CN104481142B - 对柱模板同步连锁支撑体系的施工方法 - Google Patents
对柱模板同步连锁支撑体系的施工方法 Download PDFInfo
- Publication number
- CN104481142B CN104481142B CN201410805022.5A CN201410805022A CN104481142B CN 104481142 B CN104481142 B CN 104481142B CN 201410805022 A CN201410805022 A CN 201410805022A CN 104481142 B CN104481142 B CN 104481142B
- Authority
- CN
- China
- Prior art keywords
- coupled columns
- template
- support system
- angle steel
- split bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明属于建筑技术领域,特别涉及一种对柱模板同步连锁支撑体系的施工方法,采取以下步骤:(1)定位放线;(2)安放模板;(3)安装方木次楞;(4)安装对柱连锁支撑体系;(5)对柱之间角钢次楞安装;(6)设置对拉螺栓;(7)模板系统整体固定;本发明通过连锁支撑体系,柱箍、斜撑之间通过螺栓连接,施工速度快,连接系统稳定牢固,真正实现了对柱同步施工,有效保证了对柱的施工质量;纵横向对拉螺栓间隔设置,减少对拉螺栓的使用数量,节约施工成本;对柱同步连锁支撑体系施工,缩短施工周期1/3以上,降低分项工程施工成本10%左右;模板支撑体系整体固定,有效保证对柱垂直度,防止对柱浇筑时发生偏移或侧移现象。
Description
技术领域
本发明涉及一种对柱模板同步连锁支撑体系的施工方法,属于建筑技术领域。
背景技术
现阶段一些商场、办公用房由于单层面积较大,结构上往往需要留置一道、甚至数道温度伸缩缝,以保证建筑物随着温度变化能自由伸缩,不产生内应力。温度伸缩缝两侧一般设置框架柱,由于温度伸缩缝缝宽一般10cm到30cm之间。导致框架柱的间距非常小,这种框架柱相距非常小的我们通常称为对柱,对柱的间距一般10~30cm。目前,对柱施工方法有两种,一种是先施工其中的一根框架柱,待该框架柱拆模后再施工另一根框架柱,采用该方法施工主要缺陷是施工速度慢,必须等到先施工框架柱拆模后才能继续施工,有两天左右的施工间歇,严重制约着施工工期;另一种方法是两根柱子同步施工,由于二者之间间距非常小,一般采用中间填塞挤塑聚苯板方法,混凝土浇筑时采用两个下料口同步浇筑,施工时对浇筑和振捣工人的技术要求非常高,两侧下料高度必须保持一致,振捣混凝土时振捣位置及振捣时间也必须保持一致,在实际施工操作中很难实现,施工后经常出现一跟柱子大,一根柱子小,由于挤塑聚苯板是柔性材料,受压易变形,导致两根柱子截面尺寸难易控制。
发明内容
本发明要解决的技术问题是:提供一种施工方便,便于控制对柱尺寸,从而保证施工质量的对柱模板同步连锁支撑体系的施工方法。
本发明所述的对柱模板同步连锁支撑体系的施工方法,采取以下步骤:
(1)定位放线:放出对柱的中线及外边线;
(2)安放模板:根据对柱外边线安装对柱模板,模板采用≥15㎜厚竹胶合板;
(3)安装方木次楞:采用50×70mm的方木做次楞,方木次楞间距不大于200mm,对柱之间模板不安装方木次楞;
(4)安装对柱连锁支撑体系:该支撑体系包括两个柱箍及连接两个柱箍的对角斜撑组成,柱箍及对角斜撑由螺栓连接,该支撑体系竖直分布在对柱上,两相邻柱箍的竖直间距不大于300mm;
(5)对柱之间角钢次楞安装:首先安装固定角钢次楞的竖向辅助固定角钢,该竖向辅助固定角钢与上方柱箍的横向角钢三面满焊,与下方柱箍的纵向角钢采用螺栓连接,角钢次楞通过螺栓固定在两竖向辅助固定角钢之间;
(6)设置对拉螺栓:柱箍的横向、纵向方向上设置对拉螺栓,对拉螺栓的间距采用两个连锁支撑体系之间的间距,横向、纵向的对拉螺栓在竖直分布在柱箍上间隔设置,对拉螺栓与柱箍背楞采用螺栓连接,对拉螺栓的间距以及对拉螺栓与柱箍的间距不大于400mm;
(7)模板系统整体固定:利用钢管将对柱模板支撑体系与满堂脚手架连接到一起,防止对柱模板发生偏移或侧移。
步骤4中的螺栓的直径可为14mm,步骤6中对拉螺栓采用直径不小于14mm的螺纹型对拉螺栓。
所述的步骤4中用到的柱箍包括横向角钢和纵向角钢,横向角钢和纵向角钢相互垂直设置,相邻的两纵向角钢之间通过交叉设置的对角斜撑连接。
本发明的有益效果是:
(1)通过连锁支撑体系,柱箍、斜撑之间通过螺栓连接,施工速度快,连接系统稳定牢固,有效保证了对柱的施工质量;
(2)真正实现了对柱同步施工,并保证了对柱的施工质量。
(3)纵横向对拉螺栓间隔设置,减少对拉螺栓的使用数量,节约施工成本;
(4)对柱同步连锁支撑体系施工,缩短施工周期1/3以上,降低分项工程施工成本10%左右;
(5)模板支撑体系整体固定,有效保证对柱垂直度,防止对柱浇筑时发生偏移或侧移现象。
附图说明
图1是本发明中支撑体系的结构示意图。
图2是图1中A部位的放大结构示意图。
图3是图2的右视结构示意图。
图4是图1的俯视结构示意图。
图中:1、纵向角钢2、横向角钢3、对角斜撑4、对拉螺栓5、模板6、方木次楞7、竖向辅助固定角钢8、角钢次楞。
具体实施方式
下面结合附图对本发明做进一步描述:
如图1~图4所示,本发明所述的对柱模板同步连锁支撑体系的施工方法,采取以下步骤:
(1)定位放线:放出对柱的中线及外边线;
(2)安放模板:根据对柱外边线安装对柱模板5,模板5采用≥15㎜厚竹胶合板;
(3)安装方木次楞:采用50×70mm的方木做次楞,方木次楞6间距不大于200mm,对柱之间模板5不安装方木次楞6;
(4)安装对柱连锁支撑体系:该支撑体系包括两个柱箍及连接两个柱箍的对角斜撑3组成,柱箍及对角斜撑3由直径为14mm的螺栓连接,该支撑体系竖直分布在对柱上,两相邻柱箍的竖直间距不大于300mm,柱箍包括横向角钢2和纵向角钢1,横向角钢2和纵向角钢1相互垂直设置,相邻的两纵向角钢1之间通过交叉设置的对角斜撑3连接;
(5)对柱之间角钢次楞安装:首先安装固定角钢次楞8的竖向辅助固定角钢7,该竖向辅助固定角钢7与上方柱箍的横向角钢2三面满焊,与下方柱箍的纵向角钢1采用螺栓连接,角钢次楞8通过螺栓固定在两竖向辅助固定角钢7之间;
(6)设置对拉螺栓:柱箍的横向、纵向方向上设置对拉螺栓4,对拉螺栓4采用直径不小于14mm的螺纹型对拉螺栓,对拉螺栓4的间距采用两个连锁支撑体系之间的间距,横向、纵向的对拉螺栓在竖直分布在柱箍上间隔设置,对拉螺栓4与柱箍背楞采用螺栓连接,对拉螺栓4之间的间距、对拉螺栓4与柱箍之间的间距均不大于400mm;
(7)模板系统整体固定:利用钢管将对柱模板支撑体系与满堂脚手架连接到一起,防止对柱模板发生偏移或侧移。
Claims (2)
1.一种对柱模板同步连锁支撑体系的施工方法,其特征在于采取以下步骤:
(1)定位放线:放出对柱的中线及外边线;
(2)安放模板:根据对柱外边线安装对柱模板(5),模板(5)采用≥15㎜厚竹胶合板;
(3)安装方木次楞:采用50×70mm的方木做次楞,方木次楞(6)间距不大于200mm,对柱之间模板(5)不安装方木次楞(6);
(4)安装对柱连锁支撑体系:该支撑体系包括两个柱箍及连接两个柱箍的对角斜撑(3)组成,柱箍及对角斜撑(3)由螺栓连接,该支撑体系竖直分布在对柱上,两相邻柱箍的竖直间距不大于300mm;
(5)对柱之间角钢次楞安装:首先安装固定角钢次楞(8)的竖向辅助固定角钢(7),该竖向辅助固定角钢(7)与上方柱箍的横向角钢(2)三面满焊,与下方柱箍的纵向角钢(1)采用螺栓连接,角钢次楞(8)通过螺栓固定在两竖向辅助固定角钢(7)之间;
(6)设置对拉螺栓:柱箍的横向、纵向方向上设置对拉螺栓(4),对拉螺栓(4)的间距采用两个连锁支撑体系之间的间距,横向、纵向的对拉螺栓在竖直分布在柱箍上间隔设置,对拉螺栓(4)与柱箍背楞采用螺栓连接,对拉螺栓(4)之间的间距以及对拉螺栓(4)与柱箍之间的间距均不大于400mm;
(7)模板系统整体固定:利用钢管将对柱模板支撑体系与满堂脚手架连接到一起,防止对柱模板发生偏移或侧移。
2.根据权利要求1所述的对柱模板同步连锁支撑体系的施工方法,其特征在于:步骤4中用到的柱箍包括横向角钢(2)和纵向角钢(1),横向角钢(2)和纵向角钢(1)相互垂直设置,相邻的两纵向角钢(1)之间通过交叉设置的对角斜撑(3)连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410805022.5A CN104481142B (zh) | 2014-12-22 | 2014-12-22 | 对柱模板同步连锁支撑体系的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410805022.5A CN104481142B (zh) | 2014-12-22 | 2014-12-22 | 对柱模板同步连锁支撑体系的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104481142A CN104481142A (zh) | 2015-04-01 |
CN104481142B true CN104481142B (zh) | 2016-06-22 |
Family
ID=52755737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410805022.5A Active CN104481142B (zh) | 2014-12-22 | 2014-12-22 | 对柱模板同步连锁支撑体系的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104481142B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853944A (zh) * | 2018-12-29 | 2019-06-07 | 河南科建建设工程有限公司 | 建筑物框架结构方柱方圆扣支模及其施工方法 |
CN115142672A (zh) * | 2022-08-01 | 2022-10-04 | 中国建筑第八工程局有限公司 | 一种楼梯模板钢木次楞防滑装置 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0642187A (ja) * | 1992-07-21 | 1994-02-15 | Toshiharu Miyazaki | 夛目的タワー柱と上下構造体継手付橋梁式人工台地での在来機能存続上下機能転換建築工法と、その建設システム。 |
CN100334312C (zh) * | 2005-07-29 | 2007-08-29 | 梁振成 | 可拆式建筑模组件及建筑模框架施工方法 |
KR100878791B1 (ko) * | 2007-06-29 | 2009-01-14 | (주)화인테크 | 콘크리트기둥 시공을 위한 가변형 거푸집장치 |
CN201176709Y (zh) * | 2008-04-25 | 2009-01-07 | 中冶京唐建设有限公司 | 框架柱定型柱箍模具 |
JP2012001997A (ja) * | 2010-06-18 | 2012-01-05 | Yokogawa Koji Kk | 折り畳み式支保工 |
CN201747044U (zh) * | 2010-08-19 | 2011-02-16 | 朱奎 | 一种脚手架拉结框架构造 |
CN201943347U (zh) * | 2011-02-23 | 2011-08-24 | 陕西建工集团第五建筑工程有限公司 | 框架柱塑料模板安装结构 |
-
2014
- 2014-12-22 CN CN201410805022.5A patent/CN104481142B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104481142A (zh) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888108B (zh) | 内置定位预制件钢筋混凝土剪力墙及施工方法 | |
CN104631512B (zh) | 吊模法后浇带梁板施工方法 | |
CN103352564B (zh) | 水平结构模板体系及施工方法 | |
CN202731297U (zh) | 一种可调梁模板支撑顶托架装置 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN104453224A (zh) | 一种地下室外墙的模板支护结构及其施工方法 | |
CN204983662U (zh) | 一种对拉螺杆与钢管排架组合单侧支模装置 | |
CN103422667B (zh) | 一种双板预制叠合墙体支护体系 | |
CN103982199A (zh) | 隧道二次衬砌模板台车用堵头模板、堵头节点及封堵方法 | |
CN104295088A (zh) | 一种变形缝两侧剪力墙的钢木组合模板结构及其施工方法 | |
CN104563299A (zh) | 钢筋混凝土预制组件及安装方法 | |
CN111764621A (zh) | 悬挑脚手架及施工方法 | |
CN102691412B (zh) | 可调垂直高度的预制框架结构连接支撑模板 | |
CN103993753A (zh) | 传统石砌房屋角箍拉结加固系统及施工工艺 | |
CN104481142B (zh) | 对柱模板同步连锁支撑体系的施工方法 | |
CN204001746U (zh) | 一种墙、柱模板支撑固定装置 | |
CN204059799U (zh) | 一种栏杆角度调节的安装构造 | |
CN206397137U (zh) | 一种框架柱模板加固装置 | |
CN204510479U (zh) | 钢筋混凝土预制组件 | |
CN105952140A (zh) | 用于现浇混凝土的工具式钢框木塑模板系统及其施工工艺 | |
CN204898612U (zh) | 一种用于浇筑水沟的可调式模具 | |
CN103243731B (zh) | 剪力墙梯形截面基础的支模方法 | |
CN204000885U (zh) | 地铁深基坑混凝土支撑吊模模具 | |
CN206397138U (zh) | 一种梁柱接头柱头模板的加固装置 | |
CN110030005A (zh) | 盾构隧道轻型保圆支撑体系及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zong Kefeng Inventor after: Rong Qinxuan Inventor after: Zhao Xiaobei Inventor after: Yu Guoshuai Inventor before: Zong Kefeng Inventor before: Li Yongfeng Inventor before: Li Yanxiao Inventor before: Zhang Xueyong |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |