CN104386219B - 自升式平台桩靴后续入坞工艺 - Google Patents

自升式平台桩靴后续入坞工艺 Download PDF

Info

Publication number
CN104386219B
CN104386219B CN201410543327.3A CN201410543327A CN104386219B CN 104386219 B CN104386219 B CN 104386219B CN 201410543327 A CN201410543327 A CN 201410543327A CN 104386219 B CN104386219 B CN 104386219B
Authority
CN
China
Prior art keywords
shoe
frock
track
carried out
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410543327.3A
Other languages
English (en)
Other versions
CN104386219A (zh
Inventor
李川江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHOUSHAN CHANGHONG INTERNATIONAL SHIPBUILDING Co Ltd
Original Assignee
ZHOUSHAN CHANGHONG INTERNATIONAL SHIPBUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHOUSHAN CHANGHONG INTERNATIONAL SHIPBUILDING Co Ltd filed Critical ZHOUSHAN CHANGHONG INTERNATIONAL SHIPBUILDING Co Ltd
Priority to CN201410543327.3A priority Critical patent/CN104386219B/zh
Publication of CN104386219A publication Critical patent/CN104386219A/zh
Application granted granted Critical
Publication of CN104386219B publication Critical patent/CN104386219B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

自升式平台桩靴后续入坞工艺,工装制作及安装到位:首先需确定出桩靴在船坞的终点位置,以及桩靴的划入路径,同时需考虑划入方式,本方案考虑采用三根轨道加特定工装方式,通过考虑特殊工装二,首先进行轨道安装,然后对特殊工装进行制作,轨道铺设时应考虑对接头区域,在桩靴主船体下位置投射影区域中无接头和轨道的固定装置,以便桩靴到位后轨道及时拆除;主船体搭载完整:按照设计图进行平台主船体的搭载,无需考虑桩靴及桩腿;采用本工艺的建造方法,建造平稳性好,不容易发生倒塌等安装事故,而且建造速度快质量好,深受用户的好评。

Description

自升式平台桩靴后续入坞工艺
技术领域
本发明涉及自升式平台桩靴后续入坞工艺,属于船舶技术领域。
背景技术
随着现代科技的发展,船舶制造业越来越向高端发展,由原来的小木船已向万吨级钢制船发展,尤其是大型海洋平台的建造,将海洋工业推向了最高端,但海洋平台的建造很困难,由于其有四个桩腿,在干船坞承重量很大,直接用桩腿支持很容易倒塌,必须采用合适的工艺才能进行整体建造,是一个急需解决的问题。
发明内容
本发明的目的是提供自升式平台桩靴后续入坞工艺。
本发明要解决的问题是现有干船坞整体建造海洋平台直接用桩腿支持很容易倒塌的不足。
为实现本发明的目的,本发明采用的技术方案是:
自升式平台桩靴后续入坞工艺,包括以下步骤:
A、工装制作及安装到位:首先需确定出桩靴在船坞的终点位置,以及桩靴的划入路径,同时需考虑划入方式,本方案考虑采用三根轨道加特定工装方式,通过考虑特殊工装二,首先进行轨道安装,然后对特殊工装进行制作,轨道铺设时应考虑对接头区域,在桩靴主船体下位置投射影区域中无接头和轨道的固定装置,以便桩靴到位后轨道及时拆除;
B、主船体搭载完整:按照设计图进行平台主船体的搭载,无需考虑桩靴及桩腿;
C、桩靴入工装并放入轨道做好限位装置:首先将桩靴放入做好的桩靴限位工装中,在轨道上涂上黄油,并在其前进方向上设好卷扬机设备,并通过拉索连接在桩靴滑动路径前进面上;
D、桩靴拉入并定位:沿着轨道方向进行桩靴滑入,到既定位置后,四周通过支撑板采用多个液压顶将整个平台顶起,然后拆除拉索,拆除轨道,将平台缓慢放下,撤掉液压顶;
E、桩腿第一节与桩靴对接:所有平台主船体搭载完毕,围井区域所有构件及设备安装好之后,进行第一节桩腿与桩靴的对接工作,此时可通过在桩靴入坞工进行完整组装;
F、桩靴工装中沙并承重:对桩靴工装内充满细砂初次约700mm厚沙层,并让之承重,同时桩靴支撑部件暂不拆除;
G、剩余桩腿搭载:用同样方式完成剩余三个桩腿的搭载工作;
H、桩腿升降装置试车及桩靴工装内细沙压实:桩腿搭载完毕,所有桩腿升起机构安装、调试完毕后,对起升进行试车,并将桩靴向上一定距离收近主船体,拆除桩靴支撑工装,然后对桩靴工装中补充特定高度的细沙,并再次按桩靴底面形状造模,然后放下桩靴并压实,做好起升实验的前期准备工作;
I、完成平台坞内升起实验、出坞:按船东试验要求进行平台整体升降实验,结束后船坞放水,平台与桩腿整体起伏后出坞。
工装由多根大型工字梁相互焊接而成,外形呈矩形结构,内部构成16个矩形框,使其具有良好的承重能力。
本发明的优点:采用本工艺的建造方法,建造平稳性好,不容易发生倒塌等安装事故,而且建造速度快质量好,深受用户的好评,应具有广泛的市场前景。
附图说明
图1是本发明自升式平台桩靴后续入坞工艺工装的运动示意图;
图2是本发明自升式平台桩靴后续入坞工艺桩靴的安装示意图;
图3是本发明自升式平台桩靴后续入坞工艺A部液压顶局部放大示意图;
图中:1、三根轨道 2、拉索 3、卷扬机设备 4、工装 5、细沙 6、桩靴 7、桩腿8、液压顶 9、支撑板。
具体实施方式
下面结合附图及实施例对本发明作进一步的说明。
以90米海洋平台自升式平台桩靴后续入坞工艺为例,包括以下步骤:
A、工装制作及安装到位:首先需确定出桩靴在船坞的终点位置,以及桩靴的划入路径,同时需考虑划入方式,本方案考虑采用三根轨道1加特定工装4方式,通过考虑特殊工装二,首先进行轨道安装,然后对特殊工装进行制作,轨道铺设时应考虑对接头区域,在桩靴主船体下位置投射影区域中无接头和轨道的固定装置,以便桩靴到位后轨道及时拆除;
B、主船体搭载完整:按照设计图进行平台主船体的搭载,无需考虑桩靴及桩腿;
C、桩靴入工装并放入轨道做好限位装置:首先将桩靴放入做好的桩靴限位工装中,在轨道上涂上黄油,并在其前进方向上设好卷扬机设备3,并通过拉索2连接在桩靴滑动路径前进面上;
D、桩靴拉入并定位:沿着轨道方向进行桩靴滑入,到既定位置后,四周通过支撑板9采用多个液压顶8将整个平台顶起,然后拆除拉索2,拆除轨道,将平台缓慢放下,撤掉液压顶8;
E、桩腿7第一节与桩靴6对接:所有平台主船体搭载完毕,围井区域所有构件及设备安装好之后,进行第一节桩腿与桩靴的对接工作,此时可通过在桩靴入坞工进行完整组装;
F、桩靴工装中沙并承重:对桩靴工装内充满细砂初次约700mm厚沙层,并让之承重,同时桩靴支撑部件暂不拆除;
G、剩余桩腿搭载:用同样方式完成剩余三个桩腿的搭载工作;
H、桩腿升降装置试车及桩靴工装内细沙5压实:桩腿搭载完毕,所有桩腿升起机构安装、调试完毕后,对起升进行试车,并将桩靴向上一定距离收近主船体,拆除桩靴支撑工装,然后对桩靴工装中补充特定高度的细沙,并再次按桩靴底面形状造模,然后放下桩靴并压实,做好起升实验的前期准备工作;
I、完成平台坞内升起实验、出坞:按船东试验要求进行平台整体升降实验,结束后船坞放水,平台与桩腿整体起伏后出坞。
工装由多根大型工字梁相互焊接而成,外形呈矩形结构,内部构成16个矩形框,使其具有良好的承重能力,其自重达29吨,长宽各个13米。
通过该工艺平台建造质量好下水稳定,具有良好的示范作用。

Claims (2)

1.自升式平台桩靴后续入坞工艺,其特征在于:包括以下步骤
A、工装制作及安装到位:首先需确定出桩靴在船坞的终点位置,以及桩靴的划入路径,同时需考虑划入方式,本方案考虑采用三根轨道(1)加特定工装(4)方式,通过考虑特定工装(4),首先进行轨道安装,然后对特定工装(4)进行制作,轨道铺设时应考虑对接头区域,在桩靴主船体下位置投射影区域中无接头和轨道的固定装置,以便桩靴到位后轨道及时拆除;
B、主船体搭载完整:按照设计图进行平台主船体的搭载,无需考虑桩靴及桩腿;
C、桩靴入工装并放入轨道做好限位装置:首先将桩靴放入做好的特定工装(4)中,在轨道上涂上黄油,并在其前进方向上设好卷扬机设备(3),并通过拉索(2)连接在桩靴滑动路径前进面上;
D、桩靴拉入并定位:沿着轨道方向进行桩靴滑入,到既定位置后,四周通过支撑板(9)采用多个液压顶(8)将整个平台顶起,然后拆除拉索(2),拆除轨道,将平台缓慢放下,撤掉液压顶(8);
E、桩腿(7)第一节与桩靴(6)对接:所有平台主船体搭载完毕,围井区域所有构件及设备安装好之后,进行第一节桩腿与桩靴的对接工作,此时可在桩靴入坞时进行完整组装;
F、特定工装(4)中装沙并让之承重:对特定工装(4)内充满细沙初次约700mm厚沙层,并让之承重,同时桩靴支撑部件暂不拆除;
G、剩余桩腿搭载:用同样方式完成剩余三个桩腿的搭载工作;
H、桩腿升降装置试车及特定工装(4)内细沙(5)压实:桩腿搭载完毕,所有桩腿升起机构安装、调试完毕后,对起升进行试车,并将桩靴向上一定距离收近主船体,拆除桩靴支撑工装,然后对特定工装(4)中补充特定高度的细沙,并再次按桩靴底面形状造模,然后放下桩靴并压实,做好起升实验的前期准备工作;
I、完成平台坞内升起实验、出坞:按船东试验要求进行平台整体升降实验,结束后船坞放水,平台与桩腿整体起伏后出坞。
2.根据权利要求1所述的自升式平台桩靴后续入坞工艺,其特征在于:所述特定工装(4)由多根大型工字梁相互焊接而成,外形呈矩形结构,内部构成16个矩形框,使其具有良好的承重能力。
CN201410543327.3A 2014-10-15 2014-10-15 自升式平台桩靴后续入坞工艺 Active CN104386219B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410543327.3A CN104386219B (zh) 2014-10-15 2014-10-15 自升式平台桩靴后续入坞工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410543327.3A CN104386219B (zh) 2014-10-15 2014-10-15 自升式平台桩靴后续入坞工艺

Publications (2)

Publication Number Publication Date
CN104386219A CN104386219A (zh) 2015-03-04
CN104386219B true CN104386219B (zh) 2017-07-25

Family

ID=52604207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410543327.3A Active CN104386219B (zh) 2014-10-15 2014-10-15 自升式平台桩靴后续入坞工艺

Country Status (1)

Country Link
CN (1) CN104386219B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223302B (zh) * 2016-07-22 2018-11-09 上海外高桥造船有限公司 自升式钻井平台的建造方法
CN106314718B (zh) * 2016-09-21 2018-05-22 江苏科技大学 自升式平台船坞内升桩作业环形支墩
CN107323633B (zh) * 2017-05-26 2019-02-05 广州中船文冲船坞有限公司 自升式钻井平台进坞及其出坞方法
CN107323632B (zh) * 2017-05-26 2019-02-05 广州中船文冲船坞有限公司 自升式钻井平台进坞方法
CN109018196B (zh) * 2018-06-21 2020-12-04 招商局重工(江苏)有限公司 一种自升式平台与多艘船舶共同进坞维修的定位方法
CN110280986B (zh) * 2019-05-31 2020-06-02 华核电气股份有限公司 一种大型电气柜组装用平台
CN113774817B (zh) * 2021-09-15 2023-02-28 舟山长宏国际船舶修造有限公司 一种装配式公路桥快速施工装备
CN114059530A (zh) * 2021-12-17 2022-02-18 山海关船舶重工有限责任公司 一种自升式风电安装平台桩靴的拆卸方法
CN114182710B (zh) * 2021-12-17 2023-06-27 山海关船舶重工有限责任公司 一种风电安装平台桩靴的安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101537987A (zh) * 2009-03-12 2009-09-23 大连船舶重工集团有限公司 一种海洋平台平地快速拖移的方法和装置
CN102849185A (zh) * 2012-09-18 2013-01-02 渤海装备辽河重工有限公司 一种自升式钻井平台的桩腿安装方法
CN203391981U (zh) * 2013-05-24 2014-01-15 上海外高桥造船有限公司 桩靴支承装置
CN203514366U (zh) * 2013-03-29 2014-04-02 邹聪 一种用于自升式钻井平台坞内升桩试验的砂箱
CN103924564A (zh) * 2013-01-13 2014-07-16 江齐锋 单齿条桩腿合拢方法及工装

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101537987A (zh) * 2009-03-12 2009-09-23 大连船舶重工集团有限公司 一种海洋平台平地快速拖移的方法和装置
CN102849185A (zh) * 2012-09-18 2013-01-02 渤海装备辽河重工有限公司 一种自升式钻井平台的桩腿安装方法
CN103924564A (zh) * 2013-01-13 2014-07-16 江齐锋 单齿条桩腿合拢方法及工装
CN203514366U (zh) * 2013-03-29 2014-04-02 邹聪 一种用于自升式钻井平台坞内升桩试验的砂箱
CN203391981U (zh) * 2013-05-24 2014-01-15 上海外高桥造船有限公司 桩靴支承装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
自升式钻井平台升桩方案研究;张斌,吴晗,吴晓源;《造船技术》;20140618(第2期);全文 *
自升式驳船桩腿提升试验的研究;王欢,李朝晖;《武汉船舶职业技术学院学报》;20131204(第5期);全文 *

Also Published As

Publication number Publication date
CN104386219A (zh) 2015-03-04

Similar Documents

Publication Publication Date Title
CN104386219B (zh) 自升式平台桩靴后续入坞工艺
CN106080964B (zh) 一种用于超大型集装箱船横隔舱总段双面导轨的安装方法
CN100581976C (zh) 龙门起重机在驳船总装技术
CN103661801B (zh) 海洋工程水下推进器的安装辅助系统及安装方法
CN105667737A (zh) 一种船舶下水方法及用于实现该方法的移船小车系统
CN103711491A (zh) 用于竖井混凝土衬砌施工的设备及其施工方法
CN102140779A (zh) 一种移动式现浇支架及箱梁现浇支架移动施工方法
CN107226182A (zh) 一种大型船舶的水下转移船台的方法及系统
CN109958062A (zh) 一种墩柱施工工艺
CN104727229B (zh) 适用于大型混凝土预制构件的活动底模台车系统及预制大型混凝土构件底板的方法
CN102337736A (zh) 海洋石油平台上部模块的安装工艺
CN109319045A (zh) 一种双相不锈钢化学品船隔舱中间产品的建造方法
CN108583779A (zh) 一种船舶的组装工艺
CN106958253A (zh) 一种新型深水组合钢板桩围堰施工方法
CN104878733A (zh) 一种钻井平台桩腿分段合拢工艺
CN104527923B (zh) 一种应用辅助托架的主推电机进舱安装方法
CN104210627A (zh) 用于自升式平台平地建造下水的装置及方法
CN107653856B (zh) 自升式平台的建造合拢方法
CN101806053B (zh) 自升式钻井平台悬臂梁的整体安装方法
CN201685997U (zh) 利用浮船坞造船的工装
CN104477323B (zh) 桩靴优先入坞工艺
CN203655299U (zh) 用于竖井混凝土衬砌施工的设备
CN102328728A (zh) 深水铺管起重船的重型海洋工程起重机底座的组装方法
JP2013123936A (ja) 自己昇降式台船の支持脚補強装置及び支持脚補強方法
CN205381375U (zh) 一种超大型船舶艉部分段总组支撑机构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant