CN104239597A - 基于rbf神经网络的冷却塔建模方法 - Google Patents

基于rbf神经网络的冷却塔建模方法 Download PDF

Info

Publication number
CN104239597A
CN104239597A CN201410312965.4A CN201410312965A CN104239597A CN 104239597 A CN104239597 A CN 104239597A CN 201410312965 A CN201410312965 A CN 201410312965A CN 104239597 A CN104239597 A CN 104239597A
Authority
CN
China
Prior art keywords
cooling tower
rbf neural
air
modeling method
thermal performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410312965.4A
Other languages
English (en)
Inventor
谭小卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SINRO AIR-CONDITIONING GROUP Co Ltd
Original Assignee
SINRO AIR-CONDITIONING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SINRO AIR-CONDITIONING GROUP Co Ltd filed Critical SINRO AIR-CONDITIONING GROUP Co Ltd
Priority to CN201410312965.4A priority Critical patent/CN104239597A/zh
Publication of CN104239597A publication Critical patent/CN104239597A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种基于RBF神经网络的冷却塔建模方法,所述方法包括实时监测现场冷却塔运行参数、排风参数和室外环境参数;根据现场监测参数,利用RBF神经网络建立冷却塔的数学模型;通过已建立的RBF神经网络模型实现冷却塔热力性能的实时评估;根据热力性能完成对冷却塔风机、水泵的智能调控,减少系统能耗。本发明有利于避免冷却塔非线性复杂系统建模,简化冷却塔建模过程,通过冷却塔风机、水泵的节能优化控制,减少冷却塔能耗,本方法实时性好、适应性强,可广泛应用于地铁冷却塔现场热力性能评估和节能减排。

Description

基于RBF神经网络的冷却塔建模方法
技术领域
本发明涉及冷却塔建模方法,尤其涉及基于RBF神经网络的冷却塔建模方法。
背景技术
21世纪以来,城市建筑及地下交通建设得到了高速发展,大量地铁已在各大城市兴起、发展,由于工程位于地下,通常需要建设通风空调系统,且空调系统运行能耗可占到整个地下工程营运能耗的40%,同时由于城市建筑、道路的密集性,地下空调系统的冷却塔性能的优劣越来越起引起人们及政府的关注,通风空调系统的节能环保已经是地下商场、地铁建设及运营过程中亟需解决的问题。
在整个地铁循环冷却系统中,冷却塔热力性能的优劣不仅对冷却系统节水节能具有直接影响,对地铁系统的正常稳定运行也具有重要意义。当冷却塔动力配置过高时,将降低冷却塔运行效率,而且容易造成冷却水的过度浪费;当动力配置过低时,将导致冷却塔出水温度高,无法满足循环冷却系统的需求,导致设备处于高温运行状态,损耗设备,甚至导致设备故障停止运行。若要提高换热效率,则有必要对冷却塔进行建模分析。
利用地铁排风的冷却塔运行涉及参数较多,如冷却水流速、进风风速、温湿度、地铁排风风速、温湿度及设计室外环境参数等,是一个复杂的非线性系统,难以建立准确的数学模型,而RBF神经网络是一种单隐含层的三层前馈网络,理论已证明对于一给定的非线性函数,RBF神经网络可以任意精度逼近它,且具有全局最优与最佳逼近性能,因此可采用RBF神经网络建立冷却装置系统模型,为节能优化控制提供依据。
发明内容
为解决上述技术问题,本发明的目的是提供一种基于RBF神经网络的冷却塔建模方法。
本发明的目的通过以下的技术方案来实现:
基于RBF神经网络的冷却塔建模方法,所述方法包括
A根据现场监测参数,并利用RBF神经网络建立冷却塔的数学模型;
B根据建立的数学模型对冷却塔热力性能实时评估;
C根据热力性能完成对冷却塔风机、水泵的智能优化调控。
与现有技术相比,本发明的一个或多个实施例可以具有如下优点:
基于冷却塔参数的实时监测建立模型,通过RBF神经网络避免冷却塔非线性复杂系统建模,简化冷却塔建模过程,实现冷却塔热力性能的准确评估,通过冷却塔风机、水泵的节能优化控制,减少冷却塔能耗。本方法实时性好、适应性强,可广泛应用于地铁冷却塔现场热力性能评估和节能减排。
本发明的其它特征和优点将在随后的说明书中阐述,并且,部分地从说明书中变得显而易见,或者通过实施本发明而了解。本发明的目的和其他优点可通过在说明书、权利要求书以及附图中所特别指出结构来实现和获得。
附图说明
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例共同用于解释本发明,不构成对本发明限制。在附图中:
图1是基于RBF神经网络的冷却塔建模方法流程图;
图2是基于RBF神经网络的冷却塔工作原理图;
图3是冷却塔RBF神经网络结构图;
图4是基于RBF神经网络的冷却塔建模方法建模与实施程序流程图。
具体实施方式
容易理解,根据本发明的技术方案,在不变更本发明的实质精神下,本领域的一般技术人员可以提出本发明的多个结构方式和制作方法。因此以下具体实施方式以及附图仅是本发明的技术方案的具体说明,而不应当视为本发明的全部或者视为本发明技术方案的限定或限制。
下面结合实施例及附图对本发明作进一步详细的描述。
图1是根据本发明实施例的基于RBF神经网络的冷却塔建模方法的结构示意图,下面参考图1,详细说明本发明实施例的流程。
如图1所示,本发明的基于RBF神经网络的冷却塔建模方法流程包括以下步骤:
基于RBF神经网络的冷却塔建模方法,所述方法包括
步骤10根据现场监测参数,并利用RBF神经网络建立冷却塔的数学模型;
所述现场监测参数包括冷却塔运行参数、排风参数和室外环境参数;所述现场监测参数通过监测装置实时进行监测。将冷却塔监测装置安装于图2所示的冷却塔中,启动冷却塔监测装置,为实现冷却塔的准确建模,每隔5s实时监测冷却塔现场运行参数,包括进水量V、进水温度T、进风量V风1、进风温度T风1、进风湿度H风1,冷却塔排风参数包括排风量V风2、排风温度T风2、排风湿度H风2,室外环境参数包括大气压P空气、空气温度T空气、空气湿度H空气,作为RBF神经网络输入层的11个输入参数。
步骤20根据建立的数学模型对冷却塔热力性能实时评估;
步骤30根据热力性能完成对冷却塔风机、水泵的智能优化调控。
将冷却塔监测装置安装于图2所示的冷却塔中,该冷却塔包括冷凝器、进水泵、挡水板、风机、喷淋器、填料、储水盘、风机、进风口、出风口及出水泵。在实施过程中,启动冷却塔监测装置,为实现冷却塔的准确建模,每隔5s实时监测冷却塔现场运行参数,包括进水量V、进水温度T、进风量V风1、进风温度T风1、进风湿度H风1,冷却塔排风参数包括排风量V风2、排风温度T风2、排风湿度H风2,室外环境参数包括大气压P空气、空气温度T空气、空气湿度H空气,作为RBF神经网络输入层的11个输入参数;
上述步骤10具体包括:设计如图3所示的冷却塔RBF神经网络结构,包括一个输入层、采用径向基函数神经元的隐含层及一个输出层。输入层包括5个冷却塔运行参数、3个排风参数、3个室外环境参数,输出层以出塔水温T出水为目标函数。
冷却塔RBF神经网络输入层节点为Xi(i=1,2,…11),采用高斯函数径向基函数Φ(δ)=exp(-δ2/B2)(B为实常数,用于改变高斯曲线宽度)确定神经网络隐含层,第i个隐含层节点中心向量为Ck=[Ck1,Ck2,…,Ck11]T(k=1,2,..,q;q为隐含层个数),其输出为
Z k ( δ k ) = R ( X - C k ) = exp [ - Σ i = 1 11 ( X i - C k ) 2 / B 2 ]
设隐含层输出列向量为Z=[Z1,Z2,…,Zq]T,隐含层至输出层权向量W=[ω12,…,ωq],则神经网络输出T出水=WZ-θ(θ为输出节点阈值)。训练神经网络样本,建立冷却塔模型。
建立神经网络后对该网络进行训练与校验,将数据样本分成训练样本与校验样本。训练过程分两部分,先根据训练样本决定隐含层各节点高斯基函数中心向量,再根据最小二乘法,求出输出层与隐含层间的权值向量,完成训练后通过校验样本校验得出冷却塔模型。
所述步骤20具体包括:通过已建立的冷却塔RBF神经网络模型,实时计算冷却塔出水温度T出水,设冷却塔热力性能为η,实测进出水温差ΔTt=T出水-T,设计工况水温差ΔTc=T-T′,通过对比原冷却塔设计工况完成冷却塔热力性能实时评估,可得冷却塔热力性能为
η = ΔT t ΔT c × 100 %
所述步骤30具体包括:根据实时评估的热力性能结果,进一步判断冷却塔热力性能水平,通过变频器完成成对冷却塔风机、水泵的智能优化调控,智能控制冷却塔的进水量和风机功率,若冷却塔热力性能较小,则通过减小进水量,提高冷却风机功率,选择冷却塔热力性能最优值,反之亦然,从而实现优化控制,减少冷却塔系统能耗。
本实施例的建模与实施程序流程参阅图4,首先实时监测冷却塔现场运行参数、排风参数和室外环境参数各大参数,判断各参数是否正常,参数正常,则将数据导入输入层节点,否则进行故障报警并从新监测各大参数。确定输入层节点后,通过高斯函数径向基函数确定隐含层,确定输出量,并建立RBF神经网络模型,将神经网络数据分成训练样本与校验样本,根据训练样本决定隐含层高斯基函数中心向量,利用最小二乘法求出输出层与隐含层间的权值,完成训练并通过校验样本校验得出冷却塔模型,完成冷却塔建模后,通过已建立模型实现冷却塔热力性能实时评估,根据热力性能实现冷却塔风机、水泵智能优化调控。
虽然本发明所揭露的实施方式如上,但所述的内容只是为了便于理解本发明而采用的实施方式,并非用以限定本发明。任何本发明所属技术领域内的技术人员,在不脱离本发明所揭露的精神和范围的前提下,可以在实施的形式上及细节上作任何的修改与变化,但本发明的专利保护范围,仍须以所附的权利要求书所界定的范围为准。

Claims (6)

1.基于RBF神经网络的冷却塔建模方法,其特征在于,所述方法包括
A根据现场监测参数,并利用RBF神经网络建立冷却塔的数学模型;
B根据建立的数学模型对冷却塔热力性能实时评估;
C根据热力性能完成对冷却塔风机、水泵的智能优化调控。
2.根据权利要求1所述的基于RBF神经网络的冷却塔建模方法,其特征在于,所述现场监测参数包括冷却塔运行参数、排风参数和室外环境参数;所述现场监测参数通过监测装置实时进行监测。
3.根据权利要求2所述的基于RBF神经网络的冷却塔建模方法,其特征在于,所述运行参数包括进水量V、进水温度T、进风量V风1、进风温度T风1、进风湿度H风1,排风参数包括排风量V风2、排风温度T风2、排风湿度H风2,环境参数包括大气压P空气、空气温度T空气、空气湿度H空气
4.根据权利要求1所述的基于RBF神经网络的冷却塔建模方法,其特征在于,所述步骤A具体包括:设计冷却塔RBF神经网络输入层节点为Xi(i=1,2,…11),采用高斯函数径向基函数Φ(δ)=exp(-δ2/B2)确定神经网络隐含层,以出塔水温T出水为目标函数,训练神经网络样本,建立冷却塔模型。
5.根据权利要求1所述的基于RBF神经网络的冷却塔建模方法,其特征在于,所述步骤B具体包括:根据建立的冷却塔RBF神经网络模型,实时计算冷却塔出水温度T出水,通过对比原冷却塔设计工况完成冷却塔热力性能实时评估。
6.根据权利要求1所述的基于RBF神经网络的冷却塔建模方法,其特征在于,所述步骤C具体包括:根据实时评估的热力性能结果,通过变频器对冷却塔风机、水泵进行智能优化调控,智能控制冷却塔的进水量和风机功率,减少冷却塔系统能耗。
CN201410312965.4A 2014-07-02 2014-07-02 基于rbf神经网络的冷却塔建模方法 Pending CN104239597A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410312965.4A CN104239597A (zh) 2014-07-02 2014-07-02 基于rbf神经网络的冷却塔建模方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410312965.4A CN104239597A (zh) 2014-07-02 2014-07-02 基于rbf神经网络的冷却塔建模方法

Publications (1)

Publication Number Publication Date
CN104239597A true CN104239597A (zh) 2014-12-24

Family

ID=52227653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410312965.4A Pending CN104239597A (zh) 2014-07-02 2014-07-02 基于rbf神经网络的冷却塔建模方法

Country Status (1)

Country Link
CN (1) CN104239597A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104697585A (zh) * 2015-03-13 2015-06-10 芜湖凯博实业股份有限公司 冷却塔塔筒强度预测控制系统及其方法
CN104713410A (zh) * 2015-03-13 2015-06-17 芜湖凯博实业股份有限公司 一种调控冷却塔出水温度的方法
CN104765953A (zh) * 2015-03-17 2015-07-08 芜湖凯博实业股份有限公司 冷却塔进风口导风板结构参数设定方法
CN104933322A (zh) * 2015-07-11 2015-09-23 湖南大学 一种前置式防、融霜方法
CN106440853A (zh) * 2016-10-31 2017-02-22 新菱空调(佛冈)有限公司 一种基于萤火虫算法的冷却塔出风防雾能耗优化方法
CN107607579A (zh) * 2017-09-13 2018-01-19 山东大学 一种湿式冷却塔的热力性能在线监测系统及其方法
CN109695944A (zh) * 2018-11-29 2019-04-30 中国汽车工业工程有限公司 一种基于多模型深度学习的涂装新风空调的控制方法
CN111043876A (zh) * 2018-10-11 2020-04-21 济南蓝辰能源技术有限公司 一种热水冷却的闭式冷却塔校核方法
CN111356891A (zh) * 2017-11-15 2020-06-30 巴尔的摩汽圈公司 热交换器操作的自动控制
CN114279235A (zh) * 2021-12-29 2022-04-05 博锐尚格科技股份有限公司 基于黑箱模型与灰箱模型切换的冷却塔运行控制方法
CN114279235B (zh) * 2021-12-29 2024-05-10 博锐尚格科技股份有限公司 基于黑箱模型与灰箱模型切换的冷却塔运行控制方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4392604B2 (ja) * 2004-09-07 2010-01-06 清水建設株式会社 空調負荷予測方法
CN103293013A (zh) * 2013-05-13 2013-09-11 华南理工大学 一种冷却塔热力性能评估方法及系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4392604B2 (ja) * 2004-09-07 2010-01-06 清水建設株式会社 空調負荷予測方法
CN103293013A (zh) * 2013-05-13 2013-09-11 华南理工大学 一种冷却塔热力性能评估方法及系统

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
何胜强: "《军用飞机智能综合论证理论和评价方法》", 31 December 2013, 西安:西北工业大学出版社 *
刘桂雄 等: "冷却塔热力性能在线监测装置及系统研制", 《中国测试》 *
戴振会 等: "火电厂大型冷却塔运行性能的动态综合分析与评价", 《电站系统工程》 *
李勇 等: "基于RBF网络的冷却塔运行特性数学模型", 《汽轮机技术》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104713410A (zh) * 2015-03-13 2015-06-17 芜湖凯博实业股份有限公司 一种调控冷却塔出水温度的方法
CN104697585A (zh) * 2015-03-13 2015-06-10 芜湖凯博实业股份有限公司 冷却塔塔筒强度预测控制系统及其方法
CN104765953B (zh) * 2015-03-17 2017-11-03 芜湖凯博实业股份有限公司 冷却塔进风口导风板结构参数设定方法
CN104765953A (zh) * 2015-03-17 2015-07-08 芜湖凯博实业股份有限公司 冷却塔进风口导风板结构参数设定方法
CN104933322A (zh) * 2015-07-11 2015-09-23 湖南大学 一种前置式防、融霜方法
CN104933322B (zh) * 2015-07-11 2017-10-27 湖南大学 一种前置式防、融霜方法
CN106440853B (zh) * 2016-10-31 2018-07-06 新菱空调(佛冈)有限公司 一种基于萤火虫算法的冷却塔出风防雾能耗优化方法
CN106440853A (zh) * 2016-10-31 2017-02-22 新菱空调(佛冈)有限公司 一种基于萤火虫算法的冷却塔出风防雾能耗优化方法
CN107607579A (zh) * 2017-09-13 2018-01-19 山东大学 一种湿式冷却塔的热力性能在线监测系统及其方法
CN107607579B (zh) * 2017-09-13 2020-01-17 山东大学 一种湿式冷却塔的热力性能在线监测系统及其方法
CN111356891A (zh) * 2017-11-15 2020-06-30 巴尔的摩汽圈公司 热交换器操作的自动控制
CN111043876A (zh) * 2018-10-11 2020-04-21 济南蓝辰能源技术有限公司 一种热水冷却的闭式冷却塔校核方法
CN111043876B (zh) * 2018-10-11 2021-08-24 济南蓝辰能源技术有限公司 一种热水冷却的闭式冷却塔校核方法
CN109695944A (zh) * 2018-11-29 2019-04-30 中国汽车工业工程有限公司 一种基于多模型深度学习的涂装新风空调的控制方法
CN114279235A (zh) * 2021-12-29 2022-04-05 博锐尚格科技股份有限公司 基于黑箱模型与灰箱模型切换的冷却塔运行控制方法
CN114279235B (zh) * 2021-12-29 2024-05-10 博锐尚格科技股份有限公司 基于黑箱模型与灰箱模型切换的冷却塔运行控制方法

Similar Documents

Publication Publication Date Title
CN104239597A (zh) 基于rbf神经网络的冷却塔建模方法
CN107420743B (zh) 一种智能城市燃气pe管网测控系统及测控方法
CN110440396B (zh) 云边端协同的中央空调全局优化节能控制方法和系统
Gebraad et al. Wind plant power optimization through yaw control using a parametric model for wake effects—a CFD simulation study
Gebraad et al. A data-driven model for wind plant power optimization by yaw control
CN105571073B (zh) 一种地铁站空调水系统变频控制节能方法
CN105571343B (zh) 空冷发电机组汽轮机运行背压连续优化控制方法及系统
CN102003772B (zh) 一种水源热泵节能优化控制方法
CN104359195B (zh) 基于动态响应末端总负荷变化的中央空调冷冻水控制方法
CN102541015B (zh) 一种能效智能控制系统及方法
CN104832203B (zh) 矿井通风系统在线闭环优调优控方法
CN106774247A (zh) 中央空调仿真测试系统及测试方法
CN104571068A (zh) 一种分布式能源系统的运行优化控制方法及系统
PH12013000300A1 (en) Method for determining and tuning process characteristic parameters using a simulation system
CN105320118A (zh) 基于云平台的空调系统电力需求响应控制方法
CN105627506A (zh) 一种空调冷机的建筑冷负荷预测方法及装置
CN102353119A (zh) 一种vav变风量空调系统控制方法
CN105569707A (zh) 基于环境预测的公路隧道通风前馈控制方法
CN109932896A (zh) 一种建筑能耗的控制方法和系统
CN103234256A (zh) 动态负荷跟踪的中央空调冷源全局最优节能控制方法
CN104515271A (zh) 中央空调冷冻站系统的节能优化控制系统及其控制方法
CN107023966A (zh) 一种地铁站空调冷却水出水温度设定值优化方法
KR20180138371A (ko) 데이터 기반 모델 평가 및 이를 이용한 캡슐형 빙축열 시스템 예측제어 방법
CN111025895A (zh) 一种基于人工智能的建筑节能控制系统
Liu et al. Optimization of intelligent heating ventilation air conditioning system in urban building based on BIM and artificial intelligence technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141224

RJ01 Rejection of invention patent application after publication