CN104405122B - Floor slab preformed hole hangs mould mounting structure - Google Patents

Floor slab preformed hole hangs mould mounting structure Download PDF

Info

Publication number
CN104405122B
CN104405122B CN201410608154.9A CN201410608154A CN104405122B CN 104405122 B CN104405122 B CN 104405122B CN 201410608154 A CN201410608154 A CN 201410608154A CN 104405122 B CN104405122 B CN 104405122B
Authority
CN
China
Prior art keywords
pipe
suspension wire
hole
floor
floor slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410608154.9A
Other languages
Chinese (zh)
Other versions
CN104405122A (en
Inventor
姚有为
亓立刚
崔爱珍
王东
于合利
王自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201410608154.9A priority Critical patent/CN104405122B/en
Publication of CN104405122A publication Critical patent/CN104405122A/en
Application granted granted Critical
Publication of CN104405122B publication Critical patent/CN104405122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Mould mounting structure is hung the invention discloses a kind of floor slab preformed hole, it includes:It is suspended to immediately below floor slab preformed hole, plate is close to floor lower surface hangs baffle plate;It is set up in above the floor slab preformed hole and hangs mould pipe-hanging hook, the pipe-hanging hook includes multiple legs and multiple Steelwire holding devices for being supported in the floor upper surface;Suspension wire, one end of the suspension wire, which is fixedly connected on, hangs the baffle plate other end and is fixed on the Steelwire holding device.Technical scheme using above technical scheme due to making it have following technique effect:It is supported using pipe-hanging hook and suspension wire to hanging baffle plate, being so not only convenient for installation can also avoid setting up supporting construction below baffle plate hanging.Being enclosed on the plastic flexible pipe on the outside of suspension wire can avoid in casting process suspension wire and concrete from contacting again, and suspension wire easily facilitates dismounting so during form removal.

Description

Floor slab preformed hole hangs mould mounting structure
Technical field
The present invention relates to a kind of construction equipment, especially a kind of floor slab preformed hole hangs mould mounting structure.
Background technology
It is many due to generally being had on reason, the structure floor such as construction needs or process is interspersed in building construction process Reserved opening, after construction these reserved openings of phase usually require carry out after-pouring concrete.Reserved opening includes measurement process Middle use plumb aligner vertically passes the hole reserved on floor to axial line control point;Hot-water heating pipeline reserved opening, construction is faced Shi Shuxiang pump line through-flooring reserved openings etc..These holes are universal smaller.If in order to block these small-bore reserved openings Need to set up the scaffold of support shuttering again using bottom formwork supporting plate of the prior art, and setting up for scaffold can increase a lot Workload.
The content of the invention
The present invention provides a kind of floor slab preformed hole and hangs mould mounting structure, and the floor slab preformed hole hangs mould mounting structure and can solved The problem of needing to set up formwork support structure when pouring floor slab preformed hole using bottom formwork supporting plate in the prior art.
Technical scheme hangs mould mounting structure including a kind of floor slab preformed hole, and it includes:Floor is suspended to reserve Immediately below hole and be close to floor lower surface hang baffle plate;
The pipe-hanging hook above the floor slab preformed hole is set up in, the pipe-hanging hook includes being supported in the floor upper table Multiple legs in face;And
Suspension wire, one end of the suspension wire, which is fixedly connected on, hangs baffle plate, and the other end is fixedly connected on described outstanding Hang support.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:Plastics are cased with the outside of the suspension wire Flexible pipe, the bottom of the plastic flexible pipe be resisted against it is described hang baffle plate, the top of the plastic flexible pipe is upper higher than the floor Surface.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The pipe-hanging hook is arch support, institute The two ends for stating pipe-hanging hook are bent downwardly to form leg and are supported on the floor of the hole to be provided both sides.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The bottom of the leg be fixedly connected with The supporting plate that the floor fits.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The suspension wire is filled by Steelwire holding Put and be fixedly connected on the pipe-hanging hook.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The Steelwire holding device includes:Edge is perpendicular Nogata is to the Steelwire holding hole through the pipe-hanging hook;The horizontally disposed folder connected with the Steelwire holding hole Hold bolt hole;And the grip bolt coordinated with the grip bolt hole.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The material for stating pipe-hanging hook is aluminium alloy.
Technical scheme using above technical scheme due to making it have following technique effect:Using pipe-hanging hook And suspension wire is lifted to hanging baffle plate, being so not only convenient for installation can also avoid setting up branch below baffle plate hanging Support structure.Being enclosed on the plastic flexible pipe on the outside of suspension wire can avoid in casting process suspension wire and concrete from contacting again, this Sample suspension wire during form removal easily facilitates dismounting.
Brief description of the drawings
Fig. 1 is the three-dimensional view that floor slab preformed hole of the present invention hangs mould mounting structure;
Fig. 2 is the side view that floor slab preformed hole of the present invention hangs mould mounting structure;
Fig. 3 is the top view that floor slab preformed hole of the present invention hangs mould mounting structure;And
Fig. 4 is the sectional view of Section A-A in Fig. 3.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
Fig. 1 is the three-dimensional view that floor slab preformed hole of the present invention hangs mould mounting structure.As shown in figure 1, floor of the present invention is reserved Mould mounting structure is hung in hole mainly to be included:Hang baffle plate 20, pipe-hanging hook 30 and suspension wire 40.
Fig. 2 is the side view that floor slab preformed hole of the present invention hangs mould mounting structure;Fig. 3 is that floor slab preformed hole of the present invention hangs mould peace The top view of assembling structure.As shown in Figures 2 and 3:Pipe-hanging hook 30 is set up in the top of floor slab preformed hole 11.Pipe-hanging hook 30 is consolidated Surely two suspending steel wire ropes 40 are connected with, the bottom of suspending steel wire rope 40, which is fixedly connected on, hangs baffle plate 20.Baffle plate 20 is hung to lead to Cross suspending steel wire rope 40 and be suspended to the underface of floor slab preformed hole 11, and hang the upper surface of baffle plate 20 and be close to floor 10 Lower surface.
Pipe-hanging hook 30 includes multiple legs 31, and pipe-hanging hook 30 is erected on the upper surface of floor 10 by leg 31. The bottom of leg 31 is fixedly connected with the supporting plate 32 fitted with floor 10.In the present embodiment, pipe-hanging hook 30 closes for aluminium The arch support that gold is prefabricated into, the two ends of the arch support are bent downwardly to form leg 31, and supporting plate 32 is welded in leg 31 Bottom.
Fig. 4 is the sectional view of Section A-A in Fig. 3.As shown in Figure 3 and Figure 4:Pipe-hanging hook 30 also includes being used to clamp suspention The Steelwire holding device 36 of steel wire 40.Steelwire holding device 36 includes:Vertically through the wire clip of pipe-hanging hook 30 Hold hole 33;The horizontally disposed grip bolt hole 35 connected with Steelwire holding hole 33, the inwall in grip bolt hole 35 is set There is screw thread;And the grip bolt 34 coordinated with grip bolt hole 35.During using Steelwire holding device 36, first by suspension wire 40 top is arranged in Steelwire holding hole 33, then screws grip bolt 34.After grip bolt 34 is screwed, grip bolt 34 End enters the side that Steelwire holding hole 33 is squeezed in Steelwire holding hole 33 and by suspension wire 40 from grip bolt hole 35 Wall.
The bottom of suspension wire 40, which is fixedly connected on, hangs baffle plate 20, and its top is fixedly connected on Steelwire holding device 36. The plastic flexible pipe 41 that diameter is slightly larger than suspension wire 40 is cased with the outside of suspension wire 40.The bottom of plastic flexible pipe 41 is resisted against Baffle plate 20 is hung, the top of plastic flexible pipe 41 is higher than the upper surface of floor 10.In the casting process of floor slab preformed hole 11, plastics Flexible pipe 41 can prevent suspension wire 40 and concrete from contacting, and so can easily be torn open after the completion of floor slab preformed hole 11 is poured Except hanging baffle plate and suspension wire 40.
The application method that the floor slab preformed hole of the present invention hangs mould mounting structure is as follows:First, according to floor slab preformed hole 11 Size cut lengths suitably hang baffle plate 20 and will be cased with the bottom of the suspension wire 40 of plastic flexible pipe 41 and are fixedly connected on Hang baffle plate 20;Baffle plate 20 then to be will be hung arranged at the bottom of floor slab preformed hole 11 and pipe-hanging hook 30 is set up in into floor The top of hole to be provided 11;Then suspension wire 40 is tightened and Steelwire holding device is fixed on the top of suspension wire 40 36;Suspension wire 40 can be poured after the completion of fixing to floor slab preformed hole 11;Treat i.e. dismountable after concrete setting hang Baffle plate 20 and pipe-hanging hook 30.
Technical scheme has the following technical effect that:Mould bottom is hung using 40 pairs of pipe-hanging hook 30 and suspension wire Plate 20 is lifted, and being so not only convenient for installation can also avoid setting up supporting construction below baffle plate 20 hanging.It is enclosed on suspention The plastic flexible pipe 41 in the outside of steel wire 40 can avoid suspension wire 40 and concrete from contacting in casting process again, so in form removal Suspension wire 40 easily facilitates dismounting in journey.
Described above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair The equivalent embodiment for equivalent variations is adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real Any simple modification, equivalent variations and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention It is interior.

Claims (3)

1. a kind of floor slab preformed hole hangs mould mounting structure, it is characterised in that including:
What is be suspended to immediately below floor slab preformed hole and be close to floor lower surface hangs baffle plate;
The pipe-hanging hook above the floor slab preformed hole is set up in, the pipe-hanging hook includes being supported in the floor upper surface Multiple legs, the pipe-hanging hook is arch support, the two ends of the pipe-hanging hook be bent downwardly to form leg be supported in it is described On the floor of hole to be provided both sides;And
Suspension wire, one end of the suspension wire, which is fixedly connected on, hangs baffle plate, and the other end is fixedly connected on the suspention branch Frame;The suspension wire is fixedly connected on the pipe-hanging hook by Steelwire holding device;The Steelwire holding device includes: Vertically through the Steelwire holding hole of the pipe-hanging hook;It is horizontally disposed to be connected with the Steelwire holding hole Grip bolt hole;And the grip bolt coordinated with the grip bolt hole;The suspension wire is arranged in the wire clip Hold in hole, the end of the grip bolt enters in the Steelwire holding hole from the grip bolt hole and by the suspention Steel wire is squeezed in the side wall in the Steelwire holding hole;
Further, it is cased with plastic flexible pipe on the outside of the suspension wire, the bottom of the plastic flexible pipe, which is resisted against, described hangs mould Bottom plate, the top of the plastic flexible pipe is higher than the upper surface of the floor.
2. floor slab preformed hole as claimed in claim 1 hangs mould mounting structure, it is characterised in that:The bottom of the leg, which is fixed, to be connected It is connected to the supporting plate fitted with the floor.
3. floor slab preformed hole as claimed in claim 1 hangs mould mounting structure, it is characterised in that:The material of the pipe-hanging hook is Aluminium alloy.
CN201410608154.9A 2014-10-31 2014-10-31 Floor slab preformed hole hangs mould mounting structure Active CN104405122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410608154.9A CN104405122B (en) 2014-10-31 2014-10-31 Floor slab preformed hole hangs mould mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410608154.9A CN104405122B (en) 2014-10-31 2014-10-31 Floor slab preformed hole hangs mould mounting structure

Publications (2)

Publication Number Publication Date
CN104405122A CN104405122A (en) 2015-03-11
CN104405122B true CN104405122B (en) 2017-07-28

Family

ID=52642780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410608154.9A Active CN104405122B (en) 2014-10-31 2014-10-31 Floor slab preformed hole hangs mould mounting structure

Country Status (1)

Country Link
CN (1) CN104405122B (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6848221B1 (en) * 2002-11-01 2005-02-01 The Ruhlin Company Overhang falsework
CN202017346U (en) * 2011-04-13 2011-10-26 中建七局第二建筑有限公司 Late poured band hanging formwork structure
CN204199688U (en) * 2014-10-31 2015-03-11 中国建筑第八工程局有限公司 Floor slab preformed hole hangs mould mounting structure

Also Published As

Publication number Publication date
CN104405122A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN105696801B (en) Prefabricated part hanging accurate positioning device
CN105735481B (en) Core tube of high-rise building lifting platform climbs attemperator and its construction method
JP6748470B2 (en) A suspending structure for mounting an insert on a deck plate with a reinforcing bar truss and suspending and supporting ceiling equipment on a lower floor under the deck, and a method for mounting ceiling equipment on a lower portion of a deck plate with a reinforcing bar truss using the insert.
CN204199688U (en) Floor slab preformed hole hangs mould mounting structure
CN104405122B (en) Floor slab preformed hole hangs mould mounting structure
CN208088822U (en) A kind of caisson of toilet formwork structure
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN105839914B (en) Adjustable steel beam support meanss and system
CN209353302U (en) Structure for drain hole port strobe opening and closing device mounting platform
CN207376661U (en) A kind of plugging structure of poured band of outer wall of basement
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN208884991U (en) Deformation slit formwork
CN206815820U (en) Pour toilet or kitchen concrete floor hanging mould structure
CN206267520U (en) A kind of self-supporting post-cast strip is poured with hanging mould
CN212249210U (en) Casing fixing and vertical positioning device
CN208844800U (en) A kind of easy finished product pours branch stake tool
CN205711761U (en) A kind of Novel hanging basket of convenience and safety
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN206607753U (en) After pour beam steel anchor
CN208830461U (en) A kind of new device of limitation Fabricated balcony displacement
CN207672995U (en) A kind of In Great Basement late poured band support template
CN208803700U (en) Precast concrete cushion block between sinking
CN205742662U (en) Node installed by a kind of connector and Side fascia
CN207499434U (en) The bayonet type erecting device of stair step

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200527

Address after: 300457 no.2599 Binhe Road, Tanggu, Binhai New District, Tianjin

Patentee after: Tianjin Construction Engineering Co., Ltd. of China Construction Eighth Engineering Bureau

Address before: 200122, No. 1568, Century Avenue, Shanghai, 27, Pudong New Area

Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

TR01 Transfer of patent right