CN104084679A - 绞吸式挖泥船的制造方法 - Google Patents
绞吸式挖泥船的制造方法 Download PDFInfo
- Publication number
- CN104084679A CN104084679A CN201410280477.XA CN201410280477A CN104084679A CN 104084679 A CN104084679 A CN 104084679A CN 201410280477 A CN201410280477 A CN 201410280477A CN 104084679 A CN104084679 A CN 104084679A
- Authority
- CN
- China
- Prior art keywords
- welding
- suction dredger
- cutter suction
- tack welding
- manufacture method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K9/00—Arc welding or cutting
- B23K9/18—Submerged-arc welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K9/00—Arc welding or cutting
- B23K9/235—Preliminary treatment
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Plasma & Fusion (AREA)
- Mechanical Engineering (AREA)
- Arc Welding In General (AREA)
Abstract
本发明公开了一种绞吸式挖泥船的制造方法,包括埋弧自动焊,埋弧自动焊包括下列步骤:彻底清洁被焊表面的垃圾、积水锈蚀、氧化物、污油、泥灰;在非常潮湿的情况下,必须用割炬或风管将被焊表面烘干,然后用风刷磨光方可焊接;拼缝板两端用不小于80×80d引弧板,厚度与母材相同;拼板用胎架在平整场地上进行;拼板定位焊焊条选用直径3.2mm的低氢焊条,定位焊间距为150~200mm;焊前根据不同的板厚开设坡口,板厚大于12mm对接缝的应开单面或双面坡口;高强度钢对接缝焊接,焊前应进行热处理,预热温度在100~150℃,焊后采取保温措施,焊接材料与母材材质匹配。本发明操作方便,工作效果好。
Description
技术领域
本发明涉及一种绞吸式挖泥船的制造方法。
背景技术
现有的绞吸式挖泥船的制造方法,工艺复杂,工作效果不理想。
发明内容
本发明的目的在于提供一种工作效果好的绞吸式挖泥船的制造方法。
本发明的技术解决方案是:
一种绞吸式挖泥船的制造方法,包括埋弧自动焊,其特征是:埋弧自动焊包括下列步骤:彻底清洁被焊表面的垃圾、积水锈蚀、氧化物、污油、泥灰;在非常潮湿的情况下,必须用割炬或风管将被焊表面烘干,然后用风刷磨光方可焊接;拼缝板两端用不小于80×80d 引弧板,厚度与母材相同;拼板用胎架在平整场地上进行;拼板定位焊焊条选用直径3.2mm的低氢焊条,定位焊间距为150~200mm;焊前根据不同的板厚开设坡口,板厚大于12mm对接缝的应开单面或双面坡口;高强度钢对接缝焊接,焊前应进行热处理,预热温度在100~150℃,焊后采取保温措施,焊接材料与母材材质匹配。
定位焊间距为180mm。
定位焊间距为190mm。
本发明操作方便,工作效果好。
下面结合实施例对本发明作进一步说明。
具体实施方式
一种绞吸式挖泥船的制造方法,包括埋弧自动焊,:埋弧自动焊包括下列步骤:彻底清洁被焊表面的垃圾、积水锈蚀、氧化物、污油、泥灰;在非常潮湿的情况下,必须用割炬或风管将被焊表面烘干,然后用风刷磨光方可焊接;拼缝板两端用不小于80×80d 引弧板,厚度与母材相同;拼板用胎架在平整场地上进行;拼板定位焊焊条选用直径3.2mm的低氢焊条,定位焊间距为150~200mm;焊前根据不同的板厚开设坡口,板厚大于12mm对接缝的应开单面或双面坡口;高强度钢对接缝焊接,焊前应进行热处理,预热温度在100~150℃,焊后采取保温措施,焊接材料与母材材质匹配。
定位焊间距为180mm。
定位焊间距为190mm。
Claims (3)
1.一种绞吸式挖泥船的制造方法,包括埋弧自动焊,其特征是:埋弧自动焊包括下列步骤:彻底清洁被焊表面的垃圾、积水锈蚀、氧化物、污油、泥灰;在非常潮湿的情况下,必须用割炬或风管将被焊表面烘干,然后用风刷磨光方可焊接;拼缝板两端用不小于80×80d 引弧板,厚度与母材相同;拼板用胎架在平整场地上进行;拼板定位焊焊条选用直径3.2mm的低氢焊条,定位焊间距为150~200mm;焊前根据不同的板厚开设坡口,板厚大于12mm对接缝的应开单面或双面坡口;高强度钢对接缝焊接,焊前应进行热处理,预热温度在100~150℃,焊后采取保温措施,焊接材料与母材材质匹配。
2.根据权利要求1所述的绞吸式挖泥船的制造方法,其特征是:定位焊间距为180mm。
3. 根据权利要求1所述的绞吸式挖泥船的制造方法,其特征是:定位焊间距为190mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410280477.XA CN104084679A (zh) | 2014-06-23 | 2014-06-23 | 绞吸式挖泥船的制造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410280477.XA CN104084679A (zh) | 2014-06-23 | 2014-06-23 | 绞吸式挖泥船的制造方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104084679A true CN104084679A (zh) | 2014-10-08 |
Family
ID=51632496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410280477.XA Pending CN104084679A (zh) | 2014-06-23 | 2014-06-23 | 绞吸式挖泥船的制造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104084679A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104625452A (zh) * | 2014-12-31 | 2015-05-20 | 广州文冲船厂有限责任公司 | 一种挖泥船方形泥门的安装工艺 |
CN108857218A (zh) * | 2018-07-09 | 2018-11-23 | 福建省马尾造船股份有限公司 | 一种金属拼板的连接辅助结构和金属拼板的连接方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101745718A (zh) * | 2009-12-17 | 2010-06-23 | 浙江东海岸船业有限公司 | 一种薄钢板的焊接方法 |
CN101811553A (zh) * | 2010-03-05 | 2010-08-25 | 南通港闸船舶制造有限公司 | 绞吸式挖泥船桥架制作、船上安装工艺 |
JP2010221296A (ja) * | 2009-02-27 | 2010-10-07 | Jfe Steel Corp | サブマージアーク溶接方法 |
CN102009255A (zh) * | 2010-12-01 | 2011-04-13 | 武昌船舶重工有限责任公司 | 一种高强度船体结构用钢平对接焊焊接工艺方法 |
CN102909456A (zh) * | 2012-10-31 | 2013-02-06 | 南通港闸船舶制造有限公司 | 挖泥船焊接方法 |
CN102922157A (zh) * | 2012-10-31 | 2013-02-13 | 南通港闸船舶制造有限公司 | 船舶焊接方法 |
CN102922158A (zh) * | 2012-10-31 | 2013-02-13 | 南通港闸船舶制造有限公司 | 船舶特殊焊接方法 |
-
2014
- 2014-06-23 CN CN201410280477.XA patent/CN104084679A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010221296A (ja) * | 2009-02-27 | 2010-10-07 | Jfe Steel Corp | サブマージアーク溶接方法 |
CN101745718A (zh) * | 2009-12-17 | 2010-06-23 | 浙江东海岸船业有限公司 | 一种薄钢板的焊接方法 |
CN101811553A (zh) * | 2010-03-05 | 2010-08-25 | 南通港闸船舶制造有限公司 | 绞吸式挖泥船桥架制作、船上安装工艺 |
CN102009255A (zh) * | 2010-12-01 | 2011-04-13 | 武昌船舶重工有限责任公司 | 一种高强度船体结构用钢平对接焊焊接工艺方法 |
CN102909456A (zh) * | 2012-10-31 | 2013-02-06 | 南通港闸船舶制造有限公司 | 挖泥船焊接方法 |
CN102922157A (zh) * | 2012-10-31 | 2013-02-13 | 南通港闸船舶制造有限公司 | 船舶焊接方法 |
CN102922158A (zh) * | 2012-10-31 | 2013-02-13 | 南通港闸船舶制造有限公司 | 船舶特殊焊接方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104625452A (zh) * | 2014-12-31 | 2015-05-20 | 广州文冲船厂有限责任公司 | 一种挖泥船方形泥门的安装工艺 |
CN108857218A (zh) * | 2018-07-09 | 2018-11-23 | 福建省马尾造船股份有限公司 | 一种金属拼板的连接辅助结构和金属拼板的连接方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104384677B (zh) | 一种特厚钢板焊接方法 | |
CN104209625A (zh) | Q460钢厚板的焊接工艺 | |
WO2015045299A8 (ja) | 構造用鋼の摩擦撹拌接合方法および構造用鋼の接合継手の製造方法 | |
WO2011153530A3 (en) | Process and apparatus for rail restoration and rail manufacture using welding | |
CN104625351B (zh) | 地铁车厢用铝合金侧墙焊接方法 | |
CN105312742A (zh) | 一种焊接工艺 | |
CN105983761A (zh) | 一种高强度钢焊接工艺 | |
CN104084679A (zh) | 绞吸式挖泥船的制造方法 | |
CN105750712A (zh) | 一种埋弧焊工艺 | |
CN104668741A (zh) | 高炉煤气透平叶片的焊接修复方法 | |
CN104607773A (zh) | 一种不锈钢外复合管的制管焊接方法 | |
CN101934426A (zh) | 一种提高水下搅拌摩擦焊接接头塑性的方法 | |
CN104588853A (zh) | 一种16Mn钢板的电弧焊焊接工艺 | |
CN107234319A (zh) | 薄板不锈钢波纹管卷管焊接工艺 | |
JP2009233679A (ja) | 鋼材のサブマージアーク溶接方法 | |
CN104439616A (zh) | 一种0Cr18Ni9不锈钢板的焊接工艺 | |
JP5742091B2 (ja) | 溶接熱影響部の靭性に優れた、鋼材のサブマージアーク溶接方法 | |
CN105108280A (zh) | 一种高钼不锈钢板的焊接方法 | |
CN102626839A (zh) | 一种用于钛合金钨极氩弧焊的活性剂 | |
CN105643123A (zh) | 一种q325a的钢管拼焊工艺 | |
JP5742090B2 (ja) | 溶接熱影響部の靭性に優れた、鋼材のサブマージアーク溶接方法 | |
CN103252590B (zh) | 炼钢厂房柱对接焊接方法 | |
CN102513661A (zh) | 海洋工程升降桩腿药芯焊丝co2气体保护焊方法 | |
CN104526109A (zh) | 一种q235钢管的焊接工艺 | |
CN101934406A (zh) | 太阳能水温水位传感器中不锈钢电极与导线的焊接方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |