CN202578782U - Downcast pipe used for rich water powder fine sand layer - Google Patents

Downcast pipe used for rich water powder fine sand layer Download PDF

Info

Publication number
CN202578782U
CN202578782U CN 201220202486 CN201220202486U CN202578782U CN 202578782 U CN202578782 U CN 202578782U CN 201220202486 CN201220202486 CN 201220202486 CN 201220202486 U CN201220202486 U CN 201220202486U CN 202578782 U CN202578782 U CN 202578782U
Authority
CN
China
Prior art keywords
pipe
fine sand
sand layer
downcomer
pigment fine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220202486
Other languages
Chinese (zh)
Inventor
张文新
杨祖根
邹翀
姚湘
蒋永强
李振
焦雷
方庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Research of China Railway Tunnel Group Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN 201220202486 priority Critical patent/CN202578782U/en
Application granted granted Critical
Publication of CN202578782U publication Critical patent/CN202578782U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical field of tunnel excavation, and discloses a downcast pipe used for a rich water powder fine sand layer. The downcast pipe comprises a sleeve, a strainer and a filter screen, wherein the pipe wall of the sleeve is provided with multi-circle water seepage ring holes, and the water seepage ring holes are formed by multiple weep holes which are uniformly arranged; one end of the sleeve is provided with a taper shape closed end, and the inner wall of the other end of the sleeve and the outer wall of the one end of the strainer are connected into a whole; the strainer is placed in the sleeve, the filter screen is closely packed on an end socket of the other end of the strainer, and the filter screen can fully cover a filter hole on the pipe wall of the perforated pipe; and the downcast pipe can bury through aiming at a rich water powder fine sand layer, and the construction requirement on the downcast of the rich water powder fine sand layer is effectively met.

Description

A kind of downcomer that is used for rich pigment fine sand layer
[technical field]
The utility model relates to the tunnel excavation technical field, especially relates to a kind of downcomer that is used for to rich pigment fine sand layer precipitation.
[background technology]
Known, Fu Shui does not become rock dust packsand layer to claim rich pigment fine sand layer again, and this rock stratum is extremely unstable because of being rich in moisture content; When excavating rich pigment fine sand layer in the work progress in tunneling; Rich pigment fine sand layer very easily is stream and moulds the shape modification, thereby sand in construction, occurs gushing, slip the phenomenon of collapsing, and is light then cause the preliminary bracing in tunnel to be out of shape; Jeopardize construction safety; Heavy then cause the tunnel to cave in, cause security incident, and then badly influence construction period, workmanship and production safety and the cost of production etc. in tunnel; At present, when meeting with rich pigment fine sand layer in the process in tunneling, in order to reach the purpose of excavation moulding; Generally all need implement precipitation in advance; And, particularly, all need bury downcomer in advance underground to the performing of precipitation well point in order to strengthen the validity of rich pigment fine sand layer precipitation; But; Since rich pigment fine sand layer in the domestic constructing tunnel of China difficulty meet, therefore, do not have effectively to be directed against the downcomer that rich pigment fine sand layer is buried underground traditionally; Be that existing downcomer can't be poor at self-stability, be prone in the rich pigment fine sand layer of quicksand and bury underground.
[summary of the invention]
In order to overcome the deficiency in the background technology, the utility model provides a kind of downcomer that is used for rich pigment fine sand layer, and described downcomer can be buried underground to rich pigment fine sand layer, thereby has effectively satisfied the construction requirement to rich pigment fine sand layer precipitation.
For realizing the foregoing invention purpose, the utility model adopts following technical scheme:
A kind of downcomer that is used for rich pigment fine sand layer, described downcomer comprises sleeve pipe, filter pipe and filter screen; The tube wall of said sleeve pipe has the many circle infiltrations of being provided with of spacing annular distance, and the infiltration annular distance is made up of a plurality of evenly distributed infiltration holes; Sleeve pipe one end is made as coniform blind end, and an end outer wall of the other end inwall of sleeve pipe and filter pipe connects as one; Described filter pipe places inside pipe casing, closely be enclosed with at least one metafiltration net in the other end termination of filter pipe, and filter screen covers the filter opening of filter pipe tube wall fully.
The described downcomer that is used for rich pigment fine sand layer, the spacing between described many circle infiltration annular distances is at least 30mm.
The described downcomer that is used for rich pigment fine sand layer, the circular cone end face of the coniform blind end of said sleeve pipe are provided with evenly distributed a plurality of infiltrations hole.
The described downcomer that is used for rich pigment fine sand layer, described infiltration bore dia is at least 5mm.
The described downcomer that is used for rich pigment fine sand layer, interval 5~10mm between the inwall of said sleeve pipe and the outer wall of filter pipe.
The described downcomer that is used for rich pigment fine sand layer, described filter screen are that the order number is the antirust antimagnetic steel silk screens of 60 purposes at least.
The described downcomer that is used for rich pigment fine sand layer, described sleeve pipe are that internal diameter is 42mm at least, and length is the seamless steel pipe of 3000mm at least.
The described downcomer that is used for rich pigment fine sand layer, described filter pipe are pvc pipe or PPR pipe.
Owing to adopted technique scheme, the utlity model has following beneficial effect:
The described downcomer that is used for rich pigment fine sand layer of the utility model can be embedded in rich pigment fine sand layer under the prerequisite of the rich pigment fine sand layer of not disturbance self-stability of trying one's best, thereby in the process of tunneling, has effectively satisfied the construction requirement to rich pigment fine sand layer precipitation.
[description of drawings]
Fig. 1 is the sketch map of the utility model.
Among the figure: 1, sleeve pipe; 2, infiltration hole; 3, coniform blind end; 4, filter pipe; 5, filter screen; 6, filter opening.
[specific embodiment]
Can explain the utility model in more detail through following embodiment, the purpose of open the utility model is intended to protect all variations and the improvement in the utility model scope, and the utility model is not limited to following embodiment;
In conjunction with the accompanying drawing 1 described downcomer that is used for rich pigment fine sand layer, described downcomer comprises sleeve pipe 1, filter pipe 4 and filter screen 5; It is 42mm at least that described sleeve pipe 1 adopts internal diameter, and length is the seamless steel pipe of 3000mm at least, has guaranteed that promptly described downcomer has enough bulk strengths, thereby can be easy to buried underground in the into rich pigment fine sand layer; Form a complete set of for ease of filter pipe 4 and sleeve pipe 1, described filter pipe 4 adopts the material of PVC or PPR to process; The tube wall of said sleeve pipe 1 has the many circle infiltrations of being provided with of spacing annular distance, thereby makes the moisture content that is rich in the rich pigment fine sand layer of burying said downcomer underground seep water annular distance seepage flow to sleeve pipe 1 through these; Spacing between described many circle infiltration annular distances is at least 30mm, and the infiltration annular distance of each circle constitutes by the infiltration hole 2 that a plurality of evenly distributed diameters are at least 5mm, thereby when satisfying seepage flow moisture content, also can not reduce the bulk strength of said downcomer;
One end of said sleeve pipe 1 is made as coniform blind end 3, promptly utilizes the round wedge angle of this end that described downcomer can be driven in the rich pigment fine sand layer easily, thereby accomplishes burying underground of downcomer; For further strengthening the validity of rich pigment fine sand layer precipitation; A plurality of evenly distributed infiltration holes 2 can be set at the circular cone end face of sleeve pipe 1 coniform blind end 3, can directly discharge through the port of filter pipe 4 corresponding end thereby make seepage flow advance sleeve pipe 1 coniform blind end 3 inner moisture; For ease of filter pipe 4 and sleeve pipe 1 are got into completely synchronously, can the other end inwall of sleeve pipe 1 and an end outer wall of filter pipe 4 be connected as one; Described filter pipe 4 is being placed on sleeve pipe 1 inside through the end connection, and the interval between the outer wall of the inwall of sleeve pipe 1 and filter pipe 4 is made as 5~10mm; Filter pipe 4 is positioned at sleeve pipe 1 inner other end termination and closely is enclosed with the antirust antimagnetic steel wire gauze filter 5 of one deck 60 purposes at least; And filter screen 5 covers the filter opening 6 of filter pipe 4 tube walls fully; Be that seepage flow to sleeve pipe 1 interior moisture content is wanted earlier through the filtration of screen pack 5, in can managing through filter opening 6 seepage flow to filter pipe 4.
When implementing the described downcomer that is used for rich pigment fine sand layer of the utility model; Earlier the corresponding rich pigment fine sand layer of the round wedge angle of the coniform blind end 3 of described downcomer; Again described downcomer is squeezed in the into rich pigment fine sand layer; When the only remaining port position of described downcomer outside the time, should hold port to be communicated with corresponding water pump or vacuum pump, just can utilize water pump or vacuum pump to aspirate moisture content then.
Carefully not stating in the above content is prior art partly, does not state so run business into particular one.

Claims (8)

1. downcomer that is used for rich pigment fine sand layer, it is characterized in that: described downcomer comprises sleeve pipe (1), filter pipe (4) and filter screen (5); The tube wall of said sleeve pipe (1) has the many circle infiltrations of being provided with of spacing annular distance, and the infiltration annular distance is made up of a plurality of evenly distributed infiltration holes (2); Sleeve pipe (1) one end is made as coniform blind end (3), and an end outer wall of the other end inwall of sleeve pipe (1) and filter pipe (4) connects as one; Described filter pipe (4) places sleeve pipe (1) inside, closely is enclosed with at least one metafiltration net (5) in the other end termination of filter pipe (4), and filter screen (5) covers the filter opening (6) of filter pipe (4) tube wall fully.
2. the downcomer that is used for rich pigment fine sand layer according to claim 1 is characterized in that: the spacing between per two circles of described many circle infiltration annular distances is at least 30mm.
3. the downcomer that is used for rich pigment fine sand layer according to claim 1 is characterized in that: the circular cone end face of the coniform blind end (3) of said sleeve pipe (1) is provided with evenly distributed a plurality of infiltrations hole (2).
4. according to claim 1 or the 3 described downcomers that are used for rich pigment fine sand layer, it is characterized in that: described infiltration hole (3) diameter is at least 5mm.
5. the downcomer that is used for rich pigment fine sand layer according to claim 1 is characterized in that: interval 5~10mm between the outer wall of the inwall of said sleeve pipe (1) and filter pipe (4).
6. the downcomer that is used for rich pigment fine sand layer according to claim 1 is characterized in that: described filter screen (5) is the antirust antimagnetic steel silk screens of 60 purposes for the order number at least.
7. the downcomer that is used for rich pigment fine sand layer according to claim 1 is characterized in that: described sleeve pipe (1) is 42mm for internal diameter at least, and length is the seamless steel pipe of 3000mm at least.
8. the downcomer that is used for rich pigment fine sand layer according to claim 1 is characterized in that: described filter pipe (4) is pvc pipe or PPR pipe.
CN 201220202486 2012-05-08 2012-05-08 Downcast pipe used for rich water powder fine sand layer Expired - Fee Related CN202578782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220202486 CN202578782U (en) 2012-05-08 2012-05-08 Downcast pipe used for rich water powder fine sand layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220202486 CN202578782U (en) 2012-05-08 2012-05-08 Downcast pipe used for rich water powder fine sand layer

Publications (1)

Publication Number Publication Date
CN202578782U true CN202578782U (en) 2012-12-05

Family

ID=47248203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220202486 Expired - Fee Related CN202578782U (en) 2012-05-08 2012-05-08 Downcast pipe used for rich water powder fine sand layer

Country Status (1)

Country Link
CN (1) CN202578782U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979535A (en) * 2012-12-27 2013-03-20 西南交通大学 Drain-type pipe piece for tunnel lining
CN103422868A (en) * 2013-08-06 2013-12-04 同济大学 Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body
CN103628915A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel
CN103628888A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Stability augmentation and solidification method for large-section water-rich saturation fine-silt railway tunnel
CN103912002A (en) * 2014-03-24 2014-07-09 昆山帝滤源塑管有限公司 UPVC (ultra-rigid polyvinyl chloride) composite downcast pipe
CN108843385A (en) * 2018-06-25 2018-11-20 河南理工大学 One kind adopting the efficient leting speeper method and device of the aqueous roadway in the roof of mud stone
CN110374620A (en) * 2019-08-25 2019-10-25 贵州大学 The exploitation of mining heading equipment is crushed header structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979535A (en) * 2012-12-27 2013-03-20 西南交通大学 Drain-type pipe piece for tunnel lining
CN102979535B (en) * 2012-12-27 2015-12-02 西南交通大学 Draining type section of jurisdiction is used in a kind of tunnel lining
CN103422868A (en) * 2013-08-06 2013-12-04 同济大学 Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body
CN103422868B (en) * 2013-08-06 2015-10-21 同济大学 The structure of a kind of Super-void Water Pressure that dissipates, reinforcing shield tunnel soil body and method
CN103628915A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel
CN103628888A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Stability augmentation and solidification method for large-section water-rich saturation fine-silt railway tunnel
CN103912002A (en) * 2014-03-24 2014-07-09 昆山帝滤源塑管有限公司 UPVC (ultra-rigid polyvinyl chloride) composite downcast pipe
CN108843385A (en) * 2018-06-25 2018-11-20 河南理工大学 One kind adopting the efficient leting speeper method and device of the aqueous roadway in the roof of mud stone
CN110374620A (en) * 2019-08-25 2019-10-25 贵州大学 The exploitation of mining heading equipment is crushed header structure

Similar Documents

Publication Publication Date Title
CN202578782U (en) Downcast pipe used for rich water powder fine sand layer
CN204112308U (en) A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum
CN204152521U (en) A kind of tunnel supporting and protection structure
CN103306683A (en) Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN203655249U (en) In-situ leaching uranium mining process well
CN204849738U (en) Can pierce through static pressure tubular pile of sand bed and construction equipment thereof
CN207419439U (en) The buried anti-shear concrete structure drainage system of side slope
CN104963351A (en) Reinforced structure for reinforcing treatment of artificial filled soil slopes and construction method thereof
CN102383437A (en) Well point positioned pumping tubular well and well point positioned pumping method
CN105696543B (en) A kind of method that dam front row is seeped when red mud dump constructs sub- dam
CN104179506B (en) The treatment process of a kind of shield structure mud lining
CN203569575U (en) Plastic blind ditch pipe sandless precipitation well
CN109681214A (en) A kind of construction method of Full-face pouring strengthening stratum
CN211498905U (en) Pressure reduction well with well wall compensation
CN206360705U (en) The major diameter New pipe curtain supporting construction constructed for underground digging in subway station
CN103953367B (en) In hole, eliminate the method for shield tunnel Stratigraphic liquidation
CN105569045A (en) Grouting pipe
CN105155472A (en) Dam foundation anti-seepage structure of deep overlying layer earth-rock dam and construction method of dam foundation anti-seepage structure
CN204370462U (en) Open-cut station water drainage of deep foundation pit system
CN105804690B (en) In-situ leaching process drilling inverse water mud device
CN202099807U (en) Polyethylene small-caliber precipitation well point device
CN204728350U (en) For the ruggedized construction that artificial earth fill's slope reinforcement is administered
CN202000365U (en) Seepage-proof structure for underground continuous wall
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN202450511U (en) Grouting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY TUNNEL GROUP TECHNOLOGY RESEARCH CO.

Free format text: FORMER OWNER: ZHONGTIE TUNNEL GROUP CO., LTD.

Effective date: 20140603

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140603

Address after: 471009 Luoyang City, the old town of Henan champion Red Road, No. 3

Patentee after: China Railway Tunnel Group Technology Research Co., Ltd.

Address before: 471009 Luoyang City, the old town of Henan champion Red Road, No. 3

Patentee before: Zhongtie Tunnel Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20190508

CF01 Termination of patent right due to non-payment of annual fee