CN104164890A - Large deepwater prefabricated bearing platform installation device - Google Patents
Large deepwater prefabricated bearing platform installation device Download PDFInfo
- Publication number
- CN104164890A CN104164890A CN201310196663.0A CN201310196663A CN104164890A CN 104164890 A CN104164890 A CN 104164890A CN 201310196663 A CN201310196663 A CN 201310196663A CN 104164890 A CN104164890 A CN 104164890A
- Authority
- CN
- China
- Prior art keywords
- water
- steel
- prefabricated bearing
- steel pipe
- bearing platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
According to large water prefabricated bearing platform installation at present, a water stopping device is arranged below a preformed hole, cofferdam construction is carried out on the upper portion through steel pouring jackets, and when the depth of water exceeds 30 meters, the construction difficulty of the steel pouring jackets becomes larger along with the increasing of the depth of water. The invention provides a large deepwater prefabricated bearing platform installation device to meet requirements of deepwater bearing platform installation. Steel cylinders with the diameter larger than designed steel pipe piles by about 60 cm are pre-installed on the tops of preformed holes of prefabricated bearing platforms, the tops of the steel cylinders are higher than the highest water level by two to four meters, and water pumping pipes are installed in advance. After the prefabricated bearing platforms are placed to the designed elevation positions, water in the preformed holes of the prefabricated bearing platforms is pumped away, and a manhole is formed in the bottoms of the redundant steel pipe piles. Shear keys are welded. The redundant steel pipe piles are cut off, and the redundant steel pipe piles are pulled out. After post-cast strip concrete is poured, and the steel cylinders and the water pumping pipes are pulled out.
Description
Technical field
The present invention relates to the prefabricated cushion cap erecting device of a kind of large-sized deep water.
Technical background
In current large-scale water, prefabricated cushion cap is installed as preformed hole bottom and establishes antipriming, constructs with steel boxed cofferdam in top, and when the depth of water is above over 30m, steel jacket box difficulty of construction is just along with the depth of water degree of depth increases and strengthens.
Summary of the invention
The needs of installing for solving the prefabricated cushion cap of deep water, the invention provides the prefabricated cushion cap erecting device of a kind of large-sized deep water.
The technical solution adopted for the present invention to solve the technical problems is that the steel cylinder that diameter is greater than design steel pipe pile 60cm left and right is installed in advance at the top of each prefabricated cushion cap preformed hole, steel cylinder top is higher than peak level 2-4m, drinking-water pipe is installed in advance, prefabricated cushion cap is put into design elevation, after drawing water in prefabricated cushion cap preformed hole, in unnecessary steel pipe pile bottom, open one and cross manhole, welding shear connector.Cut off unnecessary steel pipe pile and extract unnecessary steel pipe pile, building after the concrete of ater-casting, extracting steel cylinder, drinking-water pipe.
The invention has the beneficial effects as follows, simple in structure, can meet the prefabricated cushion cap of deep water needs are installed.
Accompanying drawing explanation
Fig. 1 is the prefabricated cushion cap erecting device of large-sized deep water plan view
Fig. 2 is the prefabricated cushion cap of the prefabricated cushion cap erecting device of large-sized deep water sectional drawing while putting into
Fig. 3 is that the unnecessary steel pipe pile of the prefabricated cushion cap erecting device of large-sized deep water is extracted rear sectional drawing
Fig. 4 is sectional drawing after the concreting of the prefabricated cushion cap preformed hole of the prefabricated cushion cap erecting device of large-sized deep water
Fig. 5 is that the prefabricated cushion cap erecting device of large-sized deep water steel cylinder is extracted rear sectional drawing
In figure: 1. prefabricated cushion cap; 2. prefabricated cushion cap preformed hole; 3. steel pipe pile; 4. antipriming; 5. steel cylinder; 6. preformed hole concrete seven. shear connector; 8. drinking-water pipe; 9. cross manhole.
Specific implementation method
In prefabricated cushion cap preformed hole (2) bottom, antipriming (4) is installed, steel cylinder (5), drinking-water pipe (8) are installed at prefabricated cushion cap preformed hole (2) top, prefabricated cushion cap preformed hole (2) is inserted in to steel pipe pile (3) outside, after drawing water, in unnecessary steel pipe pile (3) bottom, cut one and cross manhole (9), with shear connector (7) and steel pipe pile (3), prefabricated cushion cap (1) welding.Cut off unnecessary steel pipe pile (3) and extract, building preformed hole concrete (6), pulling out steel cylinder (5), drinking-water pipe (8).
Claims (1)
1. the prefabricated cushion cap erecting device of large-sized deep water, is characterized in that establishing a steel cylinder at prefabricated cushion cap preformed hole top, and the crest level of steel cylinder is higher than peak level elevation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310196663.0A CN104164890A (en) | 2013-05-17 | 2013-05-17 | Large deepwater prefabricated bearing platform installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310196663.0A CN104164890A (en) | 2013-05-17 | 2013-05-17 | Large deepwater prefabricated bearing platform installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104164890A true CN104164890A (en) | 2014-11-26 |
Family
ID=51908863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310196663.0A Pending CN104164890A (en) | 2013-05-17 | 2013-05-17 | Large deepwater prefabricated bearing platform installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104164890A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106245667A (en) * | 2016-09-20 | 2016-12-21 | 国网浙江省电力公司经济技术研究院 | A small-sized clump of piles and the attachment structure of cushion cap |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0046418A1 (en) * | 1980-07-09 | 1982-02-24 | COYNE ET BELLIER Bureau d'Ingénieurs Conseils | Anchoring method and foundation device for a platform, especially a mobile one |
KR100744693B1 (en) * | 2005-10-24 | 2007-08-01 | (주) 선암기술연구소 | Concrete-steel house and pile foundation footing construction method using thereof |
CN101476327A (en) * | 2009-01-09 | 2009-07-08 | 广州市市政集团有限公司 | Subaqueous bearing platform construction method |
CN101476326A (en) * | 2009-01-23 | 2009-07-08 | 广州市市政集团有限公司 | Bearing platform prefabrication and construction method |
US20120003048A1 (en) * | 2008-12-12 | 2012-01-05 | Hosoey Oeyvind | Devices and method for equipment foundation in the sea bed |
-
2013
- 2013-05-17 CN CN201310196663.0A patent/CN104164890A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0046418A1 (en) * | 1980-07-09 | 1982-02-24 | COYNE ET BELLIER Bureau d'Ingénieurs Conseils | Anchoring method and foundation device for a platform, especially a mobile one |
KR100744693B1 (en) * | 2005-10-24 | 2007-08-01 | (주) 선암기술연구소 | Concrete-steel house and pile foundation footing construction method using thereof |
US20120003048A1 (en) * | 2008-12-12 | 2012-01-05 | Hosoey Oeyvind | Devices and method for equipment foundation in the sea bed |
CN101476327A (en) * | 2009-01-09 | 2009-07-08 | 广州市市政集团有限公司 | Subaqueous bearing platform construction method |
CN101476326A (en) * | 2009-01-23 | 2009-07-08 | 广州市市政集团有限公司 | Bearing platform prefabrication and construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106245667A (en) * | 2016-09-20 | 2016-12-21 | 国网浙江省电力公司经济技术研究院 | A small-sized clump of piles and the attachment structure of cushion cap |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103742157A (en) | Method of newly building underground space under ground by pipe jacking method | |
CN103132537A (en) | Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method | |
CN202689031U (en) | Deep foundation pit retaining and protecting retaining wall | |
CN101705687B (en) | Deep foundation pit reinforced concrete waist rail detaching device and construction method | |
CN105780802A (en) | Jacket offshore wind turbine foundation with brackets and construction method thereof | |
CN104480958A (en) | Bridge prefabricated bearing platform and bridge construction method | |
CN204898672U (en) | Discard device of pulling out of pile foundation | |
CN201144418Y (en) | Special guide sleeve for hydraulic pressure raising and lining | |
CN103174141B (en) | Intertidal zone beam lower supporting frame steel pipe pile pulling-out device | |
CN204212177U (en) | A kind of double doing in the hole of stand column pile cheats diaphragm wall structure | |
CN204456160U (en) | A kind of bridge prefabrication cushion cap | |
CN211285664U (en) | I-shaped steel counterforce device for underground diaphragm wall | |
CN105625429A (en) | Pile pulling device and application method thereof | |
CN104164890A (en) | Large deepwater prefabricated bearing platform installation device | |
CN203034476U (en) | Tower crane base structure in type of combination of steel latticework columns and concrete bearing platform shaped like Chinese character 'hui' | |
CN202108045U (en) | Sleeve pipe with anchor rod penetrating through underground continuous wall | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN204040042U (en) | A kind of super large ultra-deep support with manually dug piles structure | |
CN104153366B (en) | The method of a kind of marine high wind wave high strength naked rock steel pipe pile foundation | |
CN104164887A (en) | Large deepwater prefabricated bearing platform installation device | |
CN206721891U (en) | Ground-connecting-wall goes along with sb. to guard him foundation ditch steel pipe support structure | |
CN214994007U (en) | Bridge steel protects a section of thick bamboo and steel reinforcement cage and is connected locating rack | |
CN205421332U (en) | Contrary coincide underground continuous wall that does of a core section of thick bamboo | |
CN213477808U (en) | Structure is found fast to steel construction underground garage | |
CN211713955U (en) | Slip casting type steel pipe screw pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141126 |