CN104076387B - A kind of shallow sea barrier OBC earthquake-capturing focus construction methods - Google Patents

A kind of shallow sea barrier OBC earthquake-capturing focus construction methods Download PDF

Info

Publication number
CN104076387B
CN104076387B CN201410249923.0A CN201410249923A CN104076387B CN 104076387 B CN104076387 B CN 104076387B CN 201410249923 A CN201410249923 A CN 201410249923A CN 104076387 B CN104076387 B CN 104076387B
Authority
CN
China
Prior art keywords
barrier
design
line
construction
trestle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410249923.0A
Other languages
Chinese (zh)
Other versions
CN104076387A (en
Inventor
董伟
梁宝军
张洪军
李晓东
邓波
童利清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BGP Inc
Original Assignee
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BGP Inc filed Critical BGP Inc
Priority to CN201410249923.0A priority Critical patent/CN104076387B/en
Publication of CN104076387A publication Critical patent/CN104076387A/en
Application granted granted Critical
Publication of CN104076387B publication Critical patent/CN104076387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of shallow sea barrier OBC earthquake-capturing focus construction methods, belong to shallow sea OBC earthquake-capturing, the marine geologic survey technical field that there is barrier.Contain following steps;(1) finely make an on-the-spot survey, determine particular location of the barrier in work area.(2) obstacle article coordinate is plotted on the collection such as gram unrestrained or green mountain design software.(3) avoidance and Encryption Design are carried out according to the barrier on collection design software.(4) after carrying out avoidance and Encryption Design to barrier, shot point missing and data breach situation are analyzed with collection design and treatment software, determine that degree of covering, data breach etc. meet associated specifications.(5) constructed according to avoidance and Encryption Design.

Description

A kind of shallow sea barrier OBC earthquake-capturing focus construction methods
Technical field
The present invention relates to a kind of shallow sea barrier OBC earthquake-capturing focus construction methods, belong to the shallow sea that there is barrier OBC earthquake-capturings, marine geologic survey technical field.
Background technology
Obstacle in shallow sea complicated earth surface type and region has larger shadow to High-precision O BC seismic data acquisition operations Ring, shallow sea barrier is mainly including drilling and producing platform, single point mooring, man-made island, bridge etc..The presence of these larger barriers, meeting Causing component arrangement line cannot be laid, and part shot point cannot be excited, and cause shallow-layer data to lack.Data quality is bad, imaging essence Degree is also affected.With the raising of shallow sea prospection Exploitation degree, the requirement more and more higher to data quality is more obtained Seismic data in barrier can further improve imaging precision, it is ensured that exploration effects.Traditional OBC earthquakes construction method is in barrier Hindering the implementation in area to be mainly takes special observation system to design, for example, encrypt minispread, encryption shot point etc. on barrier border, plus Close principle is all parallel to survey line arrangement or the arrangement of big gun line, although the degree of covering of mid-deep strata, shallow-layer can be made up The more difficult control of data breach.
The content of the invention
In order to overcome the deficiencies in the prior art, the present invention to provide a kind of shallow sea barrier OBC earthquake-capturing focus construction parties Method.
A kind of shallow sea barrier OBC earthquake-capturing focus construction methods, rely on the shape of barrier, using curved line method in length and breadth And the shot point such as oblique line method is laid and exciting method so that big gun line is excited and no longer stick to linear form of construction work, is become more It is flexible and changeable, so as to improve operating efficiency, more barrier seismic datas are obtained, reduce data shallow-layer breach, to greatest extent Ground ensures data-integrity.
The current light-duty OBC cable operation methods in shallow sea be mainly arranging line is completed after carried out exciting operation by energy source boat. Energy source boat carries out shot point and excites the advantage of operation, such operation to be easy for field behaviour along the shot point line direction of parallel alignment Make, reduce the offline number of times for turning around and time on energy source boat, operating efficiency is increased substantially, while when the depth of water can be avoided shallower Arrangement is crossed, arranging line is hung up, is hung partially.
But due to the presence of shallow sea barrier, big gun line cut-off is opened, influence energy source boat normal operation.For this using innovative The method of curved line in length and breadth and the construction of the method such as oblique line method,
A kind of shallow sea barrier OBC earthquake-capturing focus construction methods, contain following steps;
(1) finely make an on-the-spot survey, determine particular location of the barrier in work area.
(2) obstacle article coordinate is plotted on the collection such as gram unrestrained or green mountain design software.
(3) avoidance and Encryption Design are carried out according to the barrier on collection design software.Here it is divided into two kinds of situations:
A. when the rule barrier such as platform, single point mooring is run into, constructed using curved line method in length and breadth, the horizontal big gun line of design and Curved line big gun line.Generally the big gun line of shallow sea OBC constructions is parallel to arrange survey line, when there is barrier in construction area When, take curved line avoidance in direction arranged in parallel, the method that big gun line is encrypted in vertical arrangement direction ensureing the premise of safe distance Under, energy source boat presses close to barrier construction.
B. when the irregular slalom thing such as L-type trestle is run into, the slope of trestle is calculated, what disturbance of analysis thing influenceed excites model Enclose, press close to trestle cloth and set out the oblique line shot point group similar to trestle slope.When trestle both sides are constructed, take energy source boat it is offline fall Head does not stop big gun, continues to excite, partially the method for point construction, and data is obtained as far as possible, makes up shallow-layer degree of covering missing.
(4) after carrying out avoidance and Encryption Design to barrier, shot point is lacked and data with collection design and treatment software Breach situation is analyzed, and determines that degree of covering, data breach etc. meet associated specifications.
(5) constructed according to avoidance and Encryption Design.
It is an advantage of the invention that the present invention improves and optimizes conventional construction method, on the premise of navigation safety is ensured, Make energy source boat infinite approach barrier, in all directions surround barrier so that cannot swash under normal mode operation originally The shot point of hair obtains implementation and excites.The influence of barrier can be minimized by application the method, by shallow-layer data breach Minimum is tapered to, so as to obtain good earthquake-capturing effect.
Brief description of the drawings
When considered in conjunction with the accompanying drawings, by referring to following detailed description, can more completely more fully understand the present invention with And the adjoint advantage of many of which is easily learnt, but accompanying drawing described herein is used for providing a further understanding of the present invention, A part of the invention is constituted, schematic description and description of the invention is used to explain the present invention, does not constitute to this hair Bright improper restriction, such as figure are wherein:
Fig. 1 platforms barrier big gun is cautious to implement figure (not carrying out horizontal construction);
(note is schemed in the cautious implementation of big gun after Fig. 2 laterally constructs:Single-point is shot point in two figures, and line point is geophone station);
Fig. 3 platforms barrier coverage plot;
Fig. 4 " L-type " trestle location drawing;
Fig. 5 oblique lines method construction schematic diagram;
Fig. 6 is offline to turn around not stop big gun schematic diagram;
Fig. 7 practice of construction completes shot point figure;
Fig. 8 a:Before using oblique line method (the data breach section near trestle);
Fig. 8 b:After being constructed using oblique line method (the data breach section near trestle)
The present invention is further described with reference to the accompanying drawings and examples.
Specific embodiment
Obviously, those skilled in the art belong to guarantor of the invention based on many modifications and variations that spirit of the invention is done Shield scope.
Embodiment 1:As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8 a, Fig. 8 b,
There are multiple drilling and producing platforms in the BZ projects work area west and south, these platforms are about 70-150 meters, wide about 60-90 meters, and one As it is apart from each other between platform, wherein there is two platforms adjacent, between distance be about 300 meters;There is a L-type in the work area northwestward Trestle.In the project using the focus construction method such as curved line method and oblique line method in length and breadth, preferable collection effect is achieved.It is specific real Apply process as follows:
(1) finely make an on-the-spot survey, determine position of the barrier on construction map, safe distance or safety zone are reserved in advance. And barrier is plotted on design map.
(2) two methods have been respectively adopted and have crossed barrier construction:
A. according to the characteristics of platform barrier, shot point is laid using curved line method in length and breadth.It is curved along design when energy source boat crosses platform Line is travelled, and does not occur empty road during construction, but indivedual shot points lack (as shown in Figure 1).Horizontal big gun line is carried out further according to design Construction, compensate for 4 big guns (as shown in Figure 2) that longitudinal direction cannot construct.
Carry out bin degree of covering analysis.When crossing platform barrier, original design degree of covering 96 times, using curved line method in length and breadth Overall degree of covering more than 80 times after construction.By profile analysis, the control of shallow-layer data breach exists when survey line crosses platform barrier 0.3s or so (as shown in Figure 3), has reached expected collection effect.
B. according to the characteristics of L-type trestle, oblique line method focus arrangement and method for construction is implemented.By on L-type trestle spread to design map (as shown in Figure 4).
The slope of trestle is calculated, the shot point scope of its influence is analyzed, trestle south and north flanks respectively there are 6 artillery salvo points can not be real Apply, cause data breach for 1s (as shown in Figure 8 a), press close to trestle and design oblique line shot point (such as Fig. 5 similar to trestle slope It is shown).When trestle both sides are constructed, the offline strategy (as shown in Figure 6) for turning around not stop big gun continuation point construction partially of energy source boat is taken, The degree of covering in trestle area can so be increased.
(3) in practice of construction, along oblique line 91 big guns of construction (as shown in Figure 7).Analyzed by bin degree of covering, trestle area The actual degree of covering in domain is more than 92 times, meets technical requirements, has reached Expected Results.Final section breach control is left in 0.5s Right (as shown in Figure 8 b).
In the work progress in other similar obstacles areas of BZ projects, employ above shot point and lay and focus construction party Method, efficiently solves shallow-layer data breach and shot point missing problem, achieves good earthquake-capturing effect.
As described above, embodiments of the invention are explained, but as long as essentially without this hair of disengaging Bright inventive point and effect can have many deformations, and this will be readily apparent to persons skilled in the art.Therefore, this The variation of sample is also integrally incorporated within protection scope of the present invention.

Claims (1)

1. a kind of shallow sea barrier OBC earthquake-capturing focus construction methods, it is characterised in that contain following steps;
(1) finely make an on-the-spot survey, determine particular location of the barrier in construction area;
(2) obstacle article coordinate is plotted on gram unrestrained or green mountain collection design software;
(3) avoidance and Encryption Design are carried out according to the barrier on collection design software;Here it is divided into two kinds of situations:
A. when regular barrier, and the regular barrier is run into including platform or single point mooring, applied using curved line method in length and breadth Work, the horizontal big gun line of design and curved line big gun line;Generally the big gun line of shallow sea OBC constructions is parallel to arrange survey line, when applying When there is barrier in the domain of work area, line direction curved line avoidance arranged in parallel is taken, vertical arrangement line direction encryption big gun line Method, on the premise of safe distance is ensured, energy source boat presses close to barrier construction;
B. when irregular slalom thing, and the irregular slalom thing is run into including L-type trestle, the slope of trestle, analysis are calculated The excites scope of barrier influence, presses close to trestle cloth and sets out the oblique line shot point group similar to trestle slope;In the construction of trestle both sides When, take that energy source boat is offline to turn around not stop big gun, continue to excite, partially the method for point construction, data is obtained as far as possible, make up shallow-layer and cover Lid number of times is lacked;
(4) after carrying out avoidance and Encryption Design to barrier, shot point is lacked with collection design software and data breach situation is entered Row analysis, determines that degree of covering, data breach meet associated specifications;
(5) constructed according to avoidance and Encryption Design.
CN201410249923.0A 2014-06-06 2014-06-06 A kind of shallow sea barrier OBC earthquake-capturing focus construction methods Active CN104076387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410249923.0A CN104076387B (en) 2014-06-06 2014-06-06 A kind of shallow sea barrier OBC earthquake-capturing focus construction methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410249923.0A CN104076387B (en) 2014-06-06 2014-06-06 A kind of shallow sea barrier OBC earthquake-capturing focus construction methods

Publications (2)

Publication Number Publication Date
CN104076387A CN104076387A (en) 2014-10-01
CN104076387B true CN104076387B (en) 2017-07-07

Family

ID=51597769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410249923.0A Active CN104076387B (en) 2014-06-06 2014-06-06 A kind of shallow sea barrier OBC earthquake-capturing focus construction methods

Country Status (1)

Country Link
CN (1) CN104076387B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111273339B (en) * 2018-12-04 2022-12-02 中国石油天然气集团有限公司 Shot point encryption method and system based on barrier target area
CN111562609B (en) * 2020-05-20 2023-01-10 中石化石油工程技术服务有限公司 Automatic excitation point obstacle avoidance method and system
CN113009573B (en) * 2021-02-25 2023-07-18 中国石油集团东方地球物理勘探有限责任公司 Seismic data acquisition method, device, computer equipment and storage medium

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6629037B1 (en) * 2000-06-26 2003-09-30 Westerngeco, L.L.C. Optimal paths for marine data collection
CN102662192B (en) * 2004-03-17 2017-06-30 维斯特恩格科地震控股有限公司 Marine seismic survey method and system
US8824239B2 (en) * 2004-03-17 2014-09-02 Westerngeco L.L.C. Marine seismic survey method and system
US8593905B2 (en) * 2009-03-09 2013-11-26 Ion Geophysical Corporation Marine seismic surveying in icy or obstructed waters
CN102236103A (en) * 2010-05-07 2011-11-09 杨世奇 Automatic obstacle avoidance optimization design technology of three-dimensional seismic exploration acquisition observation system based on geographic information
CN103605152B (en) * 2013-10-30 2016-04-06 中国石油天然气集团公司 A kind of automatic shot point offset method based on barrier place of safety

Also Published As

Publication number Publication date
CN104076387A (en) 2014-10-01

Similar Documents

Publication Publication Date Title
Stein et al. Desiccation cracks provide evidence of lake drying on Mars, Sutton Island member, Murray formation, Gale Crater
CN103454686B (en) Small scale sedimentary facies based on strata slicing carries out the method and system of reservoir prediction
CN104597493B (en) The evaluation methodology of observation system geometry changed design and device based on actual seismic data
CN104076387B (en) A kind of shallow sea barrier OBC earthquake-capturing focus construction methods
CN105093320B (en) For high-speed crystallization salt crust area of coverage tomographic statics first break pickup method
CN102352757B (en) Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel
CN102758622A (en) Monitoring method for earth surface environment damage in underground mining area
Janik et al. Seismic structure of the lithosphere between the East European Craton and the Carpathians from the net of CELEBRATION 2000 profiles in SE Poland
Li et al. Structural superimposition and conjunction and its effects on hydrocarbon accumulation in the Western Sichuan Depression
CN107388950A (en) A kind of stereoscopic monitoring method of the land destruction feature of coal resources pit mining
CN107101617A (en) Stope overlying strata activity control method under a kind of coombe landform based on remote sensing monitoring
CN107766978A (en) The intelligent optimization method of skewed pattern
CN105572725B (en) A kind of ground micro-seismic monitors station distribution design method
CN102540254A (en) Method for determining effective excitation region based on lighting analysis
CN105487106B (en) A kind of benefit big gun method based on the illumination of Gaussian ray bundle target zone energy
CN102778689A (en) Wide curved line seismic data underground reflection line building method
CN106908841A (en) Marine non-repeatability towing cable time-lapse seismic data high-density acquisition method
CN105093324A (en) Residual static correction method
CN105607128A (en) Geological fault detection method under hard and soft interbedded geological condition
Zhao et al. Land subsidence risk assessment and protection in mined-out regions
Wei et al. Pre-Cretaceous Palaeogeomorphologic feature and its significance to oil and gas in hinterland area of Junggar Basin
Wawerzinek et al. SEismic imaging of the Ivrea ZonE (project SEIZE) reveals the 3D structure of the Ivrea body near Balmuccia, Italy
Teng et al. 3D Velocity Modeling Method and Application Based on Graph Decomposition
Huang et al. Images of high density resistivity method in leakage detecting of the watertight screen at Gushan open-pit mine
Leucci et al. Cetotheridae, Mysticete Whale, fragment of mandibular detection using GPR method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant