CN104180077A - Waterproof structure with pipeline penetrating through concrete floor - Google Patents
Waterproof structure with pipeline penetrating through concrete floor Download PDFInfo
- Publication number
- CN104180077A CN104180077A CN201410390324.0A CN201410390324A CN104180077A CN 104180077 A CN104180077 A CN 104180077A CN 201410390324 A CN201410390324 A CN 201410390324A CN 104180077 A CN104180077 A CN 104180077A
- Authority
- CN
- China
- Prior art keywords
- hole
- pipeline
- concrete floor
- pitch circle
- conical bore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L5/00—Devices for use where pipes, cables or protective tubing pass through walls or partitions
- F16L5/02—Sealing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a waterproof structure with a pipeline penetrating through a concrete floor. The waterproof structure comprises a process hole pre-formed in the floor and fine concrete filled in the process hole after a pipeline is mounted, wherein the process hole is formed by sleeving two or more sectional conical hole parts which are different in size and coaxial; both of the conical holes arranged vertically adopt structures that the upper parts are bigger and the lower parts are smaller; the larger end of the lower sectional conical hole extends into the upper sectional conical hole; the sleeving parts of the two conical holes are connected integrally through a bevel step of which the inner part is higher and the outer part is lower. According to the waterproof structure, the fine concrete can be filled between the process hole and the pipeline after the mounted pipeline is fixed; after the fine concrete solidifies, the built-in bevel step is formed; the bevel step can not only prevent the fine concrete from shrinking radially and axially, but also can form a labyrinth water stopping structure so as to ensure the leakproofness of the floor; the waterproof structure can be used for a water feeding pipeline to penetrate through the concrete floor, and can also be suitable for a wireway, an air channel and the other pipelines to penetrate through the concrete floor.
Description
Technical field
The present invention relates to a kind of house floor gap waterproof construction, specifically, the present invention relates to a kind of pipeline and run through concrete floor waterproof construction.
Background technique
In construction engineering, when concreting flooring, keep supplying the technique hole that drainage pipeline passes by design attitude is reserved, after upper and lower conduit road is in place, tamp with pea gravel concreten the technique hole that fills vacancy more afterwards.Technique hole majority reserved in construction engineering is cylindrical hole, also accidental up big and down small cone-shaped hole, and the technique hole of these shapes is simple in structure, make easily, after tamping, can accomplish the vacancy between effective plugging technology hole and pipeline.But, the technique hole of prior art is because lacking radially limit structure and axially waterproof construction, so on the flooring of residential building, reserved technique hole is tamped rear majority and is had seepage problem in reality, its reason is accessible contraction when tamping the pea gravel concreten that fills the later stage and solidifying, cause pea gravel concreten and concrete floor and pipeline junction to have micro-gap, once flooring ponding, water is seeped into downstairs along micro-gap, and excessive infiltration must cause neighbourhood's dispute.
Summary of the invention
There is seepage problem mainly for prior art in the present invention, proposes a kind of pipeline simple in structure, that construction is easy, leakage-proof effect is good and run through concrete floor waterproof construction.
The present invention is achieved through the following technical solutions technical goal.
Pipeline runs through concrete floor waterproof construction, and it comprises technique hole reserved on flooring, and the pea gravel concreten tamping after pipe laying in technique hole.Its improvements are: described technique hole is not waited by least two joint sizes and coaxial conical bore part is socketed to form, the perpendicular conical bore of putting is up big and down small structure, the large end of conical bore of next joint stretches in a pitch circle taper hole, two conical bore suit places are positioned at middle part, and both link into an integrated entity by low inside and high outside incline bench.
In said structure, cone angle alpha=30 in technique hole
0~60
0.On technique hole, the large end radius of next pitch circle taper hole of small end radius ratio of a pitch circle taper hole is large, both semidiameter B=10mm~30mm, and the large end of next pitch circle taper hole stretches in a pitch circle taper hole small end, coincidence amount h=15mm~25mm.
The present invention compared with prior art, has following good effect:
1, technique hole is connected to form by the good luck axle of conical bore one of different size, and simple in structure, the demoulding is easy, does not increase difficulty of construction;
2, pea gravel concreten tamps between technique hole and pipeline, and the incline bench that solidifies rear formation plays and stops the radial and axial contraction of pea gravel concreten, significantly reduces the gap of flooring really, between pipeline and pea gravel concreten, is conducive to leakage proof;
3, save up and down between the conical bore of fit and connect by incline bench, form mazy type water sealing structure after the pea gravel concreten tamping solidifies, leakage proof is effective.
Brief description of the drawings
Fig. 1 is structural profile schematic diagram figure of the present invention, and this figure shows the embodiment who is made up of flooring waterproof construction upper and lower two pitch circle taper holes.
Fig. 2 is the generalized section of reserving technique hole in Fig. 1 on flooring.
Fig. 3 is incline bench structure enlarged diagram in Fig. 2.
Fig. 4 is structural profile schematic diagram of the present invention, and this figure shows the embodiment who is made up of flooring waterproof construction 4 joint phase fit conical bores.
Embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, the invention will be further described.
Embodiment 1
Pipeline shown in Fig. 1 runs through mixed Tulou face waterproof construction, and it comprises technique hole 1.1 reserved on flooring 1, and the pea gravel concreten 2 tamping after mounting pipe 3 in technique hole 1.1.The present embodiment runs through the waterproof construction of concrete floor, supporting pipeline 3 external diameter 32mm for residence building water supply pipeline.In the time building flooring 1, by the hole of reserved technique shown in Fig. 2 1.1, because flooring 1 thickness is 120mm, belong to conventional thickness.These technique hole 1.1 use two joint sizes do not wait and coaxial conical bore part is socketed to form, and the perpendicular two pitch circle taper holes of putting are up big and down small structure.Be in the long 60mm of conical bore of next joint, cone angle 40
0, small end radius 25mm, holds greatly the about 46.8mm of radius.Be in the long 75mm of conical bore of a joint, cone angle 45
0, the large end radius of conical bore of next joint of small end radius ratio of going up as shown in Figure 3 a pitch circle taper hole is large, both semidiameter B=10mm.The large end of conical bore of next joint extend in a pitch circle taper hole, coincidence amount h=15mm, and two conical bore suit places are positioned at middle part, and both link into an integrated entity by low inside and high outside incline bench.Technique hole 1.1 in the present invention is basic components, and it is connected to form by the good luck axle of conical bore one of different size, and it is easy that flooring 1 is built the rear demoulding, do not increase difficulty of construction.After the pipeline 3 of installing in technique hole 1.1 is fixing, can between technique hole 1.1 and pipeline, tamp pea gravel concreten 2, pea gravel concreten 2 solidifies the built-in incline bench of rear formation, play and stop the 2 radial and axial contractions of the solidifying soil of microlith mud, significantly reduce the gap between flooring 1 and pea gravel concreten 2, be conducive to leakage proof.Be to connect by incline bench between the conical bore of upper and lower fit on the other hand, after the pea gravel concreten tamping solidifies, form mazy type water sealing structure, guarantee non-leakage.
Embodiment 2
Fig. 4 is the embodiment of the present invention 2 structural representations, shows that auxiliary hole 1.1 is not waited by 4 joint sizes and coaxial conical bore part is socketed to form in figure, and this embodiment is for the thicker occasion of flooring 1.The present embodiment, because junction between technique hole 1.1 and concrete is provided with 3 incline benches, that is to say and be provided with 3 road mazy type water sealing structures, and its water leakage performance is further strengthened.In addition other good effect is identical with embodiment 1.
Claims (3)
1. pipeline runs through a concrete floor waterproof construction, and it comprises the upper reserved technique hole (1.1) of flooring (1), and the pea gravel concreten (2) tamping after pipe laying (3) in technique hole (1.1); It is characterized in that: described technique hole (1.1) is not waited by least two joint sizes and coaxial conical bore part is socketed to form, the perpendicular conical bore of putting is up big and down small structure, the large end of conical bore of next joint stretches in a pitch circle taper hole, two conical bore suit places are positioned at middle part, and both link into an integrated entity by low inside and high outside incline bench.
2. pipeline according to claim 1 runs through concrete floor waterproof construction, it is characterized in that: cone angle alpha=30 in described technique hole (1.1)
0~60
0.
3. pipeline according to claim 1 runs through concrete floor waterproof construction, it is characterized in that: the large end radius of next pitch circle taper hole of small end radius ratio of the upper pitch circle taper hole in described technique hole (1.1) is large, both semidiameter B=10mm~30mm, the large end of next pitch circle taper hole stretches in a pitch circle taper hole small end, coincidence amount h=15mm~25mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410390324.0A CN104180077B (en) | 2014-08-11 | 2014-08-11 | Pipeline runs through concrete floor waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410390324.0A CN104180077B (en) | 2014-08-11 | 2014-08-11 | Pipeline runs through concrete floor waterproof construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104180077A true CN104180077A (en) | 2014-12-03 |
CN104180077B CN104180077B (en) | 2016-05-18 |
Family
ID=51961321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410390324.0A Active CN104180077B (en) | 2014-08-11 | 2014-08-11 | Pipeline runs through concrete floor waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104180077B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464224A (en) * | 2015-12-31 | 2016-04-06 | 四川航天建筑工程有限公司 | Anti-seepage structure for reserved hole in kitchen and toilet and construction method |
CN110387887A (en) * | 2019-06-28 | 2019-10-29 | 同济大学建筑设计研究院(集团)有限公司 | It is oriented to the construction method of partition wall and its construction method and foundation pit enclosure structure |
CN112283458A (en) * | 2020-09-11 | 2021-01-29 | 潍坊市晨鸣新型防水材料有限公司 | Leakage stoppage flexible waterproof piece capable of quickly stopping leakage |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2117589A1 (en) * | 1994-08-29 | 1996-03-01 | Michael Sakno | Water imprevious intumescent firestop- ii |
JP2002275975A (en) * | 2001-03-16 | 2002-09-25 | Kubota Corp | Muffling drain pipe |
CN201547402U (en) * | 2009-10-29 | 2010-08-11 | 河南省第二建筑工程有限责任公司 | Bathroom tube-through-floor waterproof structure |
CN202532026U (en) * | 2012-04-22 | 2012-11-14 | 项谱成 | Floor board pipeline waterproof structure |
CN203258205U (en) * | 2013-05-14 | 2013-10-30 | 中国建筑第八工程局有限公司 | Anti-leakage structure of floor-penetrating pipeline without sleeve |
CN204083520U (en) * | 2014-08-11 | 2015-01-07 | 锦宸集团有限公司 | Pipeline runs through concrete floor waterproof construction |
-
2014
- 2014-08-11 CN CN201410390324.0A patent/CN104180077B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2117589A1 (en) * | 1994-08-29 | 1996-03-01 | Michael Sakno | Water imprevious intumescent firestop- ii |
JP2002275975A (en) * | 2001-03-16 | 2002-09-25 | Kubota Corp | Muffling drain pipe |
CN201547402U (en) * | 2009-10-29 | 2010-08-11 | 河南省第二建筑工程有限责任公司 | Bathroom tube-through-floor waterproof structure |
CN202532026U (en) * | 2012-04-22 | 2012-11-14 | 项谱成 | Floor board pipeline waterproof structure |
CN203258205U (en) * | 2013-05-14 | 2013-10-30 | 中国建筑第八工程局有限公司 | Anti-leakage structure of floor-penetrating pipeline without sleeve |
CN204083520U (en) * | 2014-08-11 | 2015-01-07 | 锦宸集团有限公司 | Pipeline runs through concrete floor waterproof construction |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464224A (en) * | 2015-12-31 | 2016-04-06 | 四川航天建筑工程有限公司 | Anti-seepage structure for reserved hole in kitchen and toilet and construction method |
CN110387887A (en) * | 2019-06-28 | 2019-10-29 | 同济大学建筑设计研究院(集团)有限公司 | It is oriented to the construction method of partition wall and its construction method and foundation pit enclosure structure |
CN112283458A (en) * | 2020-09-11 | 2021-01-29 | 潍坊市晨鸣新型防水材料有限公司 | Leakage stoppage flexible waterproof piece capable of quickly stopping leakage |
CN112283458B (en) * | 2020-09-11 | 2022-02-15 | 潍坊市晨鸣新型防水材料有限公司 | Leakage stoppage flexible waterproof piece capable of quickly stopping leakage |
Also Published As
Publication number | Publication date |
---|---|
CN104180077B (en) | 2016-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202124865U (en) | Quick plugging device for dewatering wellhead of sand-free cement pipe deep well | |
CN205206838U (en) | Collapsible loess tunnel supporting construction | |
CN104295814B (en) | Underground steel and concrete structure pipeline of a kind of inner wall belt spiral compound stiffening ring and preparation method thereof | |
CN202023204U (en) | Water stop device for opening of circular open caisson | |
CN105569049A (en) | Construction method of high-pressure-bearing water-depth foundation pit supporting anchor rod | |
CN105673074B (en) | The local buried gutter structure of Tunnel Base | |
CN102776899B (en) | Anti-floating structure of shallow-buried shield tunnel | |
CN103866762A (en) | Pile body longitudinal multipoint grouting device | |
CN102535519A (en) | I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure | |
CN104180077B (en) | Pipeline runs through concrete floor waterproof construction | |
CN103422868A (en) | Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body | |
CN102839691B (en) | Quick sealing method and device for sandless cement pipe deep well dewatering wellhead | |
CN204083520U (en) | Pipeline runs through concrete floor waterproof construction | |
CN201835370U (en) | Pre-buried anti-leakage floor drain | |
CN101793027B (en) | Core-grouted static pressure anchor rod pile | |
CN104110265A (en) | Thixotropic slurry grouting system for large-section rectangular pipe-jacking pipeline | |
CN102747722B (en) | Underground continuous wall joint close grouting and covering construction method and expansion rubber plug | |
CN104373694A (en) | Wall bushing | |
CN204187155U (en) | A kind of underground steel and concrete structure pipeline of inner wall belt spiral compound stiffening ring | |
CN201635072U (en) | Centrally grouted static-pressured anchor pile former | |
CN212983913U (en) | Pressure-bearing downcomer well back cover is from waterproof one-way water outlet layer board piece of burying | |
CN203878568U (en) | Longitudinal multi-point pile body grouting device | |
CN208618444U (en) | A kind of Retaining Wall | |
CN106089248A (en) | The construction method of tunnel inverted arch spilled water hole | |
CN204059139U (en) | Infiltration type catchments concrete reinforced pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170515 Address after: 225500 No. 1118 Huaihai West Road, Jiangyan Economic Development Zone, Jiangyan District, Jiangsu, Taizhou Patentee after: Jiangsu Yu Hui Housing Industry Co., Ltd. Address before: 225500 No. 7 North Renmin Road, Jiangyan District, Jiangsu, Taizhou Patentee before: Jinchen Group Co., Ltd. |
|