装盘 |
CN1234005A (zh) * | 1996-10-21 | 1999-11-03 | 小詹姆斯·F·布伦南 | 可堆叠托盘 |
US6379107B1 (en) * | 1998-03-30 | 2002-04-30 | Toyota Steel Center Co., Ltd. | Method of introducing heavy article and method of discharging heavy article |
KR20100089503A (ko) * | 2009-02-04 | 2010-08-12 | 주식회사 하이닉스반도체 | 반도체 소자 패턴 및 이를 이용한 패턴 선폭 측정 방법 |
CN202657713U (zh) * | 2012-07-05 | 2013-01-09 | 刘斌 | 一种超大物件装集装箱作业装置 |
-
2014
- 2014-07-25 CN CN201410357187.0A patent/CN104609202A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2068488U (zh) * | 1990-03-02 | 1991-01-02 | 重庆钢铁公司 | 货物运输用轻型集装盘 |
CN1234005A (zh) * | 1996-10-21 | 1999-11-03 | 小詹姆斯·F·布伦南 | 可堆叠托盘 |
US6379107B1 (en) * | 1998-03-30 | 2002-04-30 | Toyota Steel Center Co., Ltd. | Method of introducing heavy article and method of discharging heavy article |
KR20100089503A (ko) * | 2009-02-04 | 2010-08-12 | 주식회사 하이닉스반도체 | 반도체 소자 패턴 및 이를 이용한 패턴 선폭 측정 방법 |
CN202657713U (zh) * | 2012-07-05 | 2013-01-09 | 刘斌 | 一种超大物件装集装箱作业装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109473189A (zh) * | 2018-09-22 | 2019-03-15 | 中核能源科技有限公司 | 一种用于高温气冷堆核电站堆芯卸料装置的安装机构 |
CN109625660A (zh) * | 2018-12-06 | 2019-04-16 | 安徽马钢比亚西钢筋焊网有限公司 | 一种焊网产品集装箱的装箱方法 |
CN110282453A (zh) * | 2019-05-08 | 2019-09-27 | 大连埃玛玻璃配套服务有限公司 | 一种将玻璃装入40尺集装箱的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204310776U (zh) | 一种双托盘起升电动堆垛车 | |
CN207748808U (zh) | 一种电动叉车 | |
CN104555489A (zh) | 一种装卸车 | |
CN204251278U (zh) | 一种起升装置及侧面式叉车 | |
CN106276265A (zh) | 一种重载气缸驱动自动栈板机 | |
CN104609202A (zh) | 一种大吨位托盘的集装箱装箱方法 | |
CN104649138B (zh) | 集装箱跨运车 | |
CN207121386U (zh) | 无人驾驶搬运车 | |
CN103395719A (zh) | 双动对接叉车 | |
CN104150397A (zh) | 一种升降架 | |
CN204980752U (zh) | 一种稳定性高的电梯轿架 | |
CN204416630U (zh) | 一种装卸车 | |
CN209306290U (zh) | 一种板式家具柔性生产线用的有轨式巷道堆垛机 | |
CN205973636U (zh) | 一种叉车尾轮起升装置 | |
CN205590242U (zh) | 两级门架单链条起升机构 | |
CN202138994U (zh) | 吨袋移动装车工具 | |
CN205327099U (zh) | 一种电动升降拉料车 | |
CN205397926U (zh) | 一种纸箱厂专用起重机 | |
CN204778663U (zh) | 一种堆高车的门架系统 | |
CN205294697U (zh) | 用于物料往复提升机构的负重结构 | |
CN204021110U (zh) | 一种新型载重三轮车 | |
CN204823915U (zh) | 一种建筑用小型机械吊装机 | |
CN204873599U (zh) | 一种效率高的吊装机 | |
CN109264357A (zh) | 一种物料装料卸料升降平台 | |
CN110588482B (zh) | 一种用于集装箱运输钢卷装拆箱专用车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150513 |