CN104141401B - A kind of method of the emergency-sheltering being applicable to winter cities - Google Patents

A kind of method of the emergency-sheltering being applicable to winter cities Download PDF

Info

Publication number
CN104141401B
CN104141401B CN201410309435.4A CN201410309435A CN104141401B CN 104141401 B CN104141401 B CN 104141401B CN 201410309435 A CN201410309435 A CN 201410309435A CN 104141401 B CN104141401 B CN 104141401B
Authority
CN
China
Prior art keywords
building
temporary habitation
preburied
component
habitation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410309435.4A
Other languages
Chinese (zh)
Other versions
CN104141401A (en
Inventor
孙澄
范乐
梁静
刘莹
张冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201410309435.4A priority Critical patent/CN104141401B/en
Publication of CN104141401A publication Critical patent/CN104141401A/en
Application granted granted Critical
Publication of CN104141401B publication Critical patent/CN104141401B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Emergency Lowering Means (AREA)

Abstract

A kind of method of the emergency-sheltering being applicable to winter cities.The present invention proposes a kind of pre-buried system of taking precautions against natural calamities being adapted to cold ground local climate feature, comprises the following aspects: preburied component is built in water-feeding drainaging line, heating line, blowdown pipeline, communication and power system, building for temporary habitation, preparation component built by building for temporary habitation;The crowd that takes refuge when occurring with reply burst fire-disaster, to basic living, the demand of Winter protection, does not affect Waiting space normal use at ordinary times simultaneously;Building for temporary habitation can be built rapidly when disaster occurs preparation component build rapidly for fixed system with preburied component, and open underground preburied tubing, meet the residential needs of the crowd that takes refuge.Present invention have an advantage that while winter cities sheltering rescue base the most normally uses, it is possible to emergency during reply calamity rapidly;For the outdoor temperature that winter cities winter is extremely low, provide sufficient warming condition for the crowd of taking refuge;Solve the inhabitation crowd demand to basic living when taking refuge.

Description

A kind of method of the emergency-sheltering being applicable to winter cities
Technical field
The invention belongs to winter cities prevention technique field, be specifically related to a kind of be applicable to the emergent of winter cities The method taken refuge.
Background technology
Along with China's rapid economic development in recent years, the threat that City Disasters brings to Loss of Life and property is more Can not look down upon.The Chinese government, from policy making to city guard against disaster infrastructure construction, all increases and prevents city The investment of calamity System Construction, has promoted the development of the cause of preventing and reducing natural disasters.The field of taking refuge that each main cities is built Greatly improve the redundancy ability in city especially.Domestic existing act of rescue space only possesses the most single Collecting and distributing function, the adaptability to changes shortcoming of reply disaster.When Waiting space needs to provide the long period for the crowd of taking refuge Living guarantee time, the tent-type Habitation form that is now provided that lacks the necessary facility such as water, electricity, communication.From cold The angle of ground city district feature is set out, and winter, outdoor temperature was extremely low, and heating is had higher by the crowd that takes refuge Requirement, this is also that act of rescue space cannot meet.Disaster has sudden strong feature, all kinds of things simultaneously Matter resource usually faces the present situation stocking deficiency, in Wenchuan earthquake, the rare of relief goods has fully been confirmed this Hidden danger.
In current present situation, it is primarily present following two problem: in the face of burst fire-disaster, emergency shelter Lack rapid adaptability to changes;In the face of the weather conditions that area, China cold ground is unique, the such as winter of severe cold, meeting Occur that the exceedingly odious weather condition of strong wind heavy snow, conventional emergency shelter do not have corresponding counter-measure.
Summary of the invention
The technical problem to be solved is to make up above-mentioned the deficiencies in the prior art, proposes one and is adapted to tremble with fear Ground local climate feature pre-buried system of taking precautions against natural calamities, with tackle burst fire-disaster occur time take refuge crowd to basic living, The demand of Winter protection, does not affect Waiting space normal use at ordinary times simultaneously;When disaster occurs can rapidly by Building for temporary habitation is built preparation component and is built rapidly for fixed system with preburied component, and opens underground preburied pipe Road system, meets the residential needs of the crowd that takes refuge.
Pre-buried system of taking precautions against natural calamities in the present invention comprises the following aspects: water-feeding drainaging line, heating line, blow-off pipe Preburied component is built in line, communication and power system, building for temporary habitation, preparation component built by building for temporary habitation.
The method of a kind of emergency-sheltering being applicable to winter cities of the present invention, comprises the steps:
Step one, select pre-buried place
Select the emergency-sheltering district of community-level or community-level ratings above as pre-buried field in winter cities is planned Ground;The openst meadow or level land is selected to carry out burying work beforehand;
Step 2, pre-buried corollary equipment
Special climate condition according to winter cities, pre-buried corollary equipment, described pre-buried corollary equipment include to Preburied component built by flowing line, heating line, blowdown pipeline, communication and power system and building for temporary habitation;
Step 3, formulate pre-buried principle
Completing the planning in advance to pre-buried place before pre-buried, described open space planning refers to when disaster occurs interim The arrangement mode of house;The principle considered is that dense population evacuates required reserved road distance, house arrangement mode And clean dirty partition requirements of living;
Step 4, stock building for temporary habitation and build preparation component
Rationalization partition is carried out, when stocking calamity needed for building for temporary habitation at the material storage of taking refuge in act of rescue place Supporting member, maintenance component and linkage members;
Preburied component arrangement mode built by step 5, formulation building for temporary habitation
Building for temporary habitation is built preburied component and is flushed with grassland soil in the non-disaster period pre-buried degree of depth, the non-disaster period Being closed by hollow inside groove, disaster completes to open rapidly use when occurring;Rationally it is subject to according to default interim inhabitation house Preburied component built by force arrangement building for temporary habitation;
Step 6, formulation pipeline arrangement mode
All kinds of preheating embedding lines arrange external-connected port by preset need, and the non-disaster period carries out shallow-layer labelling on ground, Utilizing when being easy to calamity and avoid destroying at ordinary times, disaster carries out rapidly secondary when occurring and builds, and meets crowd's need of taking refuge Ask;Pipeline external-connected port is built preburied component position and is combined, by circuit when secondary is built with building for temporary habitation Concentrating in preburied component, when being beneficial to calamity, all kinds of circuits are rationally arranged;
When step 7, calamity, emergency function starts rapidly
When disaster occurs, open building for temporary habitation preburied component 1 immediately, by building for temporary habitation preburied component protection suite 13 remove;With building for temporary habitation build preburied component for guide, secondary builds circuit;Open and external underground preburied Tubing 6;Installing preparation supporting member 2, supporting member 2 arranges for hollow, guides the most external underground preburied Tubing 6;Preparation fender member, i.e. assembled fender member 4 are installed;Open building for temporary habitation supporting member 2 Contained prefabricated rod member preheating embedding line interface 9, guides underground preburied tubing 6 to install preparation flowing line, heating The overground part of pipeline, blowdown pipeline, communication and power system;Connect according to pipeline inside building for temporary habitation External equipment;
Described building for temporary habitation is built preburied component and is configured to: preburied component 1 built by building for temporary habitation is building for temporary habitation Fixing component;For hollow internal groove structure, connect hole 8, during non-disaster containing building for temporary habitation preburied component is reserved Section is covered by building for temporary habitation preburied component protection suite 13, the internal pre-buried tubing 6 connecting underground, top Flush with ground 7;
Described building for temporary habitation is built framework and is configured to: building for temporary habitation is built preparation component structure and is divided into building for temporary habitation Supporting member 2, building for temporary habitation lateral ties component 3 and assembled fender member 4;Building for temporary habitation supporting member 2 Being engaged linking with the hollow inside groove of building for temporary habitation preburied component 1, fixing building for temporary habitation preburied component reserves connecting hole Hole 8;Overlap joint fixing building for temporary habitation lateral ties component 3;Overlap joint fixing assembled fender member 4, safeguard Component packing material is chromatic steel sandwich plate;
Described pipeline with the bonding relation of building for temporary habitation is: the non-disaster period, underground preburied tubing 6 is connect Mouth is arranged in building for temporary habitation preburied component 1;When disaster occurs, open underground preburied tubing 6, pass through Secondary builds entrance building for temporary habitation supporting member 2;Pre-buried by the prefabricated rod member of house according to indoor functional requirement difference Underground preburied tubing 6 is drawn by pipeline interface 9, external corresponding function equipment.
Present invention have an advantage that while winter cities sheltering rescue base the most normally uses, it is possible to fast Emergency during speed reply calamity;For the outdoor temperature that winter cities winter is extremely low, provide sufficient for the crowd of taking refuge Warming condition;Solve the inhabitation crowd demand to basic living when taking refuge.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that framework built by building for temporary habitation;
Fig. 2 is the schematic diagram of pipeline and the spatial relationship of house prefabricated components;
Fig. 3 is the schematic diagram of house prefabricated components detail structure;
Fig. 4 is the schematic diagram that preburied component node built by building for temporary habitation.
In figure, 1 is building for temporary habitation preburied component, and 2 is building for temporary habitation supporting member, and 3 laterally join for building for temporary habitation Being component, 4 is assembled maintenance component, and 5 are connected reserving hole, 6 underground preburied pipes for chromatic steel sandwich plate Road system, 7 ground, 8 connect hole for building for temporary habitation preburied component is reserved, and 9 is that the prefabricated rod member of house is pre- Buried pipeline interface, 10 above-ground line systems, 11 is building for temporary habitation preburied component connector, and 13 is interim House preburied component protection suite.
Detailed description of the invention
Below in conjunction with Figure of description 1-3 and detailed description of the invention, the present invention is described in more details. The method of a kind of emergency-sheltering being applicable to winter cities of the present invention, comprises the steps:
Step one, select pre-buried place
Select the emergency-sheltering district of community-level and ratings above as pre-buried place in winter cities is planned;Select The openst meadow or level land carry out burying work beforehand;
Step 2, pre-buried corollary equipment
Special climate condition according to winter cities, pre-buried corollary equipment, described pre-buried corollary equipment include to Preburied component built by flowing line, heating line, blowdown pipeline, communication and power system and building for temporary habitation;
Step 3, formulate pre-buried principle
Completing the planning in advance to pre-buried place before pre-buried, described open space planning refers to when disaster occurs interim The arrangement mode of house;The principle considered is that dense population evacuates required reserved road distance, house arrangement mode And clean dirty partition requirements of living;
Step 4, stock building for temporary habitation and build preparation component
Rationalization partition is carried out, when stocking calamity needed for building for temporary habitation at the material storage of taking refuge in act of rescue place Supporting member, maintenance component and linkage members;
Preburied component arrangement mode built by step 5, formulation building for temporary habitation
Building for temporary habitation is built preburied component and is flushed with grassland soil in the non-disaster period pre-buried degree of depth, the non-disaster period Being closed by hollow inside groove, disaster completes to open rapidly use when occurring;Rationally it is subject to according to default interim inhabitation house Preburied component built by force arrangement building for temporary habitation;
Step 6, formulation pipeline arrangement mode
All kinds of preheating embedding lines arrange external-connected port by preset need, and the non-disaster period carries out shallow-layer labelling on ground, Utilizing when being easy to calamity and avoid destroying at ordinary times, disaster carries out rapidly secondary when occurring and builds, and meets crowd's need of taking refuge Ask;Pipeline external-connected port is built preburied component position and is combined with building for temporary habitation, can be by line when secondary is built Road concentrates in preburied component, and when being beneficial to calamity, all kinds of circuits are rationally arranged;
When step 7, calamity, emergency function starts rapidly
(1), when disaster occurs, building for temporary habitation preburied component 1 is opened immediately, by building for temporary habitation preburied component protection suite 13 remove;(2) with building for temporary habitation build preburied component for guide, secondary builds circuit;Open and pre-under external ground Bury tubing 6;(3) installing preparation supporting member 2, supporting member 2 arranges for hollow, guides under external ground Pre-buried tubing 6;(4) preparation fender member, i.e. assembled fender member 4 are installed;(5) open building for temporary habitation to prop up Prefabricated rod member preheating embedding line interface 9 contained by support component 2, guides underground preburied tubing 6 to install preparation drain pipe The overground part of line, heating line, blowdown pipeline, communication and power system;(6) the internal root of building for temporary habitation External equipment is linked according to pipeline;
Described building for temporary habitation is built preburied component and is configured to: preburied component 1 built by building for temporary habitation is building for temporary habitation Fixing component;For hollow internal groove structure, connect hole 8, during non-disaster containing building for temporary habitation preburied component is reserved Section is covered by building for temporary habitation preburied component protection suite 13, internal connects underground preburied tubing 6, top with Ground 7 flushes;
Framework built by described building for temporary habitation: building for temporary habitation is built preparation component structure and is divided into building for temporary habitation to support Component 2, building for temporary habitation lateral ties component 3 and assembled fender member 4;Building for temporary habitation supporting member 2 with face Time house preburied component 1 the occlusion linking of hollow inside groove, fixing building for temporary habitation preburied component is reserved connects hole 8; Overlap joint fixing building for temporary habitation lateral ties component 3;Overlap joint fixing assembled fender member 4, maintenance component is filled out Filling material is chromatic steel sandwich plate;
Described pipeline with the bonding relation of building for temporary habitation is: the non-disaster period, underground preburied tubing 6 is connect Mouth is arranged in building for temporary habitation preburied component 1;When disaster occurs, open underground preburied tubing 6, pass through Secondary builds entrance building for temporary habitation supporting member 2;Pre-buried by the prefabricated rod member of house according to indoor functional requirement difference Underground preburied tubing 6 is drawn by pipeline interface 9, external corresponding function equipment.

Claims (1)

1. the method being applicable to the emergency-sheltering of winter cities, comprises the steps:
Step one, select pre-buried place
Select the emergency-sheltering district of community-level or community-level ratings above as pre-buried field in winter cities is planned Ground;The openst meadow or level land is selected to carry out burying work beforehand;
Step 2, pre-buried corollary equipment
Special climate condition according to winter cities, pre-buried corollary equipment, described pre-buried corollary equipment include to Preburied component built by flowing line, heating line, blowdown pipeline, communication and power system and building for temporary habitation;
Step 3, formulate pre-buried principle
Completing the planning in advance to pre-buried place before pre-buried, described open space planning refers to when disaster occurs interim The arrangement mode of house;The principle considered is that dense population evacuates required reserved road distance, house arrangement mode And clean dirty partition requirements of living;
Step 4, stock building for temporary habitation and build preparation component
Rationalization partition is carried out, when stocking calamity needed for building for temporary habitation at the material storage of taking refuge in act of rescue place Supporting member, maintenance component and linkage members;
Preburied component arrangement mode built by step 5, formulation building for temporary habitation
Building for temporary habitation is built preburied component and is flushed with grassland soil in the non-disaster period pre-buried degree of depth, the non-disaster period Being closed by hollow inside groove, disaster completes to open rapidly use when occurring;Rationally it is subject to according to default interim inhabitation house Preburied component built by force arrangement building for temporary habitation;
Step 6, formulation pipeline arrangement mode
All kinds of preheating embedding lines arrange external-connected port by preset need, and the non-disaster period carries out shallow-layer labelling on ground, Utilizing when being easy to calamity and avoid destroying at ordinary times, disaster carries out rapidly secondary when occurring and builds, and meets crowd's need of taking refuge Ask;Pipeline external-connected port is built preburied component position and is combined, by circuit when secondary is built with building for temporary habitation Concentrating in preburied component, when being beneficial to calamity, all kinds of circuits are rationally arranged;
When step 7, calamity, emergency function starts rapidly
When disaster occurs, open building for temporary habitation preburied component (1) immediately, by building for temporary habitation preburied component protection suite (13) remove;With building for temporary habitation build preburied component for guide, secondary builds circuit;Open and external underground preburied Tubing (6);Installing preparation supporting member (2), supporting member is that hollow is arranged, and guides the most external underground preburied Tubing (6);Preparation fender member, i.e. assembled fender member (4) are installed;Open building for temporary habitation supporting member (2) prefabricated rod member preheating embedding line interface (9) contained by, guide underground preburied tubing (6) install preparation flowing line, The overground part of heating line, blowdown pipeline, communication and power system;According to pipeline inside building for temporary habitation Connect external equipment;
Described building for temporary habitation is built preburied component and is configured to: preburied component (1) built by building for temporary habitation is consolidating of building for temporary habitation Determine component;For hollow internal groove structure, connect hole (8), non-disaster period containing building for temporary habitation preburied component is reserved Covered by building for temporary habitation preburied component protection suite (13), the internal underground preburied tubing (6) that connects, top and ground Face (7) flushes;
Described building for temporary habitation is built framework and is configured to: building for temporary habitation is built preparation component structure and is divided into building for temporary habitation Supporting member (2), building for temporary habitation lateral ties component (3) and assembled fender member (4);Building for temporary habitation supporting member (2) the hollow inside groove with building for temporary habitation preburied component (1) is engaged linking, and fixing building for temporary habitation preburied component is reserved to be connected Hole (8);Overlap joint fixing building for temporary habitation lateral ties component (3);Overlap joint fixing assembled fender member (4), Maintenance component packing material is chromatic steel sandwich plate;
Described pipeline with the bonding relation of building for temporary habitation is: the non-disaster period, underground preburied tubing (6) is connect Mouth is arranged in building for temporary habitation preburied component (1);When disaster occurs, open underground preburied tubing (6), logical Cross secondary and build entrance building for temporary habitation supporting member (2);According to indoor functional requirement difference by the prefabricated rod member of house Underground preburied tubing (6) is drawn by preheating embedding line interface (9), external corresponding function equipment.
CN201410309435.4A 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities Active CN104141401B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410309435.4A CN104141401B (en) 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410309435.4A CN104141401B (en) 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities

Publications (2)

Publication Number Publication Date
CN104141401A CN104141401A (en) 2014-11-12
CN104141401B true CN104141401B (en) 2016-11-23

Family

ID=51850718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410309435.4A Active CN104141401B (en) 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities

Country Status (1)

Country Link
CN (1) CN104141401B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106599467B (en) * 2016-12-14 2020-03-24 哈尔滨工业大学 Design method for building structure in severe cold region based on multi-objective optimization algorithm

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020139056A1 (en) * 2001-03-05 2002-10-03 Finnell Lee M. Fire protection system
CN102031830B (en) * 2010-12-28 2012-09-26 哈尔滨工业大学 Setting method of steel tube and hole-opening end plate embedded part
CN102486062A (en) * 2011-07-25 2012-06-06 赵树 Equipment capable of preventing disaster and protecting personal and property safety
CN203175130U (en) * 2013-01-30 2013-09-04 陈开泰 Building disaster relief emergency house
CN203475913U (en) * 2013-09-22 2014-03-12 青岛科技大学 Household emergency escape system
CN203487845U (en) * 2013-09-29 2014-03-19 李恒光 Spherical building with anti-disaster function
CN203514905U (en) * 2013-10-18 2014-04-02 李宝龄 Movable inflammables and explosives storage house
CN203569947U (en) * 2013-11-29 2014-04-30 薛艮奎 Refuge room

Also Published As

Publication number Publication date
CN104141401A (en) 2014-11-12

Similar Documents

Publication Publication Date Title
CN106337436A (en) Rectangular concrete comprehensive pipe gallery prefabricated pipe sections and machining method
Nadim et al. The bam earthquake of 26 December 2003
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
Kakderi et al. Fragility functions of water and waste-water systems
CN105386460A (en) Intelligent urban underground comprehensive pipe gallery
CN205477664U (en) Twin side heading method undercut tunnel utility tunnel
CN104141401B (en) A kind of method of the emergency-sheltering being applicable to winter cities
CN108193707A (en) A kind of comprehensive pipe gallery structure
CN106885093A (en) A kind of two-way plugging device of pipeline with strong sealing and its application method
CN205400736U (en) CRD undercut tunnel utility tunnel
CN206128117U (en) Prefabricated section of jurisdiction of rectangle concrete utility tunnel
CN205936320U (en) Bolt formula flood control device
CN212052861U (en) Underground comprehensive pipe gallery
JP3003772B2 (en) Water pipe bridge with emergency water storage function
CN205296215U (en) City underground intelligent integrated piping lane
Gordon Disposable infrastructure including relocatable buildings: Adapting to climate change
CN112343622A (en) Method for realizing underground space trenchless construction by adopting pre-constructed permanent shell
CN112814026A (en) Hidden vent structure of assembled utility tunnel
CN110541433A (en) Assembled underground pipe gallery
JP5632511B1 (en) Tsunami danger area shelter unit
CN109881709A (en) A kind of assembled rectangle pipe gallery and round pipe gallery T-section point
CN109183902B (en) Roof floor embedded permanent glass fiber reinforced plastic box type rainwater storage and utilization system
CN209816912U (en) Three-circular shield construction comprehensive pipe gallery
CN209975572U (en) Assembled rectangle utility tunnel and circular utility tunnel T shape node
Goel Use of underground space for the development of cities in India

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant