CN104132592A - Heading pit secondary pressing top exploding method - Google Patents

Heading pit secondary pressing top exploding method Download PDF

Info

Publication number
CN104132592A
CN104132592A CN201410373543.8A CN201410373543A CN104132592A CN 104132592 A CN104132592 A CN 104132592A CN 201410373543 A CN201410373543 A CN 201410373543A CN 104132592 A CN104132592 A CN 104132592A
Authority
CN
China
Prior art keywords
cave
heading
pit
exploding
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410373543.8A
Other languages
Chinese (zh)
Inventor
张纪伟
崔宝荣
刘海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hualian Mining Co Ltd
Original Assignee
Shandong Hualian Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Hualian Mining Co Ltd filed Critical Shandong Hualian Mining Co Ltd
Priority to CN201410373543.8A priority Critical patent/CN104132592A/en
Publication of CN104132592A publication Critical patent/CN104132592A/en
Pending legal-status Critical Current

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention provides a heading pit secondary pressing top exploding method and belongs to the field of mine exploding methods. A heading pit is excavated, the depth of the heading pit is 2 m, then exploding holes which are distributed in an arc shape are punched at a heading pit inlet according to roadway size, the depth of the holes is 4 m, the part formed by the arc-shape-distributed exploding holes and the top of the heading pit forms a pressing top with the length of 4 m, stick explosives are arranged in the exploding holes, the space distance between two adjacent stick explosives is 0.7m, the stick explosives are connected to a detonating cord which extends to a safe detonating position outside the heading pit, six auxiliary hole layers are evenly punched at the part, shorter than the pressing top, of the heading pit, 11 groove holes which are distributed in a rectangular shape are punched in the middle of the part, accordingly, the stress structure of a rock layer is damaged, the processes are repeated until a roadway is excavated to the needed depth, vibration of blasting can be low, and a contour formed by blasting is good.

Description

Lead the blasting method of bearing down on one of cave secondary
Technical field
The invention provides a kind of cave secondary blasting method of bearing down on one of leading, belong to mine blasting method field.
Background technology
The construction of existing underworkings often adopts on the profile in the disposable tunnel in required construction and punches, and explosive is installed and is carried out explosion, but the stressed relation due to rock, very poor of the profile that enclosed blast can make tunnel, the required dynamics of destruction with bottom is excessive, can make the upwards active force of explosive increase, and the top in tunnel is damaged, and can cause compared with big bang, thereby cause the generation of other accidents.
Summary of the invention
The object of the invention is to provide a kind of cave secondary blasting method of bearing down on one of leading, and can make concussion of blasting profile little and that explosion forms good.
Of the present inventionly lead the blasting method of bearing down on one of cave secondary, it is characterized in that:
(1) excavate and to lead cave, the degree of depth that makes to lead cave is 2m, is then leading cave porch, is the blast hole of circular arc by tunnel size marking cloth, hole depth 4m, the blast hole that circular arc distributes with lead the part that sketch the contours of at cave top, form long the bearing down on one of 4m.
(2) explosive cartridge is installed in blast hole, between two adjacent explosive cartridges, is spaced apart 0.7m, explosive cartridge is all connected to primacord, and primacord extends to the safe detonation position of leading outside cave.
(3) be shorter than the part of bearing down on one and make a call to six layer via hole uniformly, and in the centre position of this part, make a call to the slotted eye of 11 rectangular distributions leading cave, with this, destroy the force structure of lithosphere.
(4) repeat above process, until the needed degree of depth is excavated in tunnel.
Described lead the blasting method of bearing down on one of cave secondary, first according to the profile in tunnel, excavate the cave of leading of a dark 2m, make bottom, tunnel have the part hollow of two meters, then at profile top, tunnel, explode holes, Yu Daodong top, hole has formed bears down on one, it by the severity control bearing down on one, at 4m, is the twice of leading cave, then to filling out in the blast hole bearing down on one, put explosive, beat via hole prolonging on the bearing of trend of leading cave excavation direction again, destroy the load-carrying members of the rock of the below of bearing down on one, the explosive photoface exploision of bearing down on one is so only installed at the place of bearing down on one, reduced the use amount of explosive, and destruction structure and gravity have been utilized, complete explosion, vibrations have been reduced, the cave of leading because of below only has half of bearing down on one simultaneously, and structural deterioration, support force upwards reduces, when explosive charge, just reduced the active force of explosive to top, tunnel, reduced the destruction to top, tunnel, guaranteed the integrality of tunnel profile.
The present invention compared with prior art beneficial effect is:
Described lead the blasting method of bearing down on one of cave secondary, first according to the profile in tunnel, excavate the cave of leading of a dark 2m, make bottom, tunnel have the part hollow of two meters, then at profile top, tunnel, explode holes, Yu Daodong top, hole has formed bears down on one, it by the severity control bearing down on one, at 4m, is the twice of leading cave, then to filling out in the blast hole bearing down on one, put explosive, beat via hole prolonging on the bearing of trend of leading cave excavation direction again, destroy the load-carrying members of the rock of the below of bearing down on one, the explosive photoface exploision of bearing down on one is so only installed at the place of bearing down on one, reduced the use amount of explosive, and destruction structure and gravity have been utilized, complete explosion, vibrations have been reduced, the cave of leading because of below only has half of bearing down on one simultaneously, and structural deterioration, support force upwards reduces, when explosive charge, just reduced the active force of explosive to top, tunnel, reduced the destruction to top, tunnel, guaranteed the integrality of tunnel profile.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention structural representation;
Fig. 2 is profile diagram of the present invention.
In figure: 1, mine; 2, lead cave; 3, bear down on one; 4, blast hole; 5, via hole; 6, slotted eye.
The specific embodiment
Below in conjunction with the present invention, the embodiment of the present invention is described further:
Embodiment 1: as depicted in figs. 1 and 2, of the present inventionly lead the blasting method of bearing down on one of cave secondary, it is characterized in that:
(1) on mine 1, excavate and lead cave 2, the degree of depth that makes to lead cave 2 is 2m, is then leading cave 2 porch, the blast hole 4 that is circular arc by tunnel size marking cloth, hole depth 4m, the blast hole 4 that circular arc distributes with lead the part that sketch the contours of at cave 2 tops, form long the bearing down on one of 4m.
(2) in blast hole 4, explosive cartridge is installed, between two adjacent explosive cartridges, is spaced apart 0.7m, explosive cartridge is all connected to primacord, and primacord extends to the safe detonation position of leading outside cave 2.
(3) be shorter than 3 the part of bearing down on one and make a call to six layer via hole 5 uniformly, and in the centre position of this part, make a call to the slotted eye 6 of 11 rectangular distributions leading cave 2, with this, destroy the force structure of lithosphere.
(4) repeat above process, until the needed degree of depth is excavated in tunnel.
Operating procedure and operation principle:
Described lead the blasting method of bearing down on one of cave secondary, that first according to the profile in tunnel, excavates a dark 2m leads cave 2, make bottom, tunnel have the part hollow of two meters, then at profile top, tunnel, explode holes 4, blast hole 4 with lead cave 2 tops and formed and bear down on one 3, by bearing down on one, 3 severity control is the twice of leading cave 2 at 4m, then to filling out in 3 the blast hole 4 of bearing down on one, put explosive, on the bearing of trend of leading cave 2 excavation directions, beat via hole 5 prolonging again, destroy the load-carrying members of the rock of 3 belows of bearing down on one, explosives 3 photoface exploisions of bearing down on one are so only installed at 3 places of bearing down on one, reduced the use amount of explosive, and destruction structure and gravity have been utilized, complete explosion, vibrations have been reduced, simultaneously because of below lead cave 2 only have bear down on one 3 half, and structural deterioration, support force upwards reduces, when explosive charge, just reduced the active force of explosive to top, tunnel, reduced the destruction to top, tunnel, guaranteed the integrality of tunnel profile.

Claims (1)

1. lead the blasting method of bearing down on one of cave secondary, it is characterized in that:
(1) excavate and to lead cave, the degree of depth that makes to lead cave is 2m, is then leading cave porch, is the blast hole of circular arc by tunnel size marking cloth, hole depth 4m, the blast hole that circular arc distributes with lead the part that sketch the contours of at cave top, form long the bearing down on one of 4m.
(2) explosive cartridge is installed in blast hole, between two adjacent explosive cartridges, is spaced apart 0.7m, explosive cartridge is all connected to primacord, and primacord extends to the safe detonation position of leading outside cave.
(3) be shorter than the part of bearing down on one and make a call to six layer via hole uniformly, and in the centre position of this part, make a call to the slotted eye of 11 rectangular distributions leading cave, with this, destroy the force structure of lithosphere.
(4) repeat above process, until the needed degree of depth is excavated in tunnel.
CN201410373543.8A 2014-07-31 2014-07-31 Heading pit secondary pressing top exploding method Pending CN104132592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410373543.8A CN104132592A (en) 2014-07-31 2014-07-31 Heading pit secondary pressing top exploding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410373543.8A CN104132592A (en) 2014-07-31 2014-07-31 Heading pit secondary pressing top exploding method

Publications (1)

Publication Number Publication Date
CN104132592A true CN104132592A (en) 2014-11-05

Family

ID=51805367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410373543.8A Pending CN104132592A (en) 2014-07-31 2014-07-31 Heading pit secondary pressing top exploding method

Country Status (1)

Country Link
CN (1) CN104132592A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089216A (en) * 2016-07-19 2016-11-09 北京交通大学 Rock tunnel breaks rock construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101191416A (en) * 2006-11-27 2008-06-04 杨仁树 Rock lane digging method
CN101568697A (en) * 2006-12-22 2009-10-28 山特维克矿山工程机械有限公司 Designing drilling pattern for excavating rock cavern
CN101846484A (en) * 2010-04-02 2010-09-29 攀钢集团冶金工程技术有限公司 Blasting method of driving, mining and cutting drift under ultrahard fault
CN102758633A (en) * 2011-04-29 2012-10-31 中国华冶科工集团有限公司 Construction method for large- cross section tunnel with better condition of surrounding rock

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101191416A (en) * 2006-11-27 2008-06-04 杨仁树 Rock lane digging method
CN101568697A (en) * 2006-12-22 2009-10-28 山特维克矿山工程机械有限公司 Designing drilling pattern for excavating rock cavern
CN101846484A (en) * 2010-04-02 2010-09-29 攀钢集团冶金工程技术有限公司 Blasting method of driving, mining and cutting drift under ultrahard fault
CN102758633A (en) * 2011-04-29 2012-10-31 中国华冶科工集团有限公司 Construction method for large- cross section tunnel with better condition of surrounding rock

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
侯宝宁: ""洮河九甸峡水利枢纽导流隧洞工程大断面爆破技术"", 《甘肃农业》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089216A (en) * 2016-07-19 2016-11-09 北京交通大学 Rock tunnel breaks rock construction method
CN106089216B (en) * 2016-07-19 2019-01-04 北京交通大学 Rock tunnel broken rock construction method

Similar Documents

Publication Publication Date Title
CN108007285B (en) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
CN104634199B (en) Method for realizing smooth blasting of tunnel peripheral eyes by using detonating cord and detonating tube detonator
CN103063094A (en) Channeling method in rapid roadway explosion
CN103940309A (en) Underground-blasting shaft forming method
CN202630821U (en) Directional energy collection fracture blasting device of lancing pipe
CN102927866B (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN103528444B (en) A kind of stope rockburst pressure relief prevention method
CN104406470B (en) Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method
CN104819670B (en) Pre-drilling mesopore shaft excavation blasting method
KR101551905B1 (en) Tunnel blasting pattern using large hole and small hole, and method for blasting of tunnel using this same
CN101419040A (en) Deep hole blasting method in large aperture composite undermine
CN103575172A (en) Novel roadway blasting construction method
CN202002580U (en) Directional control blasting cartridge roll
CN104390538A (en) Stress relief blasting method based on tunnel face notching
CN103868420A (en) Mine gallery driving cut blasting method
CN102269544A (en) One-end-closed cumulative blasting slotted pipe device
CN102374833A (en) Mine gallery excavation blasting method
CN104132592A (en) Heading pit secondary pressing top exploding method
CN102927863B (en) A kind of new method of total rock tunnel blasting construction
CN103075935B (en) Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel
CN101709939B (en) Initiation method of deep hole blasting for dismounting building
CN107367204B (en) Gneiss terrains circular reservoir photoface exploision and rock burst substep release method
CN103175450B (en) Deep hole blasting method
RU2705430C2 (en) Device for charging horizontal bumper
CN204478954U (en) A kind of down-hole tailing filling barricade Notch blasting steel for shot plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141105