Flyover with four longitudinal and transverse bridges crossing in sequence Download PDFInfo
- Publication number
- CN104532708A CN104532708A CN201510015059.2A CN201510015059A CN104532708A CN 104532708 A CN104532708 A CN 104532708A CN 201510015059 A CN201510015059 A CN 201510015059A CN 104532708 A CN104532708 A CN 104532708A
- Authority
- CN
- China
- Prior art keywords
- bridge
- bridges
- horizontal
- vertical
- ring road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/04—Road crossings on different levels; Interconnections between roads on different levels
Abstract
The invention provides a flyover with four longitudinal and transverse bridges crossing in sequence, and belongs to the field of traffic facilities. The flyover structurally comprises the two longitudinal bridges erected in the longitudinal direction at a crossroad and the two transverse bridges erected in the transverse direction at the crossroad. The passing directions of the two longitudinal bridges are reverse, the two longitudinal bridges are erected in parallel in a staggered mode, the passing directions of the two transverse bridges are reverse, and the two transverse bridges are erected in parallel in a staggered mode. The first longitudinal bridge crosses over the first transverse bridge, the first transverse bridge crosses over the second longitudinal bridge, the second longitudinal bridge crosses over the second transverse bridge, the second transverse bridge crosses over the first longitudinal bridge, and an annular guiding bridge is erected among the four longitudinal and transverse bridges crossing in sequence. The problems existing when vehicles go straight or turn right or left or turn around are solved, and the problems that an original flyover is large in size, the number of buildings needing to be removed is large, and more crowded road junctions in cities are, more difficult building of common flyovers is because the buildings are dense are solved.
Description
(1) technical field
The present invention relates to a kind of means of transportation, specifically all the people present is mutual across overpass bridge successively in length and breadth for one.
(2) background technology
Left-hand bend is that vehicle is slow by crossroad, cause the main cause of traffic congestion, for alleviating this difficult problem, except build overpass bridge and keep right curved except, there is no better solution, build building of the overpass bridge that overpass bridge limits in the fixed buildings of the crossroad periphery of prosperity, in addition, overpass bridge to build cost high, have impact on city look and feel; And restriction is turned left moving to lower several crossroad after left turning vehicle, add the traffic congestion of lower several crossroad, the high water time chain of rings on and off duty causes blocking up of multiple crossroad.Restriction turns left fundamentally not solve the difficult problem that vehicle turns left, and is a kind of makeshift of curing the symptoms, not the disease.
(3) summary of the invention
Technical assignment of the present invention is for the deficiencies in the prior art, and all the people present is mutual across overpass bridge successively in length and breadth to provide one.
The technical solution adopted for the present invention to solve the technical problems is:
Technical scheme one: the left steering achieving vehicle by belt guide channel and the object turned around, left steering ring road and the ring road that turns around help out.
All the people present is mutual across overpass bridge successively in length and breadth, be included in crossroad longitudinally two longitudinal bridges of erection and two horizontal bridges of laterally erection, contrary and the parallel erection of staggering in the current direction of described two longitudinal bridges, the also contrary and parallel erection of staggering in the current direction of two horizontal bridges; And a vertical bridge span is located at the top of a horizontal bridge, a horizontal bridge span is located at the top of vertical two bridges, and vertical two bridge spans are located at the top of horizontal two bridges, and horizontal two bridge spans are located at the top of a vertical bridge.
Between an above-mentioned horizontal bridge and a vertical bridge, erection has the first guide bridge, vertical erection between a bridge and horizontal two bridges has the second guide bridge, between horizontal two bridges and vertical two bridges, erection has the 3rd guide bridge, vertical erection between two bridges and a horizontal bridge has the 4th guide bridge, and above-mentioned first guide bridge, the second guide bridge, the 3rd guide bridge and the 4th guide bridge form belt guide channel.
Described indulging is provided with the first right turn ring road between a bridge and a horizontal bridge, the second right turn ring road is provided with between horizontal two bridges and a vertical bridge, indulge and be provided with the 3rd right turn ring road between two bridges and horizontal two bridges, between a horizontal bridge and vertical two bridges, be provided with the 4th right turn ring road.
Described indulging is provided with the first left steering ring road between a bridge and horizontal two bridges, the second left steering ring road is provided with between horizontal two bridges and vertical two bridges, indulge and be provided with the 3rd left steering ring road between two bridges and a horizontal bridge, between a horizontal bridge and a vertical bridge, be provided with the 4th left steering ring road.
Be provided with first between the lower bridge mouth of a described vertical bridge and the upper bridge mouth of vertical two bridges to turn around ring road, be provided with second between the Xia Qiaokou of horizontal two bridges and the upper bridge mouth of a horizontal bridge to turn around ring road, be provided with the 3rd between the lower bridge mouth of vertical two bridges and the upper bridge mouth of a vertical bridge to turn around ring road, be provided with the 4th between the Xia Qiaokou of a horizontal bridge and the upper bridge mouth of horizontal two bridges and turn around ring road.
Technical scheme two: by left steering ring road and the turn around left steering that ring road achieves vehicle and the object turned around.
All the people present is mutual across overpass bridge successively in length and breadth, be included in crossroad longitudinally two longitudinal bridges of erection and two horizontal bridges of laterally erection, contrary and the parallel erection of staggering in the current direction of described two longitudinal bridges, the also contrary and parallel erection of staggering in the current direction of two horizontal bridges; And a vertical bridge span is located at the top of a horizontal bridge, a horizontal bridge span is located at the top of vertical two bridges, and vertical two bridge spans are located at the top of horizontal two bridges, and horizontal two bridge spans are located at the top of a vertical bridge.
Described indulging is provided with the first left steering ring road between a bridge and horizontal two bridges, the second left steering ring road is provided with between horizontal two bridges and vertical two bridges, indulge and be provided with the 3rd left steering ring road between two bridges and a horizontal bridge, between a horizontal bridge and a vertical bridge, be provided with the 4th left steering ring road.
Described indulging is provided with the first right turn ring road between a bridge and a horizontal bridge, the second right turn ring road is provided with between horizontal two bridges and a vertical bridge, indulge and be provided with the 3rd right turn ring road between two bridges and horizontal two bridges, between a horizontal bridge and vertical two bridges, be provided with the 4th right turn ring road.
Be provided with first between the lower bridge mouth of a described vertical bridge and the upper bridge mouth of vertical two bridges to turn around ring road, be provided with second between the Xia Qiaokou of horizontal two bridges and the upper bridge mouth of a horizontal bridge to turn around ring road, be provided with the 3rd between the lower bridge mouth of vertical two bridges and the upper bridge mouth of a vertical bridge to turn around ring road, be provided with the 4th between the Xia Qiaokou of a horizontal bridge and the upper bridge mouth of horizontal two bridges and turn around ring road.
All the people present in length and breadth of the present invention successively mutual across overpass bridge compared with prior art, the beneficial effect produced is:
The present invention not only solves vehicle and keeps straight on, turns right, turns left and the problem of tune, also solves that original overpass bridge volume is large, removal building is many, and crossing more crowded in city is more difficult to the problem of building common overpass bridge because building is intensive.
(4) accompanying drawing explanation
Accompanying drawing 1 is the main TV structure schematic diagram of first embodiment of the invention;
Accompanying drawing 2 is the main TV structure schematic diagram of second embodiment of the invention;
Accompanying drawing 3 is the main TV structure schematic diagram of third embodiment of the invention;
Accompanying drawing 4 is a vertical bridge in Fig. 1-3, indulges the A of two bridges, a horizontal bridge and horizontal two bridges to structural representation;
Accompanying drawing 5 is a vertical bridge in Fig. 1-3, indulges the B of two bridges, a horizontal bridge and horizontal two bridges to structural representation;
Accompanying drawing 6 is the perspective view of first embodiment of the invention.
In figure, 1, a vertical bridge, 2, vertical two bridges, 3, a horizontal bridge, 4, horizontal two bridges, the 5, first guide bridge, the 6, second guide bridge, 7, the 3rd guide bridge, 8, the 4th guide bridge, the 9, first left steering ring road, the 10, second left steering ring road, 11, the 3rd left steering ring road, 12, the 4th left steering ring road, the 13, first right turn ring road, the 14, second right turn ring road, 15, the 3rd right turn ring road, 16, the 4th right turn ring road, 17, first turns around ring road, and 18, second turns around ring road, 19, the 3rd to turn around ring road, the 20, the 4th turns around ring road.
(5) detailed description of the invention
Be described in detail below across overpass bridge all the people present in length and breadth of the present invention is mutual successively below in conjunction with accompanying drawing 1-6.
Embodiment 1:
As shown in accompanying drawing 1,4,5,6, all the people present in length and breadth of the present invention is mutual across overpass bridge successively, its structure is included in crossroad longitudinally two longitudinal bridges of erection and two horizontal bridges of laterally erection, contrary and the parallel erection of staggering in the current direction of described two longitudinal bridges, the also contrary and parallel erection of staggering in the current direction of two horizontal bridges; And a vertical bridge 1 is crossed on the top of a horizontal bridge 3, a horizontal bridge 3 is crossed on the top of vertical two bridges 2, and vertical two bridges 2 are crossed on the top of horizontal two bridges 4, and horizontal two bridges 4 are crossed on the top of a vertical bridge 1.
Between an above-mentioned horizontal bridge 3 and a vertical bridge 1, erection has the first guide bridge 5, vertical erection between a bridge 1 and horizontal two bridges 4 has the second guide bridge 6, between horizontal two bridges 4 and vertical two bridges 2, erection has the 3rd guide bridge 7, vertical erection between two bridges 2 and a horizontal bridge 3 has the 4th guide bridge 8, and above-mentioned first guide bridge 5, second guide bridge 6, the 3rd guide bridge 7 and the 4th guide bridge 8 form the guide channel that goes in ring.
Described indulging is provided with the first left steering ring road 9 between a bridge 1 and horizontal two bridges 4, the second left steering ring road 10 is provided with between horizontal two bridges 4 and vertical two bridges 2, indulge and be provided with the 3rd left steering ring road 11 between two bridges 2 and a horizontal bridge 3, between a horizontal bridge 3 and a vertical bridge 1, be provided with the 4th left steering ring road 12.
Described indulging is provided with the first right turn ring road 13 between a bridge 1 and a horizontal bridge 3, the second right turn ring road 14 is provided with between horizontal two bridges 4 and a vertical bridge 1, indulge and be provided with the 3rd right turn ring road 15 between two bridges 2 and horizontal two bridges 4, between a horizontal bridge 3 and vertical two bridges 2, be provided with the 4th right turn ring road 16.
Be provided with first between the lower bridge mouth of a described vertical bridge 1 and the upper bridge mouth of vertical two bridges 2 to turn around ring road 17, be provided with second between the Xia Qiaokou of horizontal two bridges 4 and the upper bridge mouth of a horizontal bridge 3 to turn around ring road 18, be provided with the 3rd between the lower bridge mouth of vertical two bridges 2 and the upper bridge mouth of a vertical bridge 1 to turn around ring road 19, be provided with the 4th between the Xia Qiaokou of a horizontal bridge 3 and the upper bridge mouth of horizontal two bridges 4 and turn around ring road 20.
Embodiment 2:
As shown in accompanying drawing 2,4,5, all the people present in length and breadth of the present invention is mutual across overpass bridge successively, its structure is included in crossroad longitudinally two longitudinal bridges of erection and two horizontal bridges of laterally erection, contrary and the parallel erection of staggering in the current direction of described two longitudinal bridges, the also contrary and parallel erection of staggering in the current direction of two horizontal bridges; And a vertical bridge 1 is crossed on the top of a horizontal bridge 3, a horizontal bridge 3 is crossed on the top of vertical two bridges 2, and vertical two bridges 2 are crossed on the top of horizontal two bridges 4, and horizontal two bridges 4 are crossed on the top of a vertical bridge 1.
Between an above-mentioned horizontal bridge 3 and a vertical bridge 1, erection has the first guide bridge 5, vertical erection between a bridge 1 and horizontal two bridges 4 has the second guide bridge 6, between horizontal two bridges 4 and vertical two bridges 2, erection has the 3rd guide bridge 7, vertical erection between two bridges 2 and a horizontal bridge 3 has the 4th guide bridge 8, and above-mentioned first guide bridge 5, second guide bridge 6, the 3rd guide bridge 7 and the 4th guide bridge 8 form the guide channel that goes in ring.
Described indulging is provided with the first right turn ring road 13 between a bridge 1 and a horizontal bridge 3, the second right turn ring road 14 is provided with between horizontal two bridges 4 and a vertical bridge 1, indulge and be provided with the 3rd right turn ring road 15 between two bridges 2 and horizontal two bridges 4, between a horizontal bridge 3 and vertical two bridges 2, be provided with the 4th right turn ring road 16.
Embodiment 3:
As shown in accompanying drawing 3,4,5, all the people present in length and breadth of the present invention is mutual across overpass bridge successively, its structure is included in crossroad longitudinally two longitudinal bridges of erection and two horizontal bridges of laterally erection, contrary and the parallel erection of staggering in the current direction of described two longitudinal bridges, the also contrary and parallel erection of staggering in the current direction of two horizontal bridges; And a vertical bridge 1 is crossed on the top of a horizontal bridge 3, a horizontal bridge 3 is crossed on the top of vertical two bridges 2, and vertical two bridges 2 are crossed on the top of horizontal two bridges 4, and horizontal two bridges 4 are crossed on the top of a vertical bridge 1.
Described indulging is provided with the first left steering ring road 9 between a bridge 1 and horizontal two bridges 4, the second left steering ring road 10 is provided with between horizontal two bridges 4 and vertical two bridges 2, indulge and be provided with the 3rd left steering ring road 11 between two bridges 2 and a horizontal bridge 3, between a horizontal bridge 3 and a vertical bridge 1, be provided with the 4th left steering ring road 12.
Described indulging is provided with the first right turn ring road 13 between a bridge 1 and a horizontal bridge 3, the second right turn ring road 14 is provided with between horizontal two bridges 4 and a vertical bridge 1, indulge and be provided with the 3rd right turn ring road 15 between two bridges 2 and horizontal two bridges 4, between a horizontal bridge 3 and vertical two bridges 2, be provided with the 4th right turn ring road 16.
Be provided with first between the lower bridge mouth of a described vertical bridge 1 and the upper bridge mouth of vertical two bridges 2 to turn around ring road 17, be provided with second between the Xia Qiaokou of horizontal two bridges 4 and the upper bridge mouth of a horizontal bridge 3 to turn around ring road 18, be provided with the 3rd between the lower bridge mouth of vertical two bridges 2 and the upper bridge mouth of a vertical bridge 1 to turn around ring road 19, be provided with the 4th between the Xia Qiaokou of a horizontal bridge 3 and the upper bridge mouth of horizontal two bridges 4 and turn around ring road 20.
All the people present in length and breadth of the present invention is mutual across construction shown in overpass bridge by specification accompanying drawing successively.
Claims (5)
1. all the people present is mutual across overpass bridge successively in length and breadth, be included in crossroad longitudinally two longitudinal bridges of erection and two horizontal bridges of laterally erection, it is characterized in that: the contrary and parallel erection of staggering in the current direction of described two longitudinal bridges, the also contrary and parallel erection of staggering in the current direction of two horizontal bridges; And a vertical bridge (1) is crossed on the top of a horizontal bridge (3), a horizontal bridge (3) is crossed on the top of vertical two bridges (2), vertical two bridges (2) are crossed on the top of horizontal two bridges (4), and horizontal two bridges (4) are crossed on the top of a vertical bridge (1);
Between an above-mentioned horizontal bridge (3) and a vertical bridge (1), erection has the first guide bridge (5), vertical erection between a bridge (1) and horizontal two bridges (4) has the second guide bridge (6), between horizontal two bridges (4) and vertical two bridges (2), erection has the 3rd guide bridge (7), vertical erection between two bridges (2) and a horizontal bridge (3) has the 4th guide bridge (8), and above-mentioned first guide bridge (5), the second guide bridge (6), the 3rd guide bridge (7) and the 4th guide bridge (8) form the guide channel that goes in ring;
Described indulging is provided with the first right turn ring road (13) between a bridge (1) and a horizontal bridge (3), the second right turn ring road (14) is provided with between horizontal two bridges (4) and a vertical bridge (1), indulge and between two bridges (2) and horizontal two bridges (4), be provided with the 3rd right turn ring road (15), between a horizontal bridge (3) and vertical two bridges (2), be provided with the 4th right turn ring road (16).
2. all the people present in length and breadth according to claim 1 is mutual across overpass bridge successively, it is characterized in that: described indulging is provided with the first left steering ring road (9) between a bridge (1) and horizontal two bridges (4), the second left steering ring road (10) is provided with between horizontal two bridges (4) and vertical two bridges (2), indulge and between two bridges (2) and a horizontal bridge (3), be provided with the 3rd left steering ring road (11), between a horizontal bridge (3) and a vertical bridge (1), be provided with the 4th left steering ring road (12).
3. all the people present in length and breadth according to claim 2 is mutual across overpass bridge successively, it is characterized in that: be provided with first between the lower bridge mouth of a described vertical bridge (1) and the upper bridge mouth indulging two bridges (2) and turn around ring road (17), be provided with second between the Xia Qiaokou of horizontal two bridges (4) and the upper bridge mouth of a horizontal bridge (3) to turn around ring road (18), be provided with the 3rd between the lower bridge mouth of vertical two bridges (2) and the upper bridge mouth indulging a bridge (1) to turn around ring road (19), be provided with the 4th between the Xia Qiaokou of a horizontal bridge (3) and the upper bridge mouth of horizontal two bridges (4) to turn around ring road (20).
4. all the people present is mutual across overpass bridge successively in length and breadth, be included in crossroad longitudinally two longitudinal bridges of erection and two horizontal bridges of laterally erection, it is characterized in that: the contrary and parallel erection of staggering in the current direction of described two longitudinal bridges, the also contrary and parallel erection of staggering in the current direction of two horizontal bridges; And a vertical bridge (1) is crossed on the top of a horizontal bridge (3), a horizontal bridge (3) is crossed on the top of vertical two bridges (2), vertical two bridges (2) are crossed on the top of horizontal two bridges (4), and horizontal two bridges (4) are crossed on the top of a vertical bridge (1);
Described indulging is provided with the first left steering ring road (9) between a bridge (1) and horizontal two bridges (4), the second left steering ring road (10) is provided with between horizontal two bridges (4) and vertical two bridges (2), indulge and between two bridges (2) and a horizontal bridge (3), be provided with the 3rd left steering ring road (11), between a horizontal bridge (3) and a vertical bridge (1), be provided with the 4th left steering ring road (12);
Described indulging is provided with the first right turn ring road (13) between a bridge (1) and a horizontal bridge (3), the second right turn ring road (14) is provided with between horizontal two bridges (4) and a vertical bridge (1), indulge and between two bridges (2) and horizontal two bridges (4), be provided with the 3rd right turn ring road (15), between a horizontal bridge (3) and vertical two bridges (2), be provided with the 4th right turn ring road (16).
5. all the people present in length and breadth according to claim 4 is mutual across overpass bridge successively, it is characterized in that: be provided with first between the lower bridge mouth of a described vertical bridge (1) and the upper bridge mouth indulging two bridges (2) and turn around ring road (17), be provided with second between the Xia Qiaokou of horizontal two bridges (4) and the upper bridge mouth of a horizontal bridge (3) to turn around ring road (18), be provided with the 3rd between the lower bridge mouth of vertical two bridges (2) and the upper bridge mouth indulging a bridge (1) to turn around ring road (19), be provided with the 4th between the Xia Qiaokou of a horizontal bridge (3) and the upper bridge mouth of horizontal two bridges (4) to turn around ring road (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510015059.2A CN104532708A (en) | 2015-01-13 | 2015-01-13 | Flyover with four longitudinal and transverse bridges crossing in sequence |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510015059.2A CN104532708A (en) | 2015-01-13 | 2015-01-13 | Flyover with four longitudinal and transverse bridges crossing in sequence |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104532708A true CN104532708A (en) | 2015-04-22 |
Family
ID=52848316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510015059.2A Pending CN104532708A (en) | 2015-01-13 | 2015-01-13 | Flyover with four longitudinal and transverse bridges crossing in sequence |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532708A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463962A (en) * | 2015-12-31 | 2016-04-06 | 金传华 | Non-stop bus transportation system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1225405A (en) * | 1998-07-28 | 1999-08-11 | 叶仰高 | Traffic lane of road crossings with interconnections between different levels, loop road |
CN1651650A (en) * | 2004-12-18 | 2005-08-10 | 张寅� | Left in left out no interlace point new generation overpass |
CN2782751Y (en) * | 2005-03-28 | 2006-05-24 | 王世明 | Composite flyover bridge with double road traffic distribution |
CN200949199Y (en) * | 2006-09-21 | 2007-09-19 | 杜三平 | Braided type overpass |
CN201080584Y (en) * | 2007-09-06 | 2008-07-02 | 亓鹏笃 | All-communication single layer runway type crossroad |
WO2012028003A1 (en) * | 2010-08-31 | 2012-03-08 | Zhang Huaiyu | Crossroad for traffic road |
-
2015
- 2015-01-13 CN CN201510015059.2A patent/CN104532708A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1225405A (en) * | 1998-07-28 | 1999-08-11 | 叶仰高 | Traffic lane of road crossings with interconnections between different levels, loop road |
CN1651650A (en) * | 2004-12-18 | 2005-08-10 | 张寅� | Left in left out no interlace point new generation overpass |
CN2782751Y (en) * | 2005-03-28 | 2006-05-24 | 王世明 | Composite flyover bridge with double road traffic distribution |
CN200949199Y (en) * | 2006-09-21 | 2007-09-19 | 杜三平 | Braided type overpass |
CN201080584Y (en) * | 2007-09-06 | 2008-07-02 | 亓鹏笃 | All-communication single layer runway type crossroad |
WO2012028003A1 (en) * | 2010-08-31 | 2012-03-08 | Zhang Huaiyu | Crossroad for traffic road |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463962A (en) * | 2015-12-31 | 2016-04-06 | 金传华 | Non-stop bus transportation system |
CN105463962B (en) * | 2015-12-31 | 2019-04-16 | 金传华 | A-road-through public transport transportation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102425090B (en) | Urban three-dimensional road for aggregating and utilizing land and avoiding traffic jam | |
CN103046444B (en) | Intersection with optimized settings and traffic control method of the intersection | |
US20160115650A1 (en) | Convenient anti-bottleneck mode traffic of vertical and horizontal interactive man-vehicle public transportation at level crossings | |
US20150117947A1 (en) | Traffic-light-free overpass at intersection | |
KR20070106184A (en) | Intersection structure and signal control method for effective allocation of car signal time | |
CN102493298B (en) | Intersection capable of realizing simultaneous left turn | |
CN101413238A (en) | Split type overpass bridge | |
CN102979019A (en) | Pedestrian and vehicle barrier-free combined flyover at arterial road and branch road intersection | |
CN104532708A (en) | Flyover with four longitudinal and transverse bridges crossing in sequence | |
WO2014131331A1 (en) | Crossroad and t junction all-direction continuous-flow overpasses | |
CN204570406U (en) | All the people present is mutual across overpass bridge successively in length and breadth | |
CN103215868A (en) | Crossroad overpass | |
CN204530360U (en) | Urban freeway | |
CN107988866B (en) | Simple overpass | |
CN101358440A (en) | No-wait traffic crossroad | |
CN102747657B (en) | T road barrier-free all-pass combined transportation hub | |
CN202023130U (en) | Elevated overpass shaped like a Chinese character `Ri` | |
CN202913322U (en) | T-shaped intersection pedestrian and vehicle barrier-free combined overpass | |
CN202139520U (en) | Flyover without left turn | |
CN202744915U (en) | Intersection traffic system without traffic light | |
CN205636387U (en) | Three branch road systems of no traffic lights | |
CN102330396B (en) | Intersection for pedestrian secondary waiting areas | |
CN201730032U (en) | Series lane-changing type single-layer full interchange overpass | |
CN207498761U (en) | Viaduct | |
CN203346747U (en) | Network type crossroad traffic system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150422 |
|
WD01 | Invention patent application deemed withdrawn after publication |