CN104552611B - Control system and method for prefabricated concrete mixing plant - Google Patents
Control system and method for prefabricated concrete mixing plant Download PDFInfo
- Publication number
- CN104552611B CN104552611B CN201410829851.7A CN201410829851A CN104552611B CN 104552611 B CN104552611 B CN 104552611B CN 201410829851 A CN201410829851 A CN 201410829851A CN 104552611 B CN104552611 B CN 104552611B
- Authority
- CN
- China
- Prior art keywords
- concrete
- mixing plant
- state information
- work state
- stirring host
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28C—PREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28C7/00—Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
- B28C7/02—Controlling the operation of the mixing
Abstract
The invention discloses a control system and method for a prefabricated concrete mixing plant. The control system of the prefabricated concrete mixing plant comprises a first controller which is used for obtaining the working state information of a mixing device and controlling to stop feeding materials to a main stirring machine when a prefabricated concrete producing device is in failure, a first network switch which is connected with the first controller through signals, a second network switch which is connected with the first network switch through signals, and a second controller which is connected with the second network switch through signals, and is used for obtaining the working state information of the prefabricated concrete producing device and controlling a material distributing cart to strop discharging the materials when the mixing device is in failure. The prefabricated concrete producing device comprises the material distributing cart. The control system and the control method for the prefabricated concrete mixing plant, provided by the invention, can realize the combined control of the prefabricated concrete mixing plant and the prefabricated concrete producing device, and therefore, the production efficiency of concrete and prefabricated concrete for the mixing plant is improved.
Description
Technical field
The present invention relates to stirring technique field, particularly to a kind of control system of concrete soil mixing station and method.
Background technology
PC component (Prefabricated Concrete Structure) i.e. " prefabricated assembled concrete structure ", be with
Precast concrete be main member, through assembling, connect, bound fraction cast-in-place and formed xoncrete structure.PC component is
The finished product concrete component being formed so that the batch production of component process unit makes.With the continuous pursuit to housing quality for the people,
House, from basic inhabitation function, is developed to the comfortable of external environment, then the raising to inherent inhabitation performance quality, requires enforcement
Housing industrialization, and PC component housing industrialization is even more the inexorable trend of China Real Estate industry development, in recent years, housing industry
A variety of building new concept such as change, energy-saving and emission-reduction, quality safety, ecological, environmental protective brings development opportunity for PC component, and urbanization is entered
A large amount of infrastructure constructions in journey, extensive guarantee house is badly in need of standardization, quick construction high-quality house, and more PC component carries
Supply broad space.
Therefore, so that concrete mixing plant is mated with precast concrete production equipment and jointly control, improve mixing plant
Concrete and precast concrete production efficiency, are technical problems urgently to be resolved hurrily.
Content of the invention
In view of this, the present invention proposes a kind of control system of concrete soil mixing station and method, to realize concrete
Mixing plant is jointly controlled with precast concrete production equipment, and then improves mixing plant concrete and precast concrete production effect
Rate.
On the one hand, the invention provides a kind of control system of concrete soil mixing station, including:First controller, if
Put in concrete mixing plant, for obtaining the work state information of mixing plant and occurring in precast concrete production equipment
Fault time control stop only feeds intake to stirring host;First network switch, is arranged in concrete mixing plant, and with described first
Controller signals connect;Second network switch, is arranged in precast concrete workshop, and exchanges with described first network
Machine signal connects;Second controller, is arranged in described precast concrete workshop, and believes with described second network switch
Number connect, described second controller is used for obtaining the work state information of precast concrete production equipment, and in mixing plant
Distributing trolley is controlled to stop discharging when breaking down, described precast concrete production equipment includes distributing trolley.
Further, the control system of described concrete soil mixing station also includes:First industrial computer, is arranged on prefabricated
In the central control room in concrete production workshop, and it is connected with described second network switch signal, for controlling described second
Controller works.
Further, the control system of described concrete soil mixing station also includes:Second industrial computer, is arranged on coagulation
In the local control box of soil mixing station, and it is connected with described first network switch signal, for controlling described first controller
Work.
Further, the control system of described concrete soil mixing station also includes:3rd industrial computer, is arranged on coagulation
The remotely control of soil mixing station is indoor, and is connected with described first network switch signal, for controlling described first controller
Work.
On the other hand, the invention provides a kind of control method of concrete soil mixing station, including:Obtain mixing plant
Work state information and precast concrete production equipment work state information;Working condition letter according to described mixing plant
When breath determines that described mixing plant breaks down, distributing trolley is controlled to stop discharging;According to described precast concrete production equipment
Work state information when determining that described precast concrete production equipment breaks down, control and stop feeding intake to stirring host.
Further, the work state information of described mixing plant includes:Stirring host emergent stopping information, stirring host
Overload messages, stirring host inspection switch status information, production ingredient information and/or elevator bucket frequency conversion status information.
Further, the work state information of described precast concrete production equipment includes:Distributing trolley emergent stopping is believed
Breath, distributing trolley motor overload information, material conveying trolley positional information, concrete demand consumption information and/or material conveying trolley motor
Overload messages.
Further, before described control distributing trolley stops discharging and controls the step stopping feeding intake to stirring host
Also include:Determining that described mixing plant does not break down according to the work state information of described mixing plant, and according to described
When the work state information of precast concrete production equipment determines that described precast concrete production equipment does not break down, control is held
Row stirring action.
Further, in the described acquisition work state information of mixing plant and the work shape of precast concrete production equipment
Also include after the step of state information:After determining that stirring host discharging finishes according to the work state information of described mixing plant,
Control material conveying trolley to run to predetermined station and concrete is offloaded to distributing trolley, and control described haul little after the completion of discharging
Car is back to the discharge port of stirring host, and after the completion of the described distributing trolley splicing of control, concrete is discharged into prefabricated mould
In;Described precast concrete production equipment includes described material conveying trolley and described distributing trolley.
Further, in the described acquisition work state information of mixing plant and the work shape of precast concrete production equipment
Also include after the step of state information:
After determining that stirring host discharging finishes according to the work state information of described mixing plant, calculate described material conveying trolley
From the discharge port of described stirring host to the two-way time of described predetermined station with concrete is offloaded to described distributing trolley
Discharge time sum, obtains very first time value;The mixing time calculating described stirring host for every biscuit is opened with stirring host
Door time sum, obtains the second time value;When described second time value is more than or equal to described very first time value, control stirring
Discharging of standing puts into concrete in stirring host after finishing at once;When described second time value is less than described very first time value,
Mixing plant discharging is controlled to put into concrete in stirring host after postponing Preset Time after finishing again;Described Preset Time is described
Very first time value and the difference of described second time value.
The control system of concrete soil mixing station and the method that the present invention provides by by concrete mixing plant with prefabricated
Concrete production equipment row jointly controls, and when concrete indigenous equipment breaks down, stirring host stops feeding intake, it is to avoid coagulation
Soil wastes, and when mixing plant breaks down, precast concrete generates equipment and can stop discharging in time, it is to avoid PC component is because of coagulation
Native deficiency causes useless mould, realizes jointly controlling of concrete mixing plant and precast concrete production equipment, and then raising mixing plant
Concrete and precast concrete production efficiency.
Brief description
The accompanying drawing constituting the part of the present invention is used for providing a further understanding of the present invention, the schematic reality of the present invention
Apply example and its illustrate, for explaining the present invention, not constituting inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the complete layout of the control system of concrete soil mixing station provided in an embodiment of the present invention, for convenience
Understand, in figure also show the other elements of preset concrete mixing plant;
Fig. 2 is the structured flowchart of the control system of concrete soil mixing station provided in an embodiment of the present invention;
Fig. 3 is the flow chart of the control method of concrete soil mixing station provided in an embodiment of the present invention.
Specific embodiment
It should be noted that in the case of not conflicting, the embodiment in the present invention and the feature in embodiment can phases
Mutually combine.To describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Fig. 1 is the complete layout of the control system of concrete soil mixing station provided in an embodiment of the present invention, and Fig. 2 is this
The structured flowchart of the control system of concrete soil mixing station that inventive embodiments provide;As shown in Figures 1 and 2, this is prefabricated mixed
The control system of solidifying soil mixing station can include:The first controller being arranged in concrete mixing plant and first network exchange
Machine, and it is arranged in precast concrete workshop (it can be appreciated that the precast concrete production line shown in Fig. 1)
Two controllers and second network switch;First controller and second controller respectively with first network switch and the second network
Switch signal connects, and is provided with transceiver interface, to enter line number by first network switch and second network switch
According to exchange.This first controller is used for obtaining the work state information of mixing plant and occurs in precast concrete production equipment
Fault time control stop only feeds intake to stirring host.Second controller is used for obtaining the working condition letter of precast concrete production equipment
Breath, and control distributing trolley to stop discharging when mixing plant breaks down.
By the equipment production status information of mixing plant is conveyed to second controller in time so that second controller is to pre-
The working condition of concrete production equipment processed adjusts in time, and the concrete square amount of such as stirring host unloading is less than PC component demand
Amount, the distributing trolley as one of precast concrete production equipment stops discharging, it is to avoid useless mould;Produced by precast concrete and set
Standby work state information conveys to the first controller of mixing plant in time, such as (belongs to prefabricated in distributing trolley and material conveying trolley
Concrete production equipment) stop in time when breaking down feeding intake toward stirring host, it is to avoid concrete wastes, thus realizing concrete
Mixing plant is jointly controlled with precast concrete production equipment, and then improves mixing plant concrete and precast concrete production effect
Rate.
During concrete operations, for realizing the centralized Control in mixing plant side or precast concrete workshop side, above-mentioned prefabricated
At least also there are one of following multiple optimal ways in the control system of concrete mixing plant:
The control system of concrete soil mixing station also includes:First industrial computer, is arranged on precast concrete workshop
Central control room (precast concrete central control room as shown in Figure 1) in, and with described second network switch signal even
Connect, for controlling second controller to work;
The control system of concrete soil mixing station also includes:Second industrial computer, is arranged on concrete mixing plant and locally controls
System is indoor, and is connected with first network switch signal, for controlling the first controller work;
The control system of concrete soil mixing station also includes:3rd industrial computer, is arranged on concrete mixing plant and remotely controls
System is indoor, and is connected with first network switch signal, for controlling the first controller work.
The function of above-mentioned each industrial computer and mechanism may refer to existing industrial computer and be configured, the not reinflated description of here.
The work process of the control system of above-mentioned concrete soil mixing station can be summarized as follows:
(1):The operator A of precast concrete workshop opens the first industrial computer, and the operator B of mixing plant opens second
Industrial computer or the 3rd industrial computer;
(2):Work state information (promptly the stopping of stirring host as shown in Figure 2 of the first controller collection site equipment
Only, overload and the various information such as inspection switch state and elevator bucket frequency conversion) it is sent to second controller;
(3):Operator A by second controller confirm mixing plant and precast concrete production equipment normal after, will be prefabricated
The concrete square amount of field demand, proportioning, station, material conveying trolley positional information etc. are sent to the first controller;
(4):Operator B passes through the second industrial computer (the 3rd industrial computer) and the first controller is pressed receiving of task and produced coagulation
Soil (executes stirring action);In mixing plant production process, if the first controller receives the concrete of second controller transmission
Autochthonal product device fault information (such as distributing trolley motor overload and jerk, material conveying trolley motor overload), mixing plant automatic pause
Produce and do not feed intake toward stirring host, if receiving the information such as production task side's amount change, real-time adjustment mixing plant production status, simultaneously
The equipment working state information sending mixing plant in real time is (as emergent stopping, stirring host overload, stirring host inspection switch shape
The information such as state, elevator bucket frequency conversion) and production information information such as (finish as main frame discharging) remaining Fang Liang to second controller, with
Second controller is made to suspend distributing trolley discharging when determining that mixing plant breaks down;
(5) first industrial computers and second controller are connected to after mixing plant information host discharging finishes, and control material conveying trolley to arrive
Concrete is offloaded to distributing trolley by the station (as No. 1 station) of this mission requirements, and by time of staying T2 (the i.e. discharging setting
Time) discharging finish after return main frame discharge port;Haul is unloaded after the discharge time reaches T2, and distributing trolley has been in material state,
Second controller can be with automatic or manual two ways after the fault message not being connected to mixing plant, distributing trolley, material conveying trolley
Concrete is uniformly dumped in the mould of PC component by setting path, in the process, if second controller is determining stirring
Suspend distributing trolley discharging in time, to avoid producing underproof PC component when equipment breaks down;
According to the work state information of mixing plant, (6) first controllers determine that stirring host discharging finishes after, calculate fortune
Trolley is from the discharge port of stirring host to the two-way time T1 of predetermined station and the discharging that concrete is offloaded to distributing trolley
Time T2 sum, obtains very first time value;When calculating mixing time T3 for every biscuit for the stirring host with stirring host enabling
Between T4 sum, obtain the second time value;When the second time value (T3+T4) is more than or equal to very first time value (T1+T2), control
Mixing plant discharging puts into concrete in stirring host after finishing at once;When the second time value is less than the very first time and is worth, control
Mixing plant discharging finish after postpone Preset Time after again by concrete put into stirring host in, Preset Time be the very first time value and
The difference of the second time value;Adjust stirring host charging time by the first controller can realize stirring station host's mixing time
Main frame discharge port can be parked in time to rear material conveying trolley, lift work efficiency;
(7) weight of the concrete according to shop-fabricated mould demand for the operator A is placed an order by the first controller in time, the
Corresponding information is transferred to second controller by controller in real time, controls the equipment work of mixing plant, so that mixing plant is circulated
Generation reaches efficiency and maximizes;In mixing plant production process, the disk number of production, square amount information are reached by the first controller and send out
Deliver to second controller (or first industrial computer), for operator A reference.
The present embodiment is pre- by being respectively sent to the work state information of mixing plant and concrete indigenous equipment in real time
The second controller of concrete production workshop processed side and the first controller of concrete mixing plant side, control in order to two
Device is controlled in time to the equipment of corresponding side, realizes the slitless connection that mixing plant is controlled, such energy with concrete indigenous equipment
Effectively reduce concrete and waste and avoid the phenomenon that PC component is scrapped because of the PC component that concrete square amount deficiency causes, effectively improve
Mixing plant concrete and precast concrete production efficiency.
As shown in figure 3, the present invention also provides a kind of control method embodiment of concrete soil mixing station, the present embodiment exists
Jointly control flow process in illustrate mixing plant and concrete indigenous equipment, can apply but be not limited to the prefabricated of structure shown in Fig. 2
The control system of concrete mixing plant, the control method of this concrete soil mixing station includes:
S31:Obtain the work state information of mixing plant and the work state information of precast concrete production equipment;
S32:Determining that mixing plant does not break down according to the work state information of mixing plant, and according to concrete
When the work state information of native production equipment determines that precast concrete production equipment does not break down, control execution stirring action;
It is understood that S32 be disposed to guarantee mixing plant do not break down and precast concrete production equipment not
Start when breaking down to execute stirring task, be preferred steps;
S33:When determining that mixing plant breaks down according to the work state information of mixing plant, distributing trolley is controlled to stop
Discharging;Wherein, the work state information of mixing plant may include:Stirring host emergent stopping information, stirring host overload messages,
Stirring host inspection switch status information, at least one producing in ingredient information and elevator bucket frequency conversion status information.
S35:Determine that precast concrete production equipment occurs event according to the work state information of precast concrete production equipment
During barrier, control and stop feeding intake to stirring host;Wherein, the work state information of precast concrete production equipment includes:Cloth is little
Car emergent stopping information, distributing trolley motor overload information, material conveying trolley positional information, concrete demand consumption information and
At least one in material conveying trolley motor overload information.
It is understood that S33 and S35 is controlled to distributing trolley and stirring host respectively, in corresponding premise bar
Part can be implemented to control accordingly when occurring, and there is not the precedence relationship of execution order between S33 and S35.
Preferably, the control method of this concrete soil mixing station is obtaining the work state information of mixing plant and prefabricated
Also include after the step of the work state information of concrete production equipment:
After determining that stirring host discharging finishes according to the work state information of mixing plant, material conveying trolley is controlled to run to pre-
Determine station and concrete is offloaded to distributing trolley, and control material conveying trolley to be back to the discharging of stirring host after the completion of discharging
Mouthful, and after the completion of control distributing trolley splicing, concrete is discharged in prefabricated mould;Precast concrete production equipment includes transporting
Trolley and distributing trolley.By determining the state of stirring host discharging according to the work state information of mixing plant, in discharging
Control material conveying trolley conveying immediately after finishing, and then control distributing trolley splicing and discharging it is achieved that mixing plant and concrete
The slitless connection that indigenous equipment controls, effectively improves mixing plant concrete and precast concrete production efficiency.
It is understood that S33 and S35 is controlled to distributing trolley and stirring host respectively, in corresponding premise bar
Part can be implemented to control accordingly when occurring, such as it is also possible to execute S33 during execution S35.
Preferably, the control method of this concrete soil mixing station is obtaining the work state information of mixing plant and prefabricated
Also include after the step of the work state information of concrete production equipment:
S36:After determining that stirring host discharging finishes according to the work state information of mixing plant, calculate material conveying trolley from stirring
Mix the discharge port extremely two-way time of predetermined station of main frame and the discharge time sum that concrete is offloaded to distributing trolley, obtain
The very first time is worth;Calculate mixing time and the stirring host opening time sum of the every biscuit of stirring host, obtain the second time value;
S37:When the second time value is more than or equal to the very first time and is worth, at once by coagulation after controlling mixing plant discharging to finish
Soil puts in stirring host;
S38:When the second time value is less than the very first time and is worth, after delay Preset Time after controlling mixing plant discharging to finish again
Concrete is put in stirring host;Preset Time is the difference of very first time value and the second time value.
It is understood that S35 and S36-S38 is respectively precast concrete to be produced after the completion of discharging in stirring host
, there is not the precedence relationship of execution order in the action control of equipment and the control that feeds intake of stirring host, due in execution S36-S38
During it is also possible to execution S35, there is not the precedence relationship of execution order between S33, S35 and S36-S38.
The present embodiment by concrete mixing plant is jointly controlled with precast concrete production equipment row, in precast concrete
When cloth/material conveying trolley equipment is out of order, main frame stops feeding intake ready-mixed concrete, it is to avoid concrete wastes, and occurs in mixing plant
Fault, when precast concrete workshop distributing trolley inner concrete side amount is not enough, can stop discharging, it is to avoid PC component is because of coagulation in time
Native deficiency causes useless mould;Additionally, the operation information of material conveying trolley that mixing plant feeds back according to precast concrete workshop, counting of carriers
Run time, it is ensured that stirring station host mixing time can be parked in main frame discharge port in time to rear material conveying trolley, improves mixing plant life
Produce efficiency.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention
Within god and principle, any modification, equivalent substitution and improvement made etc., should be included within the scope of the present invention.
Claims (10)
1. a kind of control system of concrete soil mixing station is it is characterised in that include:
First controller, is arranged in concrete mixing plant, for obtaining the work state information of mixing plant and prefabricated
The concrete production equipment time control stop that breaks down only feeds intake to stirring host;
First network switch, is arranged in concrete mixing plant, and is connected with described first controller signals;
Second network switch, is arranged in precast concrete workshop, and is connected with described first network switch signal;
Second controller, is arranged in described precast concrete workshop, and is connected with described second network switch signal,
Described second controller is used for obtaining the work state information of precast concrete production equipment, and breaks down in mixing plant
When control distributing trolley to stop discharging, described precast concrete production equipment includes distributing trolley.
2. the control system of concrete soil mixing station according to claim 1 is it is characterised in that also include:First work
Control machine, is arranged in the central control room of precast concrete workshop, and is connected with described second network switch signal, uses
Work in controlling described second controller.
3. the control system of concrete soil mixing station according to claim 1 and 2 is it is characterised in that also include:Second
Industrial computer, is arranged in the local control box of concrete mixing plant, and is connected with described first network switch signal, for controlling
Make described first controller work.
4. the control system of concrete soil mixing station according to claim 3 is it is characterised in that also include:3rd work
Control machine, the remotely control being arranged on concrete mixing plant is indoor, and is connected with described first network switch signal, for controlling
Described first controller work.
5. a kind of control method of concrete soil mixing station is it is characterised in that include:
Obtain the work state information of mixing plant and the work state information of precast concrete production equipment;
When determining that described mixing plant breaks down according to the work state information of described mixing plant, distributing trolley is controlled to stop
Discharging;
Determine that described precast concrete production equipment occurs event according to the work state information of described precast concrete production equipment
During barrier, control and stop feeding intake to stirring host.
6. the control method of concrete soil mixing station according to claim 5 is it is characterised in that described mixing plant
Work state information includes:Stirring host emergent stopping information, stirring host overload messages, stirring host inspection switch state letter
Breath, production ingredient information and/or elevator bucket frequency conversion status information.
7. the control method of concrete soil mixing station according to claim 6 is it is characterised in that described precast concrete
The work state information of production equipment includes:Distributing trolley emergent stopping information, distributing trolley motor overload information, material conveying trolley
Positional information, concrete demand consumption information and/or material conveying trolley motor overload information.
8. the control method of concrete soil mixing station according to claim 7 is it is characterised in that in described control cloth
Dolly stops discharging and also includes before controlling the step stopping feeding intake to stirring host:
Determining that described mixing plant does not break down according to the work state information of described mixing plant, and according to described prefabricated
When the work state information of concrete production equipment determines that described precast concrete production equipment does not break down, execution is controlled to stir
Mix action.
9. the control method of the concrete soil mixing station according to any one of claim 5-8 is it is characterised in that in institute
Also wrap after stating the work state information obtaining mixing plant and the step of work state information of precast concrete production equipment
Include:
After determining that stirring host discharging finishes according to the work state information of described mixing plant, material conveying trolley is controlled to run to pre-
Determine station and concrete is offloaded to distributing trolley, and control described material conveying trolley to be back to unloading of stirring host after the completion of discharging
After the completion of material mouth, and the described distributing trolley splicing of control, concrete is discharged in prefabricated mould;
Described precast concrete production equipment includes described material conveying trolley and described distributing trolley.
10. the control method of concrete soil mixing station according to claim 9 is it is characterised in that stir in described acquisition
Also include after the step of the work state information of the work state information of mixing equipment and precast concrete production equipment:
After determining that stirring host discharging finishes according to the work state information of described mixing plant, calculate described material conveying trolley from institute
State the discharge port extremely two-way time of described predetermined station of stirring host and the discharging that concrete is offloaded to described distributing trolley
Time sum, obtains very first time value;When calculating the mixing time for every biscuit for the described stirring host with stirring host enabling
Between sum, obtain the second time value;
When described second time value is more than or equal to described very first time value, at once by coagulation after controlling mixing plant discharging to finish
Soil puts in stirring host;
When described second time value is less than described very first time value, after delay Preset Time after controlling mixing plant discharging to finish again
Concrete is put in stirring host;Described Preset Time is the difference of described very first time value and described second time value.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410829851.7A CN104552611B (en) | 2014-12-26 | 2014-12-26 | Control system and method for prefabricated concrete mixing plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410829851.7A CN104552611B (en) | 2014-12-26 | 2014-12-26 | Control system and method for prefabricated concrete mixing plant |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104552611A CN104552611A (en) | 2015-04-29 |
CN104552611B true CN104552611B (en) | 2017-02-22 |
Family
ID=53070200
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410829851.7A Active CN104552611B (en) | 2014-12-26 | 2014-12-26 | Control system and method for prefabricated concrete mixing plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104552611B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105799063A (en) * | 2015-07-15 | 2016-07-27 | 杭州江河机电装备工程有限公司 | Multipurpose concrete stirring station control system |
CN113771207B (en) * | 2021-09-24 | 2023-07-07 | 筑友智造智能科技有限公司 | Material receiving control system and material receiving control method of transferring material distributor |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3250589B2 (en) * | 1994-05-26 | 2002-01-28 | 日特建設株式会社 | Automatic plant for spraying machine |
CN101777934B (en) * | 2009-12-30 | 2012-11-21 | 三一重工股份有限公司 | Radio link standby system |
JP5772023B2 (en) * | 2011-02-04 | 2015-09-02 | ソニー株式会社 | Information processing system and information processing method |
CN103862562A (en) * | 2012-12-14 | 2014-06-18 | 梁三妹 | Control system of fabric machine |
-
2014
- 2014-12-26 CN CN201410829851.7A patent/CN104552611B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104552611A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105690552B (en) | Precast concrete production system | |
CN108890850B (en) | Intelligent production line and production process capable of producing various standard PC components | |
CN102768515B (en) | A kind of automatic control system of fine powder entrucking | |
CN202196316U (en) | Intelligent control system in welding production line | |
CN103009482B (en) | Full-digital automatic control fire clay mixing method and device | |
CN105415499A (en) | Control method for proportioning and mixing of concrete | |
CN104552611B (en) | Control system and method for prefabricated concrete mixing plant | |
CN109100997A (en) | A kind of Production Scheduling System and method poured in real time based on concrete | |
CN102873805A (en) | Cluster control system of light and energy-saving wall plate forming production line | |
CN103755300A (en) | Production method of fly ash aerated concrete block | |
CN111546503A (en) | Torpedo tank master station control system, concrete distribution system and distribution method | |
CN104298193A (en) | Automatic autoclaved aerated concrete continuously matching system and control method thereof | |
CN102229205B (en) | Continuous controllable dry mixed mortar stirring station | |
CN203092773U (en) | Aluminum powder stirring and metering device | |
CN202572580U (en) | Automatic teeming system for inorganic foam concrete | |
CN202088305U (en) | Continuously controllable dry-mixed mortar mixing plant | |
CN201432351Y (en) | Agglomerate block multicolor material distributing equipment | |
CN104874502A (en) | Feeding equipment capable of achieving automatic powder quantitative control | |
CN201886346U (en) | Construction machine and bus control system thereof | |
CN206515679U (en) | A kind of universal calling system | |
CN203084519U (en) | Electric control system for equipment production line | |
CN103506027B (en) | Material homogenizing method | |
CN113093665A (en) | Production management method, production management device, storage medium, and electronic apparatus | |
CN1392036A (en) | Automatic production process for hollow block and special complete production equipment | |
CN202985787U (en) | Full-digital automatically controlled fire clay preparing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |