CN104141401A - Emergency shelter method suitable for winter cities - Google Patents

Emergency shelter method suitable for winter cities Download PDF

Info

Publication number
CN104141401A
CN104141401A CN201410309435.4A CN201410309435A CN104141401A CN 104141401 A CN104141401 A CN 104141401A CN 201410309435 A CN201410309435 A CN 201410309435A CN 104141401 A CN104141401 A CN 104141401A
Authority
CN
China
Prior art keywords
building
temporary habitation
temporary
habitation
preburied
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410309435.4A
Other languages
Chinese (zh)
Other versions
CN104141401B (en
Inventor
孙澄
范乐
梁静
刘莹
张冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201410309435.4A priority Critical patent/CN104141401B/en
Publication of CN104141401A publication Critical patent/CN104141401A/en
Application granted granted Critical
Publication of CN104141401B publication Critical patent/CN104141401B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an emergency shelter method suitable for winter cities. The invention provides a disaster prevention embedded system suitable for the climate features of clod areas. The disaster prevention embedded system comprises water supply and drainage pipelines, heating pipelines, sewage pipelines, communication and power systems, temporary housing building embedded components and temporary housing building preparing components. The requirements of sheltering people on basic living and winter heat insulation when unexpected disasters occur can be met, and meanwhile the ordinary normal use of refuge spaces can not be affected; when the disaster strikes, the temporary housing building preparing components can be used as a fixed system to be quickly built, and the embedded pipeline systems are turned on, so that the housing needs of the sheltering people are met. The emergency shelter method provided by the invention has the advantages that refuge rescue bases in winter cities can be normally used at ordinary times, and disaster emergencies can be quickly dealt with; for the winter extremely low outdoor temperature in winter cities, adequate heat insulation conditions are provided for the sheltering people; the requirements of housing people on basic living during sheltering are met.

Description

A kind of method of the emergency-sheltering that is applicable to city, cold ground
Technical field
The invention belongs to cold ground urban disaster prevention technical field, specifically relate to a kind of method of the emergency-sheltering that is applicable to city, cold ground.
Background technology
Along with China's rapid economic development in recent years, the threat that City Disasters brings to Loss of Life and property more can not look down upon.The Chinese government to urban disaster prevention infrastructure construction, has all strengthened the investment to urban disaster prevention System Construction from policy making, has promoted the development of the cause of preventing and reducing natural disasters.The shelter that build each main cities has greatly been improved the disaster tolerance ability in city especially.Domestic existing act of rescue space only possesses comparatively single collecting and distributing function, the strain capacity shortcoming of reply disaster.In the time that Waiting space need to provide the living guarantee of long period for the crowd of taking refuge, the tent-type inhabitation form that now can provide lacks the necessary facilities such as water, electricity, communication.From the angle of cold ground city district feature, winter, outside temperature was extremely low, and the crowd that takes refuge has higher requirement to heating, and this also cannot meet in linear act of rescue space.Disaster has sudden strong feature simultaneously, and all kinds of physical resources usually face stocks not enough present situation, rare this hidden danger of fully having confirmed to relief goods in Wenchuan earthquake.
In current present situation, mainly exist following two problems: in the face of burst fire-disaster, emergency shelter lacks strain capacity rapidly; In the face of the unique weather conditions in area, cold ground of China, for example winter and cold thereof, there will be the exceedingly odious weather condition of strong wind heavy snow, and conventional emergency shelter does not have corresponding counter-measure.
Summary of the invention
Technical problem to be solved by this invention is to make up above-mentioned the deficiencies in the prior art, a kind of pre-buried system of taking precautions against natural calamities that is adapted to cold ground local climate feature is proposed, the demand of crowd to basic living, Winter protection of taking refuge while generation with reply burst fire-disaster, does not affect Waiting space normal use at ordinary times simultaneously; In the time that disaster occurs, can rapidly building for temporary habitation be built to preparation member and build rapidly taking preburied component as fixed system, and open pre-buried pipe-line system, meet the crowd's that takes refuge inhabitation demand.
The pre-buried system of taking precautions against natural calamities in the present invention comprises the following aspects: water-feeding drainaging line, heating line, blowdown pipeline, communication and power system, building for temporary habitation are built preburied component, building for temporary habitation is built preparation member.
The method of a kind of emergency-sheltering that is applicable to city, cold ground of the present invention, comprises the steps:
Step 1, select pre-buried place
In the urban planning of cold ground, select the emergency-sheltering district of community-level or the above grade of community-level as pre-buried place; Select relatively open meadow or level land to carry out burying work beforehand;
Step 2, pre-buried corollary equipment
According to the special climate condition in city, cold ground, pre-buried corollary equipment, described pre-buried corollary equipment comprises that water-feeding drainaging line, heating line, blowdown pipeline, communication and power system and building for temporary habitation build preburied component;
Step 3, formulate pre-buried principle
Before pre-buried, complete the planning in advance to pre-buried place, described planning content refers to the arrangement mode of building for temporary habitation when disaster occurs; The principle of considering is that dense population is evacuated required reserved road distance, house arrangement mode and the clean dirty subregion demand of living;
Step 4, stock building for temporary habitation and build preparation member
Rationalization partition is carried out in material storage place of taking refuge in act of rescue place, required supporting member, maintenance component and the linkage members of building for temporary habitation while stocking calamity;
Step 5, formulation building for temporary habitation are built preburied component arrangement mode
Building for temporary habitation is built preburied component and is flushed with grassland soil in the pre-buried degree of depth of non-disaster period, and disaster completed rapid unlatching and used while generation by hollow inside groove closure the non-disaster period; Build preburied component according to the default reasonable stress point of the interim inhabitation house building for temporary habitation of arranging;
Step 6, formulation pipeline arrangement mode
All kinds of preheating embedding lines arrange external-connected port by preset need, and the non-disaster period is carried out shallow-layer mark on ground, utilize and avoid destroying at ordinary times while being convenient to calamity, carry out rapidly secondary and build when disaster occurs, and meet the crowd demand that takes refuge; Pipeline external-connected port is built preburied component position with building for temporary habitation and is combined, and when secondary is built, circuit is concentrated in preburied component, and while being beneficial to calamity, all kinds of circuits are rationally arranged;
When step 7, calamity, emergency function starts rapidly
When disaster occurs, open immediately building for temporary habitation preburied component 1, building for temporary habitation preburied component protection suite 13 is removed; Build preburied component as guiding taking building for temporary habitation, secondary is built circuit; Open and external pre-buried circuit 6; Preparation supporting member 2 is installed, and braced structures is hollow setting, guides external pre-buried circuit 6; Preparation fender member, i.e. assembly type fender member 4 are installed; Open building for temporary habitation supporting member 2 contained prefabricated rod member preheating embedding line interfaces 9, guide pre-buried circuit 6 that the overground part of preparation flowing line, heating line, blowdown pipeline, communication and power system is installed; Building for temporary habitation inside connects external equipment according to pipeline;
Described building for temporary habitation is built preburied component and is configured to: building for temporary habitation is built the fixed component that preburied component 1 is building for temporary habitation; For hollow internal groove structure, containing the reserved hole 8 that connects of building for temporary habitation preburied component, the non-disaster period is covered by building for temporary habitation preburied component protection suite 13, the underground preburied pipe-line system 6 of inner connection, and top flushes with ground 7;
Described building for temporary habitation is built belfry: building for temporary habitation is built preparation member structure and is divided into building for temporary habitation supporting member 2, building for temporary habitation lateral ties member 3 and assembly type fender member 4; Building for temporary habitation supporting member 2 is connected with the hollow inside groove interlock of building for temporary habitation preburied component 1, the reserved hole 8 that connects of fixing building for temporary habitation preburied component; Overlap joint fixing building for temporary habitation lateral ties member 3; Overlap joint fixing assembly type fender member 4, maintenance component packing material is chromatic steel sandwich plate;
The bonding relation of described pipeline and building for temporary habitation is: the non-disaster period, underground preburied pipe-line system 6 interfaces are arranged in building for temporary habitation preburied component 1; In the time that disaster occurs, open underground preburied pipe-line system 6, build and enter building for temporary habitation supporting member 2 by secondary; By the prefabricated rod member preheating embedding line of house interface 9, underground preburied pipe-line system 6 is drawn to external corresponding function equipment according to indoor functional requirement difference.
Advantage of the present invention is: when sheltering rescue base, city, cold ground is normally used at ordinary times, and emergency can tackle calamity rapidly time; For extremely low outside temperature chamber in winter, city, cold ground, for the crowd of taking refuge provides sufficient warming condition; Solve the demand of crowd to basic living of living while taking refuge.
Figure of description
Fig. 1 is the schematic diagram that building for temporary habitation is built framework;
Fig. 2 is the schematic diagram of the spatial relationship of pipeline and house prefabricated units;
Fig. 3 is the schematic diagram of house prefabricated units detail structure;
Fig. 4 is the schematic diagram that building for temporary habitation is built preburied component node;
In figure, 1 is building for temporary habitation preburied component, and 2 is building for temporary habitation supporting member, 3 is building for temporary habitation lateral ties members, and 4 is assembly type maintenance component, and 5 is chromatic steel sandwich plate linking reserving hole, 6 underground preburied pipe-line systems, 7 ground, 8 connect hole for building for temporary habitation preburied component is reserved, and 9 is the prefabricated rod member preheating embedding line of house interface, 10 above-ground line systems, 11 is building for temporary habitation preburied component connector, and 12 is building for temporary habitation embedded foundation, and 13 is building for temporary habitation preburied component protection suite;
Detailed description of the invention
Below in conjunction with Figure of description 1-3 and detailed description of the invention, the present invention is described in more details.
The method of a kind of emergency-sheltering that is applicable to city, cold ground of the present invention, comprises the steps:
Step 1, select pre-buried place
In the urban planning of cold ground, select the emergency-sheltering district of community-level and above grade as pre-buried place; Select relatively open meadow or level land to carry out burying work beforehand;
Step 2, pre-buried corollary equipment
According to the special climate condition in city, cold ground, pre-buried corollary equipment, described pre-buried corollary equipment comprises that water-feeding drainaging line, heating line, blowdown pipeline, communication and power system and building for temporary habitation build preburied component;
Step 3, formulate pre-buried principle
Before pre-buried, complete the planning in advance to pre-buried place, described planning content refers to the arrangement mode of building for temporary habitation when disaster occurs; The principle of considering is that dense population is evacuated required reserved road distance, house arrangement mode and the clean dirty subregion demand of living;
Step 4, stock building for temporary habitation and build preparation member
Rationalization partition is carried out in material storage place of taking refuge in act of rescue place, required supporting member, maintenance component and the linkage members of building for temporary habitation while stocking calamity;
Step 5, formulation building for temporary habitation are built preburied component arrangement mode
Building for temporary habitation is built preburied component and is flushed with grassland soil in the pre-buried degree of depth of non-disaster period, and disaster completed rapid unlatching and used while generation by hollow inside groove closure the non-disaster period; Build preburied component according to the default reasonable stress point of the interim inhabitation house building for temporary habitation of arranging;
Step 6, formulation pipeline arrangement mode
All kinds of preheating embedding lines arrange external-connected port by preset need, and the non-disaster period is carried out shallow-layer mark on ground, utilize and avoid destroying at ordinary times while being convenient to calamity, carry out rapidly secondary and build when disaster occurs, and meet the crowd demand that takes refuge; Pipeline external-connected port is built preburied component position with building for temporary habitation and is combined, and when secondary is built, circuit can be concentrated in preburied component, and while being beneficial to calamity, all kinds of circuits are rationally arranged;
When step 7, calamity, emergency function starts rapidly
(1) when disaster occurs, open immediately building for temporary habitation preburied component 1, building for temporary habitation preburied component protection suite 13 is removed; (2) build preburied component as guiding taking building for temporary habitation, secondary is built circuit; Open and external pre-buried circuit 6; (3) preparation supporting member 2 is installed, braced structures is hollow setting, guides external pre-buried circuit 6; (4) preparation fender member, i.e. assembly type fender member 4 are installed; (5) open building for temporary habitation supporting member 2 contained prefabricated rod member preheating embedding line interfaces 9, guide pre-buried circuit 6 that the overground part of preparation flowing line, heating line, blowdown pipeline, communication and power system is installed; (6) building for temporary habitation inside links external equipment according to pipeline;
Described building for temporary habitation is built preburied component and is configured to: building for temporary habitation is built the fixed component that preburied component 1 is building for temporary habitation; For hollow internal groove structure, containing the reserved hole 8 that connects of building for temporary habitation preburied component, the non-disaster period is covered by building for temporary habitation preburied component protection suite 13, the underground preburied pipe-line system 6 of inner connection, and top flushes with ground 7;
Described building for temporary habitation is built framework: building for temporary habitation is built preparation member structure and is divided into building for temporary habitation supporting member 2, building for temporary habitation lateral ties member 3 and assembly type fender member 4; Building for temporary habitation supporting member 2 is connected with the hollow inside groove interlock of building for temporary habitation preburied component 1, the reserved hole 8 that connects of fixing building for temporary habitation preburied component; Overlap joint fixing building for temporary habitation lateral ties member 3; Overlap joint fixing assembly type fender member 4, maintenance component packing material is chromatic steel sandwich plate;
The bonding relation of described pipeline and building for temporary habitation is: the non-disaster period, underground preburied pipe-line system 6 interfaces are arranged in building for temporary habitation preburied component 1; In the time that disaster occurs, open underground preburied pipe-line system 6, build and enter building for temporary habitation supporting member 2 by secondary; By the prefabricated rod member preheating embedding line of house interface 9, underground preburied pipe-line system 6 is drawn to external corresponding function equipment according to indoor functional requirement difference.

Claims (1)

1. a method that is applicable to the emergency-sheltering in city, cold ground, comprises the steps:
Step 1, select pre-buried place
In the urban planning of cold ground, select the emergency-sheltering district of community-level or the above grade of community-level as pre-buried place; Select relatively open meadow or level land to carry out burying work beforehand;
Step 2, pre-buried corollary equipment
According to the special climate condition in city, cold ground, pre-buried corollary equipment, described pre-buried corollary equipment comprises that water-feeding drainaging line, heating line, blowdown pipeline, communication and power system and building for temporary habitation build preburied component;
Step 3, formulate pre-buried principle
Before pre-buried, complete the planning in advance to pre-buried place, described planning content refers to the arrangement mode of building for temporary habitation when disaster occurs; The principle of considering is that dense population is evacuated required reserved road distance, house arrangement mode and the clean dirty subregion demand of living;
Step 4, stock building for temporary habitation and build preparation member
Rationalization partition is carried out in material storage place of taking refuge in act of rescue place, required supporting member, maintenance component and the linkage members of building for temporary habitation while stocking calamity;
Step 5, formulation building for temporary habitation are built preburied component arrangement mode
Building for temporary habitation is built preburied component and is flushed with grassland soil in the pre-buried degree of depth of non-disaster period, and disaster completed rapid unlatching and used while generation by hollow inside groove closure the non-disaster period; Build preburied component according to the default reasonable stress point of the interim inhabitation house building for temporary habitation of arranging;
Step 6, formulation pipeline arrangement mode
All kinds of preheating embedding lines arrange external-connected port by preset need, and the non-disaster period is carried out shallow-layer mark on ground, utilize and avoid destroying at ordinary times while being convenient to calamity, carry out rapidly secondary and build when disaster occurs, and meet the crowd demand that takes refuge; Pipeline external-connected port is built preburied component position with building for temporary habitation and is combined, and when secondary is built, circuit is concentrated in preburied component, and while being beneficial to calamity, all kinds of circuits are rationally arranged;
When step 7, calamity, emergency function starts rapidly
When disaster occurs, open immediately building for temporary habitation preburied component (1), building for temporary habitation preburied component protection suite (13) is removed; Build preburied component as guiding taking building for temporary habitation, secondary is built circuit; Open and external pre-buried circuit (6); Preparation supporting member (2) is installed, and braced structures is hollow setting, guides external pre-buried circuit (6); Preparation fender member, i.e. assembly type fender member (4) are installed; Open building for temporary habitation supporting member (2) contained prefabricated rod member preheating embedding line interfaces (9), guide pre-buried circuit (6) that the overground part of preparation flowing line, heating line, blowdown pipeline, communication and power system is installed; Building for temporary habitation inside connects external equipment according to pipeline;
Described building for temporary habitation is built preburied component and is configured to: it is the fixed component of building for temporary habitation that building for temporary habitation is built preburied component (1); For hollow internal groove structure, containing the reserved hole (8) that connects of building for temporary habitation preburied component, the non-disaster period is covered by building for temporary habitation preburied component protection suite (13), the inner underground preburied pipe-line system (6) that connects, and top flushes with ground (7);
Described building for temporary habitation is built belfry: building for temporary habitation is built preparation member structure and is divided into building for temporary habitation supporting member (2), building for temporary habitation lateral ties member (3) and assembly type fender member (4); Building for temporary habitation supporting member (2) is connected with the hollow inside groove interlock of building for temporary habitation preburied component (1), the reserved hole (8) that connects of fixing building for temporary habitation preburied component; Overlap joint fixing building for temporary habitation lateral ties member (3); Overlap joint fixing assembly type fender member (4), maintenance component packing material is chromatic steel sandwich plate;
The bonding relation of described pipeline and building for temporary habitation is: the non-disaster period, underground preburied pipe-line system (6) interface is arranged in building for temporary habitation preburied component (1); In the time that disaster occurs, open underground preburied pipe-line system (6), build and enter building for temporary habitation supporting member (2) by secondary; By the prefabricated rod member preheating embedding line of house interface (9), underground preburied pipe-line system (6) is drawn to external corresponding function equipment according to indoor functional requirement difference.
CN201410309435.4A 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities Active CN104141401B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410309435.4A CN104141401B (en) 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410309435.4A CN104141401B (en) 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities

Publications (2)

Publication Number Publication Date
CN104141401A true CN104141401A (en) 2014-11-12
CN104141401B CN104141401B (en) 2016-11-23

Family

ID=51850718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410309435.4A Active CN104141401B (en) 2014-07-02 2014-07-02 A kind of method of the emergency-sheltering being applicable to winter cities

Country Status (1)

Country Link
CN (1) CN104141401B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106599467A (en) * 2016-12-14 2017-04-26 哈尔滨工业大学 Building construction design method in severe cold areas based on multi-objective optimization algorithm

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020139056A1 (en) * 2001-03-05 2002-10-03 Finnell Lee M. Fire protection system
CN102031830A (en) * 2010-12-28 2011-04-27 哈尔滨工业大学 Setting method of steel tube and hole-opening end plate embedded part
CN102486062A (en) * 2011-07-25 2012-06-06 赵树 Equipment capable of preventing disaster and protecting personal and property safety
CN203175130U (en) * 2013-01-30 2013-09-04 陈开泰 Building disaster relief emergency house
CN203475913U (en) * 2013-09-22 2014-03-12 青岛科技大学 Household emergency escape system
CN203487845U (en) * 2013-09-29 2014-03-19 李恒光 Spherical building with anti-disaster function
CN203514905U (en) * 2013-10-18 2014-04-02 李宝龄 Movable inflammables and explosives storage house
CN203569947U (en) * 2013-11-29 2014-04-30 薛艮奎 Refuge room

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020139056A1 (en) * 2001-03-05 2002-10-03 Finnell Lee M. Fire protection system
CN102031830A (en) * 2010-12-28 2011-04-27 哈尔滨工业大学 Setting method of steel tube and hole-opening end plate embedded part
CN102486062A (en) * 2011-07-25 2012-06-06 赵树 Equipment capable of preventing disaster and protecting personal and property safety
CN203175130U (en) * 2013-01-30 2013-09-04 陈开泰 Building disaster relief emergency house
CN203475913U (en) * 2013-09-22 2014-03-12 青岛科技大学 Household emergency escape system
CN203487845U (en) * 2013-09-29 2014-03-19 李恒光 Spherical building with anti-disaster function
CN203514905U (en) * 2013-10-18 2014-04-02 李宝龄 Movable inflammables and explosives storage house
CN203569947U (en) * 2013-11-29 2014-04-30 薛艮奎 Refuge room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106599467A (en) * 2016-12-14 2017-04-26 哈尔滨工业大学 Building construction design method in severe cold areas based on multi-objective optimization algorithm
CN106599467B (en) * 2016-12-14 2020-03-24 哈尔滨工业大学 Design method for building structure in severe cold region based on multi-objective optimization algorithm

Also Published As

Publication number Publication date
CN104141401B (en) 2016-11-23

Similar Documents

Publication Publication Date Title
Mahdi et al. Reconstruction and retrofitting of buildings after recent earthquakes in Iran
Nadim et al. The bam earthquake of 26 December 2003
CN106337436A (en) Rectangular concrete comprehensive pipe gallery prefabricated pipe sections and machining method
Tang Izmit (Kocaeli), Turkey, earthquake of August 17, 1999 including Duzce earthquake of November 12, 1999: lifeline performance
Feroldi et al. Energy efficiency upgrading, architectural restyling and structural retrofit of modern buildings by means of “engineered” double skin façade
Jain et al. The September 29, 1993, M6. 4 Killari, Maharashtra Earthquake in Central India
Henry et al. THE 2016 MEINONG TAIWAN EARTHQUAKE: LEARNING FROM EARTHQUAKES REPORT.
CN104141401B (en) A kind of method of the emergency-sheltering being applicable to winter cities
JP2013147838A (en) Disaster prevention embankment infrastructure
CN203947593U (en) A kind of safety type steel structure node member
CN204001220U (en) A kind of steel structure node member
CN206128117U (en) Prefabricated section of jurisdiction of rectangle concrete utility tunnel
CN209816915U (en) Double-circular shield construction comprehensive pipe gallery
CN211948551U (en) Underground parking garage and urban tunnel co-construction structure
CN211057848U (en) Circular utility tunnel extensible structure of individual layer
GHAFOURI Editorial summary: Bam earthquake of 05: 26: 26 Of 26 December 2003, MS6. 5
CN209816912U (en) Three-circular shield construction comprehensive pipe gallery
JP5632511B1 (en) Tsunami danger area shelter unit
JP3003772B2 (en) Water pipe bridge with emergency water storage function
CN209227609U (en) Pipe gallery king's font concrete slab
CN109853582A (en) A kind of underground space temporary support structures
CN216839944U (en) Anti-waterlogging backward-flowing structure of medium and small-section cable trench
CN212248203U (en) Assembled ground that can reset by oneself is wall even
CN212052861U (en) Underground comprehensive pipe gallery
CN209975572U (en) Assembled rectangle utility tunnel and circular utility tunnel T shape node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant