CN104480825A - Construction method of water-permeable type pouring water-permeable stone - Google Patents

Construction method of water-permeable type pouring water-permeable stone Download PDF

Info

Publication number
CN104480825A
CN104480825A CN201410734504.6A CN201410734504A CN104480825A CN 104480825 A CN104480825 A CN 104480825A CN 201410734504 A CN201410734504 A CN 201410734504A CN 104480825 A CN104480825 A CN 104480825A
Authority
CN
China
Prior art keywords
permeable
thickness
construction method
layer
coarse sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410734504.6A
Other languages
Chinese (zh)
Inventor
李玉叶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN LIXIN CAISHI BUILDING MATERIAL Co Ltd
Original Assignee
HENAN LIXIN CAISHI BUILDING MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN LIXIN CAISHI BUILDING MATERIAL Co Ltd filed Critical HENAN LIXIN CAISHI BUILDING MATERIAL Co Ltd
Priority to CN201410734504.6A priority Critical patent/CN104480825A/en
Publication of CN104480825A publication Critical patent/CN104480825A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • E01C7/325Joining different layers, e.g. by adhesive layers; Intermediate layers, e.g. for the escape of water vapour, for spreading stresses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a construction method of a water-permeable type pouring water-permeable stone. The construction method comprises the steps of punning plain soil; paving graded crushed rock; paving coarse sand; paving the pouring water-permeable stone and a transparent silicon-fluorine reinforcing agent. A water-permeable floor obtained through the construction method of the water-permeable type pouring water-permeable stone has good water permeability, can be used for increasing the air temperature, regulating the climate and relieving the heat island effect, has the advantages of environmental friendliness, high strength, good freezing resistance, easiness in maintenance and beauty and can be applied to a pavement.

Description

The construction method of permeable stone built by a kind of permeable glue
Technical field
The present invention relates to glue and build permeable stone technical field, particularly relate to the construction method that permeable stone built by a kind of permeable glue.
Background technology
Current pitching brick mostly is concrete or lithotome makes, its ventilative water permeability is poor, with the passing of time under making brick, ground generation is hardened, water under ground surface and brick between ground, gas are exchanged and had a negative impact, destroy the regulating action of earth's surface to environment, also have now some enterprises to produce the water-permeable brick with hole, but these water-permeable bricks only have the water permeability of vertical direction, bad hydraulic permeability, the life-span is short.
Lay the hot issue that permeable stone ground has become research at present.Glue is built permeable stone and is formed through special technology gummed by color pebble, raw material asepsis environment-protecting, color nature, elegant and graceful, economical, be stone material substitute of new generation, be applicable to gardens, sidewalk, the place such as city square, swimming pool, bath center, villa garden, interior/exterior decoration, park bodybuilding and entertainment institute.Along with the development of society, the performance requirement of people to permeable stone road surface is more and more higher, especially for the permeable stone on road surface, sidewalk, but existing its intensity of permeable stone sidewalk and water permeability are not very desirable, its application life is short, and in rainy season, a large amount of rainwater is hoarded and can be brought very big inconvenience to the trip of people on road surface.
Summary of the invention
Based on Problems existing in background technology, the present invention proposes the construction method that permeable stone built by a kind of permeable glue, the ground good water permeability obtained by this construction method, environmental protection, intensity is high, frost resistance good, be easy to safeguard and attractive in appearance, meet the requirement of sidewalk.
The present invention proposes the construction method that permeable stone built by a kind of permeable glue, comprise the following steps:
S1, rammed earth, make the plain soil pressure real coefficient of compacting be greater than 0.92;
S2, to pave graded broken stone on the element soil of compacting, form granular cushion, wherein, the thickness of granular cushion is 30-250mm;
S3, the coarse sand that paves on granular cushion form coarse sand drainage layer, and wherein, the thickness of coarse sand drainage layer is 5-50mm;
S4, on coarse sand drainage layer spread concrete, form benchmark macropore pervious concrete layer, wherein, the thickness of benchmark macropore pervious concrete layer is 30-200mm;
Permeable stone built by S5, the glue that paves after benchmark macropore pervious concrete layer bone dry, and form ornamental permeable surface layer, wherein, the thickness of ornamental permeable surface layer is 5-50mm;
S6, pave transparent fluosilicic reinforcing agent on ornamental permeable surface layer.
Preferably, in S2, the thickness of granular cushion is 100-200mm.
Preferably, in S2, the thickness of granular cushion is 150mm.
Preferably, in S3, the thickness of coarse sand drainage layer is 15-30mm.
Preferably, in S3, the thickness of coarse sand drainage layer is 20mm.
Preferably, in S4, the thickness of benchmark macropore pervious concrete layer is 60-150mm.
Preferably, in S4, the thickness of benchmark macropore pervious concrete layer is 100mm.
Preferably, in S5, the thickness of ornamental permeable surface layer is 15-30mm.
Preferably, in S5, the thickness of ornamental permeable surface layer is 20mm.
Preferably, pave anti-filter geotextiles between the element soil and granular cushion of compacting.
The pervious surface good water permeability that the construction method that permeable stone built by permeable glue of the present invention obtains, air themperature can be increased, regulate the climate, alleviate heat island effect, and environmental protection, intensity is high, frost resistance good, be easy to safeguard and attractive in appearance, for in sidewalk, also a large amount of ponding can not be hoarded and long service life in rainy season, need not carry out frequently safeguarding or changing, save cost.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail; should understand; embodiment is only for illustration of the present invention, instead of for limiting the present invention, any amendment, equivalent replacement etc. made on basis of the present invention is all in protection scope of the present invention.
Embodiment 1
The construction method of permeable stone built by permeable glue of the present invention, comprises the following steps:
S1, rammed earth, the plain soil pressure real coefficient making compacting is 0.93;
S2, to pave graded broken stone on the element soil of compacting, form granular cushion, wherein, the thickness of granular cushion is 30mm;
S3, the coarse sand that paves on granular cushion form coarse sand drainage layer, and wherein, the thickness of coarse sand drainage layer is 50mm;
S4, on coarse sand drainage layer spread concrete, form benchmark macropore pervious concrete layer, wherein, the thickness of benchmark macropore pervious concrete layer is 30mm;
Permeable stone built by S5, the glue that paves after benchmark macropore pervious concrete layer bone dry, and form ornamental permeable surface layer, wherein, the thickness of ornamental permeable surface layer is 5mm;
S6, pave transparent fluosilicic reinforcing agent on ornamental permeable surface layer.
Embodiment 2
The construction method of permeable stone built by permeable glue of the present invention, comprises the following steps:
S1, rammed earth, the plain soil pressure real coefficient making compacting is 0.94;
S2, to pave graded broken stone on the element soil of compacting, form granular cushion, wherein, the thickness of granular cushion is 250mm;
S3, the coarse sand that paves on granular cushion form coarse sand drainage layer, and wherein, the thickness of coarse sand drainage layer is 5mm;
S4, on coarse sand drainage layer spread concrete, form benchmark macropore pervious concrete layer, wherein, the thickness of benchmark macropore pervious concrete layer is 200mm;
Permeable stone built by S5, the glue that paves after benchmark macropore pervious concrete layer bone dry, and form ornamental permeable surface layer, the thickness of described ornamental permeable surface layer is 50mm;
S6, pave transparent fluosilicic reinforcing agent on the permeable surface layer of decoration type.
Embodiment 3
The construction method of permeable stone built by permeable glue of the present invention, comprises the following steps:
S1, rammed earth, the plain soil pressure real coefficient making compacting is 0.96;
S2, to pave graded broken stone on the element soil of compacting, form granular cushion, wherein, the thickness of granular cushion is 150mm;
S3, the coarse sand that paves on granular cushion form coarse sand drainage layer, and wherein, the thickness of coarse sand drainage layer is 20mm;
S4, on coarse sand drainage layer spread concrete, form benchmark macropore pervious concrete layer, wherein, the thickness of benchmark macropore pervious concrete layer is 100mm;
Permeable stone built by S5, the glue that paves after benchmark macropore pervious concrete layer bone dry, and form ornamental permeable surface layer, wherein, the thickness of ornamental permeable surface layer is 20mm;
S6, pave transparent fluosilicic reinforcing agent on the permeable surface layer of decoration type.
Embodiment 4
The construction method of permeable stone built by permeable glue of the present invention, comprises the following steps:
S1, rammed earth, the plain soil pressure real coefficient making compacting is 0.95;
S2, to pave graded broken stone on the element soil of compacting, form granular cushion, wherein, the thickness of granular cushion is 130mm;
S3, the coarse sand that paves on granular cushion form coarse sand drainage layer, and wherein, the thickness of coarse sand drainage layer is 25mm;
S4, on coarse sand drainage layer spread concrete, form benchmark macropore pervious concrete layer, wherein, the thickness of benchmark macropore pervious concrete layer is 80mm;
Permeable stone built by S5, the glue that paves after benchmark macropore pervious concrete layer bone dry, and form ornamental permeable surface layer, wherein, the thickness of ornamental permeable surface layer is 25mm;
S6, pave transparent fluosilicic reinforcing agent on the permeable surface layer of decoration type.

Claims (10)

1. a construction method for permeable stone built by permeable glue, it is characterized in that, comprises the following steps:
S1, rammed earth, make the plain soil pressure real coefficient of compacting be greater than 0.92;
S2, to pave graded broken stone on the element soil of compacting, form granular cushion, wherein, the thickness of granular cushion is 30-250mm;
S3, the coarse sand that paves on granular cushion form coarse sand drainage layer, and wherein, the thickness of coarse sand drainage layer is 5-50mm;
S4, on coarse sand drainage layer spread concrete, form benchmark macropore pervious concrete layer, wherein, the thickness of benchmark macropore pervious concrete layer is 30-200mm;
Permeable stone built by S5, the glue that paves after benchmark macropore pervious concrete layer bone dry, and form ornamental permeable surface layer, wherein, the thickness of ornamental permeable surface layer is 5-50mm;
S6, pave transparent fluosilicic reinforcing agent on ornamental permeable surface layer.
2. the construction method of permeable stone built by permeable glue according to claim 1, it is characterized in that, in S2, the thickness of granular cushion is 100-200mm.
3. the construction method of permeable stone built by permeable glue according to claim 2, it is characterized in that, in S2, the thickness of granular cushion is 150mm.
4. the construction method of permeable stone built by permeable glue according to claim 1, it is characterized in that, in S3, the thickness of coarse sand drainage layer is 15-30mm.
5. the construction method of permeable stone built by permeable glue according to claim 4, it is characterized in that, in S3, the thickness of coarse sand drainage layer is 20mm.
6. the construction method of permeable stone built by permeable glue according to claim 1, it is characterized in that, in S4, the thickness of benchmark macropore pervious concrete layer is 60-150mm.
7. the construction method of permeable stone built by permeable glue according to claim 6, it is characterized in that, in S4, the thickness of benchmark macropore pervious concrete layer is 100mm.
8. the construction method of permeable stone built by permeable glue according to claim 1, it is characterized in that, in S5, the thickness of ornamental permeable surface layer is 15-30mm.
9. the construction method of permeable stone built by permeable glue according to claim 8, it is characterized in that, in S5, the thickness of ornamental permeable surface layer is 20mm.
10. according to any one of claim 1-9, the construction method of permeable stone built by permeable glue, it is characterized in that, pave anti-filter geotextiles between the element soil and granular cushion of compacting.
CN201410734504.6A 2014-12-03 2014-12-03 Construction method of water-permeable type pouring water-permeable stone Pending CN104480825A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410734504.6A CN104480825A (en) 2014-12-03 2014-12-03 Construction method of water-permeable type pouring water-permeable stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410734504.6A CN104480825A (en) 2014-12-03 2014-12-03 Construction method of water-permeable type pouring water-permeable stone

Publications (1)

Publication Number Publication Date
CN104480825A true CN104480825A (en) 2015-04-01

Family

ID=52755423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410734504.6A Pending CN104480825A (en) 2014-12-03 2014-12-03 Construction method of water-permeable type pouring water-permeable stone

Country Status (1)

Country Link
CN (1) CN104480825A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351525A (en) * 2021-11-26 2022-04-15 中国电建集团西北勘测设计研究院有限公司 Construction method based on sponge urban road pervious concrete combined pavement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2637544Y (en) * 2003-06-17 2004-09-01 穆道春 Porous pavement brick
US20070223998A1 (en) * 2004-02-07 2007-09-27 Terraelast Ag Water-Permeable Paving and Method for Producing a Paving
CN203583313U (en) * 2013-11-19 2014-05-07 苏州金螳螂园林绿化景观有限公司 Anti-cracking washing stone road surface
CN103806356A (en) * 2014-02-28 2014-05-21 北京西奥兴业园林景观工程有限公司 Decorative concrete floor structure and manufacturing method thereof
CN203700897U (en) * 2014-02-14 2014-07-09 江苏建筑职业技术学院 Pervious concrete ground

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2637544Y (en) * 2003-06-17 2004-09-01 穆道春 Porous pavement brick
US20070223998A1 (en) * 2004-02-07 2007-09-27 Terraelast Ag Water-Permeable Paving and Method for Producing a Paving
CN203583313U (en) * 2013-11-19 2014-05-07 苏州金螳螂园林绿化景观有限公司 Anti-cracking washing stone road surface
CN203700897U (en) * 2014-02-14 2014-07-09 江苏建筑职业技术学院 Pervious concrete ground
CN103806356A (en) * 2014-02-28 2014-05-21 北京西奥兴业园林景观工程有限公司 Decorative concrete floor structure and manufacturing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351525A (en) * 2021-11-26 2022-04-15 中国电建集团西北勘测设计研究院有限公司 Construction method based on sponge urban road pervious concrete combined pavement

Similar Documents

Publication Publication Date Title
CN102587243B (en) Urban road water permeability cement concrete pavement structure and construction process thereof
KR100965122B1 (en) A construction process of water permeability pavement for bicycle
US8388260B2 (en) Water-permeable and water-absorbable ecological paving
CN206902493U (en) A kind of undisguised material permeable concrete ground structure
CN107032670B (en) Composite water permeable brick with natural luster on surface and production method thereof
CN106758638A (en) A kind of city sponge brick and its construction technology
CN104233916A (en) Preparation method of color ecological permeable floor
CN103046454A (en) Gravel pavement and paving method thereof
CN102337714A (en) Ecological environmental-friendly economical and durable pavement combination panel design and assembly technologies
AU2016228704A1 (en) Hard road construction method for natural groundwater recharge
CN202482730U (en) Permeable brick
CN204282152U (en) A kind of permeable structure ground
CN104695298A (en) Complete permeable compound type road surface structure
CN204097832U (en) Multi-functional pavement bricks
CN203912647U (en) A kind of terrace cropping slot type greening side slope structure
CN106436523A (en) New-structure grass planting brick produced by recycled aggregates
CN104480825A (en) Construction method of water-permeable type pouring water-permeable stone
CN202519561U (en) Urban road permeable cement concrete pavement structure
CN105218043A (en) Brick-shaped structural product and manufacturing method thereof and manufacturing method of flow channel structure contained in brick-shaped structural product
CN202787015U (en) Landscape ecology framework
CN206752237U (en) Stealthy passageway for fire apparatus
KR20140032160A (en) Road pavement using a stone basket and perforated drain pipe
CN205295868U (en) Combination concrete road surface
CN106996063A (en) A kind of pavement structure of permeable road
CN204589747U (en) A kind of water permeability composite pavement structure completely

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150401

RJ01 Rejection of invention patent application after publication