CN104405122B - Floor slab preformed hole hangs mould mounting structure - Google Patents
Floor slab preformed hole hangs mould mounting structure Download PDFInfo
- Publication number
- CN104405122B CN104405122B CN201410608154.9A CN201410608154A CN104405122B CN 104405122 B CN104405122 B CN 104405122B CN 201410608154 A CN201410608154 A CN 201410608154A CN 104405122 B CN104405122 B CN 104405122B
- Authority
- CN
- China
- Prior art keywords
- pipe
- suspension wire
- hole
- floor
- floor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Mould mounting structure is hung the invention discloses a kind of floor slab preformed hole, it includes:It is suspended to immediately below floor slab preformed hole, plate is close to floor lower surface hangs baffle plate;It is set up in above the floor slab preformed hole and hangs mould pipe-hanging hook, the pipe-hanging hook includes multiple legs and multiple Steelwire holding devices for being supported in the floor upper surface;Suspension wire, one end of the suspension wire, which is fixedly connected on, hangs the baffle plate other end and is fixed on the Steelwire holding device.Technical scheme using above technical scheme due to making it have following technique effect:It is supported using pipe-hanging hook and suspension wire to hanging baffle plate, being so not only convenient for installation can also avoid setting up supporting construction below baffle plate hanging.Being enclosed on the plastic flexible pipe on the outside of suspension wire can avoid in casting process suspension wire and concrete from contacting again, and suspension wire easily facilitates dismounting so during form removal.
Description
Technical field
The present invention relates to a kind of construction equipment, especially a kind of floor slab preformed hole hangs mould mounting structure.
Background technology
It is many due to generally being had on reason, the structure floor such as construction needs or process is interspersed in building construction process
Reserved opening, after construction these reserved openings of phase usually require carry out after-pouring concrete.Reserved opening includes measurement process
Middle use plumb aligner vertically passes the hole reserved on floor to axial line control point;Hot-water heating pipeline reserved opening, construction is faced
Shi Shuxiang pump line through-flooring reserved openings etc..These holes are universal smaller.If in order to block these small-bore reserved openings
Need to set up the scaffold of support shuttering again using bottom formwork supporting plate of the prior art, and setting up for scaffold can increase a lot
Workload.
The content of the invention
The present invention provides a kind of floor slab preformed hole and hangs mould mounting structure, and the floor slab preformed hole hangs mould mounting structure and can solved
The problem of needing to set up formwork support structure when pouring floor slab preformed hole using bottom formwork supporting plate in the prior art.
Technical scheme hangs mould mounting structure including a kind of floor slab preformed hole, and it includes:Floor is suspended to reserve
Immediately below hole and be close to floor lower surface hang baffle plate;
The pipe-hanging hook above the floor slab preformed hole is set up in, the pipe-hanging hook includes being supported in the floor upper table
Multiple legs in face;And
Suspension wire, one end of the suspension wire, which is fixedly connected on, hangs baffle plate, and the other end is fixedly connected on described outstanding
Hang support.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:Plastics are cased with the outside of the suspension wire
Flexible pipe, the bottom of the plastic flexible pipe be resisted against it is described hang baffle plate, the top of the plastic flexible pipe is upper higher than the floor
Surface.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The pipe-hanging hook is arch support, institute
The two ends for stating pipe-hanging hook are bent downwardly to form leg and are supported on the floor of the hole to be provided both sides.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The bottom of the leg be fixedly connected with
The supporting plate that the floor fits.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The suspension wire is filled by Steelwire holding
Put and be fixedly connected on the pipe-hanging hook.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The Steelwire holding device includes:Edge is perpendicular
Nogata is to the Steelwire holding hole through the pipe-hanging hook;The horizontally disposed folder connected with the Steelwire holding hole
Hold bolt hole;And the grip bolt coordinated with the grip bolt hole.
Floor slab preformed hole of the present invention hang mould mounting structure further improvement is that:The material for stating pipe-hanging hook is aluminium alloy.
Technical scheme using above technical scheme due to making it have following technique effect:Using pipe-hanging hook
And suspension wire is lifted to hanging baffle plate, being so not only convenient for installation can also avoid setting up branch below baffle plate hanging
Support structure.Being enclosed on the plastic flexible pipe on the outside of suspension wire can avoid in casting process suspension wire and concrete from contacting again, this
Sample suspension wire during form removal easily facilitates dismounting.
Brief description of the drawings
Fig. 1 is the three-dimensional view that floor slab preformed hole of the present invention hangs mould mounting structure;
Fig. 2 is the side view that floor slab preformed hole of the present invention hangs mould mounting structure;
Fig. 3 is the top view that floor slab preformed hole of the present invention hangs mould mounting structure;And
Fig. 4 is the sectional view of Section A-A in Fig. 3.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification
Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition
The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from
Various modifications or alterations are carried out under the spirit of the present invention.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate
Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention
Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not
Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents
In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification
Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune
It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
Fig. 1 is the three-dimensional view that floor slab preformed hole of the present invention hangs mould mounting structure.As shown in figure 1, floor of the present invention is reserved
Mould mounting structure is hung in hole mainly to be included:Hang baffle plate 20, pipe-hanging hook 30 and suspension wire 40.
Fig. 2 is the side view that floor slab preformed hole of the present invention hangs mould mounting structure;Fig. 3 is that floor slab preformed hole of the present invention hangs mould peace
The top view of assembling structure.As shown in Figures 2 and 3:Pipe-hanging hook 30 is set up in the top of floor slab preformed hole 11.Pipe-hanging hook 30 is consolidated
Surely two suspending steel wire ropes 40 are connected with, the bottom of suspending steel wire rope 40, which is fixedly connected on, hangs baffle plate 20.Baffle plate 20 is hung to lead to
Cross suspending steel wire rope 40 and be suspended to the underface of floor slab preformed hole 11, and hang the upper surface of baffle plate 20 and be close to floor 10
Lower surface.
Pipe-hanging hook 30 includes multiple legs 31, and pipe-hanging hook 30 is erected on the upper surface of floor 10 by leg 31.
The bottom of leg 31 is fixedly connected with the supporting plate 32 fitted with floor 10.In the present embodiment, pipe-hanging hook 30 closes for aluminium
The arch support that gold is prefabricated into, the two ends of the arch support are bent downwardly to form leg 31, and supporting plate 32 is welded in leg 31
Bottom.
Fig. 4 is the sectional view of Section A-A in Fig. 3.As shown in Figure 3 and Figure 4:Pipe-hanging hook 30 also includes being used to clamp suspention
The Steelwire holding device 36 of steel wire 40.Steelwire holding device 36 includes:Vertically through the wire clip of pipe-hanging hook 30
Hold hole 33;The horizontally disposed grip bolt hole 35 connected with Steelwire holding hole 33, the inwall in grip bolt hole 35 is set
There is screw thread;And the grip bolt 34 coordinated with grip bolt hole 35.During using Steelwire holding device 36, first by suspension wire
40 top is arranged in Steelwire holding hole 33, then screws grip bolt 34.After grip bolt 34 is screwed, grip bolt 34
End enters the side that Steelwire holding hole 33 is squeezed in Steelwire holding hole 33 and by suspension wire 40 from grip bolt hole 35
Wall.
The bottom of suspension wire 40, which is fixedly connected on, hangs baffle plate 20, and its top is fixedly connected on Steelwire holding device 36.
The plastic flexible pipe 41 that diameter is slightly larger than suspension wire 40 is cased with the outside of suspension wire 40.The bottom of plastic flexible pipe 41 is resisted against
Baffle plate 20 is hung, the top of plastic flexible pipe 41 is higher than the upper surface of floor 10.In the casting process of floor slab preformed hole 11, plastics
Flexible pipe 41 can prevent suspension wire 40 and concrete from contacting, and so can easily be torn open after the completion of floor slab preformed hole 11 is poured
Except hanging baffle plate and suspension wire 40.
The application method that the floor slab preformed hole of the present invention hangs mould mounting structure is as follows:First, according to floor slab preformed hole 11
Size cut lengths suitably hang baffle plate 20 and will be cased with the bottom of the suspension wire 40 of plastic flexible pipe 41 and are fixedly connected on
Hang baffle plate 20;Baffle plate 20 then to be will be hung arranged at the bottom of floor slab preformed hole 11 and pipe-hanging hook 30 is set up in into floor
The top of hole to be provided 11;Then suspension wire 40 is tightened and Steelwire holding device is fixed on the top of suspension wire 40
36;Suspension wire 40 can be poured after the completion of fixing to floor slab preformed hole 11;Treat i.e. dismountable after concrete setting hang
Baffle plate 20 and pipe-hanging hook 30.
Technical scheme has the following technical effect that:Mould bottom is hung using 40 pairs of pipe-hanging hook 30 and suspension wire
Plate 20 is lifted, and being so not only convenient for installation can also avoid setting up supporting construction below baffle plate 20 hanging.It is enclosed on suspention
The plastic flexible pipe 41 in the outside of steel wire 40 can avoid suspension wire 40 and concrete from contacting in casting process again, so in form removal
Suspension wire 40 easily facilitates dismounting in journey.
Described above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though
So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people
Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair
The equivalent embodiment for equivalent variations is adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real
Any simple modification, equivalent variations and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention
It is interior.
Claims (3)
1. a kind of floor slab preformed hole hangs mould mounting structure, it is characterised in that including:
What is be suspended to immediately below floor slab preformed hole and be close to floor lower surface hangs baffle plate;
The pipe-hanging hook above the floor slab preformed hole is set up in, the pipe-hanging hook includes being supported in the floor upper surface
Multiple legs, the pipe-hanging hook is arch support, the two ends of the pipe-hanging hook be bent downwardly to form leg be supported in it is described
On the floor of hole to be provided both sides;And
Suspension wire, one end of the suspension wire, which is fixedly connected on, hangs baffle plate, and the other end is fixedly connected on the suspention branch
Frame;The suspension wire is fixedly connected on the pipe-hanging hook by Steelwire holding device;The Steelwire holding device includes:
Vertically through the Steelwire holding hole of the pipe-hanging hook;It is horizontally disposed to be connected with the Steelwire holding hole
Grip bolt hole;And the grip bolt coordinated with the grip bolt hole;The suspension wire is arranged in the wire clip
Hold in hole, the end of the grip bolt enters in the Steelwire holding hole from the grip bolt hole and by the suspention
Steel wire is squeezed in the side wall in the Steelwire holding hole;
Further, it is cased with plastic flexible pipe on the outside of the suspension wire, the bottom of the plastic flexible pipe, which is resisted against, described hangs mould
Bottom plate, the top of the plastic flexible pipe is higher than the upper surface of the floor.
2. floor slab preformed hole as claimed in claim 1 hangs mould mounting structure, it is characterised in that:The bottom of the leg, which is fixed, to be connected
It is connected to the supporting plate fitted with the floor.
3. floor slab preformed hole as claimed in claim 1 hangs mould mounting structure, it is characterised in that:The material of the pipe-hanging hook is
Aluminium alloy.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410608154.9A CN104405122B (en) | 2014-10-31 | 2014-10-31 | Floor slab preformed hole hangs mould mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410608154.9A CN104405122B (en) | 2014-10-31 | 2014-10-31 | Floor slab preformed hole hangs mould mounting structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104405122A CN104405122A (en) | 2015-03-11 |
CN104405122B true CN104405122B (en) | 2017-07-28 |
Family
ID=52642780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410608154.9A Active CN104405122B (en) | 2014-10-31 | 2014-10-31 | Floor slab preformed hole hangs mould mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104405122B (en) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6848221B1 (en) * | 2002-11-01 | 2005-02-01 | The Ruhlin Company | Overhang falsework |
CN202017346U (en) * | 2011-04-13 | 2011-10-26 | 中建七局第二建筑有限公司 | Late poured band hanging formwork structure |
CN204199688U (en) * | 2014-10-31 | 2015-03-11 | 中国建筑第八工程局有限公司 | Floor slab preformed hole hangs mould mounting structure |
-
2014
- 2014-10-31 CN CN201410608154.9A patent/CN104405122B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104405122A (en) | 2015-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105696801B (en) | Prefabricated part hanging accurate positioning device | |
CN105735481B (en) | Core tube of high-rise building lifting platform climbs attemperator and its construction method | |
JP6748470B2 (en) | A suspending structure for mounting an insert on a deck plate with a reinforcing bar truss and suspending and supporting ceiling equipment on a lower floor under the deck, and a method for mounting ceiling equipment on a lower portion of a deck plate with a reinforcing bar truss using the insert. | |
CN204199688U (en) | Floor slab preformed hole hangs mould mounting structure | |
CN104405122B (en) | Floor slab preformed hole hangs mould mounting structure | |
CN208088822U (en) | A kind of caisson of toilet formwork structure | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof | |
CN207436503U (en) | Efficient construction of precast floorslab hangs membrane module | |
CN105839914B (en) | Adjustable steel beam support meanss and system | |
CN209353302U (en) | Structure for drain hole port strobe opening and closing device mounting platform | |
CN207376661U (en) | A kind of plugging structure of poured band of outer wall of basement | |
CN106499180B (en) | A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method | |
CN208884991U (en) | Deformation slit formwork | |
CN206815820U (en) | Pour toilet or kitchen concrete floor hanging mould structure | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN212249210U (en) | Casing fixing and vertical positioning device | |
CN208844800U (en) | A kind of easy finished product pours branch stake tool | |
CN205711761U (en) | A kind of Novel hanging basket of convenience and safety | |
CN207538506U (en) | The independent supporting rack of efficient construction of precast floorslab | |
CN206607753U (en) | After pour beam steel anchor | |
CN208830461U (en) | A kind of new device of limitation Fabricated balcony displacement | |
CN207672995U (en) | A kind of In Great Basement late poured band support template | |
CN208803700U (en) | Precast concrete cushion block between sinking | |
CN205742662U (en) | Node installed by a kind of connector and Side fascia | |
CN207499434U (en) | The bayonet type erecting device of stair step |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200527 Address after: 300457 no.2599 Binhe Road, Tanggu, Binhai New District, Tianjin Patentee after: Tianjin Construction Engineering Co., Ltd. of China Construction Eighth Engineering Bureau Address before: 200122, No. 1568, Century Avenue, Shanghai, 27, Pudong New Area Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd. |
|
TR01 | Transfer of patent right |