CN104131514B - 一种钢板梁托架及施工方法 - Google Patents

一种钢板梁托架及施工方法 Download PDF

Info

Publication number
CN104131514B
CN104131514B CN201410400764.XA CN201410400764A CN104131514B CN 104131514 B CN104131514 B CN 104131514B CN 201410400764 A CN201410400764 A CN 201410400764A CN 104131514 B CN104131514 B CN 104131514B
Authority
CN
China
Prior art keywords
bracket
plate girder
variable cross
construction
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410400764.XA
Other languages
English (en)
Other versions
CN104131514A (zh
Inventor
张光桥
贾志坚
杨荣泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hi Speed Engineering Construction Group Co Ltd
Original Assignee
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luqiao Group Co Ltd filed Critical Shandong Luqiao Group Co Ltd
Priority to CN201410400764.XA priority Critical patent/CN104131514B/zh
Publication of CN104131514A publication Critical patent/CN104131514A/zh
Application granted granted Critical
Publication of CN104131514B publication Critical patent/CN104131514B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种钢板梁托架,为上钢板梁、腹板、下钢板梁从上至下焊接为一整体的变截面工字型结构,所述托架的腹板上开设有人孔;所述托架上设有若干加强筋;所述托架上设有若干预留孔;本发明还涉及一种应用钢板梁托架进行施工的方法,其包括钢板梁托架的安装使用步骤。本发明钢板梁结构不仅可以作为变截面连续箱梁0#段托架,还可用作变截面连续箱梁悬臂浇筑施工挂篮,通用性较强;作为施工挂篮用时,可提高该钢板梁托架的使用效率,经济性好;钢板梁结构整体设计科学,加工制造方便,满足运输要求。

Description

一种钢板梁托架及施工方法
技术领域
本发明属于交通工程新技术应用领域,特别涉及一种钢板梁托架及施工方法。
背景技术
目前国内在变截面连续箱梁0#段施工中通常采用钢管型钢支架。现有的钢管型钢支架存在以下问题:1、该支架结构需现场组拼,工作量较大;2、支架顶通过在墩柱上预埋钢板等构件进行锚固,对墩柱外观质量影响较大;3、该支架无法制作为标准专用设备,用途较单一;4、0#段支架与上部悬臂施工挂篮互为独立结构,不具有通用性,经济性较差。
发明内容
本发明为了解决现有技术存在的上述问题,提供一种钢板梁托架及施工方法。
本发明是通过以下技术方案实现的:
本一种钢板梁托架为上钢板梁、腹板、下钢板梁从上至下焊接为一整体的变截面工字型结构,所述托架的腹板上开设有人孔。
作为优化,所述托架上设有若干加强筋。
作为优化,所述托架上设有若干预留孔。
一种变截面连续箱梁施工用托架,包括通过精扎螺纹钢与墩柱锚固的左、右各两个托架,所述托架均通过立柱支撑于承台上,所述托架顶部为箱梁施工用模板系统,所述托架两端均配置专用工作平台。
作为优化,所述两个左托架之间以及两个右托架之间均设有横向连系。
作为优化,所述墩柱上设有用于支撑所述托架的牛腿。
一种变截面连续箱梁悬臂浇筑施工用挂篮,包括两组托架两两对接连接而成的单片挂篮结构,所述两组托架顶部连有横向连接的横梁,所述横梁上设有吊杆。
一种应用钢板梁托架进行施工的方法,包括以下步骤:
1)在施工完成的墩柱旁安装托架立柱或牛腿;
2)通过吊机逐片安装钢板梁托架,并采用精轧螺纹钢进行对拉锚固;
3)安装钢板梁托架横梁连系,加强横向稳定;
4)安装托架顶部箱梁施工用模板系统;
5)进行后续箱梁施工;
6)拆除钢板梁托架;
7)将钢板梁托架转移至桥面,组拼成挂篮,用于后续节段的施工。
本一种钢板梁托架及施工方法的有益效果是:
1、钢板梁结构不仅可以作为变截面连续箱梁0#段托架,还可用作变截面连续箱梁悬臂浇筑施工挂篮,通用性较强;
2、作为施工挂篮用时,可提高该钢板梁托架的使用效率,经济性好;
3、钢板梁结构整体设计科学,加工制造方便,满足运输要求。
附图说明
下面结合附图对本一种钢板梁托架及施工方法作进一步说明:
图1是本一种钢板梁托架的主视图结构示意图;
图2是本一种钢板梁托架的变截面工字梁结构的左视图结构示意图;
图3是本一种钢板梁托架的左视图结构示意图;
图4是本一种钢板梁托架的俯视图结构示意图;
图5是本一种变截面连续箱梁施工用托架的纵断面结构示意图;
图6是本一种变截面连续箱梁施工用托架的横断面结构示意图;
图7是本一种变截面连续箱梁悬臂浇筑施工用挂篮的纵断面结构示意图;
图8是本一种变截面连续箱梁悬臂浇筑施工用挂篮的横断面结构示意图。
图中:1为托架、1.1为上钢板梁、1.2为腹板、1.3为下钢板梁、1.4为人孔、2为精扎螺纹钢、3为立柱、4为墩柱、5为承台、6为箱梁施工用模板系统、7为专用工作平台、8为横向连系、9为横梁、10为吊杆。
具体实施方式
为使本发明的目的、技术方案及优点更加清楚明白,以下参照附图并举实施例,对本发明进一步详细说明。
实施例1:
如图1至图4所示,本一种钢板梁托架,该托架1为上钢板梁1.1、腹板1.2、下钢板梁1.3从上至下焊接为一整体的变截面工字型结构,托架1的腹板1.2上开设有人孔1.4;托架1上设有若干加强筋;托架1上设有若干预留孔。
实施例2:
如图5至图6所示,本一种变截面连续箱梁施工用托架,包括通过精扎螺纹钢2与墩柱4锚固的左、右各两个托架1,该托架1为上钢板梁1.1、腹板1.2、下钢板梁1.3从上至下焊接为一整体的变截面工字型结构,托架1的材质为高强度钢板,通过采用高强度材质,增强了托架的承载能力,满足变截面连续箱梁0#段各种工况施工需要;为方便现场作业人员操作,托架1的腹板1.2上开设有人孔1.4;托架1上设有若干加强筋;上钢板梁1.1上设有预留孔,腹板1.2端部两侧焊接包边,该包边的两端与上钢板梁1.1、下钢板梁1.3端部齐平,该包边与变截面工字型结构整体呈长方形,包边的上部和中下部设有预留孔;托架1均通过立柱3支撑于承台5上,托架1顶部为箱梁施工用模板系统6,托架1两端均配置专用工作平台7;两个左托架1之间以及两个右托架1之间均设有横向连系8,加强横向稳定;对于高墩结构,墩柱4上设有用于支撑所述托架1的牛腿。
墩柱4上设预留孔,通过在墩柱4上设置预留孔,采用精轧螺纹钢2与墩柱4对托架1进行锚固,不影响墩柱4外观质量。
实施例3:
如图7至图8所示,本一种变截面连续箱梁悬臂浇筑施工用挂篮,包括两组托架1两两对接连接而成的单片挂篮结构,该托架1为上钢板梁1.1、腹板1.2、下钢板梁1.3从上至下焊接为一整体的变截面工字型结构,托架1的腹板1.2上开设有人孔1.4;托架1上设有若干加强筋;腹板1.2端部两侧焊接包边,该包边的两端与上钢板梁1.1、下钢板梁1.3端部齐平,该包边与变截面工字型结构整体呈长方形,包边的上部和中下部设有预留孔;两组托架1顶部连有横向连接的横梁9,横梁9上设有吊杆10,形成完整的挂篮系统。
一种应用钢板梁托架进行施工的方法,包括以下步骤:
1)在施工完成的墩柱旁安装托架立柱或牛腿;
2)通过吊机逐片安装钢板梁托架,并采用精轧螺纹钢进行对拉锚固;
3)安装钢板梁托架横梁连系,加强横向稳定;
4)安装托架顶部箱梁施工用模板系统;
5)进行后续箱梁施工;
6)拆除钢板梁托架;
7)将钢板梁托架转移至桥面,组拼成挂篮,用于后续节段的施工。
上述具体实施方式仅是本发明的具体个案,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施方式。但是凡是未脱离本发明技术原理的前提下,依据本发明的技术实质对以上实施方式所作的任何简单修改、等同变化与改型,皆应落入本发明的专利保护范围。

Claims (8)

1.一种钢板梁托架,其特征在于:该托架(1)为上钢板梁(1.1)、腹板(1.2)、下钢板梁(1.3)从上至下焊接为一整体的变截面工字型结构,所述托架(1)的腹板(1.2)上开设有人孔(1.4)。
2.如权利要求1所述的一种钢板梁托架,其特征在于:所述托架(1)上设有若干加强筋。
3.如权利要求2所述的一种钢板梁托架,其特征在于:所述托架(1)上设有若干预留孔。
4.一种变截面连续箱梁施工用托架,其特征在于:包括通过精扎螺纹钢(2)与墩柱(4)锚固的如权利要求3的左、右各两个所述托架(1),所述托架(1)均通过立柱(3)支撑于承台(5)上,所述托架(1)顶部为箱梁施工用模板系统(6),所述托架(1)两端均配置专用工作平台(7)。
5.如权利要求4所述的一种变截面连续箱梁施工用托架,其特征在于:所述两个左托架(1)之间以及两个右托架(1)之间均设有横向连系(8)。
6.如权利要求5所述的一种变截面连续箱梁施工用托架,其特征在于:所述墩柱(4)上设有用于支撑所述托架(1)的牛腿。
7.一种变截面连续箱梁悬臂浇筑施工用挂篮,其特征在于:包括两组如权利要求3所述的托架(1)两两对接连接而成的单片挂篮结构,所述两组托架(1)顶部连有横向连接的横梁(9),所述横梁(9)上设有吊杆(10)。
8.一种应用钢板梁托架进行施工的方法,其特征在于包括以下步骤:
1)在施工完成的墩柱旁安装托架立柱或牛腿;
2)通过吊机逐片安装钢板梁托架,并采用精轧螺纹钢进行对拉锚固;
3)安装钢板梁托架横梁连系,加强横向稳定;
4)安装托架顶部箱梁施工用模板系统;
5)进行后续箱梁施工;
6)拆除钢板梁托架;
7)将钢板梁托架转移至桥面,组拼成挂篮,用于后续节段的施工。
CN201410400764.XA 2014-08-15 2014-08-15 一种钢板梁托架及施工方法 Active CN104131514B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410400764.XA CN104131514B (zh) 2014-08-15 2014-08-15 一种钢板梁托架及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410400764.XA CN104131514B (zh) 2014-08-15 2014-08-15 一种钢板梁托架及施工方法

Publications (2)

Publication Number Publication Date
CN104131514A CN104131514A (zh) 2014-11-05
CN104131514B true CN104131514B (zh) 2016-06-22

Family

ID=51804354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410400764.XA Active CN104131514B (zh) 2014-08-15 2014-08-15 一种钢板梁托架及施工方法

Country Status (1)

Country Link
CN (1) CN104131514B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275151A (zh) * 2015-11-18 2016-01-27 中国航空规划设计研究总院有限公司 一种变截面、高开孔率的钢梁构造
CN111691284B (zh) * 2020-07-21 2024-07-05 中铁宝桥集团有限公司 一种扁圆变截面钢管拱及其制作工艺

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201772251U (zh) * 2010-09-19 2011-03-23 浙江精功科技股份有限公司 一种新型波纹腹板h型钢
CN102277834A (zh) * 2011-05-10 2011-12-14 吴江市明港道桥工程有限公司 一种桥梁盖梁的施工托架
KR101242842B1 (ko) * 2012-07-31 2013-03-12 권예지 복부 파형강판 프리스트레스트 콘크리트 박스거더 교량의 상부구조체 시공방법
CN203049458U (zh) * 2012-11-27 2013-07-10 吴云 一种桥梁施工用挂篮
CN103352417A (zh) * 2013-07-26 2013-10-16 重庆交通大学 一种预应力混凝土变截面箱梁桥、挂篮及其施工方法
CN103374885A (zh) * 2012-04-13 2013-10-30 中铁十局集团第五工程有限公司 一种穿孔对拉铰支座型托架
CN203412188U (zh) * 2013-07-25 2014-01-29 精工工业建筑系统有限公司 一种波纹腹板h型钢
CN204139066U (zh) * 2014-08-15 2015-02-04 山东省路桥集团有限公司 一种钢板梁托架、施工用托架和施工用挂篮

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201772251U (zh) * 2010-09-19 2011-03-23 浙江精功科技股份有限公司 一种新型波纹腹板h型钢
CN102277834A (zh) * 2011-05-10 2011-12-14 吴江市明港道桥工程有限公司 一种桥梁盖梁的施工托架
CN103374885A (zh) * 2012-04-13 2013-10-30 中铁十局集团第五工程有限公司 一种穿孔对拉铰支座型托架
KR101242842B1 (ko) * 2012-07-31 2013-03-12 권예지 복부 파형강판 프리스트레스트 콘크리트 박스거더 교량의 상부구조체 시공방법
CN203049458U (zh) * 2012-11-27 2013-07-10 吴云 一种桥梁施工用挂篮
CN203412188U (zh) * 2013-07-25 2014-01-29 精工工业建筑系统有限公司 一种波纹腹板h型钢
CN103352417A (zh) * 2013-07-26 2013-10-16 重庆交通大学 一种预应力混凝土变截面箱梁桥、挂篮及其施工方法
CN204139066U (zh) * 2014-08-15 2015-02-04 山东省路桥集团有限公司 一种钢板梁托架、施工用托架和施工用挂篮

Also Published As

Publication number Publication date
CN104131514A (zh) 2014-11-05

Similar Documents

Publication Publication Date Title
CN202509404U (zh) 一种高墩单柱盖梁模板施工支撑系统
CN201714050U (zh) 电梯井整体三角支撑操作平台
CN205711776U (zh) 一种桥梁施工支撑托架
CN104594201B (zh) 一种利用单侧墩旁托架架设墩顶钢梁的方法
CN202658532U (zh) 桥梁湿接缝施工模板
CN202810204U (zh) 倾斜劲性柱自平衡模板体系结构
CN204042204U (zh) 一种泵管减震支架
CN105714692A (zh) 一种悬臂浇筑梁钢管混凝土临时固结系统
CN104131514B (zh) 一种钢板梁托架及施工方法
CN103362074B (zh) 桥梁悬臂箱梁施工挂篮预压加载装置
CN103669225A (zh) 一种连续梁0#块支架及安装方法
CN204139066U (zh) 一种钢板梁托架、施工用托架和施工用挂篮
CN204385629U (zh) 一种用于悬索桥主塔上横梁施工的支架
KR101546827B1 (ko) 우각부 강결성능이 개선된 강재거더 및 이를 이용한 라멘 또는 박스형 구조물 시공방법
CN203904852U (zh) 一种用于梁柱斜交体系现浇0号段施工的托架装置
CN210827131U (zh) 一种调整架桥机下导梁前后高差的垫墩装置
CN203729208U (zh) 一种连续梁0#块支架
CN103422436A (zh) 用波形钢腹板承担施工荷载的施工方法
CN203568689U (zh) 一种壁行式悬臂行车钢结构
CN206987351U (zh) 一种工字梁专用工作平台
CN203475309U (zh) 高架桥施工过程中用的盖梁支架
CN104179125A (zh) 一种移动模架主梁支撑用平衡梁装置
CN204418027U (zh) 一种用于自锚式悬索桥散索鞍底座安装的托架
CN208105291U (zh) 适用于岩质边坡的悬挑钢平台
CN107938524B (zh) 一种桥梁加固装置及其实施方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181123

Address after: 250200 Lijiabu intersection, Jiwang Road, Zhangqiu City, Jinan City, Shandong Province

Patentee after: Shandong Luqiao Construction Co., Ltd.

Address before: 250021 No. 330 Jingwu Road, Huaiyin District, Jinan, Shandong Province

Patentee before: Shandong Railway Road & Bridge Group Co., Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: Floor 20-21, 14677 Jingshi Road, Lixia District, Jinan City, Shandong Province

Patentee after: Shandong high speed Engineering Construction Group Co.,Ltd.

Address before: 250200 Lijiabu intersection, Jiwang Road, Zhangqiu City, Jinan City, Shandong Province

Patentee before: SHANDONG LUQIAO CONSTRUCTION Co.,Ltd.

CP03 Change of name, title or address