CN104076437A - 一种用于光纤阵列头的制作装置 - Google Patents

一种用于光纤阵列头的制作装置 Download PDF

Info

Publication number
CN104076437A
CN104076437A CN201410279869.4A CN201410279869A CN104076437A CN 104076437 A CN104076437 A CN 104076437A CN 201410279869 A CN201410279869 A CN 201410279869A CN 104076437 A CN104076437 A CN 104076437A
Authority
CN
China
Prior art keywords
base
fine
row
fixture
fiber arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410279869.4A
Other languages
English (en)
Inventor
陈波
樊建银
唐淋
余朝晃
侯易
代静波
郑敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New Sino Photoelectric Technology (baojing) Co Ltd
Original Assignee
New Sino Photoelectric Technology (baojing) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New Sino Photoelectric Technology (baojing) Co Ltd filed Critical New Sino Photoelectric Technology (baojing) Co Ltd
Priority to CN201410279869.4A priority Critical patent/CN104076437A/zh
Publication of CN104076437A publication Critical patent/CN104076437A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Mechanical Coupling Of Light Guides (AREA)

Abstract

本发明公开了一种用于光纤阵列头的制作装置,其特征在于,此装置由排纤夹具、排纤底座组成;所述排纤夹具固定在排纤底座上;所述排纤夹具包括压块固定装置、弹簧、排纤夹具底座,所述压块固定装置通过弹簧与排纤夹具底座固定连接;所述排纤夹具底座上设置有用于顶柱活动的通孔;所述排纤底座包括用于固定排纤夹具的底座锁紧螺栓、用于控制升降螺杆升降的升降旋钮;所述升降螺杆设置在排纤底座中部的一侧,升降螺杆通过连接杆与顶柱连接。本发明解决了V槽盖板受力不均、光纤不入槽或受损的问题,降低了报废率和初固化的时间,不仅提高了产品性能,还提高了制作的效率。

Description

一种用于光纤阵列头的制作装置
技术领域
本发明涉及光纤阵列制作领域,特别涉及一种用于光纤阵列头的制作装置。
背景技术
在光纤阵列制作过程中,需要先把裸光纤放入V槽,点上特制胶水,然后盖上V槽盖板,在显微镜下确认光纤入槽、胶水流动均匀后,使用特制夹具压住V槽盖板,然后用紫外光照射让胶水初步固化。传统的方式是进行中心加压固定住V槽盖板,但是中心加压于V槽盖板会因为中心压力大、四周压力小而导致力的分布不均匀,从而造成V槽盖板碎裂,产品报废,且四周压力小或不均匀,同时会造成光纤不能入槽,影响性能;中心加压也容易使得V槽盖板变形为中间低、两头高,从而造成光纤变形甚至受损,影响了可靠性;中心压力过大还会产生大量胶水气泡,或者中心区域胶水被挤出,造成空胶等问题,严重影响性能。此外,由于光线阵列头属于精密仪器,丝毫的碰撞与移动可能会对其性能造成严重的影响,所以光线阵列头点胶通常是直接在工装上进行加压和初固化,初固化完成后再取下光线阵列头,此方式则增加等待时间,导致制作效率低。
发明内容
本发明的目的是提供一种用于光纤阵列头的制作装置,此装置解决V槽盖板受力不均、光纤不入槽或受损的问题,减少了胶水气泡或者胶水被挤出而空胶,降低了报废率和初固化的时间,不仅提高了产品性能,还提高了制作的效率。
为了达到以上目的,本发明采用的技术方案为:一种用于光纤阵列头的制作装置,其特征在于,此装置由排纤夹具、排纤底座组成;所述排纤夹具固定在排纤底座上;所述排纤夹具包括压块固定装置(6)、弹簧(9)、排纤夹具底座(13),所述压块固定装置(6)通过弹簧(9)与排纤夹具底座(13)固定连接;所述排纤夹具底座(13)上设置有用于顶柱(10)活动的通孔(11);所述排纤底座包括用于固定排纤夹具的底座锁紧螺栓(1)、用于控制升降螺杆(5)升降的升降旋钮(8);所述底座锁紧螺栓(1)设置在排纤底座的右端两侧;所述升降螺杆(5)设置在排纤底座中部的一侧,升降螺杆(5)通过连接杆(14)与顶柱(10)连接。
所述压块固定装置(6)为一个凹字形状镶嵌于排纤夹具底座(13)内部的通孔中。
所述压块固定装置(6)的上端部设置有用于固定盖板压块(2)的夹块(61)。
所述排纤底座还包括V槽固定夹具(4)、控制滑轨(7)和用于控制滑轨(7)移动距离的头部锁紧螺栓(3);所述滑轨(7)和头部锁紧螺栓(3)设置在排纤底座的左端;所述V槽固定夹具(4)固定于滑轨(7)上。
所述滑轨(7)之间通过弹簧连接。
所述升降旋钮(8)上设置有刻度线。
本发明的有益效果是:(1)采用整块平面盖板压块来对光线阵列头进行加压固定,可以实现V槽盖板的受力均匀,从而解决光纤不入槽或受损,或者胶水被挤出而空胶的问题,明显减少了胶水气泡。
(2)利用弹簧的弹力自动实现V槽夹紧、固定、加压等动作,且可以长时间的保持加压的动作,排纤夹具相对于排纤底座可拆卸,当排纤夹具拆下后也会继续保持压缩状态,且一个排纤底座可以重复使用,可将排纤夹具进行收集后再进行统一初固化,不仅节约了制作时间,提高了工作效率,还保护了光纤阵列头不受外界的干扰,保证了光纤阵列头的品质。
附图说明
图1是本发明的俯视图。
图2是本发明的主视图。
图3是本发明的左视图。
图4是排纤底座的结构示意图。
图5是排纤夹具的结构示意图。
图6是排纤夹具的主视图。
图7是排纤夹具的俯视图。
图8是排纤夹具沿A-A的剖视图。
在说明书附图中所述的数字标注表示为:1、底座锁紧螺栓;2、盖板压块;3、头部锁紧螺栓;4、V槽固定夹具;5、升降螺杆;6、压块固定装置;7、滑轨;8、升降旋钮;9、弹簧;10、顶柱;11、通孔;61、夹块;12、光纤阵列头;13、排纤夹具底座;14、连接杆。
具体实施方式
为了使本领域技术人员更好地理解本发明的技术方案,下面结合附图对本发明进行详细描述,本部分的描述仅是示范性和解释性,不应对本发明的保护范围有任何的限制作用。
参看图1至图8,一种用于光纤阵列头的制作装置,此装置由排纤夹具、排纤底座组成,排纤夹具固定在排纤底座上,排纤夹具包括压块固定装置6、弹簧9、排纤夹具底座13,压块固定装置6为一个凹字形状镶嵌于排纤夹具底座13内部的通孔中,压块固定装置6通过弹簧9与排纤夹具底座13固定连接,压块固定装置6的上端部设置有用于固定盖板压块2的夹块61,排纤夹具底座13上设置有用于顶柱10活动的通孔11。
排纤底座包括用于固定排纤夹具的底座锁紧螺栓1、用于控制升降螺杆5升降的升降旋钮8,底座锁紧螺栓1设置在排纤底座的右端两侧。升降螺杆5设置在排纤底座中部的一侧,升降螺杆5通过连接杆14与顶柱10连接。
排纤底座还包括V槽固定夹具4、控制滑轨7和用于控制滑轨7移动距离的头部锁紧螺栓3,滑轨7和头部锁紧螺栓3设置在排纤底座的左端。V槽固定夹具4固定于滑轨7上,滑轨7之间通过弹簧连接,升降旋钮8上设置有刻度线。
在具体操作中,拧松底座锁紧螺栓1,将排纤夹具放置于排纤底座上,拧紧底座锁紧螺栓1,固定住排纤夹具,此时拧开头部锁紧螺栓3,拉伸弹簧,将V槽放置于排纤夹具上,慢慢旋转头部锁紧螺栓3,将V槽固定于V槽固定夹具4,再旋转升降旋钮8,使顶柱向上移动,顶起排纤夹具上的压块固定装置6,使弹簧9压缩,增大了夹块61与V槽之间的距离,然后开始光线阵列头的制作,光线入槽后,盖上V槽盖板,将盖板压块2插入夹块61内,慢慢旋转升降旋钮8,使盖板压块2完全贴合于V槽盖板上表面,然后完全收回顶柱10,利用弹簧9的拉升弹力自动实现压紧、加压的动作,待光线阵列头完全固定后,拧松底座锁紧螺栓1,旋转头部锁紧螺栓3,撑开滑轨7,取出排纤夹具,然后可开始下一个光纤阵列的制作。
本文中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实例的说明只是用于帮助理解本发明的方法及其核心思想。以上所述仅是本发明的优选实施方式,应当指出,由于文字表达的有限性,而客观上存在无限的具体结构,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进、润饰或变化,也可以将上述技术特征以适当的方式进行组合;这些改进润饰、变化或组合,或未经改进将发明的构思和技术方案直接应用于其它场合的,均应视为本发明的保护范围。

Claims (6)

1.一种用于光纤阵列头的制作装置,其特征在于,此装置由排纤夹具、排纤底座组成;所述排纤夹具固定在排纤底座上;所述排纤夹具包括压块固定装置(6)、弹簧(9)、排纤夹具底座(13),所述压块固定装置(6)通过弹簧(9)与排纤夹具底座(13)固定连接;所述排纤夹具底座(13)上设置有用于顶柱(10)活动的通孔(11);所述排纤底座包括用于固定排纤夹具的底座锁紧螺栓(1)、用于控制升降螺杆(5)升降的升降旋钮(8);所述底座锁紧螺栓(1)设置在排纤底座的右端两侧;所述升降螺杆(5)设置在排纤底座中部的一侧,升降螺杆(5)通过连接杆(14)与顶柱(10)连接。
2.根据权利要求1中所述的一种用于光纤阵列头的制作装置,其特征在于,所述压块固定装置(6)为一个凹字形状镶嵌于排纤夹具底座(13)内部的通孔中。
3.根据权利要求2中所述的一种用于光纤阵列头的制作装置,其特征在于,所述压块固定装置(6)的上端部设置有用于固定盖板压块(2)的夹块(61)。
4.根据权利要求1中所述的一种用于光纤阵列头的制作装置,其特征在于,所述排纤底座还包括V槽固定夹具(4)、控制滑轨(7)和用于控制滑轨(7)移动距离的头部锁紧螺栓(3);所述滑轨(7)和头部锁紧螺栓(3)设置在排纤底座的左端;所述V槽固定夹具(4)固定于滑轨(7)上。
5.根据权利要求4中所述的一种用于光纤阵列头的制作装置,其特征在于,所述滑轨(7)之间通过弹簧连接。
6.根据权利要求1中所述的一种用于光纤阵列头的制作装置,其特征在于,所述升降旋钮(8)上设置有刻度线。
CN201410279869.4A 2014-06-23 2014-06-23 一种用于光纤阵列头的制作装置 Pending CN104076437A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410279869.4A CN104076437A (zh) 2014-06-23 2014-06-23 一种用于光纤阵列头的制作装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410279869.4A CN104076437A (zh) 2014-06-23 2014-06-23 一种用于光纤阵列头的制作装置

Publications (1)

Publication Number Publication Date
CN104076437A true CN104076437A (zh) 2014-10-01

Family

ID=51597815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410279869.4A Pending CN104076437A (zh) 2014-06-23 2014-06-23 一种用于光纤阵列头的制作装置

Country Status (1)

Country Link
CN (1) CN104076437A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107991742A (zh) * 2018-01-11 2018-05-04 四川飞普科技有限公司 用于mt-mt多通道连接器的长度控制装置
CN109188605A (zh) * 2018-08-30 2019-01-11 中国工程物理研究院核物理与化学研究所 一种长线列密排光纤阵列排布装置
CN113406759A (zh) * 2021-08-18 2021-09-17 武汉驿路通科技股份有限公司 一种保偏光纤装配装置及其使用方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1251904A (zh) * 1998-10-20 2000-05-03 住友金属矿山株式会社 光纤阵列的制造方法
US6522813B2 (en) * 2001-06-28 2003-02-18 Chiaro Networks Ltd. Alignment technique for optical fiber array
CN1448747A (zh) * 2002-02-13 2003-10-15 富士康(昆山)电脑接插件有限公司 光纤阵列及其制造方法
CN201955490U (zh) * 2010-12-30 2011-08-31 深圳日海通讯技术股份有限公司 一种光纤阵列封装装置
CN202886638U (zh) * 2012-11-08 2013-04-17 扬中市华瑞通讯仪器有限公司 光纤阵列组件制作工装
CN103358249A (zh) * 2012-03-27 2013-10-23 广东海粤集团有限公司 光纤阵列板组装装置和应用该装置的光纤阵列板组装平台
CN203965655U (zh) * 2014-06-23 2014-11-26 新中合光电科技(保靖)有限公司 一种用于光纤阵列头的制作装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1251904A (zh) * 1998-10-20 2000-05-03 住友金属矿山株式会社 光纤阵列的制造方法
US6522813B2 (en) * 2001-06-28 2003-02-18 Chiaro Networks Ltd. Alignment technique for optical fiber array
CN1448747A (zh) * 2002-02-13 2003-10-15 富士康(昆山)电脑接插件有限公司 光纤阵列及其制造方法
CN201955490U (zh) * 2010-12-30 2011-08-31 深圳日海通讯技术股份有限公司 一种光纤阵列封装装置
CN103358249A (zh) * 2012-03-27 2013-10-23 广东海粤集团有限公司 光纤阵列板组装装置和应用该装置的光纤阵列板组装平台
CN202886638U (zh) * 2012-11-08 2013-04-17 扬中市华瑞通讯仪器有限公司 光纤阵列组件制作工装
CN203965655U (zh) * 2014-06-23 2014-11-26 新中合光电科技(保靖)有限公司 一种用于光纤阵列头的制作装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107991742A (zh) * 2018-01-11 2018-05-04 四川飞普科技有限公司 用于mt-mt多通道连接器的长度控制装置
CN107991742B (zh) * 2018-01-11 2024-03-08 四川飞普科技有限公司 用于mt-mt多通道连接器的长度控制装置
CN109188605A (zh) * 2018-08-30 2019-01-11 中国工程物理研究院核物理与化学研究所 一种长线列密排光纤阵列排布装置
CN113406759A (zh) * 2021-08-18 2021-09-17 武汉驿路通科技股份有限公司 一种保偏光纤装配装置及其使用方法
CN113406759B (zh) * 2021-08-18 2021-12-03 武汉驿路通科技股份有限公司 一种保偏光纤装配装置及其使用方法

Similar Documents

Publication Publication Date Title
CN205870848U (zh) 一种单根同组自动张拉锁紧装置
CN104076437A (zh) 一种用于光纤阵列头的制作装置
CN203965655U (zh) 一种用于光纤阵列头的制作装置
CN103203717A (zh) 一种高压安全阀拆卸工装
CN203125460U (zh) 一种高压安全阀拆卸工装
CN104190803B (zh) 一种继电器触点自动铆接方法及设备
CN102505858B (zh) 预应力碳纤维布张拉系统及张拉加固方法
CN203324094U (zh) 实验室砂浆粘结强度测试用夹具
CN103286502A (zh) 具有调节螺栓的光器件耦合座
CN103286503A (zh) 用于光器件焊接的工装
CN102590672A (zh) 一种新型pcb板功能测试治具
CN203304445U (zh) 上下起跳式电子元器件pin脚拨弯治具
CN204374052U (zh) 一种适用于普通拉力试验机的纤维粘结性能测试装置
CN203579856U (zh) 一种砌块成型机的模框脱模结构
CN105067402A (zh) 一种用于制备扯离强度测试试件的模具及其使用方法
CN105863274B (zh) 一种专用于预应力材料张拉伸长的自动锁定装置
CN214091023U (zh) 一种土木工程用建筑模板连接架
CN204230172U (zh) 一种绝缘拉杆压装工装
CN204662521U (zh) 一种测缝计阻尼式预拉装置
CN203557513U (zh) 先张法预应力高强混凝土波形板桩的预应力张拉装置
CN100363149C (zh) 一种可精密定位的静压导轨及其定位方法
CN109813590B (zh) 一种用于裂隙类岩石试件的模具
CN203385545U (zh) 矿用锚索组装件性能测试试验机
CN202522640U (zh) 一种新型pcb板功能测试治具
CN203210577U (zh) 无托板液压式轮胎硫化机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 416500 Hunan Province, Xiangxi Tujia and Miao Autonomous Prefecture Baojing County Wei Zhu Lu business building 1-3 floor

Applicant after: HUNAN NEWFIBER OPTICAL ELECTRONICS CO., LTD.

Address before: 416500 Hunan Province, Xiangxi Tujia and Miao Autonomous Prefecture Baojing County Wei Zhu Lu business building 1-3 floor

Applicant before: New Sino photoelectric technology (Baojing) Co., Ltd.

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141001