CN104047236A - 桥头跳车路面的修复方法 - Google Patents
桥头跳车路面的修复方法 Download PDFInfo
- Publication number
- CN104047236A CN104047236A CN201410223553.3A CN201410223553A CN104047236A CN 104047236 A CN104047236 A CN 104047236A CN 201410223553 A CN201410223553 A CN 201410223553A CN 104047236 A CN104047236 A CN 104047236A
- Authority
- CN
- China
- Prior art keywords
- injected hole
- nothing
- slurry
- grouting
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000002002 slurry Substances 0.000 claims abstract description 56
- 238000001514 detection method Methods 0.000 claims abstract description 18
- 239000002689 soil Substances 0.000 claims description 35
- 238000007569 slipcasting Methods 0.000 claims description 18
- 230000001771 impaired effect Effects 0.000 claims description 5
- 238000007789 sealing Methods 0.000 claims description 5
- 238000005553 drilling Methods 0.000 abstract 2
- 239000011347 resin Substances 0.000 description 8
- 229920005989 resin Polymers 0.000 description 8
- 238000012423 maintenance Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000004062 sedimentation Methods 0.000 description 3
- 230000008961 swelling Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000001035 drying Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005187 foaming Methods 0.000 description 2
- 230000002431 foraging effect Effects 0.000 description 2
- 238000005755 formation reaction Methods 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000000737 periodic effect Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000002910 structure generation Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000002861 polymer material Substances 0.000 description 1
Abstract
Description
Claims (3)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410223553.3A CN104047236B (zh) | 2014-05-26 | 2014-05-26 | 桥头跳车路面的修复方法 |
CN201610153743.1A CN105780673B (zh) | 2014-05-26 | 2014-05-26 | 解决硬、软土层沉降速度差异的桥头跳车路面的修复方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410223553.3A CN104047236B (zh) | 2014-05-26 | 2014-05-26 | 桥头跳车路面的修复方法 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610153743.1A Division CN105780673B (zh) | 2014-05-26 | 2014-05-26 | 解决硬、软土层沉降速度差异的桥头跳车路面的修复方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104047236A true CN104047236A (zh) | 2014-09-17 |
CN104047236B CN104047236B (zh) | 2016-04-13 |
Family
ID=51500607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410223553.3A Active CN104047236B (zh) | 2014-05-26 | 2014-05-26 | 桥头跳车路面的修复方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104047236B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104746501A (zh) * | 2015-04-16 | 2015-07-01 | 中南大学 | 一种桥头路基滑移型沉降的治理方法及其结构 |
CN104790290A (zh) * | 2015-04-22 | 2015-07-22 | 兰州铁道设计院有限公司 | 与桥台连接成一体的框架弹簧组合式桥路过渡段结构 |
CN104988852A (zh) * | 2015-05-25 | 2015-10-21 | 武汉理工大学 | 预置式可调搭板处理桥头跳车的顶升装置 |
CN107142852A (zh) * | 2017-06-21 | 2017-09-08 | 渠承明 | 桥梁护栏钻孔植筋结构及其施工方法 |
CN108103923A (zh) * | 2017-12-01 | 2018-06-01 | 浙江工业大学 | 一种桥梁用防桥头跳车装置 |
CN108330848A (zh) * | 2018-03-10 | 2018-07-27 | 林光琴 | 一种桥梁路面修复施工技术 |
CN108385549A (zh) * | 2018-03-25 | 2018-08-10 | 林光琴 | 一种桥梁路面修复施工方法 |
CN117266023A (zh) * | 2023-11-21 | 2023-12-22 | 北京城建信捷轨道交通工程咨询有限公司 | 轨道钢桥面板的铺装结构及铺装方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU977789A1 (ru) * | 1981-04-28 | 1982-11-30 | Научно-исследовательский институт строительства угольных и горнорудных предприятий | Способ тампонировани горных пород |
EP0456331A1 (en) * | 1990-05-10 | 1991-11-13 | Voorbij Groep B.V. | Method for the displacement of a slab-shaped carrier, and seal therefor |
CN2793458Y (zh) * | 2005-05-08 | 2006-07-05 | 张厚珕 | 旋转密封装置 |
CN101168957A (zh) * | 2007-10-01 | 2008-04-30 | 于心然 | 桥梁搭板脱空的浅层注浆加固技术 |
CN102051861A (zh) * | 2009-11-02 | 2011-05-11 | 郑州优特基础工程维修有限公司 | 桥头跳车病害防治高聚物注浆技术及其施工方法 |
CN102409598A (zh) * | 2011-09-29 | 2012-04-11 | 河海大学 | 一种既有高速公路桥头跳车的处理方法 |
CN102888796A (zh) * | 2012-09-13 | 2013-01-23 | 山西路众道桥有限公司 | 一种快速修复水泥混凝土路面脱空病害的方法 |
CN103669385A (zh) * | 2013-12-30 | 2014-03-26 | 中铁二十四局集团有限公司 | 利用网状桩基础提高桩群承载力的方法 |
-
2014
- 2014-05-26 CN CN201410223553.3A patent/CN104047236B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU977789A1 (ru) * | 1981-04-28 | 1982-11-30 | Научно-исследовательский институт строительства угольных и горнорудных предприятий | Способ тампонировани горных пород |
EP0456331A1 (en) * | 1990-05-10 | 1991-11-13 | Voorbij Groep B.V. | Method for the displacement of a slab-shaped carrier, and seal therefor |
CN2793458Y (zh) * | 2005-05-08 | 2006-07-05 | 张厚珕 | 旋转密封装置 |
CN101168957A (zh) * | 2007-10-01 | 2008-04-30 | 于心然 | 桥梁搭板脱空的浅层注浆加固技术 |
CN102051861A (zh) * | 2009-11-02 | 2011-05-11 | 郑州优特基础工程维修有限公司 | 桥头跳车病害防治高聚物注浆技术及其施工方法 |
CN102409598A (zh) * | 2011-09-29 | 2012-04-11 | 河海大学 | 一种既有高速公路桥头跳车的处理方法 |
CN102888796A (zh) * | 2012-09-13 | 2013-01-23 | 山西路众道桥有限公司 | 一种快速修复水泥混凝土路面脱空病害的方法 |
CN103669385A (zh) * | 2013-12-30 | 2014-03-26 | 中铁二十四局集团有限公司 | 利用网状桩基础提高桩群承载力的方法 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104746501A (zh) * | 2015-04-16 | 2015-07-01 | 中南大学 | 一种桥头路基滑移型沉降的治理方法及其结构 |
CN104790290A (zh) * | 2015-04-22 | 2015-07-22 | 兰州铁道设计院有限公司 | 与桥台连接成一体的框架弹簧组合式桥路过渡段结构 |
CN104988852A (zh) * | 2015-05-25 | 2015-10-21 | 武汉理工大学 | 预置式可调搭板处理桥头跳车的顶升装置 |
CN104988852B (zh) * | 2015-05-25 | 2017-03-15 | 武汉理工大学 | 预置式可调搭板处理桥头跳车的顶升装置 |
CN107142852A (zh) * | 2017-06-21 | 2017-09-08 | 渠承明 | 桥梁护栏钻孔植筋结构及其施工方法 |
CN107142852B (zh) * | 2017-06-21 | 2019-07-30 | 陕西专壹知识产权运营有限公司 | 桥梁护栏钻孔植筋结构及其施工方法 |
CN108103923A (zh) * | 2017-12-01 | 2018-06-01 | 浙江工业大学 | 一种桥梁用防桥头跳车装置 |
CN108330848A (zh) * | 2018-03-10 | 2018-07-27 | 林光琴 | 一种桥梁路面修复施工技术 |
CN108330848B (zh) * | 2018-03-10 | 2019-05-31 | 青海省恒立公路勘测设计有限公司 | 一种桥梁路面修复施工技术 |
CN108385549A (zh) * | 2018-03-25 | 2018-08-10 | 林光琴 | 一种桥梁路面修复施工方法 |
CN117266023A (zh) * | 2023-11-21 | 2023-12-22 | 北京城建信捷轨道交通工程咨询有限公司 | 轨道钢桥面板的铺装结构及铺装方法 |
CN117266023B (zh) * | 2023-11-21 | 2024-02-06 | 北京城建信捷轨道交通工程咨询有限公司 | 轨道钢桥面板的铺装结构及铺装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104047236B (zh) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104047236B (zh) | 桥头跳车路面的修复方法 | |
CN104033164B (zh) | 对隧道内拱的脱空及渗水害进行修复的方法 | |
CN104695343B (zh) | 一种基于后背墙推进技术的长距离顶进施工方法 | |
CN104047217A (zh) | 路面快速修复方法 | |
CN105735151B (zh) | 一种路面修复方法 | |
CN104746390A (zh) | 一种泡沫轻质混凝土铁路路基结构 | |
CN111503368A (zh) | 砂卵石地质条件下顶管施工方法 | |
CN104033165B (zh) | 隧道病害修复方法及修复浆料 | |
CN104047235B (zh) | 对路面的桥头台背处进行修复的方法 | |
CN104047213B (zh) | 一种能解决硬土层与软土层沉降速度差异的路面修复方法 | |
CN104047237B (zh) | 一种路面修复方法 | |
CN206467512U (zh) | 深淤泥地基段路桥衔接结构 | |
CN103912290B (zh) | 一种用于地铁隧道管片外侧隔振降噪的注浆方法 | |
CN113737624A (zh) | 一种桥头跳车囊式注浆修复施工方法 | |
CN109704656A (zh) | 一种桥接坡地聚合物注浆加固方法 | |
CN104047305A (zh) | 房屋沉陷的快速修复方法 | |
CN105926391A (zh) | 一种既有铁路路基的路肩加宽方法 | |
CN204875495U (zh) | 一种无台身坐板式桥台 | |
CN105780673B (zh) | 解决硬、软土层沉降速度差异的桥头跳车路面的修复方法 | |
CN106812065A (zh) | 一种混凝土简支预应力箱梁施工工艺 | |
CN206736649U (zh) | 一种轻质路堤结构 | |
CN210946334U (zh) | 沉陷桥头搭板软弱地基加固及搭板顶升修复系统 | |
CN109033714B (zh) | 一种控制路基路面协调变形的设计方法 | |
CN104047306A (zh) | 对沉陷的房屋进行抬升并扶正的方法 | |
CN203160089U (zh) | 一种防沉降桥头斜坡结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Zan Inventor before: Zhang Lahua Inventor before: Chen Kai Inventor before: Dong Jun |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Repair method for road surface caused by vehicle jumping at the bridgehead Granted publication date: 20160413 Pledgee: Industrial and Commercial Bank of China Danyang Branch Pledgor: JIANGSU DINGTAI ENGINEERING MATERIAL CO.,LTD. Registration number: Y2024980002806 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |