CN104179506B - The treatment process of a kind of shield structure mud lining - Google Patents

The treatment process of a kind of shield structure mud lining Download PDF

Info

Publication number
CN104179506B
CN104179506B CN201410368497.2A CN201410368497A CN104179506B CN 104179506 B CN104179506 B CN 104179506B CN 201410368497 A CN201410368497 A CN 201410368497A CN 104179506 B CN104179506 B CN 104179506B
Authority
CN
China
Prior art keywords
mud
shield structure
shield
treatment process
brush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410368497.2A
Other languages
Chinese (zh)
Other versions
CN104179506A (en
Inventor
辛振省
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201410368497.2A priority Critical patent/CN104179506B/en
Publication of CN104179506A publication Critical patent/CN104179506A/en
Application granted granted Critical
Publication of CN104179506B publication Critical patent/CN104179506B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention belongs to the technical field that shield structure is safeguarded, it is specifically related to the treatment process of a kind of shield structure mud lining, solve the problem that the treatment process investment of existing shield structure mud lining is very high with risk. Its step is as follows: when discovery shield structure has mud lining phenomenon but is not very serious, brush mud wall of constructing in the position of the front 20-40m of shielded construction in advance. The present invention has following useful effect: applies and brand-new exempts from the unartificial method that opens a position, successfully achieve the construction that shield structure removes mud cake in clay seam construction process, overturn existing solution shield cutter mud cake treatment process completely, the present invention need not open a position and also enter storehouse without the need to personnel, the greatly cost-saving duration, simultaneously safe and reliable, efficiency height.

Description

The treatment process of a kind of shield structure mud lining
Technical field
The invention belongs to the technical field that shield structure is safeguarded, it is specifically related to the treatment process of a kind of shield structure mud lining.
Background technology
Shield structure is in clay stratum or powder land floor construction process, and clay particle is very easily attached on cutterhead under hyperbaric environment, bypasses the immediate leadership more thick, cutterhead is caused to be stuck with paste extremely, cutter cannot continue to cut the soil body, and the soil body also cannot enter Tu Cang smoothly, causes Shield Construction Method Used.
The method of process cutterhead mud lining is divided into two kinds substantially at present:
Ground opens a position and abolishes. From ground construction vertical shaft until cutterhead position, then personnel are directly lower to cutterhead position, according to the intensity of mud cake and area, adopt the facility such as pneumatic pick manually to abolish.Band is pressed into storehouse and abolishes. The implementation step of this kind of method is, first penetrate into the cutterhead front soil body with the mud prepared by high pressure method and form mud film, then pressurize in clay bin, form high-pressure space and prevent the front soil body from caving in, then personnel enter shield structure Tu Cang, abolish front mud cake.
Above two kinds of methods all need specially the front tunnel face soil body to be reinforced and processed, and invest very big; Existing method all needs manually to enter soil storehouse scope and manually abolishes mud cake simultaneously, and risk is extremely high. Particularly under rich water geologic condition, measure investment and the risk of existing process mud cake all can be multiplied.
Summary of the invention
The present invention mainly realizes automatically removing mud cake in treatment process for shield structure mud lining, realizes unmanned operation, investment reduction and duration simultaneously, evades personal security risk simultaneously.
The present invention adopts following technical scheme to realize:
1, the treatment process of a kind of shield structure mud lining, it is characterised in that step is as follows:
(1) when discovery shield structure has mud lining phenomenon but is not very serious, brush mud wall of constructing in the position of the front 20-40m of shielded construction in advance, the thickness of brush mud wall is 600-800mm,
(2) specific practice of brush mud wall is, first with continuous wall trench underground machine grooving, the excavation degree of depth is the groove of below shield cutter lower rim 2m; Then configure low strength cement grout, control its intensity at 0.8-1.2MPa; Prepare common fragment of brick as aggregate; It is a construction section according to the 1m degree of depth in groove, first insert the brickbat of the 1m degree of depth, then 2m degree of depth place in priming petock earth slurries to groove, treat that slurries initial set inserts brickbat again to 3m degree of depth place, alternately construct to shield cutter upper limb 2m position successively, after the slurries initial set built for the last time, with banketing, groove being filled and led up and tamp, so far brush mud wall completes;
(3) to be attached have the shield cutter of mud cake to touch brush mud wall after, shield structure is squeezed into dispersion sex vesicle foam or water by foam hole, cutterhead front from cutterhead front, shield driving decrease in velocity is to 1cm/min simultaneously, cutterhead rotating speed is also adjusted to 0.5r/min, and cutterhead alternately rotates clockwise and counterclockwise, so by softening and brickbat and mortar the friction of water and foam, the mud cake on shield cutter is got rid of.
The present invention has following useful effect: applies and brand-new exempts from the unartificial method that opens a position, successfully achieve the construction that shield structure removes mud cake in clay seam construction process, overturn existing solution shield cutter mud cake treatment process completely, the present invention need not open a position and also enter storehouse without the need to personnel, the greatly cost-saving duration, simultaneously safe and reliable, efficiency height, in actual clay process of the test, cutterhead goes mud cake effect good, the sediment improvement comparing employing at present coordinates the method opened a position, every km can save the number of times 5 times of opening a position, direct saving investment about 4,000,000, economic benefit is very considerable. shielded construction for just using in big area solves the mud cake process problem often run into, and promotional value is very big, and realistic meaning is great.
Accompanying drawing explanation
Fig. 1 for arranging brush mud wall schematic diagram in shielded construction front;
Fig. 2 is arrival brush mud wall schematic diagram;
In figure: 1-brush mud wall, 2-shield engine, the tunnel, section of jurisdiction that 3-is assembled, 4-ground.
Embodiment
A treatment process for shield structure mud lining, when finding shield cutter mud lining but arrange brush mud wall in the front of shielded construction in advance when not being very serious, specific practice is as follows:
(1) after finding that shield structure has mud lining phenomenon, at the position construction brush mud wall of the front 20-40m of shielded construction, the thickness of brush mud wall is selected between 600-800mm according to the seriousness of mud lining, as shown in Figure 1.
(2) specific practice of brush mud wall is, first with continuous wall trench underground machine grooving (600-800mm), the excavation degree of depth is below shield cutter lower rim 2m; Then configuring low strength cement grout, its intensity of general control is at 0.8-1.2MPa; Prepare common fragment of brick (240mmx115mmx53mm)) as aggregate; Be a construction section according to 1m in groove, first insert 1m brickbat, then 2m place in priming petock earth slurries to groove, treat that slurries initial set inserts brickbat again to 3m place, successively alternately construction to shield cutter upper limb 2m position. After the slurries initial set built for the last time, with banketing, soil groove being filled and led up and tamp, so far brush mud wall completes.
(3) to be attached have the shield cutter of mud cake to touch after brush mud wall as shown in Figure 2, shield structure is squeezed into dispersion sex vesicle foam or water by foam hole, cutterhead front from cutterhead front, shield driving decrease in velocity is to 1cm/min simultaneously, cutterhead rotating speed is also adjusted to 0.5r/min, and cutterhead alternately rotates clockwise and counterclockwise, so by softening and brickbat and mortar the friction of water and foam, the mud cake on shield cutter is got rid of.

Claims (1)

1. the treatment process of a shield structure mud lining, it is characterised in that step is as follows:
(1) when discovery shield structure has mud lining phenomenon but is not very serious, brush mud wall of constructing in the position of the front 20-40m of shielded construction in advance, the thickness of brush mud wall is 600-800mm,
(2) specific practice of brush mud wall is, first with continuous wall trench underground machine grooving, the excavation degree of depth is the groove of below shield cutter lower rim 2m; Then configure low strength cement grout, control its intensity at 0.8-1.2MPa; Prepare common fragment of brick as aggregate; It is a construction section according to the 1m degree of depth in groove, first insert the brickbat of the 1m degree of depth, then 2m degree of depth place in priming petock earth slurries to groove, treat that slurries initial set inserts brickbat again to 3m degree of depth place, alternately construct to shield cutter upper limb 2m position successively, after the slurries initial set built for the last time, with banketing, groove being filled and led up and tamp, so far brush mud wall completes;
(3) to be attached have the shield cutter of mud cake to touch brush mud wall after, shield structure is squeezed into dispersion sex vesicle foam or water by foam hole, cutterhead front from cutterhead front, shield driving decrease in velocity is to 1cm/min simultaneously, cutterhead rotating speed is also adjusted to 0.5r/min, and cutterhead alternately rotates clockwise and counterclockwise, so by softening and brickbat and mortar the friction of water and foam, the mud cake on shield cutter is got rid of.
CN201410368497.2A 2014-07-30 2014-07-30 The treatment process of a kind of shield structure mud lining Active CN104179506B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410368497.2A CN104179506B (en) 2014-07-30 2014-07-30 The treatment process of a kind of shield structure mud lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410368497.2A CN104179506B (en) 2014-07-30 2014-07-30 The treatment process of a kind of shield structure mud lining

Publications (2)

Publication Number Publication Date
CN104179506A CN104179506A (en) 2014-12-03
CN104179506B true CN104179506B (en) 2016-06-01

Family

ID=51960819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410368497.2A Active CN104179506B (en) 2014-07-30 2014-07-30 The treatment process of a kind of shield structure mud lining

Country Status (1)

Country Link
CN (1) CN104179506B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703826B (en) * 2017-02-23 2018-04-10 淮南矿业(集团)有限责任公司 A kind of control of mining TBM cutterheads knot mud stone cake and method for cleaning
CN109113753B (en) * 2018-09-30 2024-08-16 中铁工程装备集团有限公司 Device and method for breaking mud cake of cutterhead
CN109139025B (en) * 2018-10-29 2019-11-08 中铁工程装备集团有限公司 A kind of cutter head of shield machine mud cake restructuring bankrupt
CN111024902B (en) * 2019-12-30 2022-07-19 中铁隧道局集团有限公司 Experimental device and method for simulating mud cake forming and removing mechanism

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440709A (en) * 2008-12-12 2009-05-27 天津大学 Cutter head center dreg stirring device of soil pressure balance shield machine
CN102071942A (en) * 2010-12-02 2011-05-25 沈阳重型机械集团有限责任公司 Processing method for protecting excavation place of shield machine from mudlining
CN102305083A (en) * 2011-08-01 2012-01-04 北京市三一重机有限公司 Shield machine and anterior shield system thereof
CN102392652A (en) * 2011-07-26 2012-03-28 广东水电二局股份有限公司 Method for removing mud cake in soil bin or muddy water chamber of shield machine and shield machine

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010121399A1 (en) * 2009-04-24 2010-10-28 北京国油联合油田技术服务有限公司 Method and device for treating waste mud

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440709A (en) * 2008-12-12 2009-05-27 天津大学 Cutter head center dreg stirring device of soil pressure balance shield machine
CN102071942A (en) * 2010-12-02 2011-05-25 沈阳重型机械集团有限责任公司 Processing method for protecting excavation place of shield machine from mudlining
CN102392652A (en) * 2011-07-26 2012-03-28 广东水电二局股份有限公司 Method for removing mud cake in soil bin or muddy water chamber of shield machine and shield machine
CN102305083A (en) * 2011-08-01 2012-01-04 北京市三一重机有限公司 Shield machine and anterior shield system thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
泥水平衡盾构机刀盘泥饼形成机理及防治技术;陈乔松等;《长沙铁道学院学报(社会科学版)》;20110630;第12卷(第2期);第214-215页,防治措施部分 *

Also Published As

Publication number Publication date
CN104179506A (en) 2014-12-03

Similar Documents

Publication Publication Date Title
CN103924956B (en) A kind of lump coal exploitation Advance presplitting method
CN102493822B (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN104179506B (en) The treatment process of a kind of shield structure mud lining
CN104763449B (en) A kind of underground water seal cave depot water curtain system method for designing
CN102155232B (en) Construction method of large-span asymmetrical double-arch railway tunnel under terrain bias pressure condition
CN103306714B (en) Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway
AU2014393124B2 (en) Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence
CN104329113B (en) A kind of method of surface drilling standing seat earth release mash gas extraction
WO2014187171A1 (en) Method for networked reinforcement of cross boreholes of outburst coal seam
CN205260041U (en) Method of freezing supporting construction is spouted soon to level
CN102937011A (en) Secondary grouting and plugging device and method of regional crack field of gas extraction and drilling group
AU2016370451A1 (en) Method for determining length of filling section of fully mechanized coal mining-filling mixed mining working face
CN104727847B (en) Filled wall is from the gob-side entry retaining method without coal column eliminated
CN202578782U (en) Downcast pipe used for rich water powder fine sand layer
CN102383728A (en) Coal mine rockburst defect segmentation and control method
CN103726858A (en) Underground large-scale cave depot project sphere-cylinder combination excavation method
CN204002927U (en) The incrusted processing structure of a kind of shield structure
CN105804786A (en) Method for layer penetrating, drilling, pressing punching and permeability improving of soft coal seam floor
AU2016431138B2 (en) Rotary jet-grouting modular rare-earth mining process
CN103953346A (en) Non-chain-pillar exploitation method
CN102787606B (en) Guard method to surrounding environment in a kind of excavation of foundation pit Precipitation Process
CN204177294U (en) A kind of road driving undercut blast hole structure
CN103307941B (en) A kind of method improving road driving Cut Blasting effect
CN105927225B (en) A kind of full seam extraction method of shallow embedding spy thick loose coal seam back production bottom slice
CN206309400U (en) A kind of slurry shield anti-clogging muddy water pump

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant