CN104520936A - 用于核燃料棒的端帽的电阻焊接 - Google Patents

用于核燃料棒的端帽的电阻焊接 Download PDF

Info

Publication number
CN104520936A
CN104520936A CN201380031505.8A CN201380031505A CN104520936A CN 104520936 A CN104520936 A CN 104520936A CN 201380031505 A CN201380031505 A CN 201380031505A CN 104520936 A CN104520936 A CN 104520936A
Authority
CN
China
Prior art keywords
end plug
engagement portion
cladding tubes
cylindrical engagement
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201380031505.8A
Other languages
English (en)
Inventor
J·T·李
E·B·巴格
S·L·费兹纳
M·J·尼勒斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BWXT mPower Inc
Original Assignee
Babcock and Wilcox mPower Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock and Wilcox mPower Inc filed Critical Babcock and Wilcox mPower Inc
Publication of CN104520936A publication Critical patent/CN104520936A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C3/00Reactor fuel elements and their assemblies; Selection of substances for use as reactor fuel elements
    • G21C3/02Fuel elements
    • G21C3/04Constructional details
    • G21C3/06Casings; Jackets
    • G21C3/10End closures ; Means for tight mounting therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/002Resistance welding; Severing by resistance heating specially adapted for particular articles or work
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C21/00Apparatus or processes specially adapted to the manufacture of reactors or parts thereof
    • G21C21/02Manufacture of fuel elements or breeder elements contained in non-active casings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

向核燃料棒的包壳管的开口端插入端塞,端塞具有主体和从主体延伸并且止于包壳座的圆柱形结合部,该包壳座具有与圆柱形结合部相比减小的直径。插入包括:抵靠端塞的包壳座夹持包壳管的开口端;以及当夹持时,在端塞与包壳管的开口端之间施加电流以便向包壳座上的包壳管的开口端施力并且使之在端塞的圆柱形结合部上滑动并且在端塞的圆柱形结合部的圆柱形结合表面与包壳管的开口端的内侧表面之间生成电阻焊接。

Description

用于核燃料棒的端帽的电阻焊接
相关申请
本申请要求在2012年4月17日提交的美国临时申请No.61/625,410的权益,在2012年4月17日提交的美国临时申请No.61/625,410以全文引用的方式并入到本申请的说明书内。
背景
下文涉及焊接技术、核反应堆技术、核燃料棒技术、核发电技术和相关技术。
在典型核反应堆中,反应堆堆芯通常包括多个燃料组件,燃料组件中每一个由燃料棒阵列组成。每个燃料棒包括管状包壳,管状包壳容纳燃料芯块,燃料芯块包括裂变材料。包壳由上下端帽或端塞密封。核反应堆堆芯由这种燃料棒阵列组成,并且安置于压力容器中,压力容器容纳主冷却剂(通常是水,但也设想到重水或另一冷却剂)。主冷却剂通过核反应堆堆芯流动并且被放射性堆芯加热。在典型沸水反应堆(BWR)配置中,热冷却剂沸腾以形成主冷却剂蒸汽,主冷却剂蒸汽从压力容器输送出来并且用于驱动涡轮。在典型压水反应堆(PWR)配置中,主冷却剂保持在过冷状态并且通过位于容器外侧的蒸汽发生器输送以加热驱动涡轮的次冷却剂。在典型一体式PWR配置中,蒸汽发生器位于压力容器内侧并且次冷却剂被泵送到蒸汽发生器。
一般而言,每个燃料棒包括加载到包壳管内的核燃料芯块列和固定到管的相反端(例如,底端或顶端)的端塞。端塞应提供可靠的密封以防止主冷却剂泄漏到燃料棒内。在已知的方案中,顶部端塞和底部端塞环焊或对焊到管的相反端,例如通过熔焊或固态焊接。
也已知端塞到包壳的电阻焊接,其中包壳管与端塞对接。在这种方案中,高电流在包壳与端塞之间传递,端塞被压缩地加载。在端塞与包壳之间界面处的电阻生成局部加热,局部加热导致融合接合。虽然电阻焊接具有许多合乎需要的属性,但这个过程具有某些缺点。例如,无破坏的焊接检查通常是不可行的。结合品质也可能易受某些污染物影响,在某些情况下,并无检测手段。焊接加厚部分或毛刺必须在焊后过程中被机械移除或抑制,这使得加工复杂。
发明内容
根据一方面,一种方法包括向核燃料棒的包壳管的开口端插入端塞,端塞具有主体和从主体延伸并且止于包壳座的圆柱形结合部,该包壳座具有与圆柱形结合部相比减小的直径。插入包括:抵靠端塞的包壳座夹持包壳管的开口端;以及,当夹持时,在端塞与包壳管的开口端之间施加电流。夹持与施加电流的组合有效地向包壳座上的包壳管的开口端施力并且使之在端塞的圆柱形结合部上滑动并且在端塞的圆柱形结合部的圆柱形结合表面与包壳管的开口端的内侧表面之间生成电阻焊接。在某些实施例中,包壳座包括与圆柱形结合部相比减小直径的圆柱形座部和在端塞的圆柱形座部与端塞的圆柱形结合部之间的陡峭或渐进式环形台阶。在某些实施例中,环形台阶为大约0.002英寸。在其它实施例中,环形台阶大于0.002英寸。在另外的实施例中,并不利用环形台阶。在某些实施例中,包壳座包括端塞的圆柱形结合部的斜削或截头圆锥形端部。在某些实施例中,端塞包括限定于端塞的主体与端塞的圆柱形结合部之间的滑动止挡件,包壳管的开口端在端塞的圆柱形结合部上的滑动由滑动止挡件阻挡。例如,滑动止挡件可以是在端塞的圆柱形结合部与端塞主体之间的陡峭或渐进式环形台阶。在某些这样的实施例中,滑动止挡件包括环形凹槽,其接纳在包壳管的开口端在端塞的圆柱形结合部上滑动期间移位的堆积材料。在其它实施例中,行进距离受到行进长度过程控制。
根据另一方面,一种方法包括如在前一段中所陈述的操作并且还包括将包括裂变材料燃料芯块加载到包壳管内的操作。该方法还可包括:对于多个包壳管中每一个重复加载和插入以生成多个组装的核燃料棒;以及,构造燃料组件,该燃料组件包括组装的核燃料棒阵列。
根据另一方面,一种核燃料棒包括:端塞,其具有圆柱形结合部,在端塞一端的锥形顶端和在端塞的相反端与圆柱形结合部相比具有减小直径的座部;包壳管,其具有由端塞的圆柱形结合部插入的端部,座部安置于包壳管的插入端内侧并且锥形顶端在包壳管的插入端外侧延伸;以及,焊接部,其结合端塞的圆柱形结合部与包壳管的插入端的内侧表面。在某些实施例中,座部包括与圆柱形结合部相比减小直径的圆柱形座部。在某些实施例中,座部包括端塞的圆柱形结合部的斜削或截头圆锥形端部。在某些实施例中,端塞还具有安置于圆柱形结合部与锥形顶端之间的圆柱形主体,圆柱形主体在包壳管的插入端外侧延伸并且止于锥形顶端。在某些这样的实施例中,圆柱形主体具有比圆柱形结合部更大的直径并且陡峭或渐进式环形台阶限定于端塞的圆柱形主体与端塞的所述圆柱形结合部之间。在某些这样的实施例中,端塞还具有在限定于圆柱形主体与圆柱形结合部之间的陡峭或渐进式环形台阶处的圆柱形结合部中的环形凹槽。端塞可选地还包括从座部突伸的短柱,短柱并不接触包壳管。
根据另一方面,在前一段中所陈述的核燃料棒还包括安置于包壳管中包括裂变材料的燃料芯块堆叠。一种设备可包括:压力容器,其容纳核反应堆堆芯,核反应堆堆芯包括浸没于主冷却剂水中的核燃料棒阵列。
根据另一方面,用于插入核燃料棒包壳管端部的端塞,该端塞包括:在端塞的一端的锥形顶端;圆柱形结合部,其大小适于在核燃料棒包壳管的端部内侧形成干涉配合;以及,座部,其在与锥形顶端相反的端塞的端部,与圆柱形结合部相比具有减小的直径。在某些实施例中,端塞还包括安置于锥形顶端与圆柱形结合部之间的直径为D1的圆柱形主体,并且圆柱形结合部具有小于圆柱形主体的直径D1的直径D2。在某些这样的实施例中,座部包括具有直径D3的圆柱形座部,直径D3小于圆柱形结合部的直径D2,而在其它这样的实施例中,座部包括圆柱形座部的斜削或截头圆锥形端部。
附图说明
本发明可以呈现各种部件和部件的布置和各种过程操作和过程操作的布置。附图只是出于说明优选实施例的目的并且不应被理解为限制本发明。
图1示意性地示出了包括上端塞和下端塞的说明性燃料棒。
图2示意性地示出了包括如图1所述的燃料棒的核反应堆堆芯。
图3示意性地示出了包括图2的核反应堆堆芯的核反应堆。
图4示出了被安放用于电阻焊接的燃料棒包壳的端塞的截面图。
图5示出了在执行了电阻焊接之后图4的端塞/包壳的截面图。
图6至图9示出了如本文所公开的适合于电阻焊接到燃料棒包壳上的额外端塞实施例的截面图。
具体实施方式
参考图1,示意性地示出了燃料棒2。燃料棒2包括包壳管4,包壳管4容纳包括裂变材料的燃料芯块6的堆叠。包壳管在其上端被插入上端塞7并且在其下端被插入(下)端塞8。在下端插入下端塞8或者在上端插入上端塞7包括如本文所公开的电阻焊接。燃料棒可选地容纳其它元件,诸如不含裂变材料或者与燃料芯块相比包含减少裂变材料浓度的间隔件。
参考图2,示意性地示出了核反应堆堆芯10,并且其包括燃料棒2的阵列。虽然说明性堆芯10包括仅100个燃料棒的10×10阵列,用于发电的反应堆可以采用数千或数万燃料棒,通常布置成被称作燃料组件的结构组。例如,一种设想到的小模块式反应堆(SMR)设计可以包括多达69个燃料组件,每个包括17×17燃料棒束。每个燃料组件的燃料棒通常由定位格架保持在一起,定位格架与引导管和上喷嘴和下喷嘴或端板焊接在一起以形成结构骨架,并且堆芯篮堆芯成型器或其它结构支承件容纳燃料组件(并未示出结构支承部件)。
参考图3,示意性地示出了核反应堆,并且其包括安置于压力容器12中并且浸没于主冷却剂水中的核反应堆堆芯10。在图3的说明性反应堆中,中心立管结构14限定主冷却剂流动循环路径17,主冷却剂流动循环路径17可以通过自然循环(即,由于反应堆堆芯10加热所造成的对流流动)或者通过内部或外部反应堆冷却剂泵(未图示)驱动。循环路径17使由反应堆堆芯10加热的主冷却剂向上穿过中心立管14的内增压室(“热”支路)流动并且向下经由降液管环形空间(“冷”支路)返回到堆芯10,降液管环形空间限定于压力容器12与中心立管14之间。核反应堆可选地包括在图3中并未示出的各种其它部件,诸如控制棒和相关联的控制棒驱动机构(CRDM)、可选的反应堆冷却剂泵、内部或外部加压器、冷却剂补充和下泄子系统、紧急堆芯冷却系统(ECCS)、外部安全壳结构等。
参考图4和图5,示出了用于将下端塞8焊接到包壳管4上的说明性电阻焊接过程。下端塞8通常为圆柱形并且包括主体,主体包括锥形(例如,圆锥形)端部20、圆柱形主体22、圆柱形结合部24和包壳座26,包壳座26在图4和图5的实施例中是圆柱形结合部24的斜削端。在图4和图5的端塞8中,圆柱形主体22、圆柱形结合部24和包壳座26包括在端塞8一端的锥形端部20与在端塞8的相反端的包壳座26之间延伸的三个相继更小圆柱形部分,分别具有更小的直径D1>D2>D3。包壳座26具有与圆柱形结合部24的直径D2相比减小的直径,例如包括端塞8的斜削或截头圆锥形端部。减小直径的包壳座26的大小适于完全(如图4所示)或部分地接纳于待由端塞8插入的包壳管4的开口端内。包壳座26的斜削或截头圆锥形端部在电阻焊接期间提供包壳管4的对准和引入。圆柱形结合部24的大小适于在包壳管4内形成干涉配合。为此目的,圆柱形结合部24具有与包壳管4的端部的内径DC,ID相同或略微更大的直径。在某些实施例中,圆柱形结合部24的直径D2具有比包壳管4的端部的内径DC,ID大0.002英寸至0.004英寸的直径。
为了执行电阻焊接,电极附连到端塞8和包壳管4中每一个上。在说明性图4和图5中,包壳电极30为蛤壳式电极,其夹持到包壳管4的端部。在替代配置中,包壳电极30的大小可以适于以在包壳电极30与包壳管4之间的干涉配合而接合包壳管端部4,将包壳管4固定于电极30中。干涉配合可以具有例如大约0.0002至0.0020英寸的大小。端塞电极34可以具有凹陷(divot)或其它配合凹部,其被配置成接纳端塞8的锥形端部20。
在包壳管4和端塞4附连到其相应电极30、34的情况下,包壳管4的开口端抵靠端塞8夹持。在图4中以箭头F示意性地示出了这种夹持。当包壳管4与端塞8压缩地加载或夹持在一起时,在施加夹持F时,电流施加于电极30、34之间并且在包壳管4与端塞8之间流动。预期电阻在包壳管8与端塞8之间的界面处最高。这种电阻造成对配合表面的电阻加热。夹持F与施加电流的组合有效地向包壳座26上的包壳管4的开口端施力并且使之在端塞8的圆柱形结合部24上滑动并且在端塞8的圆柱形结合部24的圆柱形结合表面与包壳管4的开口端的内侧表面之间生成电阻焊接25(参看图5)。为了实现这种效果,在某些实施例中,例如,夹持力F为大约200-800磅。压缩力与加热部件的组合导致包壳管4的内径在端塞8的圆柱形结合部24的外径D2上滑动。为了便于这种操作,包壳管4的内径在圆柱形结合表面(24)上在径向向外推压。由于在插塞/包壳界面处的电阻所造成的加热使金属软化并且在压缩力下,端塞8的圆柱形结合部24滑入到包壳管20内。滑动继续,直到包壳管4到达较小直径结合表面24与端塞8的主体22的较大直径圆柱形表面之间的端塞8的在径向向外延伸的肩部38。因此,肩部38为限定于端塞8的主体22与端塞的圆柱形结合部24之间的滑动止挡件38。包壳管4的开口端在端塞8的圆柱形结合部24上的滑动由滑动止挡件阻挡。替代地,管在端塞上的滑动可以通过限制端塞的行程或者通过该过程本身而受到控制。
端塞8的主体22的直径D1优选地仅略微大于圆柱形结合部24的直径D2。在某些实施例中,端塞8的主体22的直径D1等于包壳4的外径DC,OD,因此在焊接配置(图5),燃料棒的外表面在从包壳4到焊接的端塞8的过渡部上具有相同外径。
当包壳管4在端塞8的圆柱形结合部24上滑动时,来自端塞8和/或来自包壳管4的某些材料在这两个部件之间的界面的前边缘处堆积。这种堆积44在图5中示意性地示出。在某些实施例中(参看图8和图9),在端塞8中设置凹槽(例如,在总体上由附图标记44所标注的位置)以接纳堆积,和/或倒角可以添加到径向向外延伸的支座肩部以向外推压加厚材料。一般而言,焊接过程是自清洁的,因为当包壳在端塞8的圆柱形结合部24上滑动时,杂质随着加厚材料(即,堆积44)移动。此外,焊接部24的结合长度较大,例如,对应于如图5所示的圆柱形结合部24的轴向长度Lw
参考图6至图9,示出了其它说明性端塞配置,其包括包壳座和圆柱形结合部并且通常适合于以与图4至图5所示和所描述的端塞8类似的方式焊接到包壳管。此外,每个端塞的各种特征通常是可互换的,使得在一实施例中示出的特征能根据需要包括于其它实施例中。图6至图9的端塞各包括主体,主体包括锥形(例如,圆锥形)端部20和圆柱形主体22。上端塞(未图示)可以包括任何上端塞上端部,与本文关于下端塞特征所公开的主体、结合、座、凹部、滑动止挡件或短柱特征中的任一个(一个或多个)组合。图6至图9的实施例中的每一个的包壳座与图4至图5的端塞8相比修改以包括短柱48。短柱48为可选的特征,其(若包括)提供用于连接间隔元件(未图示)以使燃料芯块6(参看图1)与端塞间隔开的连接点。
参考图6,示出了端塞50,其类似于端塞8,并且包括圆锥形端部20、圆柱形主体2和与主体22相比具有减小的直径的圆柱形结合部24,并且滑动止挡件38限定为在主体22与圆柱形结合部24之间的陡峭台阶。然而,具有从直径D2到直径D3的陡峭减小的图4和图5的实施例的包壳座26在图6的端塞50中被修改的包壳座56替换,包壳座56包括截头圆锥形或斜削结构,其具有随着离圆柱形结合部24的距离增加而逐渐减小的直径。包壳座56的斜削或截头圆锥形状便于在电阻焊接期间在其在包壳座56上受力并且滑动到圆柱形结合部24上时在径向向外推压包壳。在包壳座56联结圆柱形结合部24的点,包壳座56的半径应等于或略小于圆柱形结合部24的直径,但也大于包壳4的内径DC,ID以便俘获并且安放包壳4的端部。
参考图7,示出了说明性端塞60,其类似于图6的端塞50,并且包括圆锥形端部20、圆柱形主体22、与主体22相比具有减小直径的圆柱形结合部24和斜削或截头圆锥形包壳座56。然而,图7的端塞60与图6的端塞50的不同之处在于,在图7的实施例中滑动止挡件38是渐进式滑动止挡件68,滑动止挡件在图4至图5和图6的实施例中是在主体22与圆柱形结合部24之间的陡峭台阶。说明性渐进式滑动止挡件68是45°倒角,然而,也设想到其它角度。渐进式滑动止挡件68有利地提供用于堆积的空间。相反,图4至图5和图6的陡峭边缘滑动止挡件38可以充当堆积物的陷阱。
参考图8,示出了说明性端塞70,其类似于图6的端塞50并且包括圆锥形端部20,圆柱形主体22,与限定陡峭台阶滑动止挡件38的主体22相比具有减小直径的圆柱形结合部24,以及斜削或截头圆锥形包壳座56。然而,图8的端塞70与图6的端塞50的不同之处在于,环形凹部或凹槽79设置于陡峭台阶滑动止挡件38的基部以接纳在电阻焊接过程中生成的堆积物。环形凹部或凹槽79靠近包壳管4的前边缘与滑动止挡件38会合处定位以接纳堆积物。凹部或凹槽79减小了燃料棒外部上的堆积物的向外“积聚”。可以机械地移除任何剩余过量填料。
参考图9,说明性端塞80为图7和图8的端塞70、80的复合物,并且包括圆锥形端部20,圆柱形主体22,与限定渐进式滑动止挡件68的主体22相比具有减小直径的圆柱形结合部24(如在图7中的端塞60中),以及斜削或截头圆锥形包壳座56并且还包括凹部或凹槽79(如在图8的端塞70中)。
陡峭台阶滑动止挡件38或渐进式滑动止挡件68有利地提供包壳4在圆柱形结合部24上滑动的明确终止。然而,设想到完全省略滑动止挡件。在这种实施例中,包壳4在圆柱形结合部24上的滑动由于来自包壳4与圆柱形结合部24之间的干涉配合的力而终止,可能与形成于包壳4与圆柱形结合部24之间的初始焊接界面相组合,因为滑动增加了总接触表面积,导致减小的电阻加热。电阻焊接为难以建模的动态过程。因此,设想到使用实验电阻焊接设备使用尝试错误法来确定过程参数诸如包壳4的内径DC,ID、圆柱形结合部24的外径D2、夹持力F和适合于产生所希望的滑动止挡力的电流。
本文所公开的电阻焊接过程具有多种优点。例如,焊接过程是自清洁的,因为当包壳在端塞的圆柱形接合部24上滑动时,杂质随着堆积材料移位。此外,结合长度Lw可以显著大于包壳管厚度(例如,两倍更长或更多),提供强焊接。所得到的结合线平行于包壳4的表面,这能便于无破坏地检查焊接结合。所得到的焊接部并不突伸于包壳表面上方,并且在某些实施例中,无需执行焊后机械加工来使表面平滑。(替代地,如果渐进式滑动止挡件68和/或凹槽79不足以完全容纳堆积物,设想到某些焊后机械加工移除过量堆积物)。基于焊接过程参数,诸如电流、电压、位移、焊接时间和焊接夹持力来监视和控制焊接品质。此外,陡峭台阶包壳座26或者渐进式(例如,斜削或截头圆锥形)包壳座56提供包壳座4到端塞端部上的固定和明确居中的安放,这显著地增强了牢固性、可靠性和产率。包壳安放的精确居中也便于使用说明性间隔件连接短柱48,因为包壳居中确保了包壳并不总是与短柱48上的间隔件接触或干扰其定位。短柱48具有合适大小和形状以便不在插塞过程中接触包壳管4的开口端(即,在电阻焊接到包壳管4上时)。
说明和描述了优选实施例。显然,在阅读和理解前述详细描述时,其他人可想到修改和更改。本发明意图被理解为包括所有这些修改和更改,只要它们属于所附权利要求或其等效物的范围内。

Claims (30)

1.一种方法,包括:
向核燃料棒的包壳管的开口端插入端塞,所述端塞具有主体和从所述主体延伸并且止于包壳座中的圆柱形结合部,所述包壳座具有与所述圆柱形结合部相比减小的直径,所述插入包括:
抵靠所述端塞的所述包壳座夹持所述包壳管的所述开口端;以及
当夹持时,在所述端塞与所述包壳管的开口端之间施加电流,所述夹持和所述施加电流的组合有效地向所述包壳座上的所述包壳管的所述开口端施力,并且使之在所述端塞的所述圆柱形结合部上滑动,并且在所述端塞的所述圆柱形结合部的圆柱形结合表面与所述包壳管的所述开口端的所述内侧表面之间生成电阻焊接。
2.根据权利要求1所述的方法,其特征在于,所述包壳座包括与所述圆柱形结合部相比减小直径的圆柱形座部和在所述端塞的所述圆柱形座部与所述端塞的所述圆柱形结合部之间的陡峭或渐进式环形台阶。
3.根据权利要求1所述的方法,其特征在于,所述包壳座包括所述端塞的所述圆柱形结合部的斜削或截头圆锥形端部。
4.根据权利要求1所述的方法,其特征在于,所述端塞包括限定于所述端塞的所述主体与所述端塞的所述圆柱形结合部之间的滑动止挡件,所述包壳管的所述开口端在所述端塞的所述圆柱形结合部上的滑动由所述滑动止挡件阻挡。
5.根据权利要求4所述的方法,其特征在于,所述滑动止挡件包括环形凹槽,其接纳在所述包壳管的所述开口端在所述端塞的所述圆柱形结合部上滑动期间移位的堆积材料。
6.根据权利要求4所述的方法,其特征在于,所述滑动止挡件是在所述端塞的所述圆柱形结合部与所述端塞的所述主体之间的陡峭或渐进式环形台阶。
7.根据权利要求1所述的方法,其特征在于,所述插入还包括:
在蛤壳式夹具中夹持所述包壳管的所述开口端,所述蛤壳式夹具防止所述包壳管的所述开口端的外径在所述包壳管的所述开口端在所述端塞的所述圆柱形结合部上滑动期间膨胀。
8.根据权利要求7所述的方法,其特征在于,所述端塞包括环形凹槽,其被布置成接纳在所述包壳管的所述开口端在所述端塞的所述圆柱形结合部上滑动期间移位的堆积材料。
9.根据权利要求7所述的方法,其特征在于,所述蛤壳式夹具为包壳管电极,其用于在所述端塞与所述包壳管的所述开口端之间施加电流。
10.根据权利要求9所述的方法,其特征在于,所述端塞的所述主体包括锥形顶端,在所述插入之后,所述锥形顶端位于所述包壳管外侧,并且所述插入还包括:
将所述端塞的所述主体的所述锥形顶端插置于端塞电极的配合凹部内以在所述端塞与所述包壳管的所述开口端之间施加电流。
11.根据权利要求10所述的方法,其特征在于,使用所述包壳管电极来执行所述夹持以向所述包壳管的所述开口端施加力并且使用所述端塞电极来向所述端塞施加力。
12.根据权利要求1所述的方法,其特征在于,所述圆柱形结合部具有大于所述包壳管的所述开口端的内径的直径。
13.根据权利要求1所述的方法,其特征在于,所述端塞还包括从所述包壳座突伸的短柱,所述短柱的大小和形状使之在所述插入期间并不接触所述包壳管的所述开口端。
14.根据权利要求1所述的方法,其特征在于还包括:
将包括裂变材料的燃料芯块加载到所述包壳管内。
15.根据权利要求14所述的方法,其特征在于还包括:
对于多个包壳管中每一个重复所述加载和所述插入以生成多个组装的核燃料棒;
构造燃料组件,所述燃料组件包括组装的核燃料棒阵列。
16.一种设备,包括:
核燃料棒,其包括:
端塞,其具有圆柱形结合部,在所述端塞一端的锥形顶端和在所述端塞的相反端与所述圆柱形结合部相比具有减小直径的座部;
包壳管,其具有由所述端塞的所述圆柱形结合部插入的端部,所述座部安置于所述包壳管的所述插入端内侧并且所述锥形顶端在所述包壳管的所述插入端外侧延伸;以及
焊接部,其结合所述端塞的所述圆柱形结合部与所述包壳管的所述插入端的内侧表面。
17.根据权利要求16所述的设备,其特征在于,所述焊接部为电阻焊接。
18.根据权利要求16所述的设备,其特征在于,所述座部包括与所述圆柱形结合部相比减小直径的圆柱形座部。
19.根据权利要求16所述的设备,其特征在于,所述座部包括所述端塞的所述圆柱形结合部的斜削或截头圆锥形端部。
20.根据权利要求16所述的设备,其特征在于,所述端塞还具有安置于所述圆柱形结合部与所述锥形顶端之间的圆柱形主体,所述圆柱形主体在所述包壳管的所述插入端外侧延伸并且止于所述锥形顶端。
21.根据权利要求20所述的设备,其特征在于,所述圆柱形主体具有比所述圆柱形结合部更大的直径,并且陡峭或渐进式环形台阶限定于所述端塞的所述圆柱形主体与所述端塞的所述圆柱形结合部之间。
22.根据权利要求21所述的设备,其特征在于,所述端塞还包括在限定于所述圆柱形主体与所述圆柱形结合部之间的所述陡峭或渐进式环形台阶处的所述圆柱形结合部中的环形凹槽。
23.根据权利要求22所述的设备,其特征在于,所述环形凹槽容纳在形成所述焊接部期间生成的堆积材料。
24.根据权利要求16所述的设备,其特征在于,所述端塞还包括从所述座部突伸的短柱,所述短柱并不接触所述包壳管。
25.根据权利要求16所述的设备,其特征在于,所述核燃料棒还包括燃料芯块堆叠,所述燃料芯块堆叠包括安置于所述包壳管中的裂变材料。
26.根据权利要求25所述的设备,其特征在于还包括:
压力容器,其容纳核反应堆堆芯,所述核反应堆堆芯包括浸没于主冷却剂水中的所述核燃料棒的阵列。
27.一种设备,包括:
用于插入核燃料棒包壳管的端部的端塞,所述端塞包括:
在所述端塞的一端的锥形顶端;
圆柱形结合部,其大小适于在所述核燃料棒包壳管的所述端部内侧形成干涉配合;以及
座部,其在与所述锥形顶端相反的所述端塞的端部,与所述圆柱形结合部相比具有减小的直径。
28.根据权利要求27所述的设备,其特征在于,所述端塞还包括安置于所述锥形顶端与所述圆柱形结合部之间的直径为D1的圆柱形主体,并且所述圆柱形结合部具有小于所述圆柱形主体的直径D1的直径D2
29.根据权利要求28所述的设备,其特征在于,所述座部包括具有直径D3的圆柱形座部,直径D3小于所述圆柱形结合部的直径D2
30.根据权利要求28所述的设备,其特征在于,所述座部包括所述圆柱形座部的斜削或截头圆锥形端部。
CN201380031505.8A 2012-04-17 2013-02-15 用于核燃料棒的端帽的电阻焊接 Pending CN104520936A (zh)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US201261625410P 2012-04-17 2012-04-17
US61/625,410 2012-04-17
US13/712,742 2012-12-12
US13/712,742 US9922731B2 (en) 2012-04-17 2012-12-12 Resistance welding of an end cap for nuclear fuel rods
PCT/US2013/026457 WO2013165525A2 (en) 2012-04-17 2013-02-15 Resistance welding of an end cap for nuclear fuel rods

Publications (1)

Publication Number Publication Date
CN104520936A true CN104520936A (zh) 2015-04-15

Family

ID=49325103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201380031505.8A Pending CN104520936A (zh) 2012-04-17 2013-02-15 用于核燃料棒的端帽的电阻焊接

Country Status (5)

Country Link
US (2) US9922731B2 (zh)
EP (1) EP2839465B1 (zh)
CN (1) CN104520936A (zh)
CA (1) CA2870518C (zh)
WO (1) WO2013165525A2 (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106735807A (zh) * 2016-12-28 2017-05-31 中核北方核燃料元件有限公司 一种新锆合金燃料棒顶锻成型焊方法
CN107283037A (zh) * 2016-04-12 2017-10-24 韩电原子力燃料株式会社 核燃料棒电阻焊质量监测方法
CN107900504A (zh) * 2017-12-14 2018-04-13 中核建中核燃料元件有限公司 燃料棒压力电阻焊夹头
CN108511093A (zh) * 2018-04-16 2018-09-07 西安交通大学 一种压水堆燃料棒束高温加热夹持实验装置
CN108778611A (zh) * 2015-11-26 2018-11-09 由俄罗斯原子能集团公司代表的俄罗斯联邦 燃料元件套管和塞之间的焊接接头
CN109935356A (zh) * 2017-12-19 2019-06-25 中国原子能科学研究院 一种用于燃料棒内包壳与端塞焊接的焊接结构
CN109994221A (zh) * 2017-12-29 2019-07-09 中核建中核燃料元件有限公司 一种核燃料棒上端塞
CN112975086A (zh) * 2019-12-12 2021-06-18 沈阳新松机器人自动化股份有限公司 一种端塞压力电阻焊装置
CN113118669A (zh) * 2019-12-30 2021-07-16 中核北方核燃料元件有限公司 一种集成端板拾取的棒束搬运夹具
CN113118682A (zh) * 2019-12-30 2021-07-16 中核北方核燃料元件有限公司 一种用于自动端板焊接的分体棒束夹具
CN113185315A (zh) * 2021-03-29 2021-07-30 岭东核电有限公司 核用碳化硅包壳快速连接方法、SiC包壳及其应用

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2998940B1 (fr) * 2012-11-30 2015-10-02 Livbag Element d'obturation, generateur de gaz muni de celui-ci et son procede de fabrication
KR101406076B1 (ko) * 2013-01-08 2014-06-13 한전원자력연료 주식회사 핵연료봉의 봉단마개 자동 용접장치
US10410754B2 (en) 2016-10-11 2019-09-10 Bwxt Mpower, Inc. Resistance pressure weld for nuclear reactor fuel rod tube end plug
TWI810737B (zh) * 2020-12-07 2023-08-01 美商西屋電器公司 高能核燃料、燃料總成、及更換燃料之方法
CN115116629B (zh) * 2022-05-11 2024-05-10 中国原子能科学研究院 一种环形燃料端塞、环形燃料组件及焊接方法
KR20240044343A (ko) * 2022-09-28 2024-04-04 바울 포 정 리셉터클을 폐쇄하기 위한 방법 및 시스템

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3836431A (en) * 1971-05-04 1974-09-17 Belgonucleaire Sa Nuclear fuel rods having end plugs with bores therethrough sealed by frangible membranes
US4097712A (en) * 1975-11-07 1978-06-27 Kraftwerk Union Aktiengesellschaft Method of joining nuclear fuel rod end caps and nuclear fuel rod cladding tubes
US4587094A (en) * 1984-02-27 1986-05-06 Westinghouse Electric Corp. Fuel rod assembly for a nuclear reactor
CN85101508A (zh) * 1985-04-01 1987-01-24 西屋电器公司 对燃料管管塞的改进
US4857691A (en) * 1988-06-02 1989-08-15 Westinghouse Electric Corp. Burnable absorber rod end plug welding apparatus and method
US5401933A (en) * 1992-11-20 1995-03-28 Mitsubishi Nuclear Fuel Co. Method for welding of end plug of control rod
US5513230A (en) * 1992-09-14 1996-04-30 Siemens Aktiengesellschaft Fuel rod for a nuclear reactor and welding apparatus for producing the fuel rod
CN1672219A (zh) * 2002-06-25 2005-09-21 法玛通Anp公司 调节核反应堆堆心反应性的集束、集束吸收棒及保护吸收棒防止磨损的方法
CN1906702A (zh) * 2003-12-22 2007-01-31 阿海珐核能公司 核反应堆燃料棒

Family Cites Families (50)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4865804A (en) * 1984-05-02 1989-09-12 Westinghouse Electric Corp. Fuel rod end plug
JPS63273090A (ja) 1987-04-30 1988-11-10 Mitsubishi Nuclear Fuel Co Ltd 支持格子
JPH01173898A (ja) 1987-09-10 1989-07-10 Mitsubishi Nuclear Fuel Co Ltd 原子炉燃料集合体の支持格子
US4895698A (en) 1988-03-14 1990-01-23 Westinghouse Electric Corp. Nuclear fuel rod grip with modified diagonal spring structures
US4837419A (en) 1988-06-02 1989-06-06 Westinghouse Electric Corp. Fuel rod end plug welding apparatus and method
DE3839838A1 (de) 1988-11-25 1990-05-31 Bbc Reaktor Gmbh Kerneinbauten eines wassergekuehlten kernreaktors
US4994233A (en) 1989-01-27 1991-02-19 Westinghouse Electric Corp. Fuel rod with axial regions of annular and standard fuel pellets
US4990304A (en) 1989-01-27 1991-02-05 Westinghouse Electric Corp. Instrumentation tube features for reduction of coolant flow-induced vibration of flux thimble tube
US4923669A (en) 1989-02-21 1990-05-08 Westinghouse Electric Corp. Nuclear fuel rod grid spring and dimple structures having chamfered edges for reduced pressure drop
US4996018A (en) 1989-04-19 1991-02-26 Westinghouse Electric Corp. High pressure thimble/guide tube seal fitting with built-in low pressure seal especially suitable for facilitated and more efficient nuclear reactor refueling service
US4966745A (en) 1989-06-28 1990-10-30 Westinghouse Electric Company Fuel rod gripper end cap for minimizing impact with grid cell dimples
US5043134A (en) 1989-06-28 1991-08-27 Westinghouse Electric Corp. Fuel rod gripper end cap for minimizing impact with grid cell dimples
US4971750A (en) 1989-06-29 1990-11-20 Westinghouse Electric Corp. End stop for welding sealing plugs of nuclear fuel rods
US5024806A (en) 1989-09-21 1991-06-18 Westinghouse Electric Corp. Enhanced debris filter bottom nozzle for a nuclear fuel assembly
US5009837A (en) 1989-11-03 1991-04-23 Westinghouse Electric Corp. Axially modular fuel assembly and rod for optimal fuel utilization
US5068083A (en) 1990-05-29 1991-11-26 Westinghouse Electric Corp. Dashpot construction for a nuclear reactor rod guide thimble
US5265137A (en) 1990-11-26 1993-11-23 Siemens Power Corporation Wear resistant nuclear fuel assembly components
US5158740A (en) 1991-08-05 1992-10-27 Westinghouse Electric Corp. Fuel rod end plug welding method
US5207980A (en) 1991-10-27 1993-05-04 Westinghouse Electric Corp. Top nozzle-mounted replacement guide pin assemblies
US5268948A (en) 1992-06-25 1993-12-07 Duke Power Company Locking assembly for nuclear fuel bundles
US5282231A (en) 1992-09-23 1994-01-25 Siemens Power Corporation Lower tie plate cast frame
US5299246A (en) 1992-09-25 1994-03-29 Combustion Engineering, Inc. Shape-memory alloys in the construction of nuclear fuel spacer grids
US5282233A (en) 1992-09-28 1994-01-25 Combustion Engineering, Inc. Low pressure drop easy load end cap
JP3183732B2 (ja) 1992-11-20 2001-07-09 三菱原子燃料株式会社 燃料棒の加圧溶接方法
US5375756A (en) 1993-03-31 1994-12-27 General Electric Company Apparatus for assembling and welding final end plugs to nuclear fuel-containing cladding tubes and inspecting the welds, all on an automated basis
US5367549A (en) 1993-05-06 1994-11-22 Combustion Engineering, Inc. Hexagonal grid
US5436945A (en) 1993-12-03 1995-07-25 Combustion Engineering, Inc. Shadow shielding
US5513234A (en) 1994-07-18 1996-04-30 Rottenberg; Sigmunt Structural member for nuclear reactor pressure tubes
US5640434A (en) 1995-07-31 1997-06-17 Rottenberg; Sigmunt Miniaturized nuclear reactor utilizing improved pressure tube structural members
JPH1123765A (ja) 1997-05-09 1999-01-29 Toshiba Corp 原子炉の炉心
US6055288A (en) 1998-07-24 2000-04-25 Westinghouse Electric Company Nuclear reactor vessel
GB0000241D0 (en) 2000-01-07 2000-03-01 British Nuclear Fuels Plc Improvements in and relating to nuclear fuel assemblies
JP2002122686A (ja) 2000-10-17 2002-04-26 Toshiba Corp 沸騰水型原子力発電プラントおよびその建設工法
US20030169839A1 (en) 2002-03-11 2003-09-11 Matteson Donn Moore Prefabricated in-core instrumentation chase
US6895067B2 (en) 2002-04-30 2005-05-17 Framatome Anp, Inc. Smooth collet for pulling fuel rods
US7424412B2 (en) 2002-12-23 2008-09-09 Global Nuclear Fuel - Americas, Llc Method of determining nuclear reactor core design with reduced control blade density
US7280946B2 (en) 2003-04-30 2007-10-09 Global Nuclear Fuel-Americas, Llc Method and arrangement for determining pin enrichments in fuel bundle of nuclear reactor
US7245689B2 (en) 2003-06-18 2007-07-17 Mitsubishi Heavy Industries, Ltd Nuclear reactor internal structure
DE10328920A1 (de) 2003-06-26 2005-01-20 Framatome Anp Gmbh Verfahren zum rechnerischen Modellieren des Kerns eines Kernreaktors
US7085340B2 (en) 2003-09-05 2006-08-01 Westinghouse Electric Co, Llc Nuclear reactor fuel assemblies
US20060039524A1 (en) 2004-06-07 2006-02-23 Herbert Feinroth Multi-layered ceramic tube for fuel containment barrier and other applications in nuclear and fossil power plants
US7526058B2 (en) 2004-12-03 2009-04-28 General Electric Company Rod assembly for nuclear reactors
US7574337B2 (en) 2004-12-30 2009-08-11 Global Nuclear Fuel - Americas, Llc Method of determining a fresh fuel bundle design for a core of a nuclear reactor
US8374308B2 (en) 2005-01-11 2013-02-12 Westinghouse Electric Company Llc Helically fluted tubular fuel rod support
US20060222140A1 (en) 2005-04-04 2006-10-05 Westinghouse Electric Company Llc Eccentric support grid for nuclear fuel assembly
US20060251205A1 (en) 2005-05-02 2006-11-09 Westinghouse Electric Co. Llc In-core fuel restraint assembly
US20070206717A1 (en) 2006-03-02 2007-09-06 Westinghouse Electric Company Llc Multiple and variably-spaced intermediate flow mixing vane grids for fuel assembly
US7548602B2 (en) 2006-03-09 2009-06-16 Westinghouse Electric Co. Llc Spacer grid with mixing vanes and nuclear fuel assembly employing the same
US7453972B2 (en) 2006-06-09 2008-11-18 Westinghouse Electric Co. Llc Nuclear fuel assembly control rod drive thimble to bottom nozzle connector
US20080084957A1 (en) 2006-10-06 2008-04-10 Westinghouse Electric Company, Llc Nuclear reactor fuel assemblies

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3836431A (en) * 1971-05-04 1974-09-17 Belgonucleaire Sa Nuclear fuel rods having end plugs with bores therethrough sealed by frangible membranes
US4097712A (en) * 1975-11-07 1978-06-27 Kraftwerk Union Aktiengesellschaft Method of joining nuclear fuel rod end caps and nuclear fuel rod cladding tubes
US4587094A (en) * 1984-02-27 1986-05-06 Westinghouse Electric Corp. Fuel rod assembly for a nuclear reactor
CN85101508A (zh) * 1985-04-01 1987-01-24 西屋电器公司 对燃料管管塞的改进
US4857691A (en) * 1988-06-02 1989-08-15 Westinghouse Electric Corp. Burnable absorber rod end plug welding apparatus and method
US5513230A (en) * 1992-09-14 1996-04-30 Siemens Aktiengesellschaft Fuel rod for a nuclear reactor and welding apparatus for producing the fuel rod
US5401933A (en) * 1992-11-20 1995-03-28 Mitsubishi Nuclear Fuel Co. Method for welding of end plug of control rod
CN1672219A (zh) * 2002-06-25 2005-09-21 法玛通Anp公司 调节核反应堆堆心反应性的集束、集束吸收棒及保护吸收棒防止磨损的方法
CN1906702A (zh) * 2003-12-22 2007-01-31 阿海珐核能公司 核反应堆燃料棒

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108778611A (zh) * 2015-11-26 2018-11-09 由俄罗斯原子能集团公司代表的俄罗斯联邦 燃料元件套管和塞之间的焊接接头
US10357844B2 (en) 2016-04-12 2019-07-23 Kepco Nuclear Fuel Co., Ltd. Method of monitoring of resistance welding quality of nuclear fuel rod
CN107283037B (zh) * 2016-04-12 2020-10-09 韩电原子力燃料株式会社 核燃料棒电阻焊质量监测方法
CN107283037A (zh) * 2016-04-12 2017-10-24 韩电原子力燃料株式会社 核燃料棒电阻焊质量监测方法
CN106735807A (zh) * 2016-12-28 2017-05-31 中核北方核燃料元件有限公司 一种新锆合金燃料棒顶锻成型焊方法
CN107900504A (zh) * 2017-12-14 2018-04-13 中核建中核燃料元件有限公司 燃料棒压力电阻焊夹头
CN109935356A (zh) * 2017-12-19 2019-06-25 中国原子能科学研究院 一种用于燃料棒内包壳与端塞焊接的焊接结构
CN109994221A (zh) * 2017-12-29 2019-07-09 中核建中核燃料元件有限公司 一种核燃料棒上端塞
CN108511093B (zh) * 2018-04-16 2019-05-03 西安交通大学 一种压水堆燃料棒束高温加热夹持实验装置
CN108511093A (zh) * 2018-04-16 2018-09-07 西安交通大学 一种压水堆燃料棒束高温加热夹持实验装置
CN112975086A (zh) * 2019-12-12 2021-06-18 沈阳新松机器人自动化股份有限公司 一种端塞压力电阻焊装置
CN113118669A (zh) * 2019-12-30 2021-07-16 中核北方核燃料元件有限公司 一种集成端板拾取的棒束搬运夹具
CN113118682A (zh) * 2019-12-30 2021-07-16 中核北方核燃料元件有限公司 一种用于自动端板焊接的分体棒束夹具
CN113118682B (zh) * 2019-12-30 2023-04-14 中核北方核燃料元件有限公司 一种用于自动端板焊接的分体棒束夹具
CN113118669B (zh) * 2019-12-30 2023-05-12 中核北方核燃料元件有限公司 一种集成端板拾取的棒束搬运夹具
CN113185315A (zh) * 2021-03-29 2021-07-30 岭东核电有限公司 核用碳化硅包壳快速连接方法、SiC包壳及其应用

Also Published As

Publication number Publication date
US20180261337A1 (en) 2018-09-13
EP2839465A2 (en) 2015-02-25
CA2870518C (en) 2020-07-21
WO2013165525A3 (en) 2014-01-16
US9922731B2 (en) 2018-03-20
EP2839465A4 (en) 2015-12-30
CA2870518A1 (en) 2013-11-07
EP2839465B1 (en) 2017-10-18
US20130272484A1 (en) 2013-10-17
WO2013165525A2 (en) 2013-11-07

Similar Documents

Publication Publication Date Title
CN104520936A (zh) 用于核燃料棒的端帽的电阻焊接
US11049623B2 (en) Resistance pressure weld for nuclear reactor fuel rod tube end plug
EP2439014A2 (en) Dissimilar material joint structure
JP2009122099A (ja) 原子炉内の炉心溶射下降管を修理する方法および装置
CN106001825A (zh) 耐腐蚀高温合金管-管板连接方法及换热器
CN105161149A (zh) 一种实验快堆用fms材料辐照容器
US20170206984A1 (en) End cap for nuclear fuel rod having an angled recess and welding thereof
US8891724B2 (en) Dual-cooled nuclear fuel rod having annular plugs and method of manufacturing the same
US20120246933A1 (en) Top nozzle for nuclear fuel assembly having spring insert hole improved in fastening stability and method of manufacturing the same
JP2692762B2 (ja) 核燃料棒
CN105895177A (zh) 堆芯吊篮的制造方法以及堆芯吊篮
CN104335287B (zh) 带有弯曲连结部的核控制棒
JPS62116289A (ja) 核燃料棒の端栓
US20130272483A1 (en) Lower end plug with temperature reduction device and nuclear reactor fuel rod including same
CN109935357B (zh) 一种将环形燃料棒下端与下管座固定的固定结构
KR20190005777A (ko) 조립 케이싱과 케이싱에 삽입된 조립 요소 사이의 가역성 무용접 연결부를 가진 sfr 유형의 원자로용 조립체
GB2553090A (en) Method of manufacture
US8419074B2 (en) Joint structure
CN203260332U (zh) 实验快堆用含镎嬗变试验组件
CN104183290A (zh) 实验快堆用含镎嬗变试验组件
CN201340353Y (zh) 一种深入管道或设备中的取样装置
CN210770630U (zh) 一种应用于波纹管截止阀的波纹管组件焊接结构
CN204565440U (zh) 坡口对接焊接结构
WO2014032704A1 (en) Method and apparatus for connecting pipes together
KR101387820B1 (ko) 원자력 발전소용 배관구조 및 시공방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150415