CN104166894A - Power plant scheduling voice reporting method and system - Google Patents
Power plant scheduling voice reporting method and system Download PDFInfo
- Publication number
- CN104166894A CN104166894A CN201410351712.8A CN201410351712A CN104166894A CN 104166894 A CN104166894 A CN 104166894A CN 201410351712 A CN201410351712 A CN 201410351712A CN 104166894 A CN104166894 A CN 104166894A
- Authority
- CN
- China
- Prior art keywords
- power plant
- power
- field data
- user
- barring condition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 48
- 238000012790 confirmation Methods 0.000 claims abstract description 7
- 230000005611 electricity Effects 0.000 claims description 31
- 238000003860 storage Methods 0.000 claims description 18
- 238000012550 audit Methods 0.000 claims description 10
- 238000005516 engineering process Methods 0.000 description 7
- 230000005619 thermoelectricity Effects 0.000 description 7
- 238000007726 management method Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002547 anomalous effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Disclosed are a power plant scheduling voice reporting method and system. The method includes the following steps: step1: receiving an access request of a user and accessing the user after verifying a user number and a login password; step2:carrying out voice prompting to the user for input of power plant site data; step3: judging whether the power plant site data complies with a set locking condition, if not so, carrying out voice prompting to the user for returning to the step 2 so as to input the power plant site data again; step4: carrying out voice prompting to the user for confirmation of power plant site data which complies with the locking condition or returning to the step 2 so as to input the power plant site data again; step5: storing the power plant site data which is confirmed by the user. The power plant scheduling voice reporting method and system solve a technical problem that the prior art is incapable of realizing timely and accurate reporting of site data of power plants which are not covered by enterprise intranets.
Description
Technical field
The present invention relates to power scheduling technical field, relate in particular to power plant's schedule voice declaration method and system.
Background technology
State Grid Corporation of China's 2010 " two Conferences " is upper to be proposed " three collection five are large " (human resources, finance, material intensive management, huge construction program, construction greatly, large operation, large production, marketing system construction greatly).The important embodiment of " adjust, join, control integrated " conduct " operation greatly " is a kind of Regulation pattern of carrying out energetically in current national grid system.Integrated management and running embody emphatically the efficient of intelligent grid, and it relates to the longitudinally interconnected of the standardization of dispatching center and specialized management, lean and indexing management and dispatching center, is the window that dispatching center externally provides types of functionality and data, services.
" adjust, join, control integrated " relates to two class business, to the control of the normal operation of electrical network and to the emergency processing of accident improve control room to power system operating mode, equipment running status, send out power supply plan, and the control ability of electrical network overall process, comprehensive, full specialty; The processing power of raising to accidents such as anomalous weather, outside destroy, system fluctuations.
" adjust, join, control integrated " system has realized the centralization of management and running height, automated system has been proposed to new requirement simultaneously.Along with the deep propelling of " operation greatly " System Construction, in order to guarantee that new system runs well, and need to improve the informatization platform of electrical network.The little thermoelectricity of part (it is main oil burning boiler and genset that little thermoelectricity typically refers to 50,000 kilowatts and following thermoelectricity) enterprise does not realize the covering of Intranet because of enterprise's existing network condition restriction, cannot carry out data by inner-mesh network and report in real time.
Therefore need to set up the information system of a set of intelligence, to realize little thermoelectricity field data, declare in time, promote regulation and control operation level, and then improve electricity net safety stable.Traditional information system can not prevent that little thermoelectricity field data from declaring user misoperation in process, thereby it is inaccurate to cause related data to declare, these inaccurate data store in database, need to be examined and be revised by manual type, waste time and energy, affect power plant's despatching work efficiency.
Summary of the invention
For this reason, technical matters to be solved by this invention is that prior art cannot realize and do not have power plant that corporate intranet covers to field data in time, declare exactly, thereby proposes a kind of power plant schedule voice declaration method and system solves this problem.
For solving the problems of the technologies described above, the present invention by the following technical solutions:
Power plant's schedule voice declaration method, comprises the following steps: step 1, reception user's access request, access user after authentication of users numbering and login password; Step 2, voice message user input power plant's field data; Step 3, judge whether described power plant field data meets the barring condition of setting, do not meet barring condition voice message user return to step 2 and re-enter power plant's field data; Step 4, voice message user confirm or return to step 2 and re-enter power plant's field data meeting power plant's field data of barring condition; Step 5, power plant's field data that above-mentioned process user is confirmed are stored.
As the further improvement of power plant of the present invention schedule voice declaration method, described power plant field data comprises: power minimum load, power maximum load, start power capacity, generated energy and electricity volume.
Further improvement as power plant of the present invention schedule voice declaration method, described barring condition is: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
As the further improvement of power plant of the present invention schedule voice declaration method, described barring condition is: 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
As the further improvement of power plant of the present invention schedule voice declaration method, described barring condition is: Shang net electricity Liang≤generated energy.
As the further improvement of power plant of the present invention schedule voice declaration method, described barring condition is: the Gao Fu He≤start power capacity of power minimum load < power.
As the further improvement of power plant of the present invention schedule voice declaration method, further comprising the steps of after step 5: the power plant's field data to storage is examined.
As the further improvement of power plant of the present invention schedule voice declaration method, also the power plant's field data after audit is reported to higher level's thread.
As the further improvement of power plant of the present invention schedule voice declaration method, further comprising the steps of after step 5: the power plant's field data to storage gathers displaying.
Based on same inventive concept, the present invention also proposes a kind of power plant schedule voice declaration system, comprising: user's access unit, and for receiving user's access request, access user after authentication of users numbering and login password; Input block, inputs power plant's field data for voice message user; Locking unit, for judging whether described power plant field data meets the barring condition of setting, do not meet barring condition voice message user return to input block and re-enter power plant's field data; Confirmation unit, confirms or returns to input block and re-enter power plant's field data meeting power plant's field data of barring condition for voice message user; Storage unit, for storing above-mentioned power plant's field data of confirming through user.
As the further improvement of power plant of the present invention schedule voice declaration system, described power plant field data comprises: power minimum load, power maximum load, start power capacity, generated energy and electricity volume.
As the further improvement of power plant of the present invention schedule voice declaration system, described barring condition is: the Gao Fu He≤start power capacity of power minimum load < power.
As the further improvement of power plant of the present invention schedule voice declaration system, described barring condition is: 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
As the further improvement of power plant of the present invention schedule voice declaration system, described barring condition is: Shang net electricity Liang≤generated energy.
Further improvement as power plant of the present invention schedule voice declaration system, described barring condition is: Shang net electricity Liang≤generated energy, and, the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
Further improvement as power plant of the present invention schedule voice declaration system, also comprises audit unit, for power plant's field data of storage is examined.
Further improvement as power plant of the present invention schedule voice declaration system, also comprises report unit, for the power plant's field data after audit is reported to higher level's thread.
Further improvement as power plant of the present invention schedule voice declaration system, also comprises and gathers unit, for power plant's field data of storage is gathered to displaying.
Technique scheme of the present invention has the following advantages compared to existing technology:
1, a kind of power plant schedule voice declaration method of the present invention and system, owing to comprising the following steps: step 1, reception user's access request, access user after authentication of users numbering and login password; Step 2, voice message user input power plant's field data; Step 3, judge whether described power plant field data meets the barring condition of setting, do not meet barring condition voice message user return to step 2 and re-enter power plant's field data; Step 4, voice message user confirm or return to step 2 and re-enter power plant's field data meeting power plant's field data of barring condition; Step 5, power plant's field data that above-mentioned process user is confirmed are stored.The barring condition of setting can prevent that little thermoelectricity field data from declaring user misoperation in process, guarantees that data declaration is accurate, avoids inaccurate data to store in database, thereby improves power plant's despatching work efficiency.
2, a kind of power plant schedule voice declaration method of the present invention and system, described power plant field data comprises: power minimum load, power maximum load, start power capacity, generated energy and electricity volume, described barring condition is: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.Can effectively avoid like this declaring in process in power plant's field data the apparent error that data declaration person's maloperations such as the electricity volume > generated energy of appearance, power minimum load >=power maximum load, power minimum load >=start power capacity, power maximum load > start power capacity and data unit mistake cause.Data error rate is reduced to below 5.12% by 21.33%.Simultaneously, when power plant's field data of input meets 2.4 times power minimum load < generated energy < 2.4 times power maximum load barring condition simultaneously, other data error rate that are not artificial origin causes also significantly reduce, the misdata for example, causing due to reasons such as electric instruments while, checking meter at the scene significantly reduces.By long-time statistical observation, data error rate is 0, has obtained unexpected technique effect.
Accompanying drawing explanation
For content of the present invention is more likely to be clearly understood, below according to a particular embodiment of the invention and by reference to the accompanying drawings, the present invention is further detailed explanation, wherein
Fig. 1 is a kind of power plant schedule voice declaration method schematic diagram of the embodiment of the present invention 1;
Fig. 2 is a kind of little thermal power plant schedule voice declaration method process flow diagram of the embodiment of the present invention 2.
Embodiment
Embodiment 1
Fig. 1 shows a kind of power plant schedule voice declaration method of the embodiment of the present invention, comprises the following steps:
Step 1, access user.Receive user's access request, access user after authentication of users numbering and login password.
Step 2, input power plant field data.By voice message user, input power plant's field data.Described power plant field data comprises: power minimum load, power maximum load, start power capacity, generated energy and electricity volume.
Step 3, judge whether data meet barring condition.Judge whether described power plant field data meets the barring condition of setting, described barring condition is: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.Meet barring condition and perform step 4; Do not meet barring condition voice message user return to step 2 and re-enter power plant's field data.
Can effectively avoid like this declaring in process in power plant's field data the apparent error that data declaration person's maloperations such as the electricity volume > generated energy of appearance, power minimum load >=power maximum load, power minimum load >=start power capacity, power maximum load > start power capacity and data unit mistake cause.Data error rate is reduced to below 5.12% by 21.33%.Simultaneously, when power plant's field data of input meets 2.4 times power minimum load < generated energy < 2.4 times power maximum load barring condition simultaneously, other data error rate that are not artificial origin causes also significantly reduce, the misdata for example, causing due to reasons such as electric instruments while, checking meter at the scene significantly reduces.By long-time statistical observation, data error rate is 0, has obtained unexpected technique effect.
As other embodiment, described barring condition is: the Gao Fu He≤start power capacity of power minimum load < power.
As other embodiment, described barring condition is: 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
As other embodiment, described barring condition is: Shang net electricity Liang≤generated energy.
Step 4, confirmation data.Voice message user confirms meeting power plant's field data of barring condition, confirms carry out step 5; Re-enter and return to step 2 and re-enter power plant's field data.
Step 5, storage power plant field data.Above-mentioned power plant's field data of confirming through user is stored.
As the preferred implementation of a kind of power plant schedule voice declaration method of the embodiment of the present invention, further comprising the steps of after step 5: the power plant's field data to storage is examined, and the power plant's field data after audit is reported to higher level's thread.
As the preferred implementation of a kind of power plant schedule voice declaration method of the embodiment of the present invention, further comprising the steps of after step 5: the power plant's field data to storage gathers displaying.
Embodiment 2
Fig. 2 shows a kind of little thermal power plant schedule voice declaration method of the embodiment of the present invention.
First, the data declaration person of little thermal power plant dials and declares telephone number, and voice message after connecting " is welcome to use little thermoelectricity Data-phone declaration system, please be inputted Customs Assigned Number, with # key, finish ".For example, data declaration person inputs Customs Assigned Number " 001# ", if this numbering does not exist, voice message " you do not exist by the Customs Assigned Number of input; please re-enter Customs Assigned Number; finish with # key ", if numbering exists, further voice message " please be inputted login password, with # key, finish ".For example, data declaration person inputs login password " * * * * * * # ", if password mistake, voice message " Password Input mistake, please re-enter, and finishes with # key ", if Password Input is correct, logins successfully.
After logining successfully, voice message " declaration data, please by 1, exits, and asks on-hook ", after data declaration person's input " 1 ", voice message " please be inputted generated energy, with # key, finish ", for example data declaration person's input " 1036.28 ".
Whether the generated energy of judgement input meets the barring condition of setting: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads." sorry, your input is wrong in voice message if do not met! Please re-enter ", data declaration person returns and re-enters generated energy.
If met, further voice message " your typing is: 1036.28, confirm, please by 1, re-enter, please by 2 ", incorrect if data declaration person inputs generated energy, by 2, return, re-enter; If it is correct that data declaration person inputs generated energy, by 1, confirm.After data declaration person presses 1, voice message " please be inputted electricity volume, with # key, finish ", for example data declaration person's input " 964.14 ".
Whether the electricity volume of judgement input meets the barring condition of setting: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads." sorry, your input is wrong in voice message if do not met! Please re-enter ", data declaration person returns and re-enters electricity volume.
If met, further voice message " your typing is: 964.14, confirm, please by 1, re-enter, please by 2 ", incorrect if data declaration person inputs electricity volume, by 2, return, re-enter; If it is correct that data declaration person inputs electricity volume, by 1, confirm.After data declaration person presses 1, voice message " is asked power input minimum load, with # key, is finished ", for example data declaration person's input " 102.56 ".
Whether the power minimum load of judgement input meets the barring condition of setting: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads." sorry, your input is wrong in voice message if do not met! Please re-enter ", data declaration person returns and re-enters power minimum load.
If met, further voice message " your typing is: 102.56, confirm, please by 1, re-enter, please by 2 ", if data declaration person's power input minimum load is incorrect, by 2, return, re-enter; If data declaration person's power input minimum load is correct, by 1, confirm.After data declaration person presses 1, voice message " is asked power input maximum load, with # key, is finished ", for example data declaration person's input " 505.43 ".
Whether the power maximum load of judgement input meets the barring condition of setting: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads." sorry, your input is wrong in voice message if do not met! Please re-enter ", data declaration person returns and re-enters power maximum load.
If met, further voice message " your typing is: 505.43, confirm, please by 1, re-enter, please by 2 ", if data declaration person's power input maximum load is incorrect, by 2, return, re-enter; If data declaration person's power input maximum load is correct, by 1, confirm.After data declaration person presses 1, voice message " please be inputted start power capacity, with # key, finish ", for example data declaration person's input " 665.64 ".
Whether the start power capacity of judgement input meets the barring condition of setting: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads." sorry, your input is wrong in voice message if do not met! Please re-enter ", data declaration person returns and re-enters start power capacity.
If met, further voice message " your typing is: 505.43, confirm, please by 1, re-enter, please by 2 ", if data declaration person inputs start, power capacity is incorrect, by 2, returns, and re-enters; If data declaration person inputs start, power capacity is correct, by 1, confirms.
Data declaration person enters operating database flow process after pressing 1, the above-mentioned little thermal power plant field data of confirming through data declaration person is stored, and voice message " operates successful! Generated energy: 1036.28, electricity volume: 964.16, power minimum load 102.56, power maximum load: 505.43, start power capacity: 665.64,, as also needed other service, please by 0, exit and ask on-hook ".
As the preferred implementation of a kind of little thermal power plant schedule voice declaration method of the embodiment of the present invention, dispatcher can examine the above-mentioned little thermal power plant field data of storage, and the little thermal power plant field data after audit is reported to higher level's thread.
As the preferred implementation of a kind of little thermal power plant schedule voice declaration method of the embodiment of the present invention, dispatcher can gather displaying to the above-mentioned little thermal power plant field data of storage.
Embodiment 3
A kind of power plant schedule voice declaration system of the embodiment of the present invention, comprises user's access unit, input block, locking unit, confirmation unit and storage unit.
Described user's access unit is used for receiving user's access request, access user after authentication of users numbering and login password.
Described input block is for inputting power plant's field data by voice message user.Described power plant field data comprises: power minimum load, power maximum load, start power capacity, generated energy and electricity volume.
Described locking unit is for judging whether described power plant field data meets the barring condition of setting, described barring condition is: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.Meet barring condition and perform step 4; Do not meet barring condition voice message user return to step 2 and re-enter power plant's field data.
As other embodiment, described barring condition is: the Gao Fu He≤start power capacity of power minimum load < power.
As other embodiment, described barring condition is: 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
As other embodiment, described barring condition is: Shang net electricity Liang≤generated energy.
Described confirmation unit is confirmed meeting power plant's field data of barring condition for voice message user, confirms carry out step 5; Re-enter and return to step 2 and re-enter power plant's field data.
Described storage unit is for storing above-mentioned power plant's field data of confirming through user.
A kind of power plant schedule voice declaration system of the embodiment of the present invention also comprises audit unit, reports unit and gather unit.
Described audit unit is for examining power plant's field data of storage.
Described report unit is for reporting higher level's thread by the power plant's field data after audit.
The described unit that gathers is for gathering displaying to power plant's field data of storage.
Preferred implementation as a kind of power plant schedule voice declaration system of the embodiment of the present invention, can be based on Dialogic sound card exploitation voice server, integrated above-mentioned user's access unit, input block, locking unit, confirmation unit and storage unit in described voice server.Further, build WEB server, in described voice server integrated above-mentioned audit unit, report unit and gather unit.Technology based on Dialogic voice exploitation voice server, and the technology that builds WEB server belongs to the art technology known technology, the functional requirement providing by a kind of power plant schedule voice declaration system in conjunction with the embodiment of the present invention, technical field for the art is not being paid under creative work condition and can implemented, thereby repeats no more.
Obviously, above-described embodiment is only for example is clearly described, and the not restriction to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without also giving all embodiments.And the apparent variation of being extended out thus or change are still among the protection domain in the invention.
Claims (10)
1.Yi Zhong power plant schedule voice declaration method, is characterized in that comprising the following steps:
Step 1, reception user's access request, access user after authentication of users numbering and login password;
Step 2, voice message user input power plant's field data;
Step 3, judge whether described power plant field data meets the barring condition of setting, do not meet barring condition voice message user return to step 2 and re-enter power plant's field data;
Step 4, voice message user confirm or return to step 2 and re-enter power plant's field data meeting power plant's field data of barring condition;
Step 5, power plant's field data that above-mentioned process user is confirmed are stored.
2. power plant according to claim 1 schedule voice declaration method, is characterized in that, described power plant field data comprises: power minimum load, power maximum load, start power capacity, generated energy and electricity volume.
3. power plant according to claim 2 schedule voice declaration method, it is characterized in that, described barring condition is: Shang net electricity Liang≤generated energy, and the Gao Fu He≤start power capacity of power minimum load < power, and 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
4. power plant according to claim 2 schedule voice declaration method, is characterized in that, described barring condition is: 2.4 times power minimum load < generated energy < 2.4 times power maximum loads.
5. power plant according to claim 2 schedule voice declaration method, is characterized in that, described barring condition is: Shang net electricity Liang≤generated energy.
6. power plant according to claim 2 schedule voice declaration method, is characterized in that, described barring condition is: the Gao Fu He≤start power capacity of power minimum load < power.
7. power plant according to claim 1 schedule voice declaration method, is characterized in that, further comprising the steps of after step 5: the power plant's field data to storage is examined.
8. power plant according to claim 7 schedule voice declaration method, is characterized in that, also the power plant's field data after audit is reported to higher level's thread.
9. power plant according to claim 1 schedule voice declaration method, is characterized in that, further comprising the steps of after step 5: the power plant's field data to storage gathers displaying.
10.Yi Zhong power plant schedule voice declaration system, is characterized in that comprising:
User's access unit, for receiving user's access request, access user after authentication of users numbering and login password;
Input block, inputs power plant's field data for voice message user;
Locking unit, for judging whether described power plant field data meets the barring condition of setting, do not meet barring condition voice message user return to input block and re-enter power plant's field data;
Confirmation unit, confirms or returns to input block and re-enter power plant's field data meeting power plant's field data of barring condition for voice message user;
Storage unit, for storing above-mentioned power plant's field data of confirming through user.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610081826.4A CN105629935B (en) | 2014-07-23 | 2014-07-23 | Power plant's schedule voice declaration system |
CN201410351712.8A CN104166894B (en) | 2014-07-23 | 2014-07-23 | Power plant's schedule voice declaration method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410351712.8A CN104166894B (en) | 2014-07-23 | 2014-07-23 | Power plant's schedule voice declaration method and system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610081826.4A Division CN105629935B (en) | 2014-07-23 | 2014-07-23 | Power plant's schedule voice declaration system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104166894A true CN104166894A (en) | 2014-11-26 |
CN104166894B CN104166894B (en) | 2016-08-24 |
Family
ID=51910691
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410351712.8A Active CN104166894B (en) | 2014-07-23 | 2014-07-23 | Power plant's schedule voice declaration method and system |
CN201610081826.4A Active CN105629935B (en) | 2014-07-23 | 2014-07-23 | Power plant's schedule voice declaration system |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610081826.4A Active CN105629935B (en) | 2014-07-23 | 2014-07-23 | Power plant's schedule voice declaration system |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN104166894B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101183251A (en) * | 2007-12-19 | 2008-05-21 | 田一鸣 | Electrical power system safety operation intelligent monitoring device and monitoring method thereof |
CN101458502A (en) * | 2008-12-30 | 2009-06-17 | 湖南省电力公司湘潭电业局 | Electrical power system standardized work intelligent control method and special equipment |
EP2685328A1 (en) * | 2012-07-10 | 2014-01-15 | Siemens Aktiengesellschaft | User interface of an automation system and a method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6393332B1 (en) * | 1999-04-02 | 2002-05-21 | American Standard Inc. | Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand |
CN1256465A (en) * | 1999-12-06 | 2000-06-14 | 欧阳永熙 | Control of power output from one generator set to power network and corresponding settlement method in power market |
CN2685328Y (en) * | 2003-12-29 | 2005-03-16 | 刘临杰 | Efficient combined water purifier |
CN1704945A (en) * | 2004-06-01 | 2005-12-07 | 上海市电力公司市东供电公司 | Dangerous point safety precontrol method for power network dispatch |
CN1752958A (en) * | 2004-09-26 | 2006-03-29 | 福建省电力试验研究院 | Evaluation system of electrical network operation state and dispatch decision system |
CN103198420B (en) * | 2013-03-29 | 2015-12-23 | 山东电力集团公司 | Real-time interactive long-distance fee-control management system and method |
-
2014
- 2014-07-23 CN CN201410351712.8A patent/CN104166894B/en active Active
- 2014-07-23 CN CN201610081826.4A patent/CN105629935B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101183251A (en) * | 2007-12-19 | 2008-05-21 | 田一鸣 | Electrical power system safety operation intelligent monitoring device and monitoring method thereof |
CN101458502A (en) * | 2008-12-30 | 2009-06-17 | 湖南省电力公司湘潭电业局 | Electrical power system standardized work intelligent control method and special equipment |
EP2685328A1 (en) * | 2012-07-10 | 2014-01-15 | Siemens Aktiengesellschaft | User interface of an automation system and a method |
Also Published As
Publication number | Publication date |
---|---|
CN104166894B (en) | 2016-08-24 |
CN105629935B (en) | 2018-03-30 |
CN105629935A (en) | 2016-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Patsakis et al. | Optimal black start allocation for power system restoration | |
CN105449867B (en) | A kind of visualized operation process monitoring anti-error system and control method | |
Dehghani et al. | Multi-stage resilience management of smart power distribution systems: A stochastic robust optimization model | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
JP2016192891A (en) | System and methods for improved demand response management system (drms) | |
CN102968696A (en) | Marketing-distribution-dispatch business system information fusion and application method | |
CN103839117B (en) | A kind of distribution network reliability and its investment sensitivity analysis determine method | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
Fan et al. | N-1-1 contingency-constrained optimal power flow by interdiction methods | |
CN105978147B (en) | The long-range fixed value modification system of automatic safety device based on file interaction | |
CN108898239A (en) | A kind of site selection method for distribution transformer based on data analysis | |
CN114841627B (en) | Maintenance plan checking method, device, equipment and storage medium | |
CN106446298A (en) | Data management method and device based on PDM (Pulse Duration Modulation) | |
CN109002901A (en) | A kind of province ground county's integration electric network information total management system and device | |
Zhou et al. | Robustness analysis of power system dynamic process and repair strategy | |
Zhao et al. | Online multi-stage decisions for robust power-grid operations under high renewable uncertainty | |
CN104166894A (en) | Power plant scheduling voice reporting method and system | |
CN111598377A (en) | Method and system for acquiring regional power grid reference risk on line | |
CN116128270A (en) | Power grid operation plan management method and device for multi-source data fusion | |
CN106953840B (en) | A kind of water power far controls platform method for preventing misoperation | |
CN110854848B (en) | Control aid decision-making method for distribution network scheduling load | |
CN113191692A (en) | Intelligent management system and method for power failure dispatching plan | |
CN101615361B (en) | Method for designing dispatcher training architecture based on service drive | |
Ning et al. | Design and application of comprehensive evaluation index system of smart grid based on coordinated planning of major network and power distribution network | |
CN107565579B (en) | Multi-source cooperative management and control system and method for improving reactive voltage control level |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |