CN104099872A - 一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法 - Google Patents

一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法 Download PDF

Info

Publication number
CN104099872A
CN104099872A CN201410306955.XA CN201410306955A CN104099872A CN 104099872 A CN104099872 A CN 104099872A CN 201410306955 A CN201410306955 A CN 201410306955A CN 104099872 A CN104099872 A CN 104099872A
Authority
CN
China
Prior art keywords
crossbeam
box culvert
jacking
lifting
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410306955.XA
Other languages
English (en)
Other versions
CN104099872B (zh
Inventor
刘文兵
葛立林
汪朝科
陈金发
马海贤
黄景新
袁正璞
朱善美
匡建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201410306955.XA priority Critical patent/CN104099872B/zh
Publication of CN104099872A publication Critical patent/CN104099872A/zh
Application granted granted Critical
Publication of CN104099872B publication Critical patent/CN104099872B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明公开了一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法,包括既有铁路纵挑横抬线路加固、既有桥拆除和道岔区线路加固。所述的枕木隔六换一,所述的3-5-3扣轨采用扣板及U型螺栓连接固定且接头段扣板加密。本发明应用具有既有线施工安全可控,降低拆除既有桥施工风险,减小顶进施工过程中对线路运营的影响,大跨度框架箱涵整体顶进,能有效的缩短工期、确保顶进就位精度及外观质量,利用既有桥能有效的节约成本,具有良好的经济和社会效益。

Description

一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法
技术领域
本发明涉及铁路线路工程施工领域,尤其涉及一种大跨度箱涵纵挑横抬顶进的施工方法。
背景技术
针对国家交通运输网的迅猛发展、城市建设的不断扩张,下穿铁路大跨度箱涵已经广泛应用于一些跨主要陆地交通道路和跨既有铁路的下穿施工中。纵挑横抬法大跨度顶进箱涵施工将在不影响既有铁路正常运营的情况下,一次顶进,大大的缩短了工期、最大程度的降低了既有线作业时间,节约成本。如:石家庄石炼路扩改工程,通过1-(7+16+7)m大跨度框架箱涵的顶进施工,纵挑横抬法线路加固作业及大跨度箱涵整体一次顶进,采用纵挑横抬法线路加固,利用既有桥作为横梁的一端支点,随着顶程的增大,采用横梁下方放置滑车完成体系转换,拆除剩余既有桥;道岔区纵梁不能纵向连续时,在断开段外侧避开线路设备补设纵梁进行纵连整体加强。
发明内容
本发明的目的是为了减少施工工期,节约资源成本,稳定加固体系,提供了一种大跨度箱涵纵挑横抬顶进的施工方法。
本发明是通过以下技术方案来实现的:
一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法,包括有以下施工步骤:
首先将扣板1及U型螺栓2连接在一起对轨枕3进行3-5-3扣轨,扣轨完成后穿工字钢横梁4,然后架设工字钢纵梁5,每段采用夹板6纵向连接成整体,并在设备断开处进行加密,每段纵梁5架设完成后,采用扣板1及U型螺栓2与横梁4连接牢固形成线路加固体系,在道岔区及设备处不能纵向连续时,通过减小横梁4的间距,弥补扣轨的刚度损失,并在纵向中断处外侧的横梁上加设补强纵梁;
顶进时,线路加固体系横梁4的前端支撑在既有桥上,后端利用框架上的滑车7作为支点,随着顶进在每根横梁下方放置滑车7支撑,拆除既有桥采取机械破碎,每次凿除1.0m,框架跟进顶进,随着顶程的增大,采用横梁4下方放置滑车完成体系转换,拆除剩余既有桥。
所述的线路加固体系的纵梁5为3根I45b工字钢,横梁4为单根I45b工字钢,均采用扣板1、U型螺栓2及夹板6进行连接加固,横梁4均匀等间距分布,其间距为90cm。
所述的横梁的前端利用既有桥为支点并锚固,后端支点为顶进框架上的滑车。
所述的拆除既有桥为随拆随顶,每次进尺约1.0m。
所述的道岔区加固采用避开线路设备补设纵梁进行整体加强。
本发明的优点是:既有线施工安全可控,降低拆除既有桥的施工风险,减小顶进过程中对线路运营的影响,大跨度框架箱涵整体顶进,能有效的缩短工期、确保顶进就位精度及外观质量,利用既有桥能有效的节约成本,具有良好的经济和社会效益。
附图说明
图1为线路加固横向示意图。
图2为线路加固平面示意图。
图3 为线路加固连接体系示意图。
具体实施方式
参见附图,一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法,包括有以下施工步骤:
首先将扣板1及U型螺栓2连接在一起对轨枕3进行3-5-3扣轨,扣轨完成后穿工字钢横梁4,然后架设工字钢纵梁5,每段采用夹板6纵向连接成整体,并在设备断开处进行加密,每段纵梁5架设完成后,采用扣板1及U型螺栓2与横梁4连接牢固形成线路加固体系,在道岔区及设备处不能纵向连续时,通过减小横梁4的间距,弥补扣轨的刚度损失,并在纵向中断处外侧的横梁上加设补强纵梁;
顶进时,线路加固体系横梁4的前端支撑在既有桥上,后端利用框架上的滑车7作为支点,随着顶进在每根横梁下方放置滑车7支撑,拆除既有桥采取机械破碎,每次凿除1.0m,框架跟进顶进,随着顶程的增大,采用横梁4下方放置滑车完成体系转换,拆除剩余既有桥,拆除既有桥为随拆随顶,每次进尺约1.0m。。
线路加固体系的纵梁5为3根I45b工字钢,横梁4为单根I45b工字钢,均采用扣板1、U型螺栓2及夹板6进行连接加固,横梁4均匀等间距分布,其间距为90cm。横梁的前端利用既有桥为支点并锚固,后端支点为顶进框架上的滑车。道岔区加固采用避开线路设备补设纵梁进行整体加强。

Claims (5)

1.一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法,其特征在于,包括有以下施工步骤:
首先将扣板(1)及U型螺栓(2)连接在一起对轨枕(3)进行3-5-3扣轨,扣轨完成后穿工字钢横梁(4),然后架设工字钢纵梁(5),每段采用夹板(6)纵向连接成整体,并在设备断开处进行加密,每段纵梁(5)架设完成后,采用扣板(1)及U型螺栓(2)与横梁(4)连接牢固形成线路加固体系,在道岔区及设备处不能纵向连续时,通过减小横梁 (4)的间距,弥补扣轨的刚度损失,并在纵向中断处外侧的横梁上加设补强纵梁;
顶进时,线路加固体系横梁(4)的前端支撑在既有桥上,后端利用框架上的滑车(7)作为支点,随着顶进在每根横梁下方放置滑车(7)支撑,拆除既有桥采取机械破碎,每次凿除1.0m,框架跟进顶进,随着顶程的增大,采用横梁(4)下方放置滑车(7)完成体系转换,拆除剩余既有桥。
2.根据权利要求1所述的下穿铁路大跨度箱涵纵挑横抬顶进施工方法,其特征在于,所述的线路加固体系的纵梁(5)为3根I45b工字钢,横梁(4)为单根I45b工字钢,均采用扣板(1)、U型螺栓(2)及夹板(6)进行连接加固,横梁(4)均匀等间距分布,其间距为90cm。
3.根据权利要求1所述的下穿铁路大跨度箱涵纵挑横抬顶进施工方法,其特征在于,所述的横梁 (4)的前端利用既有桥为支点并锚固,后端支点为顶进框架上的滑车(7)。
4.根据权利要求1所述的下穿铁路大跨度箱涵纵挑横抬顶进施工方法,其特征在于,所述的拆除既有桥为随拆随顶,每次进尺约1.0m。
5.根据权利要求1所述的下穿铁路大跨度箱涵纵挑横抬顶进施工方法,其特征在于,所述的道岔区加固采用避开线路设备补设纵梁进行整体加强。
CN201410306955.XA 2014-06-30 2014-06-30 一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法 Active CN104099872B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410306955.XA CN104099872B (zh) 2014-06-30 2014-06-30 一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410306955.XA CN104099872B (zh) 2014-06-30 2014-06-30 一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法

Publications (2)

Publication Number Publication Date
CN104099872A true CN104099872A (zh) 2014-10-15
CN104099872B CN104099872B (zh) 2016-08-17

Family

ID=51668388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410306955.XA Active CN104099872B (zh) 2014-06-30 2014-06-30 一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法

Country Status (1)

Country Link
CN (1) CN104099872B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887658A (zh) * 2014-12-16 2016-08-24 房士杰 多用连续施工便梁结构及其施工方法
CN110067206A (zh) * 2019-05-16 2019-07-30 成都建工路桥建设有限公司 一种卵型下穿通道桥施工方法
CN110939065A (zh) * 2019-12-05 2020-03-31 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种利用临时钢支座辅助框构桥顶进的方法
CN113652902A (zh) * 2021-08-13 2021-11-16 中铁第五勘察设计院集团有限公司 铁路道岔区的加固结构及下穿既有铁路的框架桥结构
CN114059455A (zh) * 2021-12-28 2022-02-18 中铁六局集团石家庄铁路建设有限公司 基于下穿重载铁路的立交桥施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359069A (zh) * 2011-07-05 2012-02-22 中铁十局集团有限公司 下穿铁路框架桥小夹角大高度斜顶进施工既有线加固方法
CN102926299A (zh) * 2012-11-19 2013-02-13 房士杰 一种铁路架空固定装置及采用此装置增建铁路桥涵的方法
CN102979041A (zh) * 2012-12-26 2013-03-20 中铁七局集团郑州工程有限公司 下穿铁路道岔群顶进卡跨度箱桥施工的软架空加固顶进法
CN103437254A (zh) * 2013-09-07 2013-12-11 中铁六局集团有限公司 框架桥顶进铁路岔区线路加固装置
CN203487475U (zh) * 2013-10-11 2014-03-19 中铁一局集团有限公司 既有线顶进桥涵施工用线路架空加固结构
CN103726451A (zh) * 2014-01-16 2014-04-16 中铁六局集团有限公司 一种既有铁路拆梁桥原位顶进框构桥的施工方法
CN103866694A (zh) * 2014-03-18 2014-06-18 中铁二十二局集团第一工程有限公司 深水粉砂层地质大跨度多线路加固系统及顶进涵施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359069A (zh) * 2011-07-05 2012-02-22 中铁十局集团有限公司 下穿铁路框架桥小夹角大高度斜顶进施工既有线加固方法
CN102926299A (zh) * 2012-11-19 2013-02-13 房士杰 一种铁路架空固定装置及采用此装置增建铁路桥涵的方法
CN102979041A (zh) * 2012-12-26 2013-03-20 中铁七局集团郑州工程有限公司 下穿铁路道岔群顶进卡跨度箱桥施工的软架空加固顶进法
CN103437254A (zh) * 2013-09-07 2013-12-11 中铁六局集团有限公司 框架桥顶进铁路岔区线路加固装置
CN203487475U (zh) * 2013-10-11 2014-03-19 中铁一局集团有限公司 既有线顶进桥涵施工用线路架空加固结构
CN103726451A (zh) * 2014-01-16 2014-04-16 中铁六局集团有限公司 一种既有铁路拆梁桥原位顶进框构桥的施工方法
CN103866694A (zh) * 2014-03-18 2014-06-18 中铁二十二局集团第一工程有限公司 深水粉砂层地质大跨度多线路加固系统及顶进涵施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张秉臣: ""既有线箱形立交桥施工的线路防护"", 《铁道标准设计》 *
杨炳勋: ""斜交49°箱涵顶进施工方法"", 《铁道标准设计》 *
马贺权,宋云涛: ""朔黄铁路大型框架桥顶进施工技术"", 《今日科苑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887658A (zh) * 2014-12-16 2016-08-24 房士杰 多用连续施工便梁结构及其施工方法
CN110067206A (zh) * 2019-05-16 2019-07-30 成都建工路桥建设有限公司 一种卵型下穿通道桥施工方法
CN110067206B (zh) * 2019-05-16 2020-08-18 成都建工路桥建设有限公司 一种卵型下穿通道桥施工方法
CN110939065A (zh) * 2019-12-05 2020-03-31 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种利用临时钢支座辅助框构桥顶进的方法
CN110939065B (zh) * 2019-12-05 2021-12-17 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种利用临时钢支座辅助框构桥顶进的方法
CN113652902A (zh) * 2021-08-13 2021-11-16 中铁第五勘察设计院集团有限公司 铁路道岔区的加固结构及下穿既有铁路的框架桥结构
CN114059455A (zh) * 2021-12-28 2022-02-18 中铁六局集团石家庄铁路建设有限公司 基于下穿重载铁路的立交桥施工方法

Also Published As

Publication number Publication date
CN104099872B (zh) 2016-08-17

Similar Documents

Publication Publication Date Title
CN104099872A (zh) 一种下穿铁路大跨度箱涵纵挑横抬顶进施工方法
CN206538637U (zh) 一种用于既有铁路的线路加固装置
CN106087757B (zh) 箱梁架设中的高位落梁施工方法
CN102758387B (zh) H型钢线路加固施工方法
CN105464008B (zh) 一种大纵梁体系线路加固施工装置和方法
CN103437254A (zh) 框架桥顶进铁路岔区线路加固装置
CN106192620B (zh) 一种铁路无砟轨道支撑层及下部结构拆换方法
CN204530494U (zh) 高桥墩系梁模板搭设用支架
CN105350454A (zh) 一种用于钢桁拱桥梁的钢拱肋外包混凝土施工方法
CN201554034U (zh) 逆作施工后浇带水平嵌固支撑结构
CN105019366A (zh) 一种铁路岔区线路加固施工方法
CN204457786U (zh) 一种b管片拆除后的扩挖大直径盾构隧道建造地铁车站
CN203530848U (zh) 桥梁盖梁模板的支撑支架
CN105134250A (zh) 一种软弱围岩地铁车站免拆支撑直接衬砌的方法
CN103758347B (zh) 大跨度钢筋混凝土梁板结构后浇带支撑托换施工方法
CN103882802A (zh) 一种公路跨越铁路的桥梁防护结构
CN107558375B (zh) 一种框架桥顶进过程中接触网杆拆改的施工方法
CN106274556B (zh) 一种接触网杆改移方法
CN202688805U (zh) 支撑螺柱设于模板外的排架单元
CN104264591B (zh) 在线路高差较大区域顶桥的施工方法
CN203938968U (zh) 连续梁拱吊杆下部锚固端的安装辅助吊篮
CN107642032A (zh) 一种便梁限位装置及其施工方法
CN204778385U (zh) 一种单轨葫芦的轨道固定结构
CN203440720U (zh) 框架桥顶进铁路岔区线路加固装置
CN103397779B (zh) 一种大高度剪力墙模板的支撑方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant