CN104499430B - 用于全预制拼装桥梁间的湿接段连接结构 - Google Patents
用于全预制拼装桥梁间的湿接段连接结构 Download PDFInfo
- Publication number
- CN104499430B CN104499430B CN201410801944.9A CN201410801944A CN104499430B CN 104499430 B CN104499430 B CN 104499430B CN 201410801944 A CN201410801944 A CN 201410801944A CN 104499430 B CN104499430 B CN 104499430B
- Authority
- CN
- China
- Prior art keywords
- wet
- lower floor
- prefabricated
- bridge deck
- connecing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/06—Arrangement, construction or bridging of expansion joints
- E01D19/067—Flat continuous joints cast in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种用于全预制拼装桥梁间的湿接段连接结构,包括一具有一定厚度的预制下层桥面板;所述预制下层桥面板的上缘设置有外凸钢筋结构;所述预制下层桥面板设置于两预制梁的湿接段;两所述预制梁位于湿接段的一侧设置为凹形结构;所述外凸钢筋结构延伸至所述凹形结构内。本发明为一种既可以免除使用吊模,又可以保证桥梁结构受力要求的用于预制拼装桥梁间的湿接段连接结构。
Description
技术领域
本发明涉及桥梁施工技术领域,尤其涉及一种用于全预制拼装桥梁间的湿接段连接结构。
背景技术
目前,对于由多榀预制小箱梁、预制T梁或预制板梁拼装的桥梁,安装完成后要进行纵向湿接段连接。目前常用两种连接方式,第一种为在两预制梁1的接缝处,采用如图1所示的悬吊木模2,用混凝土3进行现场浇筑,完成湿接段的连接。但是,这种接缝方式,施工时需要在湿接段下面搭设悬吊模板,施工完毕后需要设置支架拆除悬吊模板。需要较多的人力物力,劳动强度大,工作效率低,而且由于吊模的安装和拆除,对桥梁下部的地面交通的正常运行也会产生一定的影响。
第二种连接方式如图2所示,即将后浇段部分桥面板的底缘悬挑11并与预制梁1同时预制,两榀梁吊装就位并拢时,底缘悬挑部分兼做底模,在其上浇筑梁间后浇桥面板混凝土3,完成湿接段的连接。这种湿接段连接结构,虽然免除了吊模安装与拆除所带来的工作量,以及吊模安装和拆除过程给地面交通带来的不便,但是,由于两榀梁中兼作底模的预制桥面板的底缘在拼接位置并不相连,其间有一定的间隙2,从而导致接缝位置处桥面板结构的有效高度减小,导致该接缝处为桥梁结构受力不利位置。为满足桥梁结构受力要求,需额外增加桥面板厚度或增加桥面板内钢筋配置,增加了施工成本。
因此,本领域技术人员亟需研究一种既可以免除使用吊模,又可以保证桥梁结构受力要求的用于全预制拼装桥梁间的湿接段连接结构。
发明内容
有鉴于现有技术的上述缺陷,本发明提出了一种不使用吊模,同时可以保证桥梁结构受力要求的用于全预制拼装桥梁间的湿接段连接结构。
为实现上述目的,本发明提供了一种用于全预制拼装桥梁间的湿接段连接结构,包括一具有一定厚度的预制下层桥面板;所述预制下层桥面板的上缘设置有外凸钢筋结构;所述预制下层桥面板设置于两预制梁的湿接段;两所述预制梁位于湿接段的一侧设置为凹形结构;所述外凸钢筋结构延伸至所述凹形结构内;所述下层桥面板与二所述预制梁之间浇筑有将二所述预制梁连为一体的混凝土。
进一步地,所述预制梁内设置有第一钢筋;所述第一钢筋与所述外凸钢筋结构交错设置。
进一步地,所述混凝土内设置有第二钢筋;所述第二钢筋与所述外凸钢筋结构绑扎成型。
进一步地,所述预制下层桥面板的厚度为5-8cm。
本发明的有益效果:
本发明的用于全预制拼装桥梁间的湿接段连接结构,在湿接段设置有预制下层桥面板,由于该部分预制下层桥面板单独预制,可以根据湿接段的要求灵活设置,并且该预制下层桥面板在作为下层面板的同时,兼作后期浇筑混凝土的模板,避免了使用吊模需要浇筑前后安装拆卸的问题,节约了成本,节省了时间。
同时,由于下层预制桥面板上缘设置有外凸钢筋结构,该外凸钢筋结构与湿接段侧部的预制梁的凹形结构相互交错,同时湿接段与预制梁接缝位置避开了结构受力较大位置,保证了接缝处的受力要求,避免由于湿接段接缝处强度不满足要求需要增加板厚的问题,节约了施工成本。
以下将结合附图对本发明的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本发明的目的、特征和效果。
附图说明
图1为第一种现有的用于全预制拼装桥梁间的湿接段连接结构的示意图。
图2为第二种现有的用于全预制拼装桥梁间的湿接段连接结构的示意图。
图3为本发明的实施例一的湿接段连接结构的示意图。
图4为图3预制梁的结构示意图。
图5为图3中的预制下层桥面的结构示意图。
具体实施方式
本发明所提及的湿接段,是指设置于分块预制的预制梁之间,采用现浇混凝土将预制梁连为整体的部分。
本发明提供了一种用于全预制拼装桥梁间的湿接段连接结构。在实施例一中,如图3至图5所示,包括一具有一定厚度的预制下层桥面板1,为了保证该预制下层桥面板1具有一定的强度,其厚度应该大于5cm,本实施例中,选用的厚度为7cm。
预制下层桥面板1设置于两预制梁2之间的湿接段。由于预制下层桥面板1与两侧的预制梁之间有一定的缝隙3,在后期浇筑混凝土4之前,首先对该缝隙进行密封处理。
为了保证混凝土4浇注后湿接段的强度和刚度满足施工要求,预制下层桥面板1的内部设置有钢筋12,并且在其上缘设置有外凸钢筋结构11。同时,为了增强湿接段与两侧预制梁之间的结合强度,将两预制梁位于湿接段的一侧设置为凹形结构,并在预制梁内设置第一钢筋21,让预制下层桥面板1上缘的外凸钢筋结构延伸至凹形结构内,并与预制桥梁内的钢筋交错设置,即预制下层桥面板1上缘的外凸的钢筋与预制桥梁内的第一钢筋21之间沿水平或者垂直方向有重叠或则交叉。
根据湿接段强度和刚度的要求,在预制下层桥面板上部的湿接段内设置一定数量的第二钢筋,并与设置于预制下层桥面板上缘的钢筋进行连接,然后浇筑混凝土,将两预制梁连接为一整体。
本发明的具体应用情况如下:根据湿接段的宽度和长度要求,预制满足要求的一定厚度的下层桥面板1,并根据所需承受的荷载的大小在其内设置多根外凸钢筋11;将预制下层桥面板1设置于湿接段,并对预制下层桥面板与两侧预制梁之间的缝隙进行密封处理;根据湿接段对强度和刚度的要求,在预制下层桥面板上部的湿接段设置一定数量的第二钢筋,并与设置于预制下层桥面板上缘的外凸钢筋进行绑接;浇筑混凝土,将两预制梁连接为一整体。
在其他实施例中,预制下层桥面板的厚度为5-8cm,或者根据需要选用厚度更厚的预制下层桥面板。
本发明的用于全预制拼装桥梁间的湿接段连接结构,在湿接段设置有预制下层桥面板,由于该部分预制下层桥面板单独预制,可以根据湿接段的要求灵活设置,并且该预制下层桥面板在作为下层面板的同时,兼作后期浇筑混凝土的模板,避免了使用吊模需要浇筑前后安装拆卸的问题,节约了成本,节省了时间,有效减少了对地面现状交通的影响。
同时,由于下层预制桥面板上缘设置有外凸钢筋结构,该外凸钢筋结构与湿接段侧部的预制梁的凹形结构相互交错,湿接段与预制梁接缝位置避开了结构受力较大位置,保证了接缝处的受力要求,避免由于湿接段接缝处强度不满足要求需要增加板厚的问题,节约了施工成本。
以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。
Claims (2)
1.一种用于全预制拼装桥梁间的湿接段连接结构,其特征在于:包括一具有一定厚度的预制下层桥面板;所述预制下层桥面板的上缘设置有外凸钢筋结构;所述预制下层桥面板设置于两预制梁的湿接段;两所述预制梁位于湿接段的一侧设置为凹形结构;所述外凸钢筋结构延伸至所述凹形结构内;所述下层桥面板与二所述预制梁之间浇筑有将二所述预制梁连为一体的混凝土;所述预制梁内设置有第一钢筋;所述第一钢筋与所述外凸钢筋结构交错设置;所述混凝土内设置有第二钢筋;所述第二钢筋与所述外凸钢筋结构绑扎成型。
2.如权利要求1所述的用于全预制拼装桥梁间的湿接段连接结构,其特征在于:所述预制下层桥面板的厚度为5-8cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410801944.9A CN104499430B (zh) | 2014-12-18 | 2014-12-18 | 用于全预制拼装桥梁间的湿接段连接结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410801944.9A CN104499430B (zh) | 2014-12-18 | 2014-12-18 | 用于全预制拼装桥梁间的湿接段连接结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104499430A CN104499430A (zh) | 2015-04-08 |
CN104499430B true CN104499430B (zh) | 2016-03-23 |
Family
ID=52940873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410801944.9A Active CN104499430B (zh) | 2014-12-18 | 2014-12-18 | 用于全预制拼装桥梁间的湿接段连接结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104499430B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400667A (zh) * | 2016-11-16 | 2017-02-15 | 上海市城市建设设计研究总院 | 超高性能混凝土铰缝链接的空心板梁结构 |
CN107237260A (zh) * | 2017-08-11 | 2017-10-10 | 上海市城市建设设计研究总院(集团)有限公司 | 采用uhpc覆面的桥面板纵向连续结构 |
CN109137727B (zh) * | 2018-09-29 | 2024-05-17 | 中铁第四勘察设计院集团有限公司 | 一种基于早强uhpc的干湿组合节段预制拼装接缝系统及方法 |
CN110983942A (zh) * | 2019-12-23 | 2020-04-10 | 同济大学建筑设计研究院(集团)有限公司 | 预制梁横向连接结构及连接方法 |
CN111305067A (zh) * | 2020-04-02 | 2020-06-19 | 江西省高速公路投资集团有限责任公司 | 一种预制桥面板湿接缝连接结构 |
CN111926676A (zh) * | 2020-08-17 | 2020-11-13 | 北京市市政专业设计院股份公司 | 一种装配式桥梁 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003119718A (ja) * | 2001-10-09 | 2003-04-23 | Haltec:Kk | 橋 梁 |
JP2007239178A (ja) * | 2006-03-03 | 2007-09-20 | Ohbayashi Corp | 橋台部付近の接合構造及び接合方法 |
CN101570960A (zh) * | 2009-05-08 | 2009-11-04 | 北京市市政专业设计院有限责任公司 | 一种t梁桥的加固方法 |
CN203065951U (zh) * | 2012-12-19 | 2013-07-17 | 上海市城市建设设计研究总院 | 预制空心板梁的连接构造 |
CN203668829U (zh) * | 2013-06-04 | 2014-06-25 | 中铁四局集团第四工程有限公司 | 上跨桥梁的湿接缝施工防护板 |
CN204370303U (zh) * | 2014-12-18 | 2015-06-03 | 上海市城市建设设计研究总院 | 用于全预制拼装桥梁间的湿接段连接结构 |
-
2014
- 2014-12-18 CN CN201410801944.9A patent/CN104499430B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003119718A (ja) * | 2001-10-09 | 2003-04-23 | Haltec:Kk | 橋 梁 |
JP2007239178A (ja) * | 2006-03-03 | 2007-09-20 | Ohbayashi Corp | 橋台部付近の接合構造及び接合方法 |
CN101570960A (zh) * | 2009-05-08 | 2009-11-04 | 北京市市政专业设计院有限责任公司 | 一种t梁桥的加固方法 |
CN203065951U (zh) * | 2012-12-19 | 2013-07-17 | 上海市城市建设设计研究总院 | 预制空心板梁的连接构造 |
CN203668829U (zh) * | 2013-06-04 | 2014-06-25 | 中铁四局集团第四工程有限公司 | 上跨桥梁的湿接缝施工防护板 |
CN204370303U (zh) * | 2014-12-18 | 2015-06-03 | 上海市城市建设设计研究总院 | 用于全预制拼装桥梁间的湿接段连接结构 |
Also Published As
Publication number | Publication date |
---|---|
CN104499430A (zh) | 2015-04-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104499430B (zh) | 用于全预制拼装桥梁间的湿接段连接结构 | |
CN101424075B (zh) | 混凝土箱梁桥拓宽加固结构及其施工方法 | |
CN206784913U (zh) | 一种两段式叠合板接缝吊模工具 | |
CN107419824A (zh) | 再生式钢骨架全预制剪力墙结构体系及施工方法 | |
CN108589971A (zh) | 一种闭口型压型钢板混凝土组合剪力墙连接节点及制作方法 | |
CN103711067A (zh) | 一种少支架横向拼装波形钢腹板组合箱梁及施工方法 | |
CN103410265A (zh) | 一种叠合楼板的拼接构造 | |
CN110172924B (zh) | 整体式液压箱梁模板施工方法 | |
CN106120542A (zh) | 可应用于抗震设防烈度较高区域的装配式墩及其施工工艺 | |
CN203440965U (zh) | 一种叠合楼板的拼接构造 | |
CN105220792A (zh) | 一种预制暗支撑耗能剪力墙及其组装方法 | |
CN204370303U (zh) | 用于全预制拼装桥梁间的湿接段连接结构 | |
CN104314013B (zh) | 一种极不对称组合梁的双悬臂施工方法 | |
CN104047234A (zh) | 波形钢腹板连续刚构桥自承重边跨合龙施工方法 | |
CN207812307U (zh) | 斜拉桥主塔及钢锚梁的施工系统 | |
CN103669193B (zh) | 一种横向拼装波形钢腹板组合t梁及施工方法 | |
CN109797971A (zh) | 现浇钢筋混凝土框架结构建筑构件的拆解及拼装方法 | |
CN206942138U (zh) | 浇注模板拼接桥板 | |
CN203559345U (zh) | 一种无砼型桥梁伸缩缝装置 | |
CN107916625A (zh) | 一种宽悬臂箱梁的加宽结构及其方法 | |
CN104746434B (zh) | 一种不拆除外模的合龙段模板系统 | |
CN204959617U (zh) | 用于支承桥梁箱梁的初始块的模板的支架 | |
CN208668274U (zh) | 一种钢混组合梁桥 | |
CN203145273U (zh) | 可拆装钢-混凝土组合楼板 | |
CN203905210U (zh) | 一种钢管束组合结构剪力墙现场拼接节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 200011 Tibet South Road, Shanghai, No. 1170, No. Patentee after: Shanghai urban construction design & Research Institute (Group) Co., Ltd. Address before: 200011 Tibet South Road, Shanghai, No. 1170, No. Patentee before: Shanghai Urban Construction Design & Research Institute |