CN208830461U - A kind of new device of limitation Fabricated balcony displacement - Google Patents

A kind of new device of limitation Fabricated balcony displacement Download PDF

Info

Publication number
CN208830461U
CN208830461U CN201821474024.0U CN201821474024U CN208830461U CN 208830461 U CN208830461 U CN 208830461U CN 201821474024 U CN201821474024 U CN 201821474024U CN 208830461 U CN208830461 U CN 208830461U
Authority
CN
China
Prior art keywords
steel pipe
balcony
steel plate
crossed manner
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821474024.0U
Other languages
Chinese (zh)
Inventor
邓峰刚
周贞勇
王金伟
彭期祥
钟泳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201821474024.0U priority Critical patent/CN208830461U/en
Application granted granted Critical
Publication of CN208830461U publication Critical patent/CN208830461U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a kind of new device of limitation Fabricated balcony displacement, including steel pipe sleeve and connector, the both ends of steel pipe sleeve are respectively and fixedly provided with connector, two steel pipe sleeves are arranged in parallel, the both ends of two steel pipe sleeves disposed in parallel pass through connector respectively and are fixedly connected with a steel plate base, the corresponding steel plate base in steel pipe sleeve both ends be fixed by bolts in respectively cast in place balcony beam aluminum dipping form side form and on the balcony side bar of cast in place balcony beam aluminum dipping form side form face, other two steel pipe sleeve is arranged in a crossed manner, four ends of two steel pipe sleeves arranged in a crossed manner pass through connector respectively and are fixedly connected with four steel plate bases.The problems such as to solve prefabricated balcony unstability.Belong to building auxiliary equipment field.

Description

A kind of new device of limitation Fabricated balcony displacement
Technical field
The utility model relates to a kind of devices of limitation Fabricated balcony displacement, belong to building auxiliary equipment field.
Background technique
With the new trend that building trade develops to assembled architecture, prefabricated assembled balcony largely comes into operation, balcony Construction period greatly improves, but the fixation after the lifting of prefabricated assembled balcony between aluminum dipping form is a big difficulty, traditional method always It is that prefabricated balcony and aluminum dipping form are then connected into an entirety with bolt by reserving screw eyelet on prefabricated balcony bottom surface, But often due to the error of balcony, aluminum dipping form preformed hole interdigit, causes anchor bolt that can not install, water between balcony and aluminum dipping form when constructing Square to no constraint, causes when concrete vibrating prefabricated balcony to exist and move position.
Summary of the invention
The purpose of this utility model is that: a kind of new device of limitation Fabricated balcony displacement is provided, it is prefabricated to solve The problem of balcony unstability, Normal practice are that screw eyelet is reserved on prefabricated balcony, pass through spiral shell after prefabricated balcony rigging out Bolt anchoring, but often due to the error of balcony, aluminum dipping form preformed hole interdigit, causes anchor bolt that can not install, balcony water when construction Square to no constraint, balcony there are problems that moving horizontally after concrete vibrating.
To solve the above problems, the new device of such a limitation Fabricated balcony displacement of proposed adoption, including four steel Pipe sleeve cylinder and connector, docking is fixed with a connector, two of them steel pipe sleeve respectively at the both ends of each steel pipe sleeve It is arranged in parallel, and the both ends of two steel pipe sleeves disposed in parallel pass through connector respectively and are fixedly connected with a steel plate bottom Seat, and the corresponding steel plate base in steel pipe sleeve both ends be fixed by bolts in respectively cast in place balcony beam aluminum dipping form side form and with it is cast-in-place On the balcony side bar of balcony beam aluminum dipping form side form face, other two steel pipe sleeve two steel pipes arranged in a crossed manner and arranged in a crossed manner Bolt hole is offered on sleeve, bolt hole is the kidney slot or strip-shaped hole of the length direction setting along place steel pipe casing, and It is equipped with same root bolt in bolt hole on two steel pipe sleeves arranged in a crossed manner, by two steel pipe sleeves arranged in a crossed manner It is connected, four ends of two steel pipe sleeves arranged in a crossed manner pass through connector respectively and are fixedly connected with four steel plate bases.
In aforementioned device, the connector includes junction steel plate and spiral, spiral and steel pipe casing one end pair It connecing, and the two is coaxially disposed, the other end of spiral is fixedly connected with junction steel plate, and welding can be used in the connection type, Junction steel plate is hinged with the otic placode in steel plate base by bolt;
In aforementioned device, the length of the bolt hole is 150mm;
In aforementioned device, the length of two steel pipe sleeves disposed in parallel is identical, and two steel pipes disposed in parallel Sleeve is perpendicular with the balcony side bar and cast in place balcony beam aluminum dipping form side form respectively, the length of two steel pipe sleeves arranged in a crossed manner It spends also identical.
Its concrete construction method is as follows:
1, using bolt screw by four steel plate bases be fixed on two-by-two respectively cast in place balcony beam aluminum dipping form side form and with it is cast-in-place On the balcony side bar of balcony beam aluminum dipping form side form face, in two steel plate bases and cast in place balcony beam aluminium film side form on balcony side bar Two steel plate bases correspond and face be arranged;
2, the fixed connector formed by connecing steel plate and spiral, two of them are long respectively for the end of four steel pipe sleeves Spend that identical steel pipe sleeve is arranged in parallel, and by the both ends of steel pipe sleeve arranged in parallel pass through respectively connector with Cast in place balcony beam aluminum dipping form side form and with the steel plate base on the balcony side bar of cast in place balcony beam aluminum dipping form side form face correspondingly It is connected and fixed, the identical steel pipe sleeve of other two length is arranged in a crossed manner, and the both ends of two steel pipe sleeves arranged in a crossed manner are also divided It is not fixedly connected by connector with four steel plate bases, the connection type of the connector and steel pipe sleeve are as follows: spiral It is docked with steel pipe casing one end, and the two is coaxially disposed, the other end of spiral is fixedly connected with junction steel plate, the connection Welding can be used in mode, and junction steel plate is hinged with the otic placode in steel plate base by bolt;
3, on two steel pipe sleeves arranged in a crossed manner, the bolt hole of one of 150mm long is processed respectively in the two intersection, Using the bolt sequentially passed through in two bolts in intersection by two steel pipe sleeve connections;
4, root steel pipe sleeve is rotated, balcony is adjusted to design requirement position in conjunction with theodolite and level meter.
Compared with prior art, the utility model forms two triangle steel truss being arranged symmetrically using four steel pipe casings Frame, by manually being fixed with high-strength bolt and steel plate base with prefabricated balcony and aluminum dipping form, in prefabricated balcony installation and concrete vibration During smashing, it can effectively limit the torsion of balcony and move horizontally, guarantee the installation accuracy of prefabricated balcony, i.e., it is practical and can week Turn.4 steel pipe both ends of the steel truss carry the error that adjustable connector solves the problems, such as preformed hole interdigit, work efficiency Height, labor intensity are low, securely and reliably, substantially increase construction speed, reusable, to reduce cost.
Detailed description of the invention
Fig. 1 is the mounting structure schematic diagram of the utility model.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type is described in further detail.
Embodiment:
Referring to Fig.1, the present embodiment provides a kind of new devices of limitation Fabricated balcony displacement, including four steel pipe sleeves 1 and connector, docking is fixed with a connector respectively at the both ends of each steel pipe sleeve 1, and two of them steel pipe sleeve 1 is mutual It is arranged in parallel, and the both ends of two steel pipe sleeves 1 disposed in parallel pass through connector respectively and are fixedly connected with a steel plate base 4, and the corresponding steel plate base 4 in 1 both ends of steel pipe sleeve respectively by bolt 3 be fixed on cast in place balcony beam aluminum dipping form side form 9 and with On the balcony side bar 8 of 9 face of cast in place balcony beam aluminum dipping form side form, other two steel pipe sleeve 1 is arranged in a crossed manner, and arranged in a crossed manner two The length of steel pipe sleeve 1 is also identical, and offers bolt hole 6 on two steel pipe sleeves 1 arranged in a crossed manner, and disposed in parallel The length of two steel pipe sleeves 1 is identical, and two steel pipe sleeves 1 disposed in parallel respectively with the cast in place balcony beam aluminum dipping form side Mould 9 and balcony side bar 8 are perpendicular, and bolt hole 6 is the waist hole being arranged along the length direction of place steel pipe casing 1, the length of bolt hole 6 Degree is 150mm, and is equipped with same root bolt 3 in the bolt hole 6 on two steel pipe sleeves 1 arranged in a crossed manner, will intersect and set The two steel pipe sleeves 1 set are connected, and four ends of two steel pipe sleeves 1 arranged in a crossed manner pass through connector and four steel respectively Board bottom seat 4 is fixedly connected.
Connector includes junction steel plate 2 and spiral 7, and spiral 7 is docked with 1 one end of steel pipe casing, and the two is same Axis setting, the other end of spiral 7 are fixedly connected with junction steel plate 2, and welding, junction steel plate 2 can be used in the connection type It is hinged with the otic placode 5 in steel plate base 4 by bolt 3, the bolt 3 is all made of high-strength bolt;
Its concrete construction method is as follows:
5, using bolt 3 screw by four steel plate bases 4 be fixed on two-by-two respectively cast in place balcony beam aluminum dipping form side form 9 and with it is existing Two steel plate bases 4 and cast in place balcony beam aluminium film on the balcony side bar 8 for pouring 9 face of balcony beam aluminum dipping form side form, on balcony side bar 8 Two steel plate bases 4 on side form 9 correspond and face is arranged;
6, the connector formed by connecing steel plate 2 and spiral 7 is fixed in the end of four steel pipe sleeves 1 respectively, wherein two The identical steel pipe sleeve 1 of a length is arranged in parallel, and the both ends of steel pipe sleeve 1 arranged in parallel are passed through company respectively Fitting and cast in place balcony beam aluminum dipping form side form 9 and with the steel plate base 4 on the balcony side bar 8 of 9 face of cast in place balcony beam aluminum dipping form side form It is connected and fixed correspondingly, the identical steel pipe sleeve 1 of other two length is arranged in a crossed manner, two steel pipe sleeves arranged in a crossed manner 1 both ends are also fixedly connected by connector with four steel plate bases 4 respectively, the connection side of the connector and steel pipe sleeve 1 Formula are as follows: spiral 7 is docked with 1 one end of steel pipe casing, and the two is coaxially disposed, the other end and junction steel plate 2 of spiral 7 It is fixedly connected, welding can be used in the connection type, and junction steel plate 2 is hinged with the otic placode 5 in steel plate base 4 by bolt 3;
7, on two steel pipe sleeves 1 arranged in a crossed manner, the bolt hole of one of 150mm long is processed respectively in the two intersection 6, two steel pipe sleeves 1 are connected in intersection using the bolt 3 sequentially passed through in two bolts 6;
4 steel pipe sleeves 1 are rotated, balcony is adjusted to design requirement position in conjunction with theodolite and level meter.

Claims (4)

1. a kind of new device of limitation Fabricated balcony displacement, it is characterised in that: including four steel pipe sleeves and connector, often Docking is fixed with a connector respectively at the both ends of a steel pipe sleeve, and two of them steel pipe sleeve is arranged in parallel, and flat The both ends of two steel pipe sleeves of row setting pass through connector respectively and are fixedly connected with a steel plate base, and steel pipe sleeve both ends Corresponding steel plate base be fixed by bolts in respectively cast in place balcony beam aluminum dipping form side form and with cast in place balcony beam aluminum dipping form side form just Pair balcony side bar on, offer spiral shell on other two steel pipe sleeve two steel pipe sleeves arranged in a crossed manner and arranged in a crossed manner Keyhole, bolt hole are the kidney slot being arranged along the length direction of place steel pipe casing or strip-shaped hole, and two steel arranged in a crossed manner It is equipped with same root bolt in bolt hole on pipe sleeve cylinder, two steel pipe sleeves arranged in a crossed manner are connected, it is arranged in a crossed manner Four ends of two steel pipe sleeves pass through connector respectively and are fixedly connected with four steel plate bases.
2. a kind of new device of limitation Fabricated balcony displacement according to claim 1, it is characterised in that: the connector Including junction steel plate and spiral, spiral is docked with steel pipe casing one end, and the two be coaxially disposed, spiral it is another One end is fixedly connected with junction steel plate, and junction steel plate is hinged with the otic placode in steel plate base by bolt.
3. a kind of new device of limitation Fabricated balcony displacement according to claim 1, it is characterised in that: the bolt hole Length be 150mm.
4. a kind of new device of limitation Fabricated balcony displacement according to claim 1, it is characterised in that: described to set in parallel The length for the two steel pipe sleeves set is identical, and two steel pipe sleeves disposed in parallel divide equally not with the balcony side bar and cast-in-place Balcony beam aluminum dipping form side form is perpendicular, and the length of two steel pipe sleeves arranged in a crossed manner is also identical.
CN201821474024.0U 2018-09-10 2018-09-10 A kind of new device of limitation Fabricated balcony displacement Expired - Fee Related CN208830461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821474024.0U CN208830461U (en) 2018-09-10 2018-09-10 A kind of new device of limitation Fabricated balcony displacement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821474024.0U CN208830461U (en) 2018-09-10 2018-09-10 A kind of new device of limitation Fabricated balcony displacement

Publications (1)

Publication Number Publication Date
CN208830461U true CN208830461U (en) 2019-05-07

Family

ID=66312694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821474024.0U Expired - Fee Related CN208830461U (en) 2018-09-10 2018-09-10 A kind of new device of limitation Fabricated balcony displacement

Country Status (1)

Country Link
CN (1) CN208830461U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208753A (en) * 2018-09-10 2019-01-15 中国建筑第四工程局有限公司 A kind of new device and its construction method of the displacement of limitation Fabricated balcony

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208753A (en) * 2018-09-10 2019-01-15 中国建筑第四工程局有限公司 A kind of new device and its construction method of the displacement of limitation Fabricated balcony
CN109208753B (en) * 2018-09-10 2023-11-21 中国建筑第四工程局有限公司 Novel device for limiting displacement of assembled balcony and construction method thereof

Similar Documents

Publication Publication Date Title
CN109736353A (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
GB2599295A (en) Construction system for widened section of half-through arch bridge
CN104711996A (en) End steel shell mounting and positioning device and operation method
CN104018675A (en) Construction method for shear wall concrete formworks and pillar concrete formworks
CN208830461U (en) A kind of new device of limitation Fabricated balcony displacement
CN207499427U (en) Assembly integrated precast superimposed sheet support system
KR20110128396A (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
CN109555313A (en) A kind of adjustable gib truss for assembled floor
CN207211784U (en) A kind of positioner of prefabricated components installation reinforcing bar
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN108677722A (en) Hollow High Pier with Thin Wall stub top section construction technology
CN103306371A (en) Manufacturing and mounting structure of PC prefabricated part of prefabricated house
CN205907609U (en) Supplementary utensil in pre -buried hole of bridge supporting base stone location
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN209443775U (en) Support locating template three for assembled architecture primary and secondary beam nodes uses integrated device
CN208533893U (en) A kind of concrete prefabricated stairs
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN108374350B (en) Assembly jig frame of steel anchor beam and steel corbel unit and installation method
CN206815540U (en) A kind of positioner for concrete structure built-in fitting
CN203034615U (en) Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder
CN109208753A (en) A kind of new device and its construction method of the displacement of limitation Fabricated balcony
CN206600005U (en) The positioning component and positioner of reserved joint bar in shear wall
CN206070598U (en) A kind of poured band of outer wall of basement outboard template and its fixed structure
CN212249210U (en) Casing fixing and vertical positioning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190507