CN103603345B - 水泥搅拌注浆桩基及成形方法 - Google Patents

水泥搅拌注浆桩基及成形方法 Download PDF

Info

Publication number
CN103603345B
CN103603345B CN201310527476.6A CN201310527476A CN103603345B CN 103603345 B CN103603345 B CN 103603345B CN 201310527476 A CN201310527476 A CN 201310527476A CN 103603345 B CN103603345 B CN 103603345B
Authority
CN
China
Prior art keywords
pile
prefabricated pile
prefabricated
cement mixing
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310527476.6A
Other languages
English (en)
Other versions
CN103603345A (zh
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhaodi Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310527476.6A priority Critical patent/CN103603345B/zh
Publication of CN103603345A publication Critical patent/CN103603345A/zh
Application granted granted Critical
Publication of CN103603345B publication Critical patent/CN103603345B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种既适用于软土地基,又适用于一般地质构造,同时又具有高承载力,并且能够取代水泥搅拌桩、减小桩基分布密度的水泥搅拌注浆桩基及成形方法,包括注浆桩,位于地基内的注浆桩身周边包裏水泥与泥搅拌混合构成凝固层,注浆桩底部为扩头混凝土桩头。优点:一是开创了水泥搅拌桩采用注浆桩承载、水泥浆料凝固固基的先例;二是既适用于软土地基,又适用于一般地质构造,同时又具有高承载力,并且能够完全取代水泥搅拌桩;三是不仅大大降低了水泥用量,而且确保了桩的品质。

Description

水泥搅拌注浆桩基及成形方法
技术领域
本发明涉及一种既适用于软土地基,又适用于一般地质构造,同时又具有高承载力,并且能够取代水泥搅拌桩、减小桩基分布密度的水泥搅拌注浆桩基及成形方法,属注浆桩基及成型方法制造领域。
背景技术
目前现有的水泥搅拌桩施工方法: 1)桩机定位、对中 放好搅拌桩桩位后,移动搅拌桩机到达指定桩位,对中。 2)调整导向架垂直度 :采用经纬仪或吊线锤双向控制导向架垂直度。按设计及规范要求,垂直度小于1.0%桩长。3)预先搅拌下沉 :启动深层搅拌桩机转盘,待搅拌头转速正常后,方可使钻杆沿导向架边下沉边搅拌,下沉速度可通过档位调控,工作电流不应大于额定值。 4)拌制浆液:深层搅拌机预搅下沉同时,后台拌制水泥浆液,待压浆前将浆液放入集料斗中。选用水泥标号425#普通硅酸水泥拌制浆液,水灰比控制在0.45~0.50范围,按照设计要求每米深层搅拌桩水泥用量不少于50Kg。5)喷浆搅拌提升:下沉到达设计深度后,开启灰浆泵,通过管路送浆至搅拌头出浆口,出浆后启动搅拌桩机及拉紧链条装置,按设计确定的提升速度(0.50~0.8m/min)边喷浆搅拌边提升钻杆,使浆液和土体充分拌和。 6)重复搅拌下沉:搅拌钻头提升至桩顶以上500mm高后,关闭灰浆泵,重复搅拌下沉至设计深度,下沉速度按设计要求进行。7)喷浆重复搅拌提升 :下沉到达设计深度后,喷浆重复搅拌提升,一直提升至地面。 8)桩机移位 :施工完一根桩后,移动桩机至下一根桩位,重复以上步骤进行下一根桩的施工。 其存在的不足之:桩基的强度差,承载力小,在同等承载力下,需增大桩基直径及密度,费工、费时、基桩制作成本高。
发明内容
设计目的:避免背景技术中的不足之处,设计一种既适用于软土地基,又适用于一般地质构造,同时又具有高承载力,并且能够取代水泥搅拌桩、减小桩基分布密度的水泥搅拌注浆桩基及成形方法。
设计方案:为了实现上述设计目的。1、位于地基内的注浆桩身周边及底部包裏水泥与泥搅拌混合构成凝固层的设计,是本发明的技术特征之一。这样做的目的在于:水泥搅拌桩是用于软土地基加固处理的一种桩基,它实现了在软土地质条件下楼房桩基的形成,但是不仅承载力小、桩基分布密度大、制造成本高,而且桩基的成品率及品质无法保证。本申请在水泥搅拌桩的基础上,在水泥搅拌钻孔成型且尚未凝固的前提下,将注浆桩压入水泥搅拌桩的桩孔内,凝固后,不仅使桩基的成载力成数倍地提高,而且大大降低了桩基的分布密度,并且大大地提高了桩基的成品率及品质。2、预制桩中纵向设有竖立注浆管的设计,是本发明的技术特征之二。这样做的目的在于:当本申请的注浆预制桩位于桩基孔内时,高压混凝土浆料通过竖立注浆管注底部端口注入桩基孔底且浆桩基孔底部的地基压实后顺着预制桩壁向上翻浆注浆,当翻浆注浆的压力达到高压注浆的压力时,翻浆注浆自动处于停止状态,预制桩向上翻浆注浆部形成密实度极高预制桩地基承载头,极大地提高了预制桩的承载力。3、多节预制桩中第一节预制桩(最下面一节预制桩)下端面竖立注浆管的出浆口的下方设有盆状翻浆盘的设计,是本发明技术特征之三。这样做的目的在于:将盆状翻浆盘固定在第一节预制桩下端面且盆状翻浆盘盘沿与第一节预制桩的下端面呈间距配合时,它既可以防止桩基孔内的土或砂土堵塞竖立注浆管出浆口,又可以迫使竖立注浆管出浆口高压喷出浆料沿盆状翻浆盘翻出上翻,达到第一节预制桩下部地基的夯实与高密度、高强度承载桩头的形成。
技术方案1:一种水泥搅拌注浆桩基,包括注浆桩,位于地基内的注浆桩身周边包裏水泥与泥搅拌混合构成凝固层,注浆桩底部为扩头混凝土桩头。
技术方案2:一种水泥搅拌注浆桩基成形方法,采用水泥搅拌钻孔桩机钻注浆桩泥浆孔时,钻机边钻孔边喷出水泥浆,使钻孔出的土与水泥浆混合成浆料混合物,钻孔完成后将注浆桩强行下入浆料混合物的桩基孔内时,浆料混合物包裹在注浆桩桩身及底端,凝固后即得水泥搅拌注浆桩基,然后多节注浆预制桩中的多节注浆管依次对接,然后将高压混凝土浆料由竖立注浆管下端出口排出瞬间,一部混凝土由盆状翻浆盘挤出后向下往地基内压注形成扩头桩头、一部混凝土由盆状翻浆盘挤出后沿预制桩外壁上翻形成包桩桩身凝固层,当预制桩外壁四周混上翻的凝土压力达到所设定的压力值时,高压注浆完成,抽出注浆管,将废渣填充到预制桩桩芯即可。
本发明与背景技术相比,一是开创了水泥搅拌桩采用注浆桩承载、水泥浆料凝固固基的先例;二是既适用于软土地基,又适用于一般地质构造,同时又具有高承载力,并且能够完全取代水泥搅拌桩;三是不仅大大降低了水泥用量,而且确保了桩的品质;四是能够方便快速地完成预制桩的接桩的同时,不仅使强拉混凝土预制桩周边桩基土质密实度增大,而且高压注浆所形成的混凝土密实度大、强度高;五是利用废渣填充,既提高了桩基四周地质状态的稳定性,又达到了对废渣的充分利用,达到环保、节材的目的。
附图说明
图1是水泥搅拌注浆桩基的结构示意图。
图2是注浆管的剖视结构示意图。
具体实施方式
实施例1:参照附图1和2。一种水泥搅拌注浆桩基,包括注浆桩1,位于地基10内的注浆桩1身周边包裏水泥与泥搅拌混合构成凝固层9,注浆桩1底部为扩头混凝土桩头8。所述注浆桩是指混凝土预制空芯桩、混凝土预制实芯桩。
所述预制桩1芯设有一根或多根竖立注浆管2、多节预制桩中第一节预制桩1下端面竖立注浆管2的出浆口的下方设有盆状翻浆盘4,盆状翻浆盘4盆沿与第一节预制桩1下端面呈间距配合6。所述注浆管2下与固定在第一节预制桩1下端面的端板7连接且注浆管2出料孔直对盆状翻浆盘4面。所述盆状翻浆盘4背面焊有桩尖5。所述盆状翻浆盘4与端板7间采用钢柱3连接。所述盆状翻浆盘4与第一节预制桩1下端面采用钢柱3连接,或采用螺栓连接。所述注浆管2与注浆管之间采用凹凸结构插接连接或采用丝扣旋接或采用卡扣卡接。
实施例2:在实施例1的基础上,一种水泥搅拌注浆桩基成形方法,采用水泥搅拌钻孔桩机钻注浆桩泥浆孔时,钻机边钻孔边喷出水泥浆,使钻孔出的土与水泥浆混合成浆料混合物,钻孔完成后将注浆桩强行下入浆料混合物的桩基孔内时,浆料混合物包裹在注浆桩桩身及底端,凝固后即得水泥搅拌注浆桩基,然后多节注浆预制桩中的多节注浆管2依次对接,然后将高压混凝土浆料由竖立注浆管2下端出口排出瞬间,一部混凝土由盆状翻浆盘4挤出后向下往地基内压注形成扩头桩头8、一部混凝土由盆状翻浆盘4挤出后沿预制桩外壁上翻形成包桩桩身凝固层9,当预制桩外壁四周混上翻的凝土压力达到所设定的压力值时,高压注浆完成,抽出注浆管2,将废渣填充到预制桩桩芯即可。所述注浆桩是指混凝土预制空芯桩、混凝土预制实芯桩。
需要理解到的是:上述实施例虽然对本发明的设计思路作了比较详细的文字描述,但是这些文字描述,只是对本发明设计思路的简单文字描述,而不是对本发明设计思路的限制,任何不超出本发明设计思路的组合、增加或修改,均落入本发明的保护范围内。

Claims (9)

1.一种水泥搅拌预制桩基,包括预制桩(1),其特征是:位于地基(10)内的预制桩(1)桩身周边包裏水泥与泥搅拌混合构成凝固层(9),预制桩(1)底部为扩头混凝土桩头(8);预制桩(1)桩芯设有一根或多根竖立注浆管(2)、多节预制桩中第一节预制桩(1)下端面竖立注浆管(2)的出浆口的下方设有盆状翻浆盘(4),盆状翻浆盘(4)盆沿与第一节预制桩(1)下端面呈间距配合(6)。
2.根据权利要求1所述的水泥搅拌预制桩基,其特征是:所述预制桩是指混凝土预制空芯桩或混凝土预制实芯桩。
3.根据权利要求1所述的水泥搅拌预制桩基,其特征是:所述注浆管(2)下与固定在第一节预制桩(1)下端面的端板(7)连接且注浆管(2)出料孔直对盆状翻浆盘(4)面。
4.根据权利要求1或3所述的水泥搅拌预制桩基,其特征是:所述盆状翻浆盘(4)背面焊有桩尖(5)。
5.根据权利要求1或3所述的水泥搅拌预制桩基,其特征是:所述盆状翻浆盘(4)与端板(7)间采用钢柱(3)连接。
6.根据权利要求1或3所述的水泥搅拌预制桩基,其特征是:所述盆状翻浆盘(4)与第一节预制桩(1)下端面采用钢柱(3)连接,或采用螺栓连接。
7.根据权利要求1所述的水泥搅拌预制桩基,其特征是:所述注浆管(2)与注浆管之间采用丝扣旋接或采用卡扣卡接。
8.一种水泥搅拌预制桩基成形方法,其特征是:按照桩基设计的深度,采用水泥搅拌钻孔桩机钻预制桩泥浆孔时,钻机边钻孔边喷出水泥浆,使钻孔出的土与水泥浆混合成浆料混合物,钻孔完成后将预制桩强行下入浆料混合物的桩基孔内时,浆料混合物包裹在预制桩桩身及底端,凝固后即得水泥搅拌预制桩基,然后多节注浆预制桩中的多节注浆管(2)依次对接,然后将高压混凝土浆料由竖立注浆管(2)下端出口排出瞬间,一部分混凝土由盆状翻浆盘(4)挤出后向下往地基内压注形成扩头桩头(8)、一部分混凝土由盆状翻浆盘(4)挤出后沿预制桩外壁上翻形成包桩桩身凝固层(9),当预制桩外壁四周混上翻的凝土压力达到所设定的压力值时,高压注浆完成,抽出注浆管(2),将废渣填充到预制桩桩芯即可。
9.根据权利要求8所述的水泥搅拌预制桩基成形方法,其特征是:所述预制桩是指混凝土预制空芯桩或混凝土预制实芯桩。
CN201310527476.6A 2013-10-31 2013-10-31 水泥搅拌注浆桩基及成形方法 Active CN103603345B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310527476.6A CN103603345B (zh) 2013-10-31 2013-10-31 水泥搅拌注浆桩基及成形方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310527476.6A CN103603345B (zh) 2013-10-31 2013-10-31 水泥搅拌注浆桩基及成形方法

Publications (2)

Publication Number Publication Date
CN103603345A CN103603345A (zh) 2014-02-26
CN103603345B true CN103603345B (zh) 2017-01-11

Family

ID=50121600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310527476.6A Active CN103603345B (zh) 2013-10-31 2013-10-31 水泥搅拌注浆桩基及成形方法

Country Status (1)

Country Link
CN (1) CN103603345B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452752A (zh) * 2014-11-27 2015-03-25 河南黄河勘测设计研究院 一种水泥土搅拌桩在高致密板结黏土层中的施工方法
CN109750570A (zh) * 2018-12-27 2019-05-14 广东平润建设工程有限公司 在软弱地基上修建路面的施工方法
CN110863521A (zh) * 2019-11-25 2020-03-06 湘乡市交通运输局 一种注浆处理桩基缺陷的方法及其装置
CN115467322A (zh) * 2021-05-28 2022-12-13 上海同人里岩土工程技术有限公司 搅拌植入桩端后注浆预制桩及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250872A (zh) * 2008-03-24 2008-08-27 徐玉杰 软弱地基加固的水泥砂浆搅拌桩及其成桩方法
CN101581094A (zh) * 2009-06-09 2009-11-18 黄绍铭 预制混凝土与水泥土组合桩及其成桩方法
CN201581394U (zh) * 2009-11-03 2010-09-15 曹金鑫 大桩尖注浆预制桩
CN101942830A (zh) * 2010-08-19 2011-01-12 上海强劲基础工程有限公司 带有芯桩的组合型水泥土桩及其施工方法和施工设备
KR20110041391A (ko) * 2009-10-15 2011-04-21 엄기형 기초 공사용 지지력 보강 파일 구조체 형성 방법 및 이에 사용되는 파일 구조체
CN102660946A (zh) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 一种管桩注浆桩头及其使用方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101250872A (zh) * 2008-03-24 2008-08-27 徐玉杰 软弱地基加固的水泥砂浆搅拌桩及其成桩方法
CN101581094A (zh) * 2009-06-09 2009-11-18 黄绍铭 预制混凝土与水泥土组合桩及其成桩方法
KR20110041391A (ko) * 2009-10-15 2011-04-21 엄기형 기초 공사용 지지력 보강 파일 구조체 형성 방법 및 이에 사용되는 파일 구조체
CN201581394U (zh) * 2009-11-03 2010-09-15 曹金鑫 大桩尖注浆预制桩
CN101942830A (zh) * 2010-08-19 2011-01-12 上海强劲基础工程有限公司 带有芯桩的组合型水泥土桩及其施工方法和施工设备
CN102660946A (zh) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 一种管桩注浆桩头及其使用方法

Also Published As

Publication number Publication date
CN103603345A (zh) 2014-02-26

Similar Documents

Publication Publication Date Title
CN110230309B (zh) 岩溶区桥梁溶洞桩基施工方法
CN101260669B (zh) 钻喷注一体化扩体锚杆施工方法
CN104631480B (zh) 采用高压旋喷桩机进行深基坑止水帷幕施工的方法
CN104929114A (zh) 一种高压旋喷桩止水帷幕施工装置及其方法
CN102011399B (zh) 一种基于phc桩的多重高喷扩底桩施工方法
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN104863131A (zh) 多角水泥土搅拌桩及其成形方法
CN103806479A (zh) 一种结合止水帷幕的桩基复合注浆加固施工方法
CN204753574U (zh) 一种高压旋喷桩止水帷幕施工装置
CN106996105A (zh) 潜孔冲击旋喷搅拌桩施工工艺及设备
CN205907679U (zh) 现浇劲芯搅拌桩
CN110438998B (zh) 一种外钻孔注浆提高已成桩承载力的结构及方法
CN1814915A (zh) 长螺旋钻孔扩底搅拌及孔中扩孔砼灌桩的成桩方法及装置
CN103603345B (zh) 水泥搅拌注浆桩基及成形方法
CN107587502B (zh) 一种旋挖成孔压灌水泥土咬合帷幕桩的施工方法
CN203213101U (zh) 一种植入注浆组合桩
CN103556554A (zh) 加固路堤软基的钻孔桩复合地基结构及其施工方法
CN105297710A (zh) 一种高喷水泥土螺旋钻挤、扩孔钢筋混凝土灌注组合桩及制作方法
CN103603363B (zh) 水泥搅拌注浆凸节桩基及成形方法
CN107338792A (zh) 一种预应力水泥土搅拌桩及其施工方法
CN105672329B (zh) 深基坑大尺寸预制围护结构及施工方法
CN105714832B (zh) 一种深基坑大尺寸预制围护结构及施工方法
CN203821422U (zh) 水泥搅拌注浆凸节桩基
CN103603341B (zh) 废渣填充超高强桩基成形方法
CN100374657C (zh) 利用螺纹搅拌轴降低周围地基变形的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210412

Address after: 313013 workshop 1 of Huzhou Wantuo metal products Co., Ltd., rujiadian Road, Lianshi Town, Nanxun District, Huzhou City, Zhejiang Province

Patentee after: Zhejiang Zhaodi Technology Co.,Ltd.

Address before: Hangzhou Luyuan Ginkgo Garden Road is the 310017 city in Zhejiang province 5 unit 2002 room

Patentee before: Zhou Zhaodi

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Cement mixing grouting pile foundation and forming method

Effective date of registration: 20210929

Granted publication date: 20170111

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330001762

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230106

Granted publication date: 20170111

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330001762

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Cement mixing grouting pile foundation and its forming method

Effective date of registration: 20230707

Granted publication date: 20170111

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20170111

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414