CN104278667A - 一种地下溶洞的充填处理方法 - Google Patents

一种地下溶洞的充填处理方法 Download PDF

Info

Publication number
CN104278667A
CN104278667A CN201310279805.XA CN201310279805A CN104278667A CN 104278667 A CN104278667 A CN 104278667A CN 201310279805 A CN201310279805 A CN 201310279805A CN 104278667 A CN104278667 A CN 104278667A
Authority
CN
China
Prior art keywords
hole
solution cavity
soil
filling
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310279805.XA
Other languages
English (en)
Other versions
CN104278667B (zh
Inventor
江志峰
洪昌华
李树枝
陈江滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Guotai Construction Group Co Ltd
Original Assignee
Zhejiang Guotai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Guotai Construction Group Co Ltd filed Critical Zhejiang Guotai Construction Group Co Ltd
Priority to CN201310279805.XA priority Critical patent/CN104278667B/zh
Publication of CN104278667A publication Critical patent/CN104278667A/zh
Application granted granted Critical
Publication of CN104278667B publication Critical patent/CN104278667B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0076Drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明涉及一种地下溶洞的充填处理方法,其步骤包括:地质勘察、塌孔保护、钻孔、钻孔冲洗、制备气泡混合土、注浆作业。本发明克服大开挖施工或往溶洞内注水泥浆或混凝土的不经济,且保证溶洞填充充分,施工起来不仅方便,缩短工期,而且能节约投资。

Description

一种地下溶洞的充填处理方法
技术领域
本发明涉及一种地下溶洞处理方法,尤其是一种地下溶洞的充填处理方法。
背景技术
在土建工程中,常常会遇到一些施工场地内存在地下溶洞,有的工程的地下溶洞分布的范围广且深度不等,这些溶洞的长期存在将严重影响工程质量及使用寿命,必须进行处理。目前对于埋深较浅的可以通过开挖换填施工技术,对于埋深较深的地下溶洞一般用灌注水泥浆或混凝土的形式,这些施工方法一般工期较长、费用较高且无法确保溶洞的充分填充。由于气泡混合土具有良好的流动性、自硬性、施工过程中不需要振捣等特点,可以作为地下溶洞填充的极好材料。
发明内容
本发明要解决上述现有技术的缺点,提供一种施工方便,缩短工期,而且能节约投资的地下溶洞的充填处理方法,克服了大开挖施工或往溶洞内注水泥浆或混凝土的不经济,且保证溶洞填充充分。
本发明解决其技术问题采用的技术方案:这种地下溶洞的充填处理方法,其步骤包括:
1)地质勘察:确定溶洞发育范围及空间形态,深孔钻探验证溶洞的形式及溶洞内充水、充泥情况,并确定溶洞内充水、充泥数量以及水压力大小。
2)塌孔保护:由于地下水对上部土层的“倒虹吸”作用会使土层形成一定的负压,如果上部有象粉土粉砂层等易流失的土层,容易造成水、土因下部溶洞中的负压作用向洞内加速下塌,造成钻孔后沉陷,因此对于这种有比较容易流失的土层需用大的套管隔穿上部的容易流失的土层。
3)钻孔:参照原发现溶洞的钻探孔,在其间隔垂直四个方向上每2.0m布孔一个,如仍发现溶洞,根据洞体的高低不同,则向外延伸布孔,一边施工,一边判定溶洞位置及边界,以此圈定此溶洞的分布边界及处理范围,充分掌握溶洞的实际情况。
4)钻孔冲洗:钻孔完成后,在钻孔的其它的地方用钢管向洞内注入高压水进行冲洗,冲洗的钢管端部封闭并在距底部0.3m左右的地方开一水平向下45°的孔,以便于洞底充填物的冲洗。根据钻勘孔时探明的孔深,在溶洞的较低处用勘探机钻杆反循环吸泥法把洞底的淤泥等充填物清除掉,将废渣从钻杆中吸出,当冲洗的回水澄清10分钟后,孔内残存杂质沉积厚度不超过10~20cm时,结束冲孔,即进行连续注浆作业。
5)制备气泡混合土:气泡混合土可以是原料土(粘土、淤泥、砂土),也可以是砂,使用时尽量将5mm以上颗粒及异物检出。通过轻质土拌和设备搅拌后泵送到施工作业面。
6)注浆作业:注浆采用勘探机的钻杆自下而上注浆法,钻杆距孔底不大于50cm,由外向内进行,先对溶洞边界上的钻孔进行充填灌浆,再进行中部孔灌浆。在注浆时注浆的孔作为注浆孔,其它的孔作为排气孔,注完浆后不能立即提管,需等待20min左右,检查各个钻孔内是否满浆,对异常情况可再浆补浆,再次满溢后可提管。
作为优选,步骤3)中钻孔施工采用XY-100型钻机,注浆孔用φ130mm钻头泥浆护壁钻进。
作为优选,步骤5)中气泡混合土的原料土为河道吹填开挖的淤泥质土,重量配合比:土为59%,水为20%,气泡1%,水泥20%。
作为优选,步骤6)中注浆总体施工顺序遵循“先外后里、先大后小”的原则,对于单个洞由外向内进行,先对溶洞边界上的钻孔进行充填灌浆,再进行中部孔灌浆,在注浆时注浆的孔作为注浆孔,其它的孔作为排气孔;对多层溶洞要先处理下层溶洞再处理上层的;对于串珠状发育的多个溶洞,注浆时,自下而上,按照洞高分布规律,依次提升注浆导管,逐级灌满。
发明有益的效果是:本发明中气泡混合土的原料土可以利用工程废弃土,既保护环境又得到了很好的利用,节约成本,变废为宝,达到绿色施工的目的;通过该方法施工起来不仅方便,缩短了工期,而且能节约投资。
具体实施方式
下面对本发明作进一步说明:
实施例:这种地下溶洞的充填处理方法,其步骤包括:
1)地质勘察:本场地现为空地,表部为素填土,勘察表示无明显障碍物存在。根据勘察资料及对场地周围地质环境调查,本场地内主要不良地质现象为溶洞及其引起的地面沉陷,场地地下20m范围内分布的饱和粉土、粉砂,属现代、近代沉积层,具有较强的振动液化的不良作用。地质勘察场地有溶洞13个,溶洞的深度范围为42~53m左右,溶洞的高度0.3~7m,溶洞的宽度7~18m左右,有的地方存在多层溶洞。
2)塌孔保护:由于在场地内地下20m左右处分布有饱和砂土和粉砂土,遂下24m套管将上部的粉土粉砂层基本隔穿,钻孔时未见明显的地面沉陷。
3)钻孔:钻孔施工采用XY-100型钻机,注浆孔用φ130mm钻头泥浆护壁钻进,参照原发现溶洞的钻探孔,在其间隔垂直四个方向上每2.0m布孔一个,如仍发现溶洞,根据洞体的高低不同,则向外延伸布孔,一边施工,一边判定溶洞位置及边界,以此圈定此溶洞的分布边界及处理范围,充分掌握溶洞的实际情况。
4)钻孔冲洗:钻孔完成后,根据地质探孔的数据在溶洞的最低处布置勘探机钻杆,用反循环吸洞内充填物,在距钻杆较远的地方的孔从地面放入A110mm冲洗钢管,向洞内注入高压水进行冲洗,冲洗的钢管端部封闭并在距底部0.3m左右的地方开一水平向下45°的孔,以便于洞底充填物的冲洗。根据钻勘孔时探明的孔深,在溶洞的较低处用勘探机钻杆反循环吸泥法把洞底的淤泥等充填物清除掉,将废渣从钻杆中吸出。当冲洗的回水澄清10分钟后,孔内残存杂质沉积厚度不超过10~20cm时,结束冲孔,即进行连续注浆作业。
5)制备气泡混合土:本工程气泡混合土的原料土为河道吹填开挖的淤泥质土,使用时尽量将5mm以上颗粒及异物检出。根据试配后确定气泡混合土重量配合比:土为59%,水为20%(包括土中的水),气泡1%,水泥20%,密度为1.15g/cm3,无侧限抗压强度220kpa。通过轻质土拌和设备搅拌后泵送到施工作业面。
6)注浆作业:注浆总体施工顺序遵循“先外后里、先大后小”的原则,对于单个洞采用由外向里先对溶洞的边界进行灌浆再进行中部灌浆。对多层溶洞要先处理下层溶洞再处理上层的。对于串珠状发育的多个溶洞,注浆时,自下而上,按照洞高分布规律,依次提升注浆导管,逐级灌满。灌注施工时,地面应设置3-5个水准观测点,密切观测洞体地表的变化情况,不允许地面产生裂缝和抬升情况。一旦发现地面出现裂缝和抬升,必须及时降低泵送压力和灌注量。
除上述实施例外,本发明还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。

Claims (4)

1.一种地下溶洞的充填处理方法,其步骤包括:
1)地质勘察:确定溶洞发育范围及空间形态,深孔钻探验证溶洞的形式及溶洞内充水、充泥情况,并确定溶洞内充水、充泥数量以及水压力大小;
2)塌孔保护:对于上部有像粉土粉砂层这类比较容易流失的土层需用套管隔穿;
3)钻孔:参照原发现溶洞的钻探孔,在其间隔垂直四个方向上每2.0m布孔一个,如仍发现溶洞,根据洞体的高低不同,则向外延伸布孔,一边施工,一边判定溶洞位置及边界,以此圈定此溶洞的分布边界及处理范围,充分掌握溶洞的实际情况;
4)钻孔冲洗:钻孔完成后,在钻孔的其它的地方用钢管向洞内注入高压水进行冲洗,冲洗的钢管端部封闭并在距底部0.3m左右的地方开一水平向下45°的孔,以便于洞底充填物的冲洗,根据钻勘孔时探明的孔深,在溶洞的较低处用勘探机钻杆反循环吸泥法把洞底的淤泥等充填物清除掉,将废渣从钻杆中吸出,当冲洗的回水澄清10分钟后,孔内残存杂质沉积厚度不超过10~20cm时,结束冲孔;
5)制备气泡混合土:气泡混合土可以采用原料土,也可以是砂,使用时将5mm以上颗粒及异物检出,通过轻质土拌和设备搅拌后泵送到施工作业面;
6)注浆作业:注浆采用勘探机的钻杆自下而上注浆法,钻杆距孔底不大于50cm,由外向内进行,先对溶洞边界上的钻孔进行充填灌浆,再进行中部孔灌浆,在注浆时注浆的孔作为注浆孔,其它的孔作为排气孔,注完浆后需等待20min左右,检查各个钻孔内是否满浆,对异常情况可再浆补浆,再次满溢后可提管。
2.根据权利要求1所述的地下溶洞的充填处理方法,其特征是:所述步骤3)中钻孔施工采用XY-100型钻机,注浆孔用φ130mm钻头泥浆护壁钻进。
3.根据权利要求1所述的地下溶洞的充填处理方法,其特征是:所述步骤5)中气泡混合土的原料土为河道吹填开挖的淤泥质土,重量配合比:土为59%,水为20%,气泡1%,水泥20%。
4.根据权利要求1所述的地下溶洞的充填处理方法,其特征是:所述步骤6)中注浆总体施工顺序遵循“先外后里、先大后小”的原则,对于单个洞由外向内进行,先对溶洞边界上的钻孔进行充填灌浆,再进行中部孔灌浆,在注浆时注浆的孔作为注浆孔,其它的孔作为排气孔;对多层溶洞要先处理下层溶洞再处理上层的;对于串珠状发育的多个溶洞,注浆时,自下而上,按照洞高分布规律,依次提升注浆导管,逐级灌满。
CN201310279805.XA 2013-07-02 2013-07-02 一种地下溶洞的充填处理方法 Active CN104278667B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310279805.XA CN104278667B (zh) 2013-07-02 2013-07-02 一种地下溶洞的充填处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310279805.XA CN104278667B (zh) 2013-07-02 2013-07-02 一种地下溶洞的充填处理方法

Publications (2)

Publication Number Publication Date
CN104278667A true CN104278667A (zh) 2015-01-14
CN104278667B CN104278667B (zh) 2017-02-22

Family

ID=52253975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310279805.XA Active CN104278667B (zh) 2013-07-02 2013-07-02 一种地下溶洞的充填处理方法

Country Status (1)

Country Link
CN (1) CN104278667B (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105300444A (zh) * 2015-04-14 2016-02-03 贵州省水利水电勘测设计研究院 一种峡谷岸坡深埋地下大型溶洞形态特征勘探的方法
CN105625293A (zh) * 2016-01-26 2016-06-01 广西建工集团第五建筑工程有限责任公司 溶岩强发育施工场地填充式地质处理结构及其施工方法
CN107387116A (zh) * 2017-09-11 2017-11-24 中国矿业大学 一种隧道底板隐伏泥质充填岩溶换填处治方法
CN107938650A (zh) * 2017-12-22 2018-04-20 中交第三航务工程局有限公司宁波分公司 地下溶洞的充填处理方法
CN108931822A (zh) * 2018-09-17 2018-12-04 贵州省水利水电勘测设计研究院 一种地下全填充溶洞勘探方法
CN109000599A (zh) * 2018-09-28 2018-12-14 山东大学 针对封闭充水溶洞的体积测量系统及方法
CN108999181A (zh) * 2018-08-15 2018-12-14 广州地铁设计研究院有限公司 溶、土洞注浆处理施工方法及其应用
CN109024569A (zh) * 2018-08-22 2018-12-18 中国建筑第四工程局有限公司 一种串珠溶洞预处理施工方法
CN110295947A (zh) * 2019-08-05 2019-10-01 中南大学 一种盾构隧道溶洞充填方法
CN111254933A (zh) * 2020-01-20 2020-06-09 武汉正洪岩土工程有限公司 袖阀管岩溶注浆施工方法
CN111333374A (zh) * 2020-03-03 2020-06-26 云南建投第一勘察设计有限公司 一种载体桩机夯实溶洞填充物及溶洞填充方法
CN111395346A (zh) * 2020-03-19 2020-07-10 广州市建筑科学研究院有限公司 一种溶洞灌注混凝土的施工方法
CN113502799A (zh) * 2021-07-20 2021-10-15 深圳市岩土综合勘察设计有限公司 一种嵌固桩底下溶洞加固的施工方法
CN114198142A (zh) * 2021-11-22 2022-03-18 中铁第四勘察设计院集团有限公司 一种岩溶塌陷的处置方法
CN114278312A (zh) * 2021-12-31 2022-04-05 中铁五局集团有限公司 地铁隧道盾构施工中河道区域的岩溶处理施工方法
WO2023178908A1 (zh) * 2022-03-21 2023-09-28 中交第四航务工程局有限公司 一种高压预填充溶洞桩基施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0988058A (ja) * 1995-09-28 1997-03-31 Tachibana Material:Kk 地盤改良方法
CN1448370A (zh) * 2003-05-07 2003-10-15 河海大学 气泡混合轻量土及生产方法
KR20050114193A (ko) * 2005-05-09 2005-12-05 김진춘 지하 공동부용 충전재 시공방법
CN101634142A (zh) * 2009-08-13 2010-01-27 广东省基础工程公司 一种多重钢套管溶洞填充预处理施工方法
CN101864763A (zh) * 2010-05-29 2010-10-20 中国二十二冶集团有限公司 覆盖型岩溶地区地基综合处理施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0988058A (ja) * 1995-09-28 1997-03-31 Tachibana Material:Kk 地盤改良方法
CN1448370A (zh) * 2003-05-07 2003-10-15 河海大学 气泡混合轻量土及生产方法
KR20050114193A (ko) * 2005-05-09 2005-12-05 김진춘 지하 공동부용 충전재 시공방법
CN101634142A (zh) * 2009-08-13 2010-01-27 广东省基础工程公司 一种多重钢套管溶洞填充预处理施工方法
CN101864763A (zh) * 2010-05-29 2010-10-20 中国二十二冶集团有限公司 覆盖型岩溶地区地基综合处理施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
白双喜: "岩溶地区钻孔桩施工技术", 《山西建筑》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105300444A (zh) * 2015-04-14 2016-02-03 贵州省水利水电勘测设计研究院 一种峡谷岸坡深埋地下大型溶洞形态特征勘探的方法
CN105625293A (zh) * 2016-01-26 2016-06-01 广西建工集团第五建筑工程有限责任公司 溶岩强发育施工场地填充式地质处理结构及其施工方法
CN107387116A (zh) * 2017-09-11 2017-11-24 中国矿业大学 一种隧道底板隐伏泥质充填岩溶换填处治方法
CN107938650A (zh) * 2017-12-22 2018-04-20 中交第三航务工程局有限公司宁波分公司 地下溶洞的充填处理方法
CN108999181A (zh) * 2018-08-15 2018-12-14 广州地铁设计研究院有限公司 溶、土洞注浆处理施工方法及其应用
CN109024569A (zh) * 2018-08-22 2018-12-18 中国建筑第四工程局有限公司 一种串珠溶洞预处理施工方法
CN108931822A (zh) * 2018-09-17 2018-12-04 贵州省水利水电勘测设计研究院 一种地下全填充溶洞勘探方法
CN109000599A (zh) * 2018-09-28 2018-12-14 山东大学 针对封闭充水溶洞的体积测量系统及方法
CN110295947A (zh) * 2019-08-05 2019-10-01 中南大学 一种盾构隧道溶洞充填方法
CN111254933A (zh) * 2020-01-20 2020-06-09 武汉正洪岩土工程有限公司 袖阀管岩溶注浆施工方法
CN111254933B (zh) * 2020-01-20 2021-05-28 武汉正洪岩土工程有限公司 袖阀管岩溶注浆施工方法
CN111333374A (zh) * 2020-03-03 2020-06-26 云南建投第一勘察设计有限公司 一种载体桩机夯实溶洞填充物及溶洞填充方法
CN111395346A (zh) * 2020-03-19 2020-07-10 广州市建筑科学研究院有限公司 一种溶洞灌注混凝土的施工方法
CN113502799A (zh) * 2021-07-20 2021-10-15 深圳市岩土综合勘察设计有限公司 一种嵌固桩底下溶洞加固的施工方法
CN114198142A (zh) * 2021-11-22 2022-03-18 中铁第四勘察设计院集团有限公司 一种岩溶塌陷的处置方法
CN114198142B (zh) * 2021-11-22 2023-12-05 中铁第四勘察设计院集团有限公司 一种岩溶塌陷的处置方法
CN114278312A (zh) * 2021-12-31 2022-04-05 中铁五局集团有限公司 地铁隧道盾构施工中河道区域的岩溶处理施工方法
CN114278312B (zh) * 2021-12-31 2023-10-17 中铁五局集团有限公司 地铁隧道盾构施工中河道区域的岩溶处理施工方法
WO2023178908A1 (zh) * 2022-03-21 2023-09-28 中交第四航务工程局有限公司 一种高压预填充溶洞桩基施工方法

Also Published As

Publication number Publication date
CN104278667B (zh) 2017-02-22

Similar Documents

Publication Publication Date Title
CN104278667A (zh) 一种地下溶洞的充填处理方法
CN103696775B (zh) 大段高多组含水层分段下行注浆法
CN109594564A (zh) 一种地铁深基坑明挖防坍塌施工方法
CN105672348A (zh) 一种深水区砂卵石地层截除桥梁桩基的施工方法
CN110735600B (zh) 一种用于喀斯特地质的机械成孔桩施工工艺
CN103938617A (zh) 一种超深地下连续墙及其施工方法
CN103437339A (zh) 岩溶地层地下连续墙槽壁附近溶洞封闭的施工方法
CN103882858A (zh) 直径300mm微型桩施工方法
CN105239598A (zh) 井式全自动立体车库的整体下沉施工方法
CN103015429A (zh) 长螺旋旋喷搅拌水泥土型钢桩基坑止水支护方法
CN107178077B (zh) 一种岩溶地区溶洞上覆土层注浆加固结构及其设计方法
CN108867673A (zh) 一种基于抽水帷幕的基坑中地下水治理方法
CN103572764A (zh) 超深人工挖孔桩护壁止水结构及其施工方法
CN102587385A (zh) 一种换填淤泥质软土的基坑支护方法
CN104480929A (zh) 一种将咬合桩应用于永久地下室外墙的桩墙合一施工方法
CN102304915A (zh) 钻孔桩桩顶质量控制新方法
CN104141300A (zh) 一种基桩钻孔施工工艺
CN106869153B (zh) 一种井点降水快速处理软地基的方法
CN103343534A (zh) 基坑施工封闭降水方法
CN101591906A (zh) 一次插管、多遍真空井点降水动力固结的地基处理方法
CN107700508A (zh) 一种型钢搅喷水泥土帷幕支护桩的施工方法
CN104763437B (zh) 一种强透水地层隧道开挖方法
CN103806444A (zh) 一种软土层旋挖桩施工方法
CN102979105A (zh) 一种井孔注浆隔渗的地下水控制方法
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Jiang Zhifeng

Inventor after: Hong Changhua

Inventor after: Zhou Tao

Inventor after: Liao Jianping

Inventor after: Shi Jia

Inventor before: Jiang Zhifeng

Inventor before: Hong Changhua

Inventor before: Li Shuzhi

Inventor before: Chen Jiangbin

COR Change of bibliographic data