CN102409598A - 一种既有高速公路桥头跳车的处理方法 - Google Patents

一种既有高速公路桥头跳车的处理方法 Download PDF

Info

Publication number
CN102409598A
CN102409598A CN2011103024926A CN201110302492A CN102409598A CN 102409598 A CN102409598 A CN 102409598A CN 2011103024926 A CN2011103024926 A CN 2011103024926A CN 201110302492 A CN201110302492 A CN 201110302492A CN 102409598 A CN102409598 A CN 102409598A
Authority
CN
China
Prior art keywords
embankment
drilling rod
light material
highway
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103024926A
Other languages
English (en)
Inventor
刘汉龙
丁选明
陈育民
陈永辉
吴跃东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN2011103024926A priority Critical patent/CN102409598A/zh
Publication of CN102409598A publication Critical patent/CN102409598A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种既有高速公路桥头跳车的处理方法,包括以下步骤:在现场拌和轻质材料;从高速公路两侧路堤边坡处钻孔,一边旋转钻进一边通过螺纹口向外自动排土;待达到设计深度后,旋转缓慢外拔钻杆,同时开启增压泵,通过钻杆中心管将轻质材料泵送到钻孔;轻质材料通过钻杆中心的孔洞喷出,从下而上逐渐填满孔洞,置换了路堤填土。钻孔在路堤边坡面排列成方形或梅花形,钻孔与水平面呈一定夹角,孔口标高位于路面结构层以下和路堤填土底面以上。本发明路堤重量大大减轻,从而减小了路堤荷载引起的工后沉降,有效解决了桥头跳车问题。施工期不需封闭公路,不影响正常通行。本发明施工工序简明,操作方便、设备简单、经济高效。

Description

一种既有高速公路桥头跳车的处理方法
 
技术领域
本发明属于土木工程技术领域,特别涉及一种既有高速公路桥头跳车的处理方法。
背景技术
我国高速公路建设飞速发展,而我国大部分高速公路位于东部沿海地区,在沿海地区修建高速公路,存在大量软土地基处理的问题。在软土地区修建高速公路,需要解决路基的不均匀沉降问题,这在桥头位置尤为重要。我国《公路路基设计规范》(JTG D30—2004)规定一般路段的工后沉降小于30cm,桥头过渡段的工后沉降小于20cm,桥头段的工后沉降小于10cm。
我国目前修建的高速公路,很多桥头路段由于地基处理强度不够,致使桥头软基路段和桥台之间产生较大的差异沉降,在车辆经过桥头时会产生跳跃,俗称“桥头跳车”,当差异沉降过大时甚至影响高速公路的正常使用。
本发明之前,处理高速公路桥头跳车常用的方法是在桥头产生沉降的路段摊铺一层路面材料,使路面与桥台的标高一致。但该方法的缺点为:摊铺的材料容重较大,作为荷载施加在路堤上,在软土地基中产生附加应力,引起地基的压缩变形,从而产生新的固结沉降,在使用一段时间后桥头段与桥台之间又有差异沉降。倘若继续采用摊铺材料的方法解决该差异沉降,新摊铺的材料又作为荷载产生附加应力,引起进一步的沉降,形成一个恶性循环,无法终止。摊铺材料还有一个缺点,就是在施工时必须封闭施工的路面,影响高速公路的正常通行。
发明内容
本发明的目的就在于克服上述缺陷,提供一种一次性解决既有高速公路桥头跳车问题、且施工时不影响高速公路正常使用的桥头跳车的处理方法。
本发明一种既有高速公路桥头跳车的处理方法,包括以下技术步骤:
(1)采用拌和机在现场拌和轻质材料,轻质材料应有一定的流动性。
(2)拌和机在底部开孔通过软管与增压泵相连,再通过软管连接到钻杆上端部,形成轻质材料的输送通道。
(3)采用螺栓钻杆分别在高速公路桥头路段左、右两侧路堤边坡处倾斜钻
孔,钻杆旋转钻进并通过螺纹口向外自动排土,钻孔深度接近路堤填土中心。
(4)边旋转边缓慢外拔长螺旋钻机的钻杆,同时开启增压泵,通过钻杆中心管将轻质材料泵送到钻孔。
(5)轻质材料通过钻杆中心的孔洞喷出,从下而上逐渐填满孔洞,置换掉了原来的路堤填土。
(6)一孔注满轻质材料后,钻杆完全拔出,移机至下一钻孔,直到整个坡面完成钻孔置换。
(7)轻质材料凝固后,按设计要求进行边坡防护,完成施工。
所述钻孔孔口位于路堤边坡表面,孔底位于路堤边坡内部或地基土体中。
所述的钻孔在路堤边坡面呈方形或梅花形排列,钻孔与水平面呈一定夹角。
所述钻孔的孔口标高位于路面结构层以下和路堤填土底面以上。
所述的轻质材料密度较小而强度较高,可采用EPS颗粒轻质混合土或气泡轻质混合土等。
所述路堤采用轻质材料置换原有路堤材料,置换率达到50%以上。
所述钻杆为中空型,可通过钻杆内部孔洞输送轻质填料。
本发明的优点和效果在于:
(1)原有桥头段路堤填料密度较大,因此地基产生的变形大,采用轻质材料置换之后,路堤重量大大减轻,从而减小了路堤荷载作用产生的附加应力,减小了桥头段地基工后沉降,有效解决了桥头跳车问题。
(2)本发明采用的施工方法从路堤侧面钻孔施工,施工期间不需要封闭高速公路,不影响高速公路正常通行。
(3)钻杆为中空,可直接输送轻质材料到孔内,置换掉原来密度较大的填土,施工速度快。边拔管边输送轻质材料,避免了打孔后孔壁塌孔的问题。
(4)成孔直径大,置换率高,同样的处理面积所需钻孔数量少,因此施工工程量少,施工速度快,效率高。
(5)不仅可以在卵石路堤施工,也可在软土地基中施工完成置换,在路堤钻孔,孔深可达地基软土层,应用范围广。
本发明施工工序简明,只需钻孔和灌浆,操作方便、设备简单、经济高效。
 
本发明的优点和效果还将在具体实施方式中进一步描述。
 
附图说明:
图1——本发明桥头段和桥梁段纵断面示意图。
图2——本发明桥头段和桥梁段平面俯视图。
图3——本发明桥头段横断面示意图。
图4——本发明施工方法示意图。
图中:1为轻质材料;2为路面;3为桥头段路堤;4为钻杆;5为拌和机;6为增压泵;7为钻孔;8为钻机;9为软管;10为排出的土体;11为桥梁段;12为地基土体;13为持力层。
 
具体实施方式
如图1~图4所示,桥梁段(11)的桩基础打入持力层(13),持力层(13)一般为基岩,因此桥梁段(11)几乎没有沉降,而桥头段路堤(3)下部为地基土体(12),一般都会在附加应力作用下产生一定的沉降量。因此,在桥梁段(11)和桥头段路堤(3)之间会有差异沉降的产生,使得车辆经过时要产生跳跃,即桥头跳车。
为解决桥头跳车问题,必须设法减小桥头段路堤(3)的沉降。 采用本发明的方法,在路堤边坡施工,用轻质材料(1)置换掉较重的路堤填土,减少荷载,从而减小沉降,施工方便,不破坏路面(2),不影响通车。
本发明采用履带式长螺旋钻机(8)形成钻孔(7),可实现在坡面上的倾斜钻孔(7)。钻孔(7)与水平面的夹角在10°~30 °之间,钻孔(7)与水平面呈一定夹角,可使灌入的轻质材料(1)向钻孔(7)底部流动而不至于漏出。钻孔(7)在路堤平面内排列成方形或梅花形(本实施例为梅花形),轻质材料(1)置换率在50%以上,以大大减轻桥头段路堤(3)自重。轻质材料(1)为EPS颗粒轻质混合土或气泡轻质混合土,前者将EPS颗粒与土体充分拌和,并加入一定量的固化材料形成;后者通过气泡机的发泡系统将发泡剂用机械方式充分发泡,并将泡沫与固化材料均匀混合,然后经过发泡机的泵送系统进行现浇施工。采用轻质材料(1)不仅质量轻,而且强度高,替代原有填土后,不仅减轻了重
量,同时提高了桥头段路堤(3)强度,使桥头段路堤(3)在荷载作用下的变形可忽略不计。
本发明采用轻质材料(1)置换原有桥头段路堤(3)部分填料,其实施的具体技术步骤包括:
步骤1,在现场拌和机(5)内拌和轻质材料(1),轻质材料(1)应有一定的流动性,以方便其通过软管(9)和增压泵(6)及钻杆(4)中的孔洞,将其注入钻孔(7)。
步骤2,拌和机(5)在底部开孔通过软管(9)与增压泵(6)相连,再通过软管(9)连接到钻杆(4)上端部,形成轻质材料(1)的输送通道。
步骤3,采用履带式长螺旋钻机(8)从高速公路左、右两侧路堤边坡处钻孔,钻孔(7)深度接近路堤(3)中心,可达地基土体(12)内部,钻孔(7)孔口标高在路面(2)以下,使钻孔时不破坏路面(2)的结构层。钻孔时,桥头段路堤(3)的土体被螺旋形钻杆(4)自动排出,及时清除孔口排出的土体(10)。
步骤4,边旋转边缓慢外拔长螺旋钻机(8)的钻杆(4),同时开启增压泵(6),轻质材料(1)在增压泵(6)的压力作用下,从拌和机(5)经软管(9),再通过钻杆(4)中心管被泵送到钻孔(7)。
步骤5,轻质材料(1)通过钻杆(4)中心的孔洞喷出,从下而上逐渐填满孔洞,置换掉了原来的桥头段路堤填土(3)。
步骤6,一孔注满轻质材料(1)后,关闭增压泵(6),并将钻杆(4)完全拔出,移机至下一钻孔,直到整个坡面完成钻孔置换
步骤7,轻质材料(1)凝固后,按设计要求进行边坡防护,完成施工。
本发明的保护范围并不以具体实施方式为限,而是由权利要求加以限定。

Claims (5)

1.一种既有高速公路桥头跳车的处理方法,包括以下技术步骤:
(1)采用拌和机在现场拌和具有一定流动性的轻质材料;
(2)拌和机在底部开孔通过软管与增压泵相连,再通过软管连接到钻杆上端部,形成轻质材料的输送通道;
(3)采用螺栓钻杆分别在高速公路左、右两侧路堤边坡处倾斜钻孔,钻杆旋转钻进并通过螺纹口向外自动排土,钻孔深度接近路堤填土中心;
(4)边旋转边缓慢外拔钻杆,同时开启增压泵,通过钻杆中心管将轻质材料泵送到钻孔;
(5)轻质材料通过钻杆中心的孔洞喷出,从下而上逐渐填满孔洞,置换掉了原来的路堤填土;
(6)一孔注满轻质材料后,钻杆完全拔出,移机至下一钻孔,直到整个坡面完成钻孔置换;
(7)轻质材料凝固后,按设计要求进行边坡防护,完成施工。
2.根据权利要求1所述的一种既有高速公路桥头跳车的处理方法,其技术特征在于钻孔的孔口标高位于路面结构层以下和路堤填土底面以上。
3.根据权利要求1所述的一种既有高速公路桥头跳车的处理方法,其技术特征在于轻质材料密度较小而强度较高, 优选EPS颗粒轻质混合土或气泡轻质混合土。
4.根据权利要求1所述的一种既有高速公路桥头跳车的处理方法,其技术特征在于路堤采用轻质材料置换原有路堤材料,置换率达到50%以上。
5.根据权利要求1所述的钻杆,其技术特征在于为中空型,可通过钻杆内部孔洞输送轻质填料。
CN2011103024926A 2011-09-29 2011-09-29 一种既有高速公路桥头跳车的处理方法 Pending CN102409598A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103024926A CN102409598A (zh) 2011-09-29 2011-09-29 一种既有高速公路桥头跳车的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103024926A CN102409598A (zh) 2011-09-29 2011-09-29 一种既有高速公路桥头跳车的处理方法

Publications (1)

Publication Number Publication Date
CN102409598A true CN102409598A (zh) 2012-04-11

Family

ID=45911920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103024926A Pending CN102409598A (zh) 2011-09-29 2011-09-29 一种既有高速公路桥头跳车的处理方法

Country Status (1)

Country Link
CN (1) CN102409598A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195047A (zh) * 2013-04-18 2013-07-10 浙江大学 一种减少软土地基沉降的处理方法
CN103572679A (zh) * 2013-11-13 2014-02-12 河海大学 一种降低桥头跳车发生率的路堤结构及填筑方法
CN104047236A (zh) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 桥头跳车路面的修复方法
CN104047235A (zh) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 对路面的桥头台背处进行修复的方法
CN104988815A (zh) * 2015-07-03 2015-10-21 河海大学 铁路路基工后沉降病害处治方法
CN105887613A (zh) * 2014-05-26 2016-08-24 江苏鼎泰工程材料有限公司 对环境无污染、消除桥头跳车现象的路面修复方法
CN105926421A (zh) * 2016-05-12 2016-09-07 姜正晖 一种基于荷载减量的桥头跳车修复与预防方法
CN108643202A (zh) * 2018-05-17 2018-10-12 广东卓建实业集团有限公司 山体修复设备
CN109914240A (zh) * 2019-03-06 2019-06-21 浙江工业大学 一种通车条件下聚氨酯高聚物注浆处治桥头跳车施工方法
CN113737624A (zh) * 2021-09-13 2021-12-03 天津大学 一种桥头跳车囊式注浆修复施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003020604A (ja) * 2001-07-05 2003-01-24 Iwate Kenko Kk 地盤形成方法
JP4506316B2 (ja) * 2004-07-13 2010-07-21 ナラサキ産業株式会社 道路の段差解消構造
CN101949122A (zh) * 2010-10-25 2011-01-19 河海大学 正常通车情况下路堤横向钻孔轻质置换控制沉降的方法
CN102127890A (zh) * 2011-03-31 2011-07-20 湖南恒盾岩土工程注浆科技有限公司 既有线路基强化施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003020604A (ja) * 2001-07-05 2003-01-24 Iwate Kenko Kk 地盤形成方法
JP4506316B2 (ja) * 2004-07-13 2010-07-21 ナラサキ産業株式会社 道路の段差解消構造
CN101949122A (zh) * 2010-10-25 2011-01-19 河海大学 正常通车情况下路堤横向钻孔轻质置换控制沉降的方法
CN102127890A (zh) * 2011-03-31 2011-07-20 湖南恒盾岩土工程注浆科技有限公司 既有线路基强化施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李占德: "论大新高速公路桥头跳车的处治措施", 《山西建筑》, no. 03, 15 February 2003 (2003-02-15), pages 250 - 251 *
李海平: "EPS轻质路堤在桥头跳车防治中的应用分析", 《安徽建筑》, no. 05, 10 October 2010 (2010-10-10), pages 110 - 112 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195047A (zh) * 2013-04-18 2013-07-10 浙江大学 一种减少软土地基沉降的处理方法
CN103572679B (zh) * 2013-11-13 2016-01-06 河海大学 一种降低桥头跳车发生率的路堤结构及填筑方法
CN103572679A (zh) * 2013-11-13 2014-02-12 河海大学 一种降低桥头跳车发生率的路堤结构及填筑方法
CN104047236B (zh) * 2014-05-26 2016-04-13 江苏鼎泰工程材料有限公司 桥头跳车路面的修复方法
CN104047235A (zh) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 对路面的桥头台背处进行修复的方法
CN104047236A (zh) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 桥头跳车路面的修复方法
CN104047235B (zh) * 2014-05-26 2016-04-27 江苏鼎泰工程材料有限公司 对路面的桥头台背处进行修复的方法
CN105862560A (zh) * 2014-05-26 2016-08-17 江苏鼎泰工程材料有限公司 对环境无污染的对路面的桥头台背处进行修复的方法
CN105887613A (zh) * 2014-05-26 2016-08-24 江苏鼎泰工程材料有限公司 对环境无污染、消除桥头跳车现象的路面修复方法
CN104988815A (zh) * 2015-07-03 2015-10-21 河海大学 铁路路基工后沉降病害处治方法
CN105926421A (zh) * 2016-05-12 2016-09-07 姜正晖 一种基于荷载减量的桥头跳车修复与预防方法
CN105926421B (zh) * 2016-05-12 2018-04-10 姜正晖 一种基于荷载减量的桥头跳车修复与预防方法
CN108643202A (zh) * 2018-05-17 2018-10-12 广东卓建实业集团有限公司 山体修复设备
CN109914240A (zh) * 2019-03-06 2019-06-21 浙江工业大学 一种通车条件下聚氨酯高聚物注浆处治桥头跳车施工方法
CN113737624A (zh) * 2021-09-13 2021-12-03 天津大学 一种桥头跳车囊式注浆修复施工方法

Similar Documents

Publication Publication Date Title
CN102409598A (zh) 一种既有高速公路桥头跳车的处理方法
CN103184734B (zh) 一种植入注浆组合桩的施工方法
CN101949122B (zh) 正常通车情况下路堤横向钻孔轻质置换控制沉降的方法
CN102127890B (zh) 既有线铁路路基强化施工方法
CN106192650B (zh) 基于结构变形协调控制的营运公路桥头跳车处置结构及方法
CN103174074B (zh) 一种已通车公路路基沉降控制结构及施工方法
CN106012697A (zh) 无砟轨道路基高聚物注浆抬升方法
CN109914240B (zh) 一种通车条件下聚氨酯高聚物注浆处治桥头跳车施工方法
CN107012861B (zh) 一种散体材料芯膨胀混凝土桩及其施工方法
CN203213101U (zh) 一种植入注浆组合桩
CN103556554A (zh) 加固路堤软基的钻孔桩复合地基结构及其施工方法
CN105672329B (zh) 深基坑大尺寸预制围护结构及施工方法
CN106592569A (zh) 一种加固客运专线粉细砂地基的设备及加固方法
CN105804101A (zh) 减小支挡结构受力的减荷支挡体系及施工方法及应用
CN103603345B (zh) 水泥搅拌注浆桩基及成形方法
JP2012117330A (ja) 土路盤置換工法
CN107975027A (zh) 盾构始发与到达端头土体加固的施工方法
CN103556555A (zh) 加固路堤软基的钉形钻孔桩复合地基结构及其施工方法
CN111395082B (zh) 运营隧道上方的轻质路基结构、设计及施工方法
CN116427396A (zh) 一种搅拌桩施工方法及其复合桩施工方法
CN203514141U (zh) 加固路堤软基的钻孔桩复合地基结构
CN106065608B (zh) 一种预拌高强度水泥土地基基础
CN103556552A (zh) 一种偏软型软基营运公路的加固方法
CN109183828A (zh) 一种钢管-混凝土串联桩组合群桩基础及其构建方法
CN203514142U (zh) 加固路堤软基的钉形钻孔桩复合地基结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120411